8/13/2019 Traffic Volume Study - Putalisadak Intersection
1/26
TRAFFIC VOLUME STUDY
OF
PUTALISADAK INTERSECTION
Presented by:
069/MST/261-270
8/13/2019 Traffic Volume Study - Putalisadak Intersection
2/26
INTERSECTION LAYOUT
8/13/2019 Traffic Volume Study - Putalisadak Intersection
3/26
GENERAL INFORMATION
Cross Intersection in Four Legs:
Baghbazaar Dillibazaar
Singhdurbar Kamalpokhari
Two major legs and two minor legs
Signalized Intersection but currently the traffic
signals are not functioning. So, Traffic Police
Controlled Intersection (Manually Controlled)
8/13/2019 Traffic Volume Study - Putalisadak Intersection
4/26
GENERAL INFORMATION
Zebra Crossing for Pedestrians
Public Vehicle Stops very near to the intersection.
(These often interrupt the traffic flow from the
intersection during peak hours)
8/13/2019 Traffic Volume Study - Putalisadak Intersection
5/26
TRANSPORTATION UNITA Transport Unit (TU) is the impact that a mode of
transport has on traffic variables (such as headway,
speed, density) compared to a single car.
Amount of road space they occupy
The loads they impose on road structure
But in traffic engineering, we are mainly interested inthe equivalent congestion they create on the
roadway.
8/13/2019 Traffic Volume Study - Putalisadak Intersection
6/26
Transport unit from NRS 2045
8/13/2019 Traffic Volume Study - Putalisadak Intersection
7/26
Transport unit
NRS doesnt specify TU for
Motor-bikes Tempo
For our convenience, we have classified vehicles into 7
groups and the following units were assigned: Cycles 0.5
Motor-bikes 0.5
Tempo 1
Car/ Jeep/Van 1 Micro/Mini Bus 3
Bus/ Truck 3
Others: School bus, Ambulance 3
8/13/2019 Traffic Volume Study - Putalisadak Intersection
8/26
Masters in Transportation Engineering - 2069
Traffic - Volume Count
Location: Putalisadak Intersection Date: Dec 12, 2012 (Wed)
1. From Dillibazaar Leg Group: Second
Cycle BikeCar/Taxi/Van/
Pick-upsTempo Micro/Mini Bus/Truck Others
0.5 TU 0.5 TU 1 TU 1 TU 3 TU 3 TU 3 TU
Dilliba
zaar-B
aghbaz
aar
Direction Time Interval Total TU
4:15 - 4:30 PM 15 118 19 1 6 11 0 137.5
4:30 - 4:45 PM 11 122 27 1 9 8 1 148.5
4:45 - 5:00 PM5 165 33 0 7 9 2 1725:00 - 5:15 PM 20 111 27 0 4 5 0 119.5
Total => 51 516 106 2 26 33 3 577.5Dillib
azaar-B
aghbaz
aar
Dilliba
zaar-Ka
malpo
khari
4:15 - 4:30 PM 7 114 34 5 12 135.5
4:30 - 4:45 PM 8 127 42 3 19 169.5
4:45 - 5:00 PM 5 169 56 2 22 1 1 217
5:00 - 5:15 PM 7 126 43 3 7 2 139.5
Total => 27 536 175 13 60 3 1 661.5
Dilliba
zaar-
Singhdurb
ar
Dilliba
zaar-Ka
malpo
khari
4:15 - 4:30 PM 4 73 28 19 4 97.5
4:30 - 4:45 PM 4 97 38 21 2 1 118.54:45 - 5:00 PM 8 113 33 19 3 121.5
5:00 - 5:15 PM 6 79 20 12 2 80.5
Total => 22 362 119 71 0 9 3 418Dillib
azaar-
Singhdurb
ar
8/13/2019 Traffic Volume Study - Putalisadak Intersection
9/26
Masters in Transportation Engineering - 2069
Traffic - Volume Count
Location: Putalisadak Intersection Date: Dec 12, 2012 (Wed)
2. From Baghbazaar Leg Group: Second
Cycle BikeCar/Taxi/Van/
