The Glance Project ATLAS Management January 2012

Preview:

Citation preview

The Glance Project

ATLAS ManagementJanuary 2012

Problems

• Data are stored in different databases, technologies, terminologies

• How to retrieve data?

✘Build many retrieval systems

➡difficult maintenance, hard to find the correct system

✘Build a single, big, complex system

➡Hard to meet the requirements of the whole collaboration

➡Management is centralized in a developer or team

• Experiment should last 20+ years, and has a high turnover

• Need for maintenance and training

Example: Equipments

• Different Attributes for each type of equipment

• E.g. Computers (CPU, MAC Address) and Cables (Length, Connector)

• All equipments must be registered and tracked

• Have a single model for all the equipments?

• Have multiple systems for viewing the details of each equipment?

The Glance System

• Single platform for generating Search and Insert/Update interfaces

• Can access any database (technology, location, etc)

• Interfaces are described independently of the database technology, in a high level description language (no coding)

• All interfaces managed by a single system → lower maintenance costs

• Collaborators can create their interfaces and share them → decentralized management of data

• Data can be output in multiple ways

• HTML, XML, Excel files, Plots, ROOT Files

Quick creation of a Search Interface

• http://cern.ch/atglance/ on the Use Glance link

Create SI

Fill in DB Credentials

1. Choose Schema

2. Choose Table

Done!(in 10 clicks)

Browse

Browse ExistingInterfaces

Acessing Saved Interfaces

Modifying Existing Interfaces

Parametric Search

Parametric Search

Operators chosen by the type of the

attribute (automatically identified)

Operators chosen by the type of the

attribute (automatically identified)

Multiple Output Formats

Other File FormatsOther File Formats

Multiple Output Formats

XMLRoot Excel

Results in the WEB browser

Results in the WEB browser

PlotsPlots

Simple Customizatio

ns

Advanced Customizatio

ns

Advanced Customizations of the Interface

Advanced Customizations of the Interface

ATLAS Systems built with Glance

ATLASMembers

CERN Users

GlanceGlance

SearchInterfaces

First version of ATLAS Appointment was built in 4

days!

ATLAS Systems built with Glance

• ATLAS Management: 14

• ATLAS Physics Office

• LHCb: 1 (Traceability)

• Membership (under development)

ATLAS Systems built with Glance

• Cable Database: cables and connections

• MTF Database: equipment inventory

• ATLAS Equipment Traceability (*): tracking and radioactivity measurements

• ATLAS DSS Alarm Viewer: Detector Safety System Alarms configurations

• ATLAS Membership (*): management of members, contracts, institutes and authorship status

• ATLAS Appointment: management of member appointments

• ATLAS Analysis Follow-up: manages the process for publications approval

• ATLAS Analysis Confnotes: manages the process for conference notes approval

• ATLAS Speakers: manages nominations of speakers for ATLAS talks

• ATLAS SSC: manages nominations of speakers for sub-committee talks

(*) Also for LHCb

Goals for 2012

• Improved requirements management

• Configurations for interfaces, rules and access

• FAQ and User support

• Glance 2.0 - improved flexibility, security,

Recommended