SOLUTION PROVIDER-POWER,FERTILIZER,REFINERY
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 1
IRC in Numbers: Growing From Strength to Strength
1
25
+50
300Location Services Provided World Wide
years of experience
One-stop technical solution provider
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 2
+150 Employee in India
Power / Fertilizer/Refineries/Oil & Gas
Oil & Gas
Fertilizer Aviation & InfrastructurePower –Thermal/Renewable
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 3
Waste to Energy
1993 - 2018
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 4
1993 2001 2010 2012-18
Thermal Thermal / O&G Thermal / O&G/ NuclearThermal / O&G/ Nuclear/ Renewable / Waste to Energy / Drone Services
Radiography
RLAAdvance NDT
R&M
Owners Engineering
RLA FS/DPR
DT/NDT DT/NDT
RLA/FFS
Risk Assessment & critical Piping
Failure analysis
• Metallographic testing• Creep/Stress Rupture Test• Measurement of
Mechanical Properties• Microbiological analysis• Metallurgical chemical
Analysis• Tensile , Bend Test using
Universal testing machine• Impact Test as per BIS &
ASTM up to 200-Centigrade.
• Brinell, Rockwell, Hardness• Spectro Analysis Machine• IGC/HIC/SSC Test• Fertiloscope• Micro/Macro test
• VT Visual Testing• PT Liquid Penetrant Test• MT Magnetic Particle• UT Ultrasonic Testing • ET Eddy Current testing• RT Radiographic Testing• MR Metallographic Rep. • PMI Positive Material
Identification.• HT Hardness Testing• TD Tan Delta Test High• HV Voltage Test• DM Dimensional
measurement
• Phased Array ultrasonic testing
• Pulsed eddy Current Testing.
• Computed Radiography• Helium Leak Detection• Corrosion mapping with
PAUT• Closed Proximity
Radiography• Eddy current/IRIS/REFT/
MFL• Automated Ultrasonic
Testing
• Review of O&M Manual• Review of Records• History of power plant• Hot & cold Walk down
Inspection• Civil, Concrete and steel
structure• Boiler• Turbine• Generator & Transformer• Balance of Plant• Electrical Item• C&I and DCS
Services- Inspection
RLANon destructive Test Advanced NDTDestructive Test
9/27/2016
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 5
• Saudi Arabia-SOGEC• Sudan (Khartoum Refinery)-
ESNAD• Bahrain-Global Remote• Bangladesh-Max. Group.• Zimbabwe-Zimbabwe Govt.
Power plant
Overseas: Reference & Some Other Services
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 6
Overseas Reference Some other Services
• Fitness for Service as per-579
• Pipeline integrity Assessment
• Boiler maintenance.• Chemical Cleaning of
Boiler & Heat exchanger of pipe line.
Concept to Commissioning
From feasibility and planning through toprocurement, construction, commissioning,operation, maintenance, and decommissioning,Conventional Power ensures improvedoperational safety, reliability and overallperformance of power plants for investors,engineering, procurement and constructioncontractors, and operators.
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 7
Product Quality With Compliance Certification
Compliance certification Services• ISO-9001:2008• NABL-ISO 17025• Chief controller of Explosive• Central Boiler Board• Atomic Energy Regulatory Board
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 8
Execution & Commissioning Support
Deploy our expert for execution of Project on man month basis
Boiler Expert
1 2Civil Expert
Turbine Expert
3 4BOP Expert
5 6Electrical Expert C&I Expert
9/27/2016 Power & Systems - Conventional Power
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 9
S.NO REFERENCEPLANT
WORK DESCRIPTION UNITS PLACE
1 APPGENCO. APGENCO- Dr. NTTPS, –Residual Life Assessment (RLA), Risk Assessment , FS, DPR for R&M Including Project Management
4 UNITS OF 210 MW
HYDERABAD
2 NEYVELI LIGNITE CORPORATION
Contracts - Risk Assessment, R&M, Residual LifeAssessment, Feasibility Study, Condition Assessment,Detailed Project Report
TS-II, UNIT-7, 210 MW
TAMILNADU
3 C&C ENERGY PRIVATE LIMITED
Project Management, Risk Assessment , FS, DPR forR&M Including Residual Life Assessment, ConditionAssessment
2 UNITS OF 120 MW
ZIMBABWE
4 MPPGCL Award of work contract for “Consultancy of workcontract for “ Conductance of, Risk Assessment,feasibility Study, Detail project Report for, RLA/CAremaining life assessment/condition assessment, R&Mincluding project management
3 UNITS OF 210 MW
MADHYA PRADESH
IRC-Some Major Projects In power Plants
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 10
IRC-Some Major Projects- Refinery & Petro chemicals Plants
Major Projects-In Refinery & Petro Chemicals Plants
1. Long Range Ultrasound Testing, Pulsed Eddy Current, Corrosion Mapping Using PAUT Services at ONGC Offshore for Mumbai High, Neelam & Heera, Bassein & Satellite.
