Andrew Drager - Juwi Renewable Energy PTY LTD

Preview:

Citation preview

Renewable Integration: DeGrussa Solar Project

2017-03-21 – Andrew Drager (Director)

juwi at a Glance

Wind Energy

2,000 MW of installed capacity;

100 wind parks (900 turbines);

Solar Energy

2,000 MW of installed capacity;

1,500 PV Installations;

Company

1,000 employees worldwide;

$8 billion investment volume;

Top 10 largest solar EPC.

Location: Arizona (USA) 25 MWp, single axis tracker, Ronneburg (Germany) 20 MWp,

Malaysia 10MWp Carport, Oiniades (Greece) 3MW

4,000 MWp renewable energy completed worldwide

Off-Grid Projects

Off-grid Projects: Rwanda, Chile, Namibia, Egypt, Germany

Renewable Energy Integration

6

Exit.

Speed Control

Voltage Control

Gov

Crank

AVR Sp

Ctrl

Fuel

Sync

Load Share

Unit

Vac

Vac

P%

Opn/Close

Close

Engine Controller /PLC

VacGen

VacBus

Close

Diesel Generator Control Hardware

The good old days Today

7

Speed Control

Droop CT

Close

Speed Control

Droop CT

Close

Battery Solar

Advantages

• Simple

• No Plant Controller

• No Communication

Disadvantages

• Limited Control

• Frequencey droop

Diesel Parallel Operation Droop Operation

8

Battery Solar

Diesel Parallel Operation Isochronous Operation

Advantages

• Fixed Frequency

• Optimised Dynamics

• Stability

Disadvantages

• Complex Control system

• Higher Capex

CAN-Bus

DeGrussa Solar Project

The Mine

Degrussa Mine:

Mining: Gold and copper;

Location: Doolgunna Region, WA;

Customer: Sandfire Resources NL;

Distance: 900 km North of Perth.

Power Supply:

Diesel Generators: 19MW;

Operator: 3rd party power station owner;

Avg. load: ~ 11MW;

Avg. consumption: ~ 100GWh p.a.

10

The Solar Facility

Hybrid Power Plant:

PV-Modules: 10.6 MWp;

Tracking: East-West tracking;

PV-Inverter: 10 MW;

Storage: 4 MW / 1,8 MWh (6 MW peak);

Builder / Operator: juwi Australia;

Financier: ARENA, Neoen & CEFC.

Storage tasks:

Spinning reserve;

Ramp rate control;

Provide frequency support;

Power factor correction;

Diesel-off mode.

11

Renewable Energy Integration at DeGrussa

13

Simulation

Success:

1 minute solar yield

Optimisation

Challenges:

Diesel price forecast

Power station operation

14

Solar inverters

Success:

Mass produced / off-the shelf inverters

Containerised solution

Challenges:

Energisation in mining environment

Remote fault-finding

Commissioning time required

UPS

15

Battery inverters

Success:

Reliability

Containerised solution

Challenges:

DC busbar connection

Commissioning time required

Diesel-off mode control

16

Battery

Success:

Reliability and performance

HV busbar

Challenges:

Meeting the required standards

Balance of systems

17

Control System

Success:

Ability for customisation

Ramp rate control

frequency support

Challenges:

Firmware upgrades impacting on system

Commissioning time required

Protection settings

18

SCADA

Success:

Highly customised

Remote monitoring and reporting

Challenges:

De-bugging

Implementation of complex calculations

19

Diesel Network

Success:

Connection of HV

Dynamic spinning reserve

Challenges:

5MVA battery transformer energisation

Control system integration

20

Benefits

Reduction in power costs:

Cheaper than Diesel? (subject to supply term);

Reduced exposure to power price rises:

Fossil fuel market prices;

Transport;

Exchange rate;

Current & future cost of CO2.

21

Benefits

Technical Benefits

Energy security;

Improved power quality;

Better monitoring analysis;

Employee energy consciousness.

Social License

Sustainability image;

Local employment;

Increased marketing/recognition.

The Result

22

The Result

23

The Result

24

The Result

25

Thank You.

Andrew Drager

Directror

juwi Renewable Energies Pty Ltd

Level 1, 33 Queen St.

Brisbane Qld 4000

Tel. +61 7 3194 5052

Mob. +61 408 729 258

andrew.drager@juwi.com

www.juwi.com