Process Evaluation to Provide Sustainable Arsenic Compliance for a Potable Water Treatment System; St. Michaels, MD
Christopher Curran, PE
Christopher Walker, PE
Mark Prouty, PE
PA AWWA ConferenceApril 23, 2015
Background
Arsenic Treatment Technologies
Existing System Challenges
Evaluation Approach
Evaluation Findings
Alternatives
Recommendations
Presentation Outline
Background - Arsenic
Water Treatment Facility Evaluation - St. Michaels, MD
3
• What is Arsenic?
• Sources of Environmental Arsenic
• Effects of Arsenic on Human Health
• US EPA Regulations
Background - Arsenic
Water Treatment Facility Evaluation - St. Michaels, MD
4
Background – Source Water
Water Treatment Facility Evaluation - St. Michaels, MD
5
Town of St. Michaels
Background
6
• St. Michaels – Vibrant Tourism
• Existing System Description
Glory Ave WTP (250,000 gpd)
Marengo St WTP (125,000 gpd)
Water Treatment Facility Evaluation - St. Michaels, MD
Arsenic Treatment Technologies
• Adsorption Process– Granular Ferric Hydroxide (GFH)– Granular Ferric Oxide (GFO)– Activated Alumina { Lower pH Req’d }– Media Disposal
• Ion Exchange Process– Pressure Vessel – Media Regeneration
• Oxidation/Co-Precipitation/Filtration– Ferric Chloride Addition– pH Adjustment– Pressure Filtration– Backwash Needs
Water Treatment Facility Evaluation - St. Michaels, MD
7
Existing System Challenges
8
• New Arsenic Systems Installed in 2006 to Meet EPA MCLs
• Ex. Treatment Systems -Arsenic Breakthrough
• Reduced Bed Life of Media
• Solids Accumulation in Filters
• Backwash Management
• Aged Raw Water / Well Pump Piping and Valving
• Operational Challenges
Water Treatment Facility Evaluation - St. Michaels, MD
Existing System – Glory Ave WTP
Water Treatment Facility Evaluation - St. Michaels, MD
9
• Raw H2O As: 32 – 48 ppb
• 2006 IBS System Installation (Bayoxide®)
• Media Change-Outs�2010 & 2012 & 2014
Existing System - Marengo St WTP
Water Treatment Facility Evaluation - St. Michaels, MD
10
• Raw H2O As: 32 – 48 ppb
• 2006 IBS System Installation
�Media Change-Outs• 3/10, 8/10 & 10/10 (Breakthrough)
• 4/2011 Ion Exchange Installation (Purolite FerrIX A33)
�Media Change-Outs• 9/11, 11/11, 6/12
• December 2012 Permanently Offline
Project Approach
• Review Data and Operations Records
• Engage Operations Staff and Include in Team
• Identify Alternatives
• Evaluate Alternatives in Matrix Evaluation for Cost Effectiveness and Overall Benefit
• Submit Alternative Evaluation Report to Town
• Gain Regulatory Concurrence
• Prepare Grant Application
• Develop & Execute Implementation Plan
Water Treatment Facility Evaluation - St. Michaels, MD
11
General Alternatives
Water Treatment Facility Evaluation - St. Michaels, MD
12
Project Evaluation - Items Evaluated
1. Water Quality Parameters• Develop Sampling Program• Review Data
2. Operational Review• System Control Logic• Review Operational Set Points• Review Operations Data• Investigate Backwash Activities• Investigate Potential Cross-Connections• Verify Loading Rates and Compliance with Manufacturer O&M
Guidelines
3. Review Previous Engineering Reports
4. Discussions with Equipment Manufacturers
Water Treatment Facility Evaluation - St. Michaels, MD
13
Important Water Quality Parameters
�Arsenic Speciation
�pH
�Chloride
�Selenium
�Fluoride
�Silica
�Sulfate
�Nitrate
�Phosphate
�Total Dissolved Solids
�Total Organic Carbon
�Iron
�Manganese
�Turbidity
Water Treatment Facility Evaluation - St. Michaels, MD
14
Project Findings – Water Quality DataRaw Water Quality Parameter
Acceptable Range
Detected RangeMarengo WTP
Detected RangeGlory WTP
Total Arsenic ** 32-48 32-48
pH 5.5-9.0 6.9-9.4 7.7-8.8
Ferrous Iron <0.25 ppm 0.13 0.18
Manganese <0.05 ppm 0.014-0.037 ND
Aluminum <0.2 ppm 0.089-0.096 ND
Silica <20 ppm 12.4-13.8 12.0-15.0
Phosphate <0.05 ppm 0.05-0.076 0.02-0.31
Water Treatment Facility Evaluation - St. Michaels, MD
15
Evaluation Findings – pH Effect on IBS
Water Treatment Facility Evaluation - St. Michaels, MD
16
Courtesy of Siemens
Project Findings – Filter Inspections
Water Treatment Facility Evaluation - St. Michaels, MD
17
Marengo WTP Filters
Project Findings – Filter Inspections
Water Treatment Facility Evaluation - St. Michaels, MD
18
Marengo WTP Lead Bed – Inlet Piping / Strainer
Project Findings – Filter Inspections
Water Treatment Facility Evaluation - St. Michaels, MD
19
Marengo WTP Lag Bed – Uneven Media Surface
Uneven Media Surface
