Objective and Scope

Regulating

Labour Factories

Areas cover

India J& K Also

Objective

Ensure safety measure

Promote health and welfare of

factory worker

Page 3: A brief on factory act

Applicability of factory Act

Factory Building

Precincts (A area

enclosed by walls)

Factory

If use power:10 or more worker

during any day.

If not use power:20 or more worker

during any day.

Page 4: A brief on factory act

• Mines• Unit of armed

forces• Railway running

shed• Eating places like

restaurants.Excludes

• Length of railway line

• Conversion of sea water into salt

• Seasonal factory like sugarcane.

Includes

Page 5: A brief on factory act

Who is worker ?

Pre conditionEmployer can control the work

as well as manner in which work to be done

Employee through some

agency

Are employee if there is contract

Independent directors or partner are not worker.

He should be work for

manufacturing but includes

People working in canteen

Munim in a factory

Remuneration not necessary,

includes

Apprentice

Honorary worker

Piece rate worker.

Charitable worker.

Page 6: A brief on factory act

Working Hours Year • 365 days

240 days • 1 leave allow for every 20 days/ 15 days (if child)

10 days • Compulsory 1 day leave

7 days • Minimum 1 day leave

48 Hrs • Maximum working hrs in a week

9 Hrs • Maximum W. Hrs for a day, after it O.T.

5 Hrs• Continuous working hours a time, after

that minimum half hr break needed.

Page 7: A brief on factory act

Officer for factories Act

CG State Govt.

If > 1000 workerSafety Officer

If > 500 workerWelfare officer & Ambulance

If > 250 workerCanteen Facility

For every 150 worker, First aid required.

Rest room & lunch room

For every 30 woman workerRoom for child below six month

Page 8: A brief on factory act

NOTICES

Inspector under

factories Act

(District Magistrate)

Occupier (director if Company)

Manager Appoints

Use of premises as a factory

Within 7 days

Before 15 days, in case of resumption of seasonal factory – 30 days

Application for extension

Including state Govt

for extensionCase 1: Approval not granted, deemed granted after 3 months

Case 2: application rejected, can file appeal within 30 days

Page 9: A brief on factory act

AGE UNDER FACTORIES ACT

18 Yrs15 Yrs14 Yrs

Between 15 to 18 called

Adolescent

Adult

Child

Not allow to work before

14 YrsPenalty Rs.

1,000/-

Needs to provide certificate of fitness

(valid for 12 M)By certifying surgeon

Max W. hrs 4.5 Hrs(if provided wrong penalty Rs 1000 +

2Month)

Page 10: A brief on factory act

Maintenance of factory

Washing of floor

Once in week

Colour wash

In every 14 months

All wooden shall be paint

In every 5 Yrs.

Drinking water

Within 6 meter of washing

place, urinals

Hoists & Lifts should be examined

Once in 6 month

Lifting machines,

chains should be examined

Once in 12 month

Page 11: A brief on factory act

Minimum requirement to

follow

Maximum voltage of portable

electronic device inside chamber,

pipe, flue etc

24 Volts

Page 12: A brief on factory act

Site Appraisal Committees

Chairman

Chief inspector of state

Who can not be member

MCA member

Member

1- Department of environment

2- Metrological department

3- Town planning department

Responsible for

Hazardous substance

Make recommendation

to state

Within 90 days

Occupier needs to intimate for

hazardous

Within 30 days

Page 13: A brief on factory act

Inquiry Committee

• Advisory in nature

• One chairman and two member

• Central Government

Power to appoint Inquiry

CommitteeConstitution

Nature of recommendation

Page 14: A brief on factory act