Department of Public Works and Town & Country Planning (DPT)Ministry of Interior, Thailand
Resilient Spatial Planning in Thailand23 May 2019,
1
Policy Workshop on Adaptation and Subnational Implementation
• Thailand Info.
• NAP in Human Settlement sector by DPT
Spatial Issues
Administrative
Spatial planning system
Climate Change Situations
Urban Planning
Urban Development
CONTENTS
BKK
Thailand Spatial IssuesAREA
513,115 sq.km.
49%
20%
12%
19%
SERVICES
AGRI.BUSSINESS
Others
16%
68%
16% 0%Child Elderly
68 million
Population
68 million
34%
66%
0%0%Urban Area
Rural Area
Main economic areas are on coastal line
Forestry
Water
Agriculture
Industry
Land Use
Other
76,207
98,999
143,544
460,377
143,878
258,839
427,199
NORTHEASTERN
NORTHERN
SOUTHERN
EASTERN
WESTERN
CENTRAL
BANGKOK AND …
encroachment
Thailand Spatial Issues
Urbanized
6 Regions
76 Provinces
Administrative structure of Thailand
Ministry of Interior (MOI)Ministries (20 )
Departments
Provincial Governor (MOI) (76)
Districts Officer (878)
Sub Districts Staff
Municipals (2,441)
BMA, Pattaya
Senate and Parliament
Government (Cabinet)
Regional or Provincial Agencies
Districts Agencies
Provincial Ad. Org. (76)
Subdistrict Ad. Org. (5,333)
Provincial Offices Provincial Agencies
Nat
iona
l Lev
elRe
gion
al a
nd Lo
cal L
evel
5
Urban Planning
Urban Development
BuildingsAct
ion
Plan
Policy
Plan
Compreh
ensive
Plan
Provincial
Comprehensive Plan
Town Comprehensive
Plan (District Level)
Specific Plan
Land Readjustment
Project
Sub-Regional Plan
Watershed Plan
National Plan
Regional Plan
spatial planning system
6
TOWN PLANNING Act 1975
TOWN CONTROL Act 1979
LAND EXCAVATION and LAND FILLING Act 2000
LAND READJUSTMENT Act 2004
DPT’s Missions
GPP (mil. Baht)
Less than 80,000
80,000 – 160,000
More than 160,000
Urban Area
River
SERVICES
AGRI.
INDUSTRY
GDP 2017$1.229 trillion
GDP Composition Breakdown(Source:https://theodora.com/wfbcurrent/thailand/thailand_econ
omy.html)
Human Settlement
GDP Map vs. Climate Change Risk Map
Flood risk areaDraught risk areaLand Slide risk areaDraught + Land Slide risks areaDraught + Flood risks areaSettlement Area
Source: ONEP (2017)7
Impacts from Climate Change
Source: ONEP (2017)
Flood
Drought Coastal Erosion
(Source: https://ethailand.com/breaking-news/thailands-heatwave-is-now-longest-in-65-years/2420/)
(Source: https://www.21stcentech.com/wp-content/uploads/2013/02/Thai-flood.png)
8
Effect of Climate Change in ThailandGreat Flood in 2011 : La Nina Effect Total Rain 1,824 mm. (Average 1,467 mm.)
Day of disaster 175 days
Economic Loss 41,150 million EURO
Flood covered 49,600 Km2 (71 of 77 Provinces )Bangkok
Central Region
Great Drought in 2005: El Nino Effect Civilians in Effect 11.15 million peoples
Agriculture areas in Effect 22,000 Km2
Economic Loss 216 million EURO
Drought covered 71 of 77 Provinces )
Coastal Erosion
Gulf of Thailand 1,660 km. erosion 180.9 km. 10.9%
Andaman Sea 954 km. erosion 23.4 km. 2.4%High Risk Areas ; Bangkok Metropolitan
Samutprakarn Samutsakorn Chonburi Rayong
National and Regional Plan : Disaster Mitigation Policy
Rejuvenate forest areas in upstream
Land use planning, control urban sprawl to
avoid floodplain and determined detention areas
Increase water source capacity and
reservoir in upstream
Allocate areas of flood for large urban
settlement areas
Development of urban flooding
Prevention system and drainage systems
Moderate the flow of water by
preserving soil and water in foothills plain
agricultural areas
Increase numbers of reservoirs; both
of medium and large scale
Increase water management
efficiency, reduce water loss, invest in
low-water consumption plants and diverse
between water basins
Coastal erosion protection
systems, reduce the strength of wave
impact
Establish coastal erosion monitoring
systems
Increase coastal sediment to protect
beach for tourism purpose
Determine points of set back along the
coastal line
Rejuvenate mangrove forest and Sea grass
along the coastal area to reduce the
• Thailand Info.
