Top 10 Data Center Success Criteria

Preview:

Citation preview

#datacentersuccess

Top 10 Data Center Strategy Success Criteria Build, Buy, Colocation or Cloud? May 16, 2012

Randy Ortiz VP, Data Center Design and Engineering

#datacentersuccess #datacentersuccess

Agenda

What are your data center options?

Top ten criteria to analyze your needs

Why flexibility matters

Questions?

2

#datacentersuccess #datacentersuccess

Platform

Perf

orm

ance

Flexibility

to th

e E

nd u

ser

IT Vendor

IT Vendor

IT Vendor IT Vendor

IT Vendor

IT Vendor

IT Vendor

3 3

#datacentersuccess #datacentersuccess

Platform Flexibility

Performance to the End user

IP Connectivity • Enterprise IP • TCP Acceleration

Colocation

Hosting

Cloud

• Space, Power, Cooling •  Interconnection

• Managed Hosting • Dedicated Hosting

• Private Cloud • Public Cloud • Cloud Storage

Content Delivery Network • Media Delivery, Transparent

Caching, Mobile Delivery • Analytics

We live and breathe a full range of intelligent IT Infrastructure services

4

#datacentersuccess #datacentersuccess

What are my options?

5

#datacentersuccess #datacentersuccess

Where do I start? Where am I headed?

Internet start-ups tend to migrate toward more dedicated infrastructure

Build, Wholesale, Retail Data Center

Managed Hosting

Private Cloud

Public Cloud

Enterprises tend to migrate their infrastructure toward the cloud

6

#datacentersuccess #datacentersuccess

Four options: many considerations

Build your own data center

•  Time to market •  Capital

investment •  Capacity •  Security and

asset control •  Redundancy •  Core business

focus

Wholesale considerations

•  Consistently high-occupancy in large pods

•  Power and cooling cannot be scaled

•  Strong presence in key markets

•  Cash flow stability

•  Lower operating costs

•  Lower price points

Colocation considerations

•  Cost-effective alternative to build your own

•  Flexible footprint up to certain dimensions

•  Service level agreements

•  Reduce and eliminate costs

•  Meets compliance requirements

•  Customize your requirements

Cloud considerations

•  Scalability •  Zero provisioning

cost •  Reduction of IT

staff •  Availability of

cloud data centers

•  Overestimating your needs in the cloud

•  Does it meet compliance and security requirements

7

#datacentersuccess #datacentersuccess

Definitions

Generally, greenfield, brownfield and powered shells are traditional real estate models

Turn-key is the core wholesale model, but some wholesalers will offer real estate solutions

Colocation is the most basic retail data center model

Hosting/cloud matches demand most closely, but higher opex per unit

Real Estate Wholesale Retail

Greenfield Brownfield Powered

Shell Turn-key Colocation Hosting/Cloud Definition A grassy field An

unimproved building

An improved building

A data center An improved multi-tenant data center

Fully outsourced, no physical equipment

8

#datacentersuccess #datacentersuccess

Poll question

How will you handle demand for more Data Center Infrastructure over the next 12-18

months?

9

#datacentersuccess #datacentersuccess

Topic: Data center demand trends

Uptime Institute Symposium Survey: May 2012 “How will you handle demand for more Data Center Infrastructure over the next 12-18 months?”

10

10%

24% 29% 30%

42%

66%

Deploy Modular Solution

Lease Colocation

Space Build a New Data Center

Deploy to Cloud

Update Infrastructure

Consolidate Servers

#datacentersuccess #datacentersuccess

Top 10 Criteria to Analyze Your Needs

11

#datacentersuccess #datacentersuccess

1. Required availability: commonly known as the Uptime Institute’s Tier level

12

Have your carefully evaluated your availability needs to avoid over sizing and over designing your data

center?

The more available your site, the larger the expense.

#datacentersuccess #datacentersuccess

2. Anticipated day one loads and incremental growth

13

Do you know the power profile of your existing equipment and its longevity?

Track your IT equipment patterns.

#datacentersuccess #datacentersuccess

3. Location impacts

14

Can you rank what is most critical: close to headquarters, DR site, energy rates, power/cooling,

carrier diversity?

Decide on the most important factors.

#datacentersuccess #datacentersuccess

4. Design and construction consulting and vendor selection

15

How will you go about choosing a vendor/partner?

Selecting the correct team can make or break your project.

#datacentersuccess #datacentersuccess

Have you considered your variables for computing, facility and financial impacts?

5. Life cycle cost modeling

16

Data center lifecycles include many components.

-

0.5

1.0

1.5

2.0

2.5

3.0

3.5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

PUE

#datacentersuccess #datacentersuccess

6. Green evaluation to PUE

17

Have you quantified the costs associated with going green? What are your business requirements for this

certification?

It isn’t easy being green.

#datacentersuccess #datacentersuccess

7. Modular approach

18

What are your sizing needs now and later?

Build with the future in mind and allow for easy transitions.

#datacentersuccess #datacentersuccess

8. Staffing capabilities

19

Do you have the personnel needed to operate your facility?

Building a data center is complex.

#datacentersuccess #datacentersuccess

9. Budget analysis

20

Who makes these decisions? What about CAPEX vs. OPEX?

Corporate expectations and goals need to be aligned.

#datacentersuccess #datacentersuccess

10. Regulatory impact

21

Do you need to meet industry compliance requirements such as HIPAA or data center-specific

needs such as SOC?

Costs and time increase with specific regulatory specifications.

#datacentersuccess #datacentersuccess

Why Flexibility Matters

22

#datacentersuccess #datacentersuccess

Have a clear goal but be flexible in

how you achieve it.

Flexibility

Flexibility The Importance of

Money

Expertise

Risk

Speed

Regul- ations

23

#datacentersuccess #datacentersuccess

Questions?

www.internap.com #datacentersuccess

24

?