Shakir Updated CV 21-3-2016

Preview:

Citation preview

Personnel Details:

4D,15/1-A,Arshad Plaza,Flat No C-7, Nazimabad No 4, kararchi.

Cell:0300-2265214

Email:

engrshakir@gmail.com

Professional reg:-

Civil/06 94 04 584 /00

006 18/94

Area of Work:-

Civil & Earth Works.

Construction of Well

Site ,Access Road &

Rig Camp, cutting

pit/water pit, soak &

Garbage pit.

Evaporation pond.

Plant Extension.

Air Strip construction

Building Projects,

Resort, Bank, office

HSE & PTW system.

Shaikh Shakir, Civil Engineer 1994 from College of Engineering University

of the Philippines

EXECUTIVE SUMMARY

Over 21 years of International and Domestic experience in oil & gas and petrochemical sector. Seeking a challenging and result oriented position in Pipeline Engineering, Civil Structure, Surveying of Project Layout and Project Engineering Management where I effectively utilize my professional experience and skills.

SKILLS AS GAS FACILITIES, PIPELINE & CIVIL ENGINEER

Experience of working as a Civil Lead on Industrial Structure & Piping & Pipeline Engineer on domestic and international projects of Uch gas field Dehydration Plant, ICI Raw water Pipe line Gravity & pressure line, United Energy Pakistan with SGS Pakistan Gas Facility, Bosicor Oil Refinery, Huge Industrial civil work and mainly involved in providing engineering and construction supervision services to oil & gas and petrochemical sectors to construct new facilities and upgrading of existing facilities. Core Skills involve developing piping materials specifications, scope of work, general arrangement drawings, pipeline plan & profile drawings, supervision of trenching survey and excavation for large diameter pipeline welding and laying in trench etc.

CORE RESPONSIBILITIES

• Managing and coordinating multidisciplinary engineering activities to ensure projects are executed in a safe, efficient, cost effective and timely manner.

• Prepare Project quality & execution plans at the start of project. Conduct kickoff meetings & interactive planning session. Front end engineering design validation.

• Review project key drawings like P&ID’s and overall plot plan. Request technical information from client and ensure its timely flow from client.

• Manage Interdisciplinary interfaces & information flow for smooth execution of project.

• Ensure design team is aware of, and complying with client's Basis of Design, standards & codes.

• Identify long lead items & innovated equipment at early stage of project. Assess procurement process through the project to ensure goods meet specification and are delivered on time and within budget.

• Identify trends with lead engineers, take action to avoid cost overruns & raise change orders.

• Supervise work in accordance with the approved schedule using MS Project.

• Prepare, monitor & control manpower loading plan.

• Prepare weekly and monthly reports, progress monitoring and updates.

• Monitor & control document control index as per project scope.

• Monitor any deviation from the agreed original scope and contract.

Professional Skills:-

Equipment Management

Bar Bending Schedule

& BOQs.

Material & Manpower

Management.

Quality Assurance/

Quality Control

Site Supervision

Procurement.

Daily Progress

Reporting.

Personnel Skills:-

Ability to understand

& present others points

of view.

Good communication

skills.

A team player with

enthusiastic attitude.

A Hard working &

devoted person.

Can handle stress.

Always Proactive

Safety conscious.

Doer & Conformist

Computer Tools:-

AutoCAD

MS Office & Project

• Effectively manage assigned budgets within project total scope.

• Monitor cost aspects of the project within direct control and forecasts final costs.

• Ensure timely delivery of project documents to client per agreed milestones.

• Monitor closure of all identified risks & opportunities.

• Prepare lesson learnt, clients satisfaction survey and project closeout reports.

• Maintain HSE focus within the team to ensure its requirements are included in the design & procurement.

PROFESSIONAL EXPERIENCE

Period: Dec 2015 – till date

Position: Lead Civil Engineer

Client:: UNITED ENERGY PAISTAN

Construction of 30mmcfd Gas Processing Plant at Buhari Facility UEPL

• Verifying execution of works as per IFC Drawings & Spartan specifications.

• Making Inspection & Test Plan for the activities involved in construction of plant.

• Ensuring implementation of Checklist/protocols by the contractors for all the major activities carried out at site.

• Verifying Contractor’s Invoices/Project Bills.

• Issuing Revised IFC Drawings to contractors.

• Verifying Release Notes of work Sites from various contractors.

• Coordination with Design house for Resolve any deficiency in civil dwg

• Specifying Taking Over of the completed civil jobs to Mechanical Contractors.

• Keeping a follow-up of Project deadlines & schedule for civil works.

• Ensuring Health & Safety protocols to be implemented at site.

• Daily progress reporting of the works carried out at site.

Period: sept 2014 – Nov 2016

Position: Senior Civil Engineer

Client:: UNITED ENERGY PAISTAN

Construction of 160mmcfd Gas Processing Plant at UEPL

• Verifying execution of works as per IFC Drawings & C.P.E specifications.

• Making Inspection & Test Plan for the activities involved in construction of plant.

• Ensuring implementation of Checklist/protocols by the contractors for all the major activities carried out at site.

Outlook & Emails • Verifying Contractor’s Invoices/Project Bills.

• Issuing Revised IFC Drawings to contractors.

• Verifying Release Notes of work Sites from various contractors.

