On the following investment projects, the following can be contacted: Bauyrzhan Kudebayev, Director, Kudebay Invest and Trade LLC, +7 7172 48 67 93, [email protected] Nurgali Arystanov, Counselor, Embassy of Kazakhstan, [email protected] Kaisar Kopish, Economic Officer, Embassy of Kazakhstan, [email protected] Construction of plant for deep processing of meat and the creation of an irrigation system in the area of 700 hectares Applicant: LLC «Shalabai» The purpose and concept of the project are: Production modernization, creation of a stable food supply for the cattle breeding and production of competitive meat products. Period of realization: 2016-2020 Place of realization: EKR, Zharma rayon, Shalabai village. Current state: For irrigating 700 hectares of arable land on the river Kyzyl-Su is built reservoir capacity of 650-700tys.m3. project documentation for the construction of plant for meat processing is developed. Total cost of project: 5 500 million tenge Required investments: 5 500 million tenge (15.1 million USD) Government support: 1. Subsidies of interest rates on loans, and leasing of technological equipment and agricultural machinery; 2. Subsidies to implement irrigation system; 3. Subsidies for feed production (seeds, fuels and lubricants, herbicides, fertilizers), and the delivery of water; 4. Subsidies for meat production. Expected Result: Production of 200 tons per year of premium beef and

East Kazakhstan Investment Projects

Embed Size (px)

Citation preview

Page 1: East Kazakhstan Investment Projects

On the following investment projects, the following can be contacted:

Bauyrzhan Kudebayev, Director, Kudebay Invest and Trade LLC, +7 7172

48 67 93, [email protected]

Nurgali Arystanov, Counselor, Embassy of Kazakhstan,

[email protected]

Kaisar Kopish, Economic Officer, Embassy of Kazakhstan,

[email protected]

Construction of plant for deep processing of meat and the creation of an

irrigation system in the area of 700 hectares

Applicant: LLC «Shalabai»

The purpose and concept of the project are:

Production modernization, creation of a stable food

supply for the cattle breeding and production of

competitive meat products.

Period of realization: 2016-2020

Place of realization:

EKR, Zharma rayon, Shalabai village.

Current state: For irrigating 700 hectares of arable land on the river

Kyzyl-Su is built reservoir capacity of 650-700tys.m3.

project documentation for the construction of plant for

meat processing is developed.

Total cost of project: 5 500 million tenge

Required investments: 5 500 million tenge (15.1 million USD)

Government support: 1. Subsidies of interest rates on loans, and leasing of

technological equipment and agricultural machinery;

2. Subsidies to implement irrigation system;

3. Subsidies for feed production (seeds, fuels and

lubricants, herbicides, fertilizers), and the delivery of

water;

4. Subsidies for meat production.

Expected Result: Production of 200 tons per year of premium beef and

Page 2: East Kazakhstan Investment Projects

canned meat products

Workplaces 30 persons

Construction of oil processing of oilseeds crops

Applicant: LLC «EastAroKholding»

The purpose and concept of the project are:

production and sale of its oil in the region

Period of realization: 2016-2020 years

Place of realization: EKR, Ust-Kamenogorsk city

Current state There is an engineering infrastructure, where develop

design documentation.

Total cost of project: 900 million tenge

Required investments: 600 million tenge (163k USD)

Government support Subsidized of interest rates on loans, and leasing of

technological equipment and agricultural machinery;

Expected Result: Production annual 16,900 tons of sunflower oil, 15

600 tonnes of sunflower meal.

Workplaces 47 persons

Page 3: East Kazakhstan Investment Projects

Growing and processing of artichoke to produce granular concentrated feed,

bioethanol and monosugars

Applicant: LCC «Zelenstroi KZ»

The purpose and concept of the project are:

creation of a modern agricultural holding for

breeding and deep processing of complex technical

and forage crops

Period of realization: 2016 2018 years

Place of realization: EKR, Ust-Kamenogorsk

Current state There are 1600 hectares of land. Also all the

necessary engineering and transport communications

are available. Business plan.

Total cost of project: 400 million tenge

Required investments: 320 million tenge (876k USD)

Government support subsidies for feed production (seeds, fuels and

lubricants, herbicides, fertilizers).

