SOUTH HALL MWC Los Angeles 2019Skyworks Netcracker Technology Netcracker Technology S2.306 Sprint...

Preview:

Citation preview

HANGING POINTS ON EITHER SIDESOUTH HALL MEETING ROOMS HAVE

OF EVERY OTHER A/C VENT LOCATEDTHROUGH MAIN CORRIDOR.BANNER SIZE IS 10'X3'

NOTE:

301A 302 303A 304A 305 306A 307

UPPER LEVEL MEETING ROOMSSOUTH HALL

FOYER

309

308A301B 303B 304B 304C 308B306B

STORAGE

STORAGE

STORAGE

STORAGE

Convention Center

Los Angeles

TO S

OU

THLO

BB

Y

TO C

OMPASS

CAFE

4' F

re

em

an

ta

ble

6' F

re

em

an

ta

ble

6' F

re

em

an

ta

ble

S2.308A

S2.308B

Media Center

6'

ENTER

water

cooler

monitor

4'-6"

4'-6"

4'-6"4'-6"

Workspace for 76

4'-6"

5'-2"

5'

printer

food service

printer

S2.301A S2.301B S2.302 S2.303B

GSMA GSMA GSMA

S2.305

S2.303B-A

20'

15'

Cisco

Systems,

Inc

S2.303B-B

15'

20'

Cisco

Systems,

Inc

S2.304

43'

15'

EMR Lounge

S2.304-A

15'

15'

RF Pixels

S2.304-B

15'

15'

Global

Certification

S2.304-C

15'

15'

S2.304-D

20'

15'

S2.304-E

15'

15'

S2.304-F

15'

15'

Skyworks

Netcracker

Technology

Netcracker

Technology

S2.306

Sprint

Corporatiion

S2.307

Media

Village

S2.309

FREIGHT CARRIER CHECK IN DATE & TIME

Oct 22 - 24, 2019

Los Angeles, CA

Los Angeles Convention Center

TARGET MOVE IN SCHEDULE

This schedule refers to the date and time your delivering carrier must check into the marshaling area for the Los Angeles Convention Center to be placed in line for unloading (see marshaling yard directions in this section of your Exhibitor Kit).

This schedule is for the move-in of your exhibit and display equipment. You are not required to begin setting your display at this time.

OFF TARGET

If you are unable to meet your assigned target date for any reason and wish to request a change, please contact Freeman at:

MWCLA@freeman.com

No targets will be changed without written approval from Freeman.

300 Series Meeting Rooms

Disclaimer - Every effort has been made to ensure the accuracy of all information contained on this floor plan. However, no warranties, either expressed of implied, are made with respect to this floor plan. If the location of building

columns, utilities or other architectural components of the facility is a consideration in the construction or usage of an exhibit, it is the sole responsibility of the exhibitor to physically inspect the facility to verify all dimension and locations.

© Copyright 2018, Freeman, all rights reserved.

Floor plan as of March 15, 2019

INBOUND FREIGHT

TARGET SCHEDULE

MWC Los Angeles 2019

Sunday, Oct. 20,

8am-5pm

Recommended