• Specifying Taking Over of the completed civil jobs to Mechanical Contractors.

• Keeping a follow-up of Project deadlines & schedule for civil works.

• Ensuring Health & Safety protocols to be implemented at site.

• Daily progress reporting of the works carried out at site.

Period: 2007 – Dec 2013

Position: Operation Manager

Company & Location: Survcon Construction , Pakistan

Responsibilities:

• This position, Operation Manager, Pakistan and is responsible for providing all Projects Engineering support, Planning and development.

• Dp world at port qasim, Crain Rail track Maintenance surveying and design for birth level fluctuations Containers stacking and oil terminal Piping maintenance

• Fauji Akbar Portia Terminal at port qasim, silo foundation and erection of silo and conveyer belt from silo to birth under main contractor china harbor , weigh bridge complete work , diesel tank installation piping and pumping station, pre engineered rice ware house complete work etc

• Byco oil Refinery Hub Balochistan, Sand Blasting and coating for new Plant, storage tank fabrication foundation and sand blasting and epoxy coating

• Pak hy oil Korangi Karachi, existing Pre engineered building maintenance and new pre engineered building construction, construction of Bitumen debarrelling plant foundation, Fabrication and installation.

• Meezan Bank Head office building in Karachi gulbai (survey and managing project)

• Supervision and technical support in SQUAIRE ONE Saima builder project in gulistane jouhar near milinium mall.

• NRL National Refinery Limited Korangi, Pre engineered shed for tanker loading and pre engineered residence for workers.

• Earthquake Rehabilitation Project Abbotabad NWFP, worked on primary and secondary school building in galyat and thandyani.

• Small Reservoir Dam Upper and lower kohistan Sindh Pakistan

Period: 2005 – 2007

Position: Manager Engineering

Company & Location: GH Construction, Pakistan.

Responsibilities:

• Bosicor oil Refinery, Oil storage Tank foundation and fabrication sand blasting and epoxy coating Pre engineered shed pip rack construction

and piping

• Oil storage tank 6 no complete in kemari oil terminal.

• Pre engineered building in engro zarkhez and mahpak edible oil port qasim

• Oil storage tank mahpak oil and engro vopak port qasim.

• Panjgoor to gawadar road aprx 180km

• Period: 2003 – 2004

• Position: DRE Deputy Resident Engineer

• Company & Location: Petrosin Pakistan., UCH GAS FIELD, Dera Bugti, Balochistan.

Responsibilities:

• Dehydration Plant, complete civil work surveying to completion foundation of pipe vessel administration building roads etc.

• H2S Plant, complete civil work surveying to completion.

• Managed all engineering activities from Planning to Implementation, development, plus field engineering support in Project.

• Responsible for all administrative management and engineering functions as well as P&I for department.

• Responsible for all civil foundation for pipe rack vessels, administration Building, Internal Road etc and engineering functions as well as P&I for department.

• Responsible for all Plant Erection Fabrication Installations pipe vessel, administration Building, Internal Road etc and engineering functions as well as P&I for department.

Responsibilities:

• Period: 2000– 2002

• Position: Construction Manager

• Company & Location: Echo West International. ICI Pta plant for raw Water pipe line.

• Managed all engineering activities from Planning, Implementation, development plus field engineering support in Project. Under consultancy of Foster Wheeler.

• Responsible for Profile Survey, Designee of Gravity & pressure line Break pressure Tank.

• Responsible for all civil work, Thrust Block, Trust bore for Road Crossing, Pumping Station Etc.

• Responsible for all welding work using DOLIMIX welding procedure , laying pipe line by side boom, sand Blasting Coating and all engineering functions as well as P&L for department.

• Period: 1995– 2000

• Position: Pipeline Engineer

• Company & Location: ARAMCO Saudi Arabia

Responsibilities:

• Supervise as client Yanbu Export Refinery–Offsite Pipelines Project, Client Saudi Aramco

• Pipeline engineer detail design, survey profile design supervise trenching laying and testing of Khafji NGL Pipeline Project; Client: Saudi Aramco

• Pipeline Detail design SHY-1 Pipeline Capacity Expansion Project, Phase II, Client: Saudi Aramco;

• Detail design package of Water Injection Header Extension for Well ABQQ-221 and hook-up connections points for wells, ABQQ-246/222/247. Client: Saudi Aramco;

• Detail design package of Water Injection Header Extension for Well ABQQ-291 and hook-up / connection points for wells ABQQ-152/297/345, Client: Saudi Aramco;

• Pipeline engineer Detail design package of Upgrade Crude Facility phase-I of Safaniya Client: Saudi Aramco;

• Detail design package of Upgrade Substation #50 at Juaymah Tank Farm, Client: Saudi Aramco;

• RESPONSIBILITIES:

• Managed all engineering activities from Planning, Implementation, development plus field engineering support in Project.

• Responsible for Profile Survey,

• Responsible for all civil work, Thrust Block, Trust bore for Road Crossing, Pumping Station Etc.

• Responsible for all welding procedure using DOLIMIX, laying pipe line by side boom, sand Blasting Coating and all engineering functions as well as P&L for department.

HSE Certifications:-

• HITRA TEAM LEADER

Certification No : HTL-0128-00418-14-06

• 8- Golden Safety Rules & Control of Work Standard

Certification No : URS/UEP/COW/0128-00417-14-002428