2. Phased Array Testing at Chenab Bridge Project.3. Eddy Current Testing, LRUT for SABIC in “Saudi Arabia”.4. Fitness for Service Assessment of critical piing of 5 Units.5. Fitness for Service Assessment of OIL INDIA PLANT “DULIAJAN”6. Scaffolding, Cleaning, Testing, Inspection, Certification of 1 Mounded bullets in HMEL
“Bathinda Refinery”7. Radiography, Close proximity Radiography, Ultrasound, PWHT for Expansion of NFL
Nangal project.8. Long range Ultrasound testing of Underground Lines in “GAIL” Rajahmundhary.
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 11
Renovation & Modernization-Critical Piping Package 5 X 200 MW Coal Based Power Plant-NTPC SINGRAULI
Singrauli Super Thermal Power Station, Conventional power
• Preparation of Detailed project report
• Start date for initial project: 2016
benefit analysis for renovation and life
• Performance Guarantee certificate provide
• Residual Life Assessment
• Stress/Finite Element analysis
• Detailed project report with technical and
• Conventional & Advance NDT
Our solution
Preparation of project Report after completed the R&M Package, material Supply, Residual Life Assessment, Condition Assessment 5x200 MW.
Engg.- services
• Material Supply (LRB, CLADDING)
Outcome
• Detect the Defect In pipe line
• Heat Rate
About the project
Project description
Performance period
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 12
Vindhyachal Super Thermal Power Station, Conventional power
• Preparation of Detailed project report
• Start date for initial project: 2016
benefit analysis for renovation and life
• Performance Guarantee certificate provide
• Residual Life Assessment
• Stress/Finite Element analysis
• Detailed project report with technical and
• Conventional & Advance NDT
Our solution
Preparation of project Report after completed the R&M Package, material Supply, Residual Life Assessment, Condition Assessment 5x200 MW.
Engg.- services
• Material Supply (LRB, CLADDING)
Outcome
• Detect the Defect In pipe line
• Heat Rate
About the project
Project description
Performance period
• currently in progress
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 13
Renovation & Modernization-Critical Piping Package 6 X 210 MW Coal Based Power-NTPC VINDYACHAL
Renovation & Modernization, Detailed Project Report 3X 210 MW Coal Based Power- APPGENCO, HYDERABAD
Dr. NTTPS Stage-I
• R& M
• Start date for initial project: 2013-14
benefit analysis for renovation and life
• Performance parameter
• R&M
• Feasibility Study
• Project Management, Risk Assessment
• Detailed project Report
Our solution
Preparation of DPR after completed the job & investment grade energy audit, performanceevaluation tests, life assessment and conditionassessment of the plant with high accuracyinstrumentation and experts.
IRC Engg.- services
Outcome
• Bankable Detailed project report with cost
extension of plant.
• Baseline establishment
About the project
Project description
Performance period
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 14
Renovation & Modernization, Detailed Project Report 3X 210 MW Coal Based Power- MPPGCL MADHYA PRADESH
Sanjay Gandhi Thermal Power Station, Conventional power
• R & M
• Start date for initial project: 2016
benefit analysis for renovation and life
• Performance parameter
• Energy efficiency audit
• Remnant life assessment
• Detailed project report with technical and
• IRR and investment calculations with cost
Our solution
Preparation of DPR after completed the job &investment grade energy audit, performanceevaluation tests, life assessment and conditionassessment of the plant with high accuracyinstrumentation and experts.
