Henry Fahman, PHI Group delivered the presentation at IMM’s 2014 Kalimantan Coal Conference. The IMM’s Kalimantan Coal Conference brings together 120+ senior executives, decision makers from government, mining, infrastructure, shipping and supply sectors to discuss new policies and strategies for tackling the current and emerging issues within the burgeoning Kalimantan coal sector. For more information about the event, please visit: http://www.immevents.com/kalicoalconference13
Citation preview
2ND ANNUAL KALIMANTAN
COAL CONFERENCE
From coal mining to
power generation
September 4-5, 2013
Established June 1982
Trading Symbol: PHIL
SAFE-HARBOR LANGUAGE
- This presentation may contain forward-looking information within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended (the "Exchange Act"), including statements regarding potential sales, the success of the company's business, as well as statements that include the word "believe" or similar expressions. - Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of PHI Group, Inc. to differ materially from those implied or expressed by such forward-looking statements. Such factors include, among others, the risk factors included in reports filed with the SEC under the Exchange Act. - This presentation speaks as of the date first set forth above and PHI Group, Inc. assumes no responsibility to update the information included herein for events occurring after the date hereof. Actual results could differ materially from those anticipated due to factors such as the lack of capital, timely development of products and services, inability to deliver products and services when promised, inability of potential customers to pay for ordered products and services, and political and economic risks inherent in international trade.
Established June 1982
Trading Symbol: PHIL
Established June 1982
! A Nevada (US) corporation
! Founded: June 1982
! Publicly traded: PHIL
! Authorized capital:
- 300 million shares common stock.
- 100 million shares preferred stock.
- Common stock I/O :12,075,017 shares
- Total I/O expected to increase following
acquisitions.
! Business focus:
Energy and Natural Resources.
Trading Symbol: PHIL
Established June 1982
A. DOUBLE-TRACKED ENERGY STRATEGY:
I. CONVENTIONAL ENERGY:
1. Acquisition of energy assets, Joint Operations, J.V. s
2. Independent Power Plant Development
3. Carbon Capture and Storage
II. RENEWABLE ENERGY:
1. Wind power, Airborne wind turbine (AWT)
2. Hydro-magnetic wave system, etc.
B. NATURAL RESOURCES:
Gold, copper, limestone, agricultural
C. TRADING ACTIVITY:
Coal, oil products, LNG, gold, gems, etc.
D. SPECIAL SITUATIONS
Petrobras bonds, Brazil
Trading Symbol: PHIL
Established June 1982
Trading Symbol: PHIL
Source: Global Sun Wind & Power Corp., NV, U.S.A. (helicoptering mechanism)
Established June 1982
Trading Symbol: PHIL
Systems installed in 12 countries – Source GSWP, Neveda, USA
Established June 1982
Trading Symbol: PHIL
AWT system: lower mass, lower capital cost ($US1/Watt) – Source Makani Power, Inc.
Established June 1982
Trading Symbol: PHIL
Makani Power AWT system – Source Makani Power, Inc.
Established June 1982
Trading Symbol: PHIL
Wave Pump: Power = Water pressure * water volume per minute - Source GDS, USA .
Established June 1982
Trading Symbol: PHIL
EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEssssssssstttttttttttaaaaaaaaaaaaaaaaaaabbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbllllllllllllllllllllllllllliiiiiiiiiiiiiiiiiiiiiiiiiiiisssssshhhhhhhhhhhhhhhhhhhhhhheeeeeedddddddddddd JJJJJJJJJJJuuuuuuuuuuuuuunnnnnnnnneeeee 1111119999999999888888222222
Hydro-magnetic gravitational wave system – Source GDS, Conroe, Texas, USA.
Established June 1982
Trading Symbol: PHIL
EEEEEEEEEEEEssssssssssttttttttttaaaaaaaaaaaaaaaaaabbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbllllllllllllllllllllllllllllllllllllllllllllllliiiiiiiiiiiiiiiiissssssssssshhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhheeeeeeeeeeeeedddddddddddddddddddddddddddddddddddddddddddddd JJJJJJJJJJJJJJJJJuuuuuuuuuuuuuuuuuuuuune 1982
POPDICE CO2 extraction and capture design – Source Oceanoco, Inc., USA.
Established June 1982
Trading Symbol: PHIL
FROM MINING TO POWER GENERATION
THE RATIONALE
PURPOSE: To participate in and contribute
towards providing sustainable solutions to the
global energy demand.
CRITERIA: - Points of entry in value chain that
can create/add most value.
- Synergistic relationships to
improve effectiveness and efficiency.
- Maximizing applications of
technological advances.
REASONS: - Growing energy demand.
- Environmental concerns.
Established June 1982
Trading Symbol: PHIL
Key findings - International Energy Outlook 2013 Courtesy US Energy Information Administration
" With world GDP rising by 3.6 percent per year, world energy use will
grow by 56 percent between 2010 and 2040. Half of the increase is
attributed to China and India.
" Coal grows faster than petroleum consumption until after 2030,
mostly due to increases in China s consumption of coal, and slow
growth in oil demand in OECD member countries.
" Renewable energy and nuclear power are the world s fastest-
growing energy sources, each increasing by 2.5 percent per year;
however, fossil fuels continue to supply almost 80 percent of world
energy use through 2040.
" Natural gas is the fastest growing fossil fuel in the outlook,
supported by increasing supplies of shale gas, particularly in the United
States.
" Given current policies and regulations, worldwide energy-related
carbon dioxide emissions are projected to increase 46 percent by 2040,
reaching 45 billion metric tons in 2040.
Established June 1982
Trading Symbol: PHIL
EEEEEEEEEEEEEEEEEEEEEEEEEEEEsssssssssssssssssssssssssssssttttttttttttttttttttttttaaaaaaaaaaaaaaaabbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbblllllllllllllllllllllllllliiiiiiiiiiiiissshhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhheeeeeeeeeeeeeeeeeeeedddddddddddddddddddddddddddddddddddddddd JJJJJJJJJJJJJJJJJJJJJJJJJJJJJuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnneeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee 11111111111111111111111111111111111111111111111111119999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999888888888888888888888888888888888888888888888888888888888888888882
Courtesy US Energy Information Administration
Established June 1982
Trading Symbol: PHIL
Esttttttttttttttttttttaaaaaaaaaaaaaaaaaaaaaaaaaaaaaabbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbblllllllllllllllllllllllllllllllllllllliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiisssssssssssssssssssssssssssshed June 1982Courtesy US Energy Information Administration
Established June 1982
Trading Symbol: PHIL
Established June 1982
Trading Symbol: PHIL
EEEEEEEEEEEEEEEEEEEEEEEEEEEEEstabbbbbbbllllllllllllllllllllllllllllllllllllllllllllliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiisssssssssssssssssssssssssssssssssssssssssssssssssssssssshhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhheeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd JJune 1982
Courtesy US Energy Information Administration
ENERGY-RELATED CO2 EMISSIONS
!"#$%&$'()$*+%,)-').$/0-+)12)$/0$)3/22/%02$4)'5))0$0%5$6$7898$-%3)2$&+%3$0%0:;<=>$
-%?0'+/)2$@$'(+)):A?1+')+2$&+%3$=(/01B$C0./1$6$'()$D/..E)$<12'$1E%0)$@$F%?+-)$C<G$
!"
#"
$!"
$#"
%!"
%#"
&!"
&#"
'!"
'#"
$()!" $((!" %!!!" %!$!" %!%!" %!&!"
*+,-./0012"
30.140-5/0-6"7-4+01"890:142"-0;"-<+-5/0"
=/0>?@AB">",-2"
=/0>?@AB">"/+6"
=/0>?@AB">"C/-6"
?@AB">",-2"
?@AB">"/+6"
?@AB">"C/-6"
Established June 1982
Trading Symbol: PHIL
EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEssssstttttttaaaaabbbbbbbblllliiiisssshhhheeeedddddddddddddddd JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnneeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222Existing Indonesian coal-fired power plants currently in operation – Courtesy PLN
Established June 1982
Trading Symbol: PHIL
EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEsssssssssssssssssssssssstttttttttttttttttttttttttaaaaaaaaaaaaabbbbbbbbbbbbbbbbbbblllllllllllliiiiiiisssssssssshhhhhheeeedddddddddd JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnneeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111199999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888822222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222
Additional coal-fired power plants by end of 2013 (PLN & IPP) – Courtsey PLN
Established June 1982
Trading Symbol: PHIL
Indonesian Fast Track Project Phase II - 10,000 MW
# PLN: 26 Projects; 3,757 MW (37%)
Coal-fired PP: 8 projects, 1,804 MW
Coal-gas PP: 8 projects, 64 MW
# IPP: 72 Projects; 6,290 MW (63%)
Coal-fired PP: 19 projects, 1,221 MW
Source: Indonesian MoEMR, Reg. No 01/2012
Established June 1982
Trading Symbol: PHIL
Established June 1982
Vietnam power demand forecast Courtesy Electricity of Vietnam, 4th VietPower Summit
Established June 1982
Trading Symbol: PHIL
Vietnam s aggregate energy production projection - 2030 Courtesy Electricity of Vietnam, 4th VietPower Summit
Vietnam s investment in coal power generation to 2030
" Currently in operation: 13 coal-fired plants,
6,746 MW
" 2020: 36,000 MW, to produce 156 Billion kWh and
consume 67.3 million MT of coal.
" 2030: 75,000 MW, to produce 397 Billion kWh and
consume 171 million MT of coal.
(Decision No.1208/QD-TTg, July 21, 2011 of the Prime Minister, Vietnam)
Established June 1982
Trading Symbol: PHIL
Established June 1982
Trading Symbol: PHIL
TOTAL DEMAND OF COAL FOR VIETNAM S DOMESTIC
MARKET
# 2015: 56.2 million tons.
# 2020: 112.4 million tons.
# 2025: 145.5 million tons.
# 2030: 220.3 million tons. Courtesy MOIT - Vinacomin, 4th VietPower Summit
VIETNAM S DEMAND OF COAL FOR POWER GENERATION (basic plan)
# 2015: 33.6 million tons.
# 2020: 82.8 million tons.
# 2025: 112.7 million tons.
# 2030: 181.3 million tons.
Courtesy MOIT - Vinacomin, 4th VietPower Summit
Established June 1982
Trading Symbol: PHIL
VIETNAM S COAL RESOURCES: - Total 48.7 BMT (measured and indicated 2.75 BMT:
6%; inferred & prognostic resources: 94%
- Northeast area: 8.7 BMT (anthracite).
- Red River Delta Coal Basin: 39.3 BMT (sub-bituminous).
- Some anthracite and fat coal deposits in Northern provinces
and peat in Mekong Delta.
- Production projections (Vinacomin): 2010: 47.5 million MT; 2015: 64.7 million MT; 2020: 74.6 million MT; 2025: 82 million
MT. Courtesy MOIT - Vinacomin, 4th VietPower Summit
Established June 1982
Trading Symbol: PHIL
VIETNAM S COAL EXPORTS:
# Reduced from 24.8 MMT in 2007 to 17 MMT in
2011.
# High quality coal to EU, Japan, Korea, Taiwan and
India.
# Continued reduction ahead: 2012 (14.5MMT), 2013
(11.5MMT), 2014 (9.5 MMT), 2015 (4 MMT).
# Vinacomin plans to maintain 4-6 MMT/year of high
quality coal exports. Courtesy MOIT - Vinacomin, 4th VietPower Summit
Established June 1982
Trading Symbol: PHIL
VIETNAM S COAL EXPORTS - Courtesy MOIT – Vinacomin
Established June 1982
Trading Symbol: PHIL
- Courtesy MOIT – Vinacomin
Established June 1982
Trading Symbol: PHIL
Vietnam's coal import for power plants through 2030 - Courtesy EVN, 4th VietPower Summit, 2013
Established June 1982
Trading Symbol: PHIL
COAL MINING DEVELOPMENT AND EXECUTION PLAN
# Building a portfolio of energy assets via acquisitions of
concessions, joint operations, and joint ventures in Indonesia,
Australia, and North America.
# Engaging local partners and fostering long-term value creation.
# Engaging industry experts to assist in due diligence review:
technical, legal, financial, environmental, social.
# Utilizing services of established mining contractors for
production and operation.
# Funding acquisitions and operations through public capital
markets, private equity, institutional investors, and strategic
alliances.
# Emphasizing sale and marketing through long-term relationships
with end-users.
Established June 1982
Trading Symbol: PHIL
COAL MINING DEVELOPMENT PROGRESS # At various stages: the Company has entered into preliminary and
definitive agreements with a number of opportunities in Sumatra,
Kalimantan, and West Sulawesi and has identified and investigated
other prospects in Australia and North America .
# Establishing relationships with international mining consultants
and mining contractors that can undertake various projects.
# Having worked closely with investment bankers and institutional
investors in North America, Europe, and Asia that participate in
energy and mining projects of various scales.
# Building a network of buyers, end users, and trading companies
that deal with coal and other energy commodities.
# Cooperating with industry experts and government agencies with
regard to policy making and implementation.
# Investigating and engaging advanced technologies to provide
better solutions for conventional energy and renewables.
Established June 1982
Trading Symbol: PHIL
IPP DEVELOPMENT AND EXECUTION PLAN
# Identifying and investigating opportunities for IPP development.
# Engaging qualified local and international partners.
# Selecting projects for development.
# Engaging domain experts for related disciplines.
# Providing and/or arranging capital.
# Providing and/or arranging technologies and technical services.
# Retaining equity interest in projects
# Committing secured supply for IPP s via proprietary coal mining.
# Participating in oversight of EPC activities.
# Promoting POPDICE technology for CO2 capture.
Established June 1982
Trading Symbol: PHIL
IPP DEVELOPMENT PROGRESS # Identifying and investigating opportunities for development of
coal-fired power plants and wind power projects in Vietnam, Africa,
and Honduras together with our partners.
# Engaging three Vietnamese companies and a dozen international
partners in various disciplines related to power generation (Pacific
Energy Network, SNC Lavalin, Cross Border