• NAP in Human Settlement sector by DPT
Spatial Issues
Administrative
Spatial planning system
Climate Change Situations
Urban Planning
Urban Development
CONTENTS
Concept of NAP: Human settlement
Source: ONEP (2017)
Climate Change Risk Maps: Human settlement
Flood risk areaDraught risk areaLand Slide risk areaDraught + Land Slide risks areaDraught + Flood risks areaSettlement Area
12
The integration of Climate Change Master Plan (CCMP) to Economic and Social Development Plans and Spatial Development Plans
National Strategy Plan
Climate Change Master Plan(2015 – 2050) National Economic and Social
Development Plan
Ministry, Department and State Enterprise Plans
Provincial Development Plans
Local Development Plans
National andRegional Structure Plans
River Basin Plan
Provincial Structure Plans
Comprehensive and Project Plans
Climate Change Action Plans
Economic and Social Development PlanClimate Change Issues Spatial Development
Plan
GHGs MITTIGATION
ADAPTATION(NAP)
Enabling environmentfor CC Mng.
Initiative to strengthen climate resilience at local and subnational level
Source: ONEP (2017)13
To mitigate flood and reduce damage from flood by the 3 aspectsObjectives of Studies
1. Conserve, protect and
improve the natural flood
way/ natural drainage system
2. Increase drainage capacity
(Bridges, Box Culvert , Crossing
Pipes etc.)
3. Measurement and staging
planPilot project, Chantaburi
Eastern Coast River Basin
MINISTRY OF INTERIOR
Department of Public Works and Town & Country Planning
Drainage System Plan (River Basin - based)
๒
4. Flood protection projects
3. Create “Flood Risk Map”
Prachinburi River Basin Prachinburi Province
Revise Comprehensive Plan for Sustainable Development
2. Improve the obstructions (Brigge, Box Culvert, etc.)
Expected Results / Outputs
1. Drainage system Planning
ผังที่โลงผังการใชประโยชนที่ดิน
ผังคมนาคมขนสง ผังการระบายนํ้า
5. Revise Comprehensive Urban Plan
Land use Plan
Drainage System
Urban Space
Transport
วาระที ่๓ เร ือ่งเพือ่พจิารณาData for Hydrological Modeling
TOPOGRAPHY MAP
DISCHARGERAIL FALL
DYKESRIVERS / STREAM/
CANAL CROSS-SECTIONS
FLOODING AND RETARDING AREA
Results of Hydrological Modeling FLOOD RISK MAPS AT DIFFERENT
RETURN PERIOD2 years
50 years25 years
10 years5 years
100 years
25 RIVER BASINS
Way Forwards
1. Integration and sharing
results, data and
information
Central government (DOH, DRR, RID etc.) and
local gov.
“Building Control Ministerial Declaration / Ministerial Regulation”, in flood way/ retarding area/ reservoir etc.
2. Short term Plan
District Level
Provincial Level
3. Long Term Plan
Revise Urban Planning
Present Trang Comprehensive Plan : Land use Plan 19
Comprehensive Plan (District Level)
Land use and Settlement System Map
Case Study: Trang District, Trang Province
Comprehensive Plan (District Level) Issues for revise Comprehensive Plan
• Expand comprehensive plan boundary
• Adaptive urban planning approach
• Compact Land use• Green Network
Khon Khan City Comprehensive Plan :
Compact CitySustainable Urban Transportation Planning
Land use PlanTransportation Plan
Walkable Community(Walking Distance 500 m.)
Sustainable Urban Transportation Planning Khon Khan City Comprehensive Plan :
Improve Existing Bus System
Route and Applications
Sustainable Urban Transportation Planning Khon Khan City Comprehensive Plan :
Future Public Transport
(22.6 km. 16 Stations)
Tha Muang Comprehensive
Plan, Kanchanaburi Province:
Bicycle Lane and Side Walk
Sustainable Urban Transportation Planning
Bicycle Bicycle
Bicycle Bicycle
Bicycle Bicycle
To mitigate flood and reduce damage from flood by the 3 aspectsObjectives of Studies
1. Conserve, protect and
improve the natural flood
way/ natural drainage system
2. Increase drainage capacity
(Bridges, Box Culvert , Crossing
Pipes etc.)
