Status of LIGO. Upper limits on known pulsar ellipticities. Barry Barish PAC Meeting Caltech 3-June-04. Goals and Priorities. Interferometer performance Integrate commissioning and data taking consistent with obtaining one year of integrated data at h = 10 -21 by end of 2006 - PowerPoint PPT Presentation
Citation preview
LIGO-G030557-00-M
Statusof
LIGOBarry Barish
PAC MeetingCaltech
3-June-04
Upper limits on known pulsar ellipticities
3-June-04 PAC Mtg -- Caltech 2
LIGO-G030557-00-M
Goals and Priorities Interferometer performance
» Integrate commissioning and data taking consistent with obtaining one year of integrated data at h = 10-21 by end of 2006
Physics results from LIGO I» Initial upper limit results by early 2003
» First search results in 2005
» Reach LIGO I goals by 2007
Advanced LIGO» Prepare advanced LIGO proposal this fall
» International collaboration and broad LSC participation
» Advanced LIGO installation beginning by 2007
3-June-04 PAC Mtg -- Caltech 3
LIGO-G030557-00-M
LIGO Sensitivity EvolutionHanford 4km Interferometer
Dec 01
Nov 03
3-June-04 PAC Mtg -- Caltech 4
LIGO-G030557-00-M
Best Performance to Date ….
Range ~ 6 Mpc
3-June-04 PAC Mtg -- Caltech 5
LIGO-G030557-00-M
LIGO Commissioning and Science Timeline
Now
3-June-04 PAC Mtg -- Caltech 6
LIGO-G030557-00-M
Goals and Priorities Interferometer performance
» Integrate commissioning and data taking consistent with obtaining one year of integrated data at h = 10-21 by end of 2006
Physics results from LIGO I» Initial upper limit results by early 2003
» First search results in 2004
» Reach LIGO I goals by 2007
Advanced LIGO» Prepare advanced LIGO proposal this fall
» International collaboration and broad LSC participation
» Advanced LIGO installation beginning by 2007
3-June-04 PAC Mtg -- Caltech 7
LIGO-G030557-00-M
Sensitivity during S1
GEO data exchange
for S1 RUN
LIGO S1 Run----------“First
Upper Limit Run”
23 Aug–9 Sept 200217 daysAll interferometers in power recycling configuration
LLO 4Km
LHO 2Km
LHO 4Km
3-June-04 PAC Mtg -- Caltech 8
LIGO-G030557-00-M
S1 “Methodology” Papers Detector Paper
“Detector Description and Performance for the First Coincidence Observations between LIGO and GEO”
Periodic Sources “Setting upper limits on the strength of periodic gravitational waves
using the first science data from the GEO600 and LIGO detectors”
Inspiral Sources “Analysis of LIGO data for gravitational waves from binary neutron
stars”
Stochastic Sources “Analysis of First LIGO Science Data for Stochastic Gravitational
Waves”
Burst Sources “First upper limits on gravitational wave bursts from LIGO”
3-June-04 PAC Mtg -- Caltech 9
LIGO-G030557-00-M
LIGO Sensitivity -- L1
May 01
Jan 03
S1First Science
Run17 days - Sept 02
S2Second Science
Run59 days - April 03
3-June-04 PAC Mtg -- Caltech 10
LIGO-G030557-00-M
Science Runs
S2 ~ 0.9Mpc
S1 ~ 100 kpc
E8 ~ 5 kpc
NN Binary Inspiral Range
S3 ~ 3 Mpc
Design~ 18 Mpc
A Measure of Progress
Milky WayAndromedaVirgo Cluster
3-June-04 PAC Mtg -- Caltech 11
LIGO-G030557-00-M
Post S3 at LLOactive external seismic
HAM
BSC
External Pre-Isolators
3-June-04 PAC Mtg -- Caltech 12
LIGO-G030557-00-M
Advanced LIGOproposed in early 2003
Active Seismic
Multiple Suspensions
Sapphire Optics
Higher Power Laser
3-June-04 PAC Mtg -- Caltech 13
LIGO-G030557-00-M
AdLIGO Status as a Project• Large Projects at NSF are funded through MREF account (projects with total cost of more than ~10% of the annual division budget)
• A long list of possible MREF projects (23) are under discussion by all the directorates and the list changes with time.
• A shorter list of reviewed projects (11) are discussed annually with the NSB annually (a more stable list, but not prioritized)
• The Assistant Directors advise the Directorate (who decides) what and when to bring projects forward to NSB for consideration and approval
• Next big step is to obtain NSB approval and then inclusion in future MREF budgets to OMB (FY06?)
LIGO
LIGO-G030557-00-M
LIGO Outreach Program$5M for 5 years
LSC Collaborating Groups are invited to participate in the LIGO Laboratory Outreach Activities
3-June-04 PAC Mtg -- Caltech 15
LIGO-G030557-00-M
LIGO Outreach Collaboration
LIGO provides the science and facilities
Exploratorium exhibits the science
Southern University brings LIGO science to science education
Louisiana Board of Regents extends our program through public education
3-June-04 PAC Mtg -- Caltech 16
LIGO-G030557-00-M
Site Plan
OUTREACHCENTER
LVEA
OSB
Existing unpaved site adjacent to LLO conference facility & temporary exhibit space
Erect new building with direct access to auditorium foyer
BUS & CAR PARKING
staging lot
3-June-04 PAC Mtg -- Caltech 17
LIGO-G030557-00-M
Conclusions S1 Analysis Complete. Five Papers approved for publication.
S2 Data Run was ~x10 better sensitivity and ~x4 more running time. Data analysis is near complete and we plan to present the results at GR-17 in Dublin in July. LSC Data Analysis Meeting this weekend
S3 Data Run: Three interferometers with extragalactic sensitivity. Analysis not yet underway
LIGO is shutdown to install L1 seismic mitigation
Advanced LIGO was proposed in Jan 03 and was well reviewed. It is now awaiting approval by the NSB.
Short term goals:» Commission Seismic Retrofit» Improve sensitivity and reliability to near design and initiate the
extended LIGO I search run.
3-June-04 PAC Mtg -- Caltech 18
LIGO-G030557-00-M
This Meeting
Review the Status of the LIGO Data Analysis, including new results
Review Status of Commissioning and Seismic Retrofit
Discussion and Advice on Possible LIGO Laboratory Management Structural Changes
Recommended