Pick-upsTempo Micro/Mini Bus/Truck Others
0.5 TU 0.5 TU 1 TU 1 TU 3 TU 3 TU 3 TU
Time Interval Total TU
Baghbaz
aar-Ka
malpo
khari
Direction
4:15 - 4:30 PM 24 111 19 86.5
4:30 - 4:45 PM 13 102 26 83.5
4:45 - 5:00 PM14 110 19 1 845:00 - 5:15 PM 20 164 26 118
Total => 71 487 90 0 0 0 1 372
3. From Kamalpokhari Leg
Cycle BikeCar/Taxi/Van/
Pick-upsTempo Micro/Mini Bus/Truck Others
0.5 TU 0.5 TU 1 TU 1 TU 3 TU 3 TU 3 TU
Direction Time Interval Total TU
Baghbaz
aar-Ka
malpo
khari
Kama
lpokha
ri-Singh
durbar
4:15 - 4:30 PM 6 281 107 1 15 296.5
4:30 - 4:45 PM 13 292 86 1 7 260.54:45 - 5:00 PM 10 259 95 3 10 262.5
5:00 - 5:15 PM 10 243 67 3 7 217.5
Total => 39 1075 355 8 0 39 0 1037Kam
alpokh
ari-Sing
hdurbar
8/13/2019 Traffic Volume Study - Putalisadak Intersection
10/26
Masters in Transportation Engineering - 2069
Traffic - Volume Count
Location: Putalisadak Intersection Date: Dec 12, 2012 (Wed)
4. From Singhdurbar Leg Group: Second
Cycle BikeCar/Taxi/Van/
Pick-upsTempo Micro/Mini Bus/Truck Others
0.5 TU 0.5 TU 1 TU 1 TU 3 TU 3 TU 3 TU
Direction Time Interval Total TU
Singhd
urbar
-Bagh
bazaa
r4:15 - 4:30 PM 6 70 10 1 6 694:30 - 4:45 PM 4 51 13 4 52.5
4:45 - 5:00 PM 10 72 14 7 76
5:00 - 5:15 PM 4 69 15 8 75.5
Total => 24 262 52 0 1 25 0 273Sing
hdurba
r-Ba
ghbaz
aar
Singhdu
brar-Ka
malpo
khari
4:15 - 4:30 PM 0 330 143 12 16 392
4:30 - 4:45 PM 9 381 107 3 19 368
4:45 - 5:00 PM 24 366 118 7 22 400
5:00 - 5:15 PM 21 419 126 3 17 406
Total => 54 1496 494 0 25 74 0 1566Singhdu
brar-Ka
malpo
khari
8/13/2019 Traffic Volume Study - Putalisadak Intersection
11/26
Cycle Bike Car/Taxi/Van/Pick-ups
Tempo Micro/Mini
Bus/Truck Total TU
Dillibazaar - Baghbazaar 15 118 19 1 6 11 138
Dillibazaar - Kamalpokhari 7 114 34 5 12 136
Dillibazaar - Singhdurbar 4 73 28 19 4 98
Baghbazaar - Kamalpokhari 24 111 19 87
Kamalpokhari - Singhdurbar 6 281 107 1 15 297
Singhdurbar - Baghbazaar 6 70 10 1 6 69
Singhdubrar - Kamalpokhari 0 330 143 12 16 392
0
50
100
150
200
250
300
350
400
No.ofVehicles
Time Duration: 4:15 - 4:30 PM
8/13/2019 Traffic Volume Study - Putalisadak Intersection
12/26
Cycle Bike Car/Taxi/Van
/Pick-ups Tempo Micro/Mini Bus/Truck Others Total TU
Dillibazaar - Baghbazaar 11 122 27 1 9 8 1 149
Dillibazaar - Kamalpokhari 8 127 42 3 19 170
Dillibazaar - Singhdurbar 4 97 38 21 2 1 119
Baghbazaar - Kamalpokhari 13 102 26 84
Kamalpokhari - Singhdurbar 13 292 86 1 7 261
Singhdurbar - Baghbazaar 4 51 13 4 53
Singhdubrar - Kamalpokhari 9 381 107 3 19 368
0
50
100
150
200
250
300
350
400
N
o.ofVehicles
Time Duration: 4:30 - 4:45 PM
8/13/2019 Traffic Volume Study - Putalisadak Intersection
13/26
Cycle Bike Car/Taxi/Van
/Pick-ups Tempo Micro/Mini Bus/Truck Others Total TU
Dillibazaar - Baghbazaar 5 165 33 0 7 9 2 172
Dillibazaar - Kamalpokhari 5 169 56 2 22 1 1 217
Dillibazaar - Singhdurbar 8 113 33 19 3 122
Baghbazaar - Kamalpokhari 14 110 19 1 84
Kamalpokhari - Singhdurbar 10 259 95 3 10 263
Singhdurbar - Baghbazaar 10 72 14 7 76