Project Findings – Filter Inspections
Water Treatment Facility Evaluation - St. Michaels, MD
20
Marengo WTP Lead Bed – Underdrains
Operational Parameters Effect: IBS Bed Life (GFH)
Water Treatment Facility Evaluation - St. Michaels, MD
21
Courtesy of Siemens
Evaluation Findings – Well Production
Water Treatment Facility Evaluation - St. Michaels, MD
22
0
50
100
150
200
250
300Ja
n-0
6
Ap
r-0
6
Ju
l-0
6
Oct-
06
Ja
n-0
7
Ap
r-0
7
Ju
l-0
7
Oct-
07
Ja
n-0
8
Ap
r-0
8
Ju
l-0
8
Oct-
08
Ja
n-0
9
Ap
r-0
9
Ju
l-0
9
Oct-
09
Ja
n-1
0
Ap
r-1
0
Ju
l-1
0
Oct-
10
Ja
n-1
1
Ap
r-1
1
Ju
l-1
1
Oct-
11
Ja
n-1
2
Ap
r-1
2
Ju
l-1
2
Flo
w R
ate
(1
,00
0 G
PD
)
Well Flow Rates
Well #2 - Marengo StWTP
Well #3 - Glory AveWTP
Well #3 Target Flow Rate = 250,000 GPD
Well #2 Target Flow Rate = 125,000 GPD
Evaluation Findings – Hydraulic Loading
Water Treatment Facility Evaluation - St. Michaels, MD
23
Parameter Target Value Marengo WTP Glory WTP
Empty Bed Contact Time (min)*
3.5 – 5.0 2.64 3.68
HydraulicLoading (gpm/sf)
8 10 gpm/sf 8.1 gpm/sf
Flow Rate Marengo (gpm) 211 280 --
Flow Rate Glory (gpm) 400 -- 408
Underdrain Loading Rate (gpm/sf)
N/A 724 272
* EBCT was 28% Lower at Marengo WTP than Glory WTP
Evaluation Findings – Backwashing
Water Treatment Facility Evaluation - St. Michaels, MD
24
• Glory WTP� Operator Intensive – Hoses� Supply Water From Well Pump� Receiving Pump Station Lacks Capacity� No Floor Drains
• Marengo WTP� Operator Intensive – Hoses� Supply Water From Well Pump� No Floor Drains
Evaluation Findings - Summary
Water Treatment Facility Evaluation - St. Michaels, MD
25
• Competing Chemical Compounds in
Raw Water
• Poor Hydraulics Through Vessels
• Insufficient Contact Time with Media
(Marengo WTP)
• Better Control on Water Production
and Flow Rate Necessary at Both
WTPs
Evaluation Findings - Summary
Water Treatment Facility Evaluation - St. Michaels, MD
26
• Testing Indicated IX Media was Only 50% Exhausted at
Breakthrough
• Odors Generated from Ion Exchange Media Following
Idle Periods
• Lack of Backwash Disposal Capacity at Glory Street WTP
• Lack of Backwash Drainage Appurtenances at Both Wells
Alternatives
• Oxidation / Co-Precipitation / Filtration with Catalytic Greensand Plus®
– Pre-oxidation
– Ferric Chloride Addition
– pH Adjustment
– Backwash
• Proven Technology
• Removes Iron
• Minimum Operational Complexity
Water Treatment Facility Evaluation - St. Michaels, MD
27
Alternatives
Water Treatment Facility Evaluation - St. Michaels, MD
28
• Iron Based Sorption Media Improvements
• Flow Control
• pH Adjustment
• Hybrid Approach
• Maintain IBS System at Glory WTP
• Install Co-Precipitation / Filtration System at Marengo WTP
Alternatives
Alternative Capital Cost Annual Cost Present Worth
IBS Media $770,000 $73,900 $1,774,325
CatalyticOxidation/Filtration $1,490,000 $21,800 $1,786,171
Hybrid Approach $1,110,000 $48,393 $1,767,677
Water Treatment Facility Evaluation - St. Michaels, MD
29
Recommendations
• Install Catalytic Oxidation System at Marengo Street
• Implement Improvements to Ex. Treatment System (Glory)
– Precondition Raw Water
• Provide Backwashing Improvements
– Backwash Supply / Metering
– Backwash Holding Tanks
– Backwash Recycle (Marengo WTP)
• Well Flow Control Improvements (Need VFDs)
• Safety Improvements – Convert to NaOCl
Water Treatment Facility Evaluation - St. Michaels, MD
30
Recommendations – Marengo WTP
Water Treatment Facility Evaluation - St. Michaels, MD
31
Well House
Generator
Well
Filter Building
Recommendations – Marengo WTP
Water Treatment Facility Evaluation - St. Michaels, MD
32
New Chemical Room
Blow-off
Backwash Tank
New FiltrationEquipment
New Piping Gallery /Trench Drain
Recommendations – Marengo WTP
Water Treatment Facility Evaluation - St. Michaels, MD
33
Backwash Tank
Backwash Pipe to 12,000 gal Aqua StoreBackwash Recycle Tank
Backwash Tank
Recommendations – Glory WTP
Water Treatment Facility Evaluation - St. Michaels, MD
34
Well HouseGenerator
Well
Filter Building
Recommendations – Glory WTP
Water Treatment Facility Evaluation - St. Michaels, MD
35
25,000 gal Concrete Backwash Holding Tank
Backwash Tank
New Chemical Room
New Piping Gallery /Trench Drain
Well House
Filter Building
Water Treatment Facility Evaluation - St. Michaels, MD
36
Acknowledgements
Town of St. Michaels
• Jean Weisman (Town Administrator)
• Jeff Richardson (Public Works Director)
April 23, 2015
Questions