TDR Kickoff Meeting
Tim Bolton and Sam ZellerSeptember 11, 2018
09/11/2018 Initial TDR Kick-off Meeting1
Thank you
09/11/2018 Initial TDR Kick-off Meeting2
• IDRwasabigsuccess
• LBNC:“TheIDRrepresentsalengthy,comprehensive,andimpressiveaccomplishmentbytheDUNEcollaborationandisanimportantmilestoneonthepathtotheTDR”
• nowontotheTDR!
I. Executive Summary (~200 pages)II. Physics (~200 pages)III. Single Phase Module (~400 pages)IV. Dual Phase Module (~400 pages)V. Technical Coordination (~200 pages) VI. Computing Executive Summary (~50 pages)VII. Near Detector Executive Summary (~50 pages)
09/11/2018 Initial TDR Kick-off Meeting3
Overall Structure
Connected stand-alone volumes …
I. Executive Summary (~200 pages)II. Physics (~200 pages)III. Single Phase Module (~400 pages)IV. Dual Phase Module (~400 pages)V. Technical Coordination (~200 pages) VI. Computing Executive Summary VII. Near Detector Executive Summary
09/11/2018 Initial TDR Kick-off Meeting4
Overall Structure
Connected stand-alone volumes … concisesummarydistilledfromothervolumesaimedatfundingagencies
contentdeterminedbyvolumeeditorsaimedatan HEPphysicist,reviewer
Single and Dual Phase Volumes (each chapter should be ~50 pages)
1. Design motivation and overview2. CRP or APA3. TPC electronics 4. High voltage system5. Photon detection system6. Data acquisition system7. Cryogenic Instrumentation and Slow Controls (CISC)8. Technical Coordination9. Calibration
09/11/2018 Initial TDR Kick-off Meeting5
Single and Dual Phase Volumes updated IDR narrative (not much longer) plus some standardized summary tables that will be new to the TDR:
09/11/2018 Initial TDR Kick-off Meeting6
1. Requirements Table (“Schmitz Table”)2. Components summary and table3. Cost summary and table4. Schedule summary and table5. Risk summary and table6. Interface summary and table
seeDaveSchmitz’sMay2018DUNEcollaborationmeetingtalk
Themes(to be worked in at all levels)
• Requirements from physics for the detector• protoDUNE• Safety• Professional practices (cost, schedule, risks, interfaces)• Be Concise• Try to ensure that sections do not have exactly repeated text
09/11/2018 Initial TDR Kick-off Meeting7
Early Key Decisions• Baseline- What is the baseline system or scheme for the TDR?
- What is the development plan, if needed, for post-TDR elements?
• Incorporating protoDUNE- What information do we need from protoDUNE for the TDR?
- What will be ready with high confidence?
- What are reasonable stretch goals?
- Implementing a placeholder structure
09/11/2018 Initial TDR Kick-off Meeting8
Nominal Schedule- September: Consortium/working group editors appointed- October: Outlines due including outline of protoDUNE strategy - November: First drafts due including first pass at requirements table.
Editors’ initial review complete by November 15- December: Second drafts due. Must include initial cost, risk, schedule,
and interface tables, plus any iteration of protoDUNE strategy and requirements.
- January: Review of second drafts.- February: Outcome of independent reviews of second drafts back to
consortia/working groups- March: Final drafts due- April: Review of final documents complete- April 15: Submit final document to LBNC
09/11/2018 Initial TDR Kick-off Meeting9
LBNC’s Two Main Issues(DUNE docdb #10030)
09/11/2018 Initial TDR Kick-off Meeting10
• Requirements: not there- New scheme:- Small set of ~25 EC-held central
requirements/parameters (need help from Leadership)
- Physics TDR ties central requirements/parameters set to physics goals
- Consortia show requirements are met by design, add any needed further specifications
- Fixed format tables- May need central
management/version control
• Length: too long– New scheme:– Break TDR and CDRs into
readable stand-alone volumes– Add Overview volume:
collection of executive summaries
– Expanded Technical Coordination volume: one-stop shopping for all matters project
– Some elements to LBNC at 2nd
draft stage– Hold the line on chapter length
Connection to the Physics
09/11/2018 Initial TDR Kick-off Meeting11
• Whatworkedwell&whatdidn’tfromourexperiencewiththeIDR?
Lessons Learned
• Whatisthetimelineforupdatedphysicsstudies?
• HowdowefurthertightentheconnectionbetweenthephysicsofDUNEandtechnicalrequirementsforthedesignofthedetector?
• MorefromJonandAlbertatthismeeting…