Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation

Preview:

DESCRIPTION

Using Trimble 4D Control for High Wall Monitoring at Round Mountain Gold Corporation. Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation. Kinross Gold. Dvoinoye, Russia Kupol, Russia. Fort Knox Fairbanks, AK, USA. Kettle River – Buckhorn - PowerPoint PPT Presentation

Citation preview

1

Prepared by

Richard MusselmanOperations Support EngineerRound Mountain Gold Corporation

Using Trimble 4D Control for High Wall Monitoring at Round Mountain Gold Corporation

2

Round Mountain, NV, USA

Kettle River – BuckhornRepublic, WA, USA

Dvoinoye, RussiaKupol, RussiaFort Knox

Fairbanks, AK, USA

Tasiast, Mauritania

Lobo-Marte, ChileLa Coipa, Chile

Maricunga, Chile

Fruta del Norte, Ecuador

Chirano, Ghana

Paracatu, Brazil

KCorporate Offices

Toronto, ON, Canada

Kinross Gold

3

Round Mountain Gold Corporation

• Joint Venture with Barrick Gold Corporation (50:50)

• Conventional Open Pit Mining

4

Purpose of Slope Monitoring

5

NE Highwall–T1/T2 FailureLooking Northeast

Looking Northeast

“Slip Face”

Round MtnPrior to Pit Expansion

Mining

6

South Ramp Failure

South Haul Road

Back Break Structure

Alluvial Failure

Rock Failure

Toe HeaveLooking Southeast

7

Damage to South Haul Road

Looking Southeast

8

Solution

• 2 - Trimble S8 1” Robotic, DR HP, Long Range Instruments• 6 – Trimble NetR9 Ti-1 Reference Stations• 1 –Trimble 4D Control Software v3.0 with various licenses (Upgraded to

v4.1 in March 2013)

9

Monitoring Strategy

Control Application ReportsWeb Based ReportsReport Generator ApplicationThreshold Alerts

Customized Accessto Database Tables

PostProcessing

WirelessMine

Network

TrimbleSQL ServerDatabase

TrimbleData

StorageServer

Trimble 4D Control Server•Post Processing•RTK•Terrestrial

10

Mobile Slope Monitoring Station

11

Monitoring Strategy–Field Configuration

12

Trimble 4D Control Software

Terrestrial Displacement Chart

GNSS Scatter Plot

13http://rmo-sql-02/t3dweb

Web Interface Functionality

14

Before After

Average Amplitude 0.70 ft 0.13 ft

Measurements/day/prism 4 11

Historical Data Integration

15

Why is slope monitoring valuable?

16

3 electric shovels14 haul trucks

Protect Property?

17

Maintain Production?

18

Putting People First

Rigorous Financial Discipline High Performance Culture

Outstanding Corporate Responsibility

Recommended