PROFILE OF THE BUILDING
Building facts
•Prime location NH8
•Green Building
•Fresh air throughout the building thru the ventilation units attached to the AC’s , cross air ventilated building
•Power backup
•Four side open building
• Terrace anti aircraft light
•CCTV Cameras at prime locations
•The flooring carpets are anti static carpets
• Plantation
• Glass Mosaic tiles
• Safety glass all through the building
Ground Floor
GROUND floor
• 3 Cabins
• 2 Training Rooms
• 1 CCTV Room
• 1 Production Hall
• 3 Washrooms
• 1 Cafeteria
Ground floor Total AC Unit Capacity : 70 tons
Reception:5.5 Tons : Voltas
Cafeteria :27 Tons : Carrier and LG
Training Center :9.5 Tons : Carrier
Production Area and Storage Area : 22 Tons : Blue
Star
Individual Units : 6 Tons : Carrier and Samsung
PANELS
• 2 Fire Hydrant stations
1 Notifier Fire control panel
1 Ground Floor Panel 400 Amperes
First floor
• 13 Cabin
• 26 Cubical
• 188 Workstation
• 5 Meeting Room
• 2 Server Room
• 3 Washrooms
First floor
AC Units
•Total AC packaged unit : 68 Tonnes : Voltas
• Individual AC units : 12 Tonnes :Diakin
Panels :
• 2 Fire hydrant station
• 1 First floor panel 200 amperes
Second floor
• 22 Cabins
• 35 Cubicals
• 144 Workstation
• 3 Meeting Room
• 1 Server Room
• 3 Washrooms
Second Floor
AC Units ;
•Total Package Unit : 66 Tons : Voltas
• Individual Units : 24.5 Tons: Carrier /Diakin
Panels
• 2 fire hydrant station
•MDB UPS panel 125 ampere
•Server room control UPS panel 125 ampere
• Research and development panel 100 ampere
THIRD FLOOR
•21 Cabins
• 31 Cubicles
• 60 Workstations
• 1 Meeting Room
• 1 Board Room
• 1 Auditorium
• 1 Server Room
•1 Pantry Directors Area
• 3 Washrooms
• 2 Director Washroom
Third Floor
AC Units :
•Total Package Unit : 68 tons : Voltas
• Individual Units : 23.5 Tons : Diakin /Carrier/Toshiba
Panels :
• 2 Fire hydrant station
•Third floor UPS panel :125 ampere
•Electrical panel : 200 amperes
•Lighting Panel : 125 Amperes
Terrace
Panels :
• 2 Cooling Towers : 165 TR : Case /Asian
• 1 Cooling Tower Pump Room
• 1 Lift room
• 2 Fresh Air Unit
• 2 Exhaust fan unit
Outer AREa ( GF )
Panels :
•HT Meter Room
•HT Panel Rooms
•STP Plant : 50 KLD
•Isolator Panel: 2000 AMPERE
•POLE LIGHTS 39
•RAMP SHUTTERS -2
•PUMP ROOM
•DG SETS
•DIESEL TANK YARD :40000 KLD
Basement •LT PANEL -1 (2000 KVA)
• VENTILATION PANEL -1(250 AMPERE)
• NEW UPS PANEL -1 (100 AMPERE)
• UPS BYPASS CHANGEOVER PANEL -5 (100 AMPERE EACH )
• AC PANE L-1(630 AMPERE)
• ADDITIONAL AC PANEL – 1(250 AMPERE )
• UNIVERSAL TRANSFORMER CONTROL PANEL(RTCC )
• CAPACITOR PANEL -1 (400 AMPERES )
• BLOWER-2(18.5 KW AND 7.5KW)
• FIRE HYDRANT STATION -2
• APC UPS -4 (30 KVA ) WITH 32 BATTERIES EACH OF 65 AH
• APC UPS -3 (40 KVA ) WITH 64 BATTERIES EACH OF 26 AH