IRC Engg.- services
• Performance evaluation tests financial details, Risk Assessment
• Condition assessment benefit analysis• Material Supply( LRB, Cladding), Project Management
Outcome
• Bankable Detailed project report with cost
extension of plant.
• Baseline establishment
About the project
Project description
Performance period
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 15
Renovation & Modernization, Detailed Project Report 3X 210 MW Coal Based Power- NLC, TAMILNADU
TS-II
• R & M
• Start date for initial project: 2013
benefit analysis for renovation and life
• Performance parameter
• Energy efficiency audit
• Remnant life assessment
• Detailed project report with technical and
• IRR and investment calculations with cost
Our solution
Preparation of DPR after investment grade energy audit, performance evaluation tests, life assessment and condition assessment of the plant with high accuracy instrumentation and experts.
IRC Engg.- services
• Performance evaluation tests financial details, R&M
• Condition assessment benefit analysis• Material Supply( LRB, Cladding)
Outcome
• Bankable Detailed project report with cost
extension of plant.
• Baseline establishment
About the project
Project description
Performance period
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 16
Renovation & Modernization, Detailed Project Report 2X 120MW Coal Based Power- C&C ENERGY LIMITED
Zimbabwe Power Plant
• R & M
• Start date for initial project: 2014
benefit analysis for renovation and life
• Performance parameter
• Energy efficiency audit
• Remnant life assessment
• Detailed project report with technical and
• Rik Assessment and investment calculationswith cost, Project Management, R&M
Our solution
Preparation of DPR after investment grade energy audit, performance evaluation tests, life assessment and condition assessment of the plant with high accuracy instrumentation and experts.
IRC Engg.- services
• Feasibility Report, Detailed Project report
Outcome
• Bankable Detailed project report with cost
extension of plant.
• Baseline establishment
About the project
Project description
Performance period
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 17
Advanced NDT, Project Report Basis of Condition Assessment-N&H, B&S, MH-I-ONGC, MUMBAI
ONGC PLATFORM
• Preparation of Detailed project report
• Start date for initial project: 2015
• Fit for Service
• Thickness• Hardness• MPI• UT
• Log Range Ultrasonic Testing• Phased array ultrasonic Testing• Pulsed eddy Current testing
Our solution
Preparation of report after completing the inspection on complete Platform
IRC Engg.- services
Outcome
About the project
Project description
Performance period
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 18
Scaffolding, Cleaning, Testing, Inspection, Certification of 13 Mounded Bullets-HMEL ,BHATHINDA
HMEL BHATHINDA
• Preparation of project report on the basis Inspection results
• Start date for initial project: 2015
• Hydro test• Conventional NDT• Scaffolding
• Cleaning,• Inspection• Box-up of bullets.
Our solution
Preparation of Report after Completing the Several Activities erection& Dismantling of Scaffolding, Testing, Inspection, Certification of 13 Mounded Bullets.
IRC Engg.- services
Outcome
• Fit For Services Next Five years
About the project
Project description
Performance period
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 19
Radiography, Close Proximity, Ultrasound, PWHT for Expansion of NFL Nangal Project- NFL, Punjab
NFL NANGAL, PUNJAB
• Preparation of project report on the basis Inspection results
• Start date for initial project: 2013
• Radiography• Close Proximity Radiography• Scaffolding
• Cleaning,• Inspection.
Our solution
Preparation of Report after Completing the Radiography & Inspection.
RC Engg.- services
Outcome
• Fit For Services Next Five years
About the project
Project description
Performance period
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 20
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 21
IRC-CLIENT
IRC ENGINEERING SERVIES (I) PVT. LTD.-SOLUTION PROVIDER –POWER/REFINERY/FERTILIZER 22
IRC-MANAGEMENT TEAM FOR CONTACT
NAME MOBILE MAIL ID
Abhinav Singhi 9810401316ircenngg@gmail.comSinghiabhinav14@gmail.com
Jitendra Kumar 9599811525Jitendra.skumar@ircengg.co.injkumar1014@gmail.com
Address:1. IRC Engineering Services (I) Pvt. Ltd. 612, Chiranjiv Tower,43,
Nehru Place, New Delhi, 110019, INDIA2. IRC Engineering Services (I) Pvt. Ltd., A-53 Sector-63 Noida
201301, INDIA