Expected Result: The annual production of up to 37,000 granulated

concentrated feed, bioethanol and monosugars.

Workplaces: 220 persons

Page 4: East Kazakhstan Investment Projects

Construction corn-treacle factory

Applicant: «Bota» farm

The purpose and concept of the project are: processing of corn starch release and other

products for sale on the territory of the region and

outside.

Period of realization: 2016 2018 years

Place of realization EKR, Zaisan

Current state:

There are 1500 hectares of land. Develop a

business plan, feasibility study for the project.

Total cost of project: 2 500 million tenge

Required investments: 1 800 million tenge (4.9 million USD)

Government support 1. Subsidized of interest rates on loans, and

leasing of technological equipment and

agricultural machinery;

2. Subsidies for crop production (seeds, fuels and

lubricants, herbicides, fertilizers).

Expected Result:

Production per day 70 tons of starch.

Workplaces: 60 persons

Page 5: East Kazakhstan Investment Projects

Construction of plant for packing the honey

Applicant: CH "Paseka"

The purpose and concept of the project: Increasing production and sales volumes in the

region and the Republic of honey products.

Period of realization: 2016

Project location: East Kazakhstan region, Ust-

Kamenogorsk city, Menovnoe village

Current Status: The construction of the plant and are maintained

interior finishing work. It is considering the

issue of the supply of equipment to suppliers.

Total project cost:

360 million tenge

Required investments:

140 million tenge for the purchase of

equipment. (838k USD)

Government support:

Subsidizing interest rates on loans, and leasing

of technological equipment and agricultural

machinery.

Expected Result:

The annual production of up to 1,000 ton of

honey products.

Job Creation:

15 persons

Page 6: East Kazakhstan Investment Projects

Construction of ethno-ecological agricultural tourism and recreation сentre

Applicant: SP "Kanapyanov"

The purpose and concept of the project: the

development of agricultural tourism

Period of realization: 2016-2017 years

Project location: East Kazakhstan region, Ulan

district, Kobayashi Utepov village

Current status: Available land of 580 hectares. The project is

under development

Total project cost: 370 million tenge

Required investments: 300 million tenge for the construction of the base,

a cafe, stables (821k USD)

Expected Result: restoration of the destroyed ethno-village of

Kush-Birlik with a single capacity of 60 persons

Job Creation: 11 persons

Page 7: East Kazakhstan Investment Projects

Construction of a hothouse complex

Applicant: LLP "Alzhan AGROTRADE"

The purpose and concept of the project: Growing vegetable crops using advanced

technologies.

Period of realization: 2016-2017 years

Project location: East Kazakhstan region,

Ust-Kamenogorsk city

Current status: There is a 2.2 hectare plot of land in the area of

New Sogra. The necessary infrastructure is

lacking. PSD does not. There is a business plan.

The total cost of the project: 1 350 mln. tenge

Required investments: 1 350 mln. tenge (3.7 million USD)

State support:

1. Wrap the missing infrastructure on the

program "Business Road Map-2020";

2. Subsidize interest rates on loans, and leasing

of technological equipment and agricultural

machinery;

3. Investment subsidies for the construction and

expansion of the greenhouse complex.

Output expected: Annual production of

vegetables and 550 tons of cucumbers and 450

tons of tomatoes.

Job Creation:

40 persons

Organization of the production of wood products

Page 8: East Kazakhstan Investment Projects

Applicant: "Tsykunov AA" IB

The purpose and concept of the project: Procurement of raw materials for the wood

production and the further processing.

Implementation period: 2016-2017

Project location: EKR, Ridder city

Current status: - At the design stage

Total project cost: 750.0 million tenge

Required investments: 720.0 million tenge

(1.9 million USD)

The State Support

Expected result

1. Summing missing infrastructure by the program

"Business Road Map-2020";

2. Preferences in according by the Law of the

Republic of Kazakhstan "On Investments";

3. Different measures of financial and nonfinancial

state support and business development services,

business support for the "Road Map of Business-

2020".

The final product (the number of ton per year):

- Cutting board - 10,000 m3; - Dry timber - 1350 m3;

- Laminated veneer lumber for housing - 1200m3; -

glulam for manufacturing euro windows - 1200m3; -

Round logs for log cabins - 10000m3; - wooden

doors

Creating jobs 60 persons

###