Why us?
Smarter Network SolutionsWe are driven by our core purpose and values…
We understand the environment …
Demand Drivers for Transmission
PM vision “Power for all”
UDAY Scheme
Increasing focus on Renewables
Congestion in top 200 cities
“Planning before demand”
We solve the unmet needs of our customers…
Utilities need “Transmission as a service” model
Existing EPC contractor unable to meet above customer need
Over 7,00,000 Cr debt taken by State utilities
We will build in record time
Leverage Technology
Impeccable Project execution
We will deliver in just 6 months
against 36 months
Offer Re-conductoring as a solution
Utilities will be happy to share unlock
value with solution provider
Live line technologies not available in
India
NO MONEY NO TIME NO SPACE
Sterlite Power has presence across transmission value chain…Sterlite Power has developed end to end capability through three business lines — Products, Solutions and Power Transmission Infrastructure development.
PRODUCT
• Overhead Transmission conductors• Underground HV/EHV Cables• OPGW• Hardware & Fittings
• Transmission Infrastructure development ~ 35 years BOOM Projects• ~$2.5 Bn. Capital Commitment
INFRASTRUCTURE DEVELOPMENT
• Uprating/uprating capacity• Integrated O/H & U/G T&D network
with communication capability• T&D Loss reduction
SOLUTIONS
We use technology across the life cycle of projects
• LiDAR for survey, design and engineering.• Use of Helicopter for Stringing of conductor and OPGW.• Use of Helicrane for Tower erection.• UAV(Drone) for Operation and Maintenance
Pre - Construction Construction Post - Construction