River Morphology and River Restoration - danubeparks.org · River Morphology and River Restoration...

Preview:

Citation preview

River Morphology and River RestorationConclusions of DANUBEPARKS Work Package 3

and

Possible Future Perspectives for a Follow-up Project

Georg FrankDANUBEPARKS Workshop

River Morphology and RestorationOrth, 26th/27th May 2011

Task Force Meeting WP3Bratislava, January 2010

Task Force Meeting WP3

Bratislava, January 2010

Task Force Meeting WP3

Ingolstadt, November 2010

Task Force Meeting WP3

Ingolstadt, November 2010

Cross-border Restoration Concept Romania - Ukraine

Strategy Conservation and NavigationDanube River´s Morphologyand Revitalization

riverban

k

groyn

Dan

ub

eD

anu

be

Adaption of croynes

Hungary (Duna-Drava National Park)

Removement of Checkdams in small Side arms,

Slovakia (BROZ)

Removement of Checkdams

Hungary (Duna-Drava National Park)

1. What are our joint conclusions of WP3?

2. Is river restoration high priority for your PA in a follow-up?

3. Shall we again inlcude the navigation issue?

4. What are your exptectations for a follow-up? (Wich levels of cooperation do we need: capacity building, strategies, implementation?)

5. How can we build up on the results on DANUBEPARKS I?

LIFE07 NAT/SK/000707 Conservation of Endangered Bird SpeciesPopulations in Natural Habitats of the Danube Inland Delta

1. What are your conclusions of WP3?

2. Is river restoration high priority for your PA in a follow-up?

3. Shall we again inlcude the navigation issue?

4. What are your exptectations for a follow-up? (Wich levels of cooperation do we need: capacity building, strategies, implementation?)

5. How can we build up on the results on DANUBEPARKS I?

Recommended