Singhdubrar - Kamalpokhari 24 366 118 7 22 400
0
50
100
150
200
250
300
350
400
No.ofV
ehicles
Time Duration: 4:45 - 5:00 PM
8/13/2019 Traffic Volume Study - Putalisadak Intersection
14/26
Cycle Bike Car/Taxi/Van
/Pick-ups Tempo Micro/Mini Bus/Truck Others Total TU
Dillibazaar - Baghbazaar 20 111 27 0 4 5 0 120
Dillibazaar - Kamalpokhari 7 126 43 3 7 2 140
Dillibazaar - Singhdurbar 6 79 20 12 2 81
Baghbazaar - Kamalpokhari 20 164 26 118
Kamalpokhari - Singhdurbar 10 243 67 3 7 218
Singhdurbar - Baghbazaar 4 69 15 8 76
Singhdubrar - Kamalpokhari 21 4 19 126 3 17 406
0
50
100
150
200
250
300
350
400
450
No.o
fVehicles
Time Duration: 5:00 - 5:15 PM
8/13/2019 Traffic Volume Study - Putalisadak Intersection
15/26
Cycle Bike Car/Taxi/Van/Pick-ups
Tempo Micro/Mini Bus/Truck Others Total TU
Dillibazaar - Baghbazaar 51 516 106 2 26 33 3 578
Dillibazaar - Kamalpokhari 27 536 175 13 60 3 1 662
Dillibazaar - Singhdurbar 22 362 119 71 0 9 3 418
Baghbazaar - Kamalpokhari 71 487 90 0 0 0 1 372
Kamalpokhari - Singhdurbar 39 1075 355 8 0 39 0 1037
Singhdurbar - Baghbazaar 24 262 52 0 1 25 0 273
Singhdubrar - Kamalpokhari 54 1496 494 0 25 74 0 1566
0
200
400
600
800
1000
1200
1400
1600
No.ofVe
hicles
Hourly Volume: 4:15 - 5:15 PM
8/13/2019 Traffic Volume Study - Putalisadak Intersection
16/26
Masters in Transportation Engineering - 2069
Traffic - Volume Count
Total Hourly Volume departing the Intersection
Location: Putalisadak Intersection Date: Dec 12, 2012 (Wed)
Group: Second
Direction Cycle BikeCar/Taxi/Van
/Pick-upsTempo Micro/Mini Bus/Truck Others
Total 288 4734 1391 94 112 183 8
Total No. of Vehicles 6810
Total TU of Vehicles 4905
8/13/2019 Traffic Volume Study - Putalisadak Intersection
17/26
2731566
372
418 578 662
1037
8/13/2019 Traffic Volume Study - Putalisadak Intersection
18/26
75 m
MAXIMUM QUEUE LENGTHS
80 m
35 m
No Queue Formation
8/13/2019 Traffic Volume Study - Putalisadak Intersection
19/26
Some Photographs taken during Survey
Queue in Kamalpokhari Leg
8/13/2019 Traffic Volume Study - Putalisadak Intersection
20/26
Some Photographs taken during Survey
Queue in Dillibazaar Leg
8/13/2019 Traffic Volume Study - Putalisadak Intersection
21/26
8/13/2019 Traffic Volume Study - Putalisadak Intersection
22/26
Some Photographs taken during Survey
Vehicles crossing the Intersection
8/13/2019 Traffic Volume Study - Putalisadak Intersection
23/26
Some Photographs taken during Survey
Pedestrians crossing the road in Singhdurbar Leg
8/13/2019 Traffic Volume Study - Putalisadak Intersection
24/26
8/13/2019 Traffic Volume Study - Putalisadak Intersection
25/26
CONCLUSION AND RECOMMENDATIONS
Though the data is insufficient, it may be extended
for the use of signal timing design.
We can also find out the capacity of the intersection
and hence evaluate the adequacy of the intersection.
We can analyze this result to recommend better
measures for smooth vehicular flow
8/13/2019 Traffic Volume Study - Putalisadak Intersection
26/26
Thank
You!