View
785
Download
0
Category
Preview:
Citation preview
Laurinda Shaw
Woodside Energy (Myanmar) Pte Ltd
11 July 2016
တူးေဖာ္ ရွာေဖြျခင္း
This presentation contains forward looking statements that are subject to risk factors
associated with oil and gas businesses. It is believed that the expectations reflected in
these statements are reasonable but they may be affected by a variety of variables and
changes in underlying assumptions which could cause actual results or trends to differ
materially, including but not limited to: price fluctuations, actual demand, currency
fluctuations, drilling and production results, reserve estimates, loss of market, industry
competition, environmental risks, physical risks, legislative, fiscal and regulatory
developments, economic and financial market conditions in various countries and
regions, political risks, project delay or advancement, approvals and cost estimates.
All references to dollars, cents or $ in this presentation are to US currency, unless
otherwise stated.
References to “Woodside” may be references to Woodside Petroleum Ltd. or its
applicable subsidiaries.
Disclaimer and important notice
Naypyitaw workshop July 16 218 July 2016
က်ႏုုပ္တုုိ႕၏လုုပ္ငန္းကြင္းဆက္
Naypyitaw workshop July 16 318 July 2016
• ဆုုိက္စမစ္စူးစမ္းေလ့လာျခင္း• ေရနံတြင္းတူးရွာေဖြျခင္း
ဆည္းပူးျခင္းနွင့္ စူးစမ္ရွာေဖြျခင္း
•ေရနံတြင္းတူး ထုတ္လုပ္ျခင္း•စီမံကိန္းေပးေ၀ျခင္း•တည္ေဆာက္ျခင္း
ဖြ႕ံၿဖိဳးတုုိးတက္ျခင္း လုုပ္ငန္းေဆာင္ရြက္ျခင္း
• အေထာက္အပံ့ပစၥည္းမ်ား
ေစ်းကြက္တည္ေဆာက္ျခင္း
• သုုံးစြသူဲမ်ားအတြက္ပံ့ပိုုးျခင္း
Oil and Gas Lifecycle
ACQUIRE & EXPLORE
DEVELOP OPERATE MARKET
Woodside in Myanmar
Naypyitaw workshop July 16 418 July 2016
Block JVP’s Completed Activity ~ Commencement Planned Future Activities
A-7 WEM (operator)
BG E&P
MPEP
Marine Seismic
Seabed sampling
Mid Nov 2015 Flexibility to drill depending on
outcomes of seismic survey
AD-5 WEM (operator)
BG E&P
Marine Seismic Mid Nov 2015 Flexibility to drill depending on
outcomes of seismic survey
A-6 MPRL E&P
(Government liaison
operator)
WEM (operator save
in respect of
government liaison)
Total E&P
Exploration Drilling
Marine Seismic
December 2015
May 2016Planning to drill in 2017
AD-7 WEM (operator for
Deepwater drilling)
POSCO Daewoo
(operator for all other
activities)
Exploration Drilling