3. Measurement and staging
planPilot project, Chantaburi
Eastern Coast River Basin
MINISTRY OF INTERIOR
Department of Public Works and Town & Country Planning
Drainage System Plan (River Basin - based)
To mitigate coastal erosionURBAN DEVELOPMENT
Flood risk areaDraught risk areaLand Slide risk areaDraught + Land Slide risks areaDraught + Flood risks areaSettlement Area
พืน้ทีอ่าํเภอปากพนงั
ครอบคลุมแนวชายฝงของ 4 ตําบล ต้ังแตบานชายทะเล หมูที่ 1
ต.ปากพนังฝงตะวันออก ถึงปากคลองทาพญา หมูที่ 9 ต.ทาพญา
อ.ปากพนัง จ.นครศรีธรรมราช ระยะทางรวม 9.584 กิโลเมตร
ประกอบดวย หมูบานทีไ่ดรับผลกระทบ จํานวน 9 หมูบาน
8
แผนที่ภาพรวมแบงเขตพ้ืนที่กอสรางเขื่อนฯ ของ กรมโยธาธิการและผังเมืองและกรมเจาทา
7
คล่ืนซัดถลมกัดเซาะทางหลวงหมายเลข 4013 (ปากพนงั-หัวไทร) ไดรบัความเสียหายไมสามารถสัญจรได
4
ในชวงมรสมุพายุปาบึกภายหลงัพายุปาบึก
คล่ืนขนาดใหญในทะเลอาวไทยพัดถลมกัดเซาะตลอดแนวชายฝงอําเภอปากพนัง
โฉนดที่ดินของชาวบานถูกคล่ืนกัดเซาะกลายเปนทะเล
กุมภาพันธ 2559 ชาวบานปากพนัง 6 ตําบล รวมตัวกันตั้งศูนยรับเร่ืองราวรองทุกข “ทวงคืนโฉนดทะเล”
และย่ืนหนังสือรองเรียนขอความเปนธรรมกับนายกรัฐมนตรี
รัฐมนตรีวาการกระทรวงมหาดไทย ไดมอบหมายใหกรมโยธาธิการและผังเมือง
ดําเนินการ “โครงการกอสรางเขื่อนปองกันการกัดเซาะชายฝงทะเล”
เพื่อชวยเหลือราษฎรที่ไดรับผลกระทบ
ความเปนมาของโครงการ
6
พื้นที่กอสรางเขื่อนปองกันการกัดเซาะชายฝงทะเล (โฉนดทะเล)
ของกรมโยธาธกิารและผงัเมือง ระยะทาง 9.584 กิโลเมตร
พ้ืนที่กอสราง
ของกรมเจาทา พ้ืนท่ีกอสรางเข่ือนฯ (โฉนดทะเล) ของกรมโยธาธิการและผังเมือง
ตลอดแนวพ้ืนที่เขื่อนปองกันการกัดเซาะชายฝงทะเลของกรมโยธาธิการและผังเมือง
ระยะทางประมาณ 9.584 กม. มีแปลงที่ดินครอบคลุมรวมทั้งสิ้น 276 แปลง
โฉนด จํานวน 231 แปลง
นส.3ก. จาํนวน 45 แปลง 9
รปูแบบการกอสราง“เขื่อนเรียงหนิใหญ” ตลอดแนวชายฝง
“ตามประกาศกระทรวงทรัพยากรธรรมชาติและสิ่งแวดลอม เรื่องกําหนดประเภทและขนาดของโครงการหรือกิจการ ซึ่งตองจัดทํา
รายงานการวิเคราะหผลกระทบสิง่แวดลอม และหลักเกณฑ วิธีการ ระเบียบปฏิบัติ และแนวทางการจัดทํารายงานการวิเคราะห
ผลกระทบสิ่งแวดลอม ฉบับที่ 3 (พ.ศ. 2556) ลงวันที่ 11 พฤศจิกายน พ.ศ. 2556 ไดยกเลิกขอความลําดับที่ 25 (ยกเลิก
กําแพงริมชายฝง ติดแนวชายฝงความยาวตั้งแต 200 เมตรขึ้นไป) ดังนั้น จึงสามารถดําเนินการกอสรางไดโดยไมตองจัดทํา
รายงานการวิเคราะหผลกระทบสิ่งแวดลอม (EIA) ” 11
พื้นที่ หมู 3 ตําบลบางพระ ตอน 1 และตอน 2
22พื้นที่ หมู 3 ตําบลบางพระ ตอน 3 และตอน 4
ผลงานกอสรางท่ีแลวเสร็จจนถงึปจจุบัน งบประมาณป 2559 (งบกลาง) พื้นที่ หมู 3 ตําบลบางพระ ความยาว 2,005 เมตร งบประมาณ 138.281 ลานบาท
ผลงานกอสรางอยูระหวางกอสรางงบประมาณป 2560-2561
42
งบป 60 พ้ืนท่ี ตาํบลทาพญา และตาํบลบานเพิง ความยาว 1,600 เมตร งบประมาณ 156.753 ลานบาทงบป 61 พ้ืนท่ี ตาํบลทาพญา และตาํบลบางพระ ความยาว 1,667 เมตร งบประมาณ 104.076 ลานบาท
รวมความยาว 3,267 เมตร งบประมาณ 260.829 ลานบาท
งบป 60 ผลงาน 55.65% กําหนดแลวเสร็จ ป
62 งบป 61 ผลงาน 69.25% กําหนดแลวเสร็จ ป 63
พ้ืนท่ีหมู 1, 3 ตําบลบางพระ
พ้ืนท่ีหมู 9 ตําบลทาพญา
15