TDR Kickoff Meeting

Tim Bolton and Sam ZellerSeptember 11, 2018

09/11/2018 Initial TDR Kick-off Meeting1

Page 2: TDR KickoffMeeting - Fermilab

Thank you

09/11/2018 Initial TDR Kick-off Meeting2

• IDRwasabigsuccess

• LBNC:“TheIDRrepresentsalengthy,comprehensive,andimpressiveaccomplishmentbytheDUNEcollaborationandisanimportantmilestoneonthepathtotheTDR”

• nowontotheTDR!

Page 3: TDR KickoffMeeting - Fermilab

I. Executive Summary (~200 pages)II. Physics (~200 pages)III. Single Phase Module (~400 pages)IV. Dual Phase Module (~400 pages)V. Technical Coordination (~200 pages) VI. Computing Executive Summary (~50 pages)VII. Near Detector Executive Summary (~50 pages)

09/11/2018 Initial TDR Kick-off Meeting3

Overall Structure

Connected stand-alone volumes …

Page 4: TDR KickoffMeeting - Fermilab

I. Executive Summary (~200 pages)II. Physics (~200 pages)III. Single Phase Module (~400 pages)IV. Dual Phase Module (~400 pages)V. Technical Coordination (~200 pages) VI. Computing Executive Summary VII. Near Detector Executive Summary

09/11/2018 Initial TDR Kick-off Meeting4

Overall Structure

Connected stand-alone volumes … concisesummarydistilledfromothervolumesaimedatfundingagencies

contentdeterminedbyvolumeeditorsaimedatan HEPphysicist,reviewer

Page 5: TDR KickoffMeeting - Fermilab

Single and Dual Phase Volumes (each chapter should be ~50 pages)

1. Design motivation and overview2. CRP or APA3. TPC electronics 4. High voltage system5. Photon detection system6. Data acquisition system7. Cryogenic Instrumentation and Slow Controls (CISC)8. Technical Coordination9. Calibration

09/11/2018 Initial TDR Kick-off Meeting5

Page 6: TDR KickoffMeeting - Fermilab

Single and Dual Phase Volumes updated IDR narrative (not much longer) plus some standardized summary tables that will be new to the TDR:

09/11/2018 Initial TDR Kick-off Meeting6

1. Requirements Table (“Schmitz Table”)2. Components summary and table3. Cost summary and table4. Schedule summary and table5. Risk summary and table6. Interface summary and table

seeDaveSchmitz’sMay2018DUNEcollaborationmeetingtalk

Page 7: TDR KickoffMeeting - Fermilab

Themes(to be worked in at all levels)

• Requirements from physics for the detector• protoDUNE• Safety• Professional practices (cost, schedule, risks, interfaces)• Be Concise• Try to ensure that sections do not have exactly repeated text

09/11/2018 Initial TDR Kick-off Meeting7

Page 8: TDR KickoffMeeting - Fermilab

Early Key Decisions• Baseline- What is the baseline system or scheme for the TDR?

- What is the development plan, if needed, for post-TDR elements?

• Incorporating protoDUNE- What information do we need from protoDUNE for the TDR?

- What will be ready with high confidence?

- What are reasonable stretch goals?

- Implementing a placeholder structure

09/11/2018 Initial TDR Kick-off Meeting8

Page 9: TDR KickoffMeeting - Fermilab

Nominal Schedule- September: Consortium/working group editors appointed- October: Outlines due including outline of protoDUNE strategy - November: First drafts due including first pass at requirements table.

Editors’ initial review complete by November 15- December: Second drafts due. Must include initial cost, risk, schedule,

and interface tables, plus any iteration of protoDUNE strategy and requirements.

- January: Review of second drafts.- February: Outcome of independent reviews of second drafts back to

consortia/working groups- March: Final drafts due- April: Review of final documents complete- April 15: Submit final document to LBNC

09/11/2018 Initial TDR Kick-off Meeting9

Page 10: TDR KickoffMeeting - Fermilab

LBNC’s Two Main Issues(DUNE docdb #10030)

09/11/2018 Initial TDR Kick-off Meeting10

• Requirements: not there- New scheme:- Small set of ~25 EC-held central

requirements/parameters (need help from Leadership)

- Physics TDR ties central requirements/parameters set to physics goals

- Consortia show requirements are met by design, add any needed further specifications

- Fixed format tables- May need central

management/version control

• Length: too long– New scheme:– Break TDR and CDRs into

readable stand-alone volumes– Add Overview volume:

collection of executive summaries

– Expanded Technical Coordination volume: one-stop shopping for all matters project

– Some elements to LBNC at 2nd

draft stage– Hold the line on chapter length

Page 11: TDR KickoffMeeting - Fermilab

Connection to the Physics

09/11/2018 Initial TDR Kick-off Meeting11

• Whatworkedwell&whatdidn’tfromourexperiencewiththeIDR?

Lessons Learned

• Whatisthetimelineforupdatedphysicsstudies?

• HowdowefurthertightentheconnectionbetweenthephysicsofDUNEandtechnicalrequirementsforthedesignofthedetector?

• MorefromJonandAlbertatthismeeting…