U.S. Bank Stadiumenergytransition.umn.edu/wp...Std_Modified_20160629...ùs%x 2S%x NV: x 2029 x 2020...

Preview:

Citation preview

U.S. Bank Stadium

TCF Bank Stadium

Target Field

ENERGY GROUPS

Established in 1995

Projects throughout the U.S. and Canada

Wind Energy

Established in 2009

Projects throughout the U.S.

Solar and Emerging Renewables

Established in 2012

Projects throughout the U.S. and Canada

High Voltage Transmission

Established in 2012

Projects throughout the U.S.

Completes civil work for renewable energy projects

Civil Group

Building what’s next.

THE BUSINESS CASE FOR ENERGY STORAGE:

A RENEWABLE ENERGY CONTRACTOR’S PERSPECTIVE

Source: 2013 Special Reliability Assessment, November 2013, NERC/CAISO

Renewable Portfolio Standard Policieswww.dsireusa.org / June 2015

1325 MW Energy Storage by 2020

Building what’s next.

THE BUSINESS CASE FOR ENERGY STORAGE:

A RENEWABLE ENERGY CONTRACTOR’S PERSPECTIVE

Additional Slides

Recommended