Marine Seismic
February 2016
March 2016Planning to drill in 2017
A4 BG E&P (operator)
(WEM, MPEP)
Marine Seismic
Seabed Sampling
Nov 2015
AD2 BG E&P (operator)
(WEM)
Marine Seismic
Seabed Sampling
Nov 2015
WEM – Woodside Energy (Myanmar) Pte LtdMPEP – Myanmar Petroleum Exploration & Production Company Limited (MPEP)BG E & P – BG Exploration and Production Myanmar
Social Understanding
Naypyitaw workshop July 16 518 July 2016
Environment Understanding
Naypyitaw workshop July 16 618 July 2016
ေရနံႏွင့္ဓာတ္ေငြ႕ဆုိင္ရာ လုပ္ငန္းမ်ား အေကာင္အထည္ေဖာ္ေဆာင္ရြက္ရန္ အနီးစပ္ဆံုး ၾကာခ်ိန္ကာလ
Naypyitaw workshop July 16 718 July 2016
Seismic
တူးေဖာ္ရွာေဖြျခင္း
Construction
လုပ္ငန္းလည္ပတ္ေဆာင္ရြက္ျခင္း
လမ်ား ႏွစ္မ်ား ဆယ္စုႏွစ္မ်ား
၃ ပတ္ မွ ၆ လ အထိ
၃ ႏွစ္ မွ ၅ ႏွစ္ အထိ
၁ လ မွ ၁၂ - ၁၈ လ အထိ
၂၀ ႏွစ္ အထက္
အနီးစပ္ဆံုး ကာလသတ္မွတ္ခ်က္
Environmental Aspects Offshore Drilling
Naypyitaw workshop July 16 818 July 2016
Stakeholder Engagement
Naypyitaw workshop July 16 918 July 2016
လုပ္ငန္းစဥ္မ်ားႏွင့္ EIA အစီအစဥ္ ေရးဆြျဲခင္း
Naypyitaw workshop July 16 1018 July 2016
လုပ္ငန္း စတင္လည္ပတ္ရန္
(အနီးစပ္ဆံုး ၾကာခ်ိန္ လမ်ား) အစီအစဥ္ ေရးဆြျဲခင္း
ပတ္၀န္းက်င္ သက္ေရာက္မႈအကဲျဖတ္ခ်က္ (အနီးစပ္ဆံုး ၾကာခ်ိန္ လမ်ား)
ေရနံတြင္းႏွင့္ တြင္းတူးစင္ အတြက္လုပ္ငန္းမ်ား လုပ္ေဆာင္ရန္
အစီအစဥ္ ေရးဆြျဲခင္းစတင္ရန္
EIA ေရးဆြျဲခင္းစတင္ရန္
EIA တင္သြင္းရန္ ပတ္၀န္းက်င္ဆုိင္ရာ
လုပ္ငန္းမ်ားအႀကိဳ
လုပ္ေဆာင္မႈစီစဥ္ျခင္း
ECC ရယူရန္လုပ္ငန္း အဆုိျပဳ
အစီရင္ခံစာတင္သြင္းရန္
Submit Terms of
Reference Report
$ $$$$$$$
၁၈ လ
ဆံုးျဖတ္ခ်က္ ခ်မွတ္ျခင္းအသိေပးရန္ လုပ္ငန္းစဥ္၊အခ်ိန္ သတ္မွတ္ျခင္း၊
အတည္ျပဳျခင္း
အခ်ိန္ယူေဆာင္ရြက္ရမည့္ကိစၥမ်ား လုပ္ေဆာင္ရန္
ACTIVITY ASSESSMENT
TIMING as per EIA
Procedure
(working days)
Project Proposal
Report
15
Terms of
Reference
Scoping Report
15
Environmental
Impact
Assessment
Report
90
Total Assessment
Time
120
Approximate EIA Timelines
Naypyitaw workshop July 16 1118 July 2016
Intra-governmental process and timing uncertainty
Woodside သည္ အရဲစြန္႔ရမႈကုိ အေျခခံသည့္ (risk based) နည္းလမ္းကုိအသုံးျ႔ပဳ၍ အကဲျဖတ္မႈမ်ား ေဆာင္ရြက္သည္။
စည္းကမ္းပုိင္းဆုိင္ရာ လုပ္ငန္းစဥ္သည္ အခ်ိန္သတ္မွတ္ခ်က္ႏွင့္အေၾကာင္းအရာမ်ား တိက်ရပါမည္။
အကဲျဖတ္ခ်က္မ်ားျပဳလုပ္သည့္ အဆင့္တုိင္းတြင္ အတည္ျပဳျခင္းလုပ္ငန္းစဥ္အပါအ၀င္ အျခားေသာ လုိအပ္ခ်က္မ်ားႏွင့္ စပ္လ်ဥ္းသည့္ ကိစၥရပ္မ်ားသည္ရွင္းလင္းမႈရိွရမည္။
နိဂံုးခ်ဳပ္
Naypyitaw workshop July 16 1218 July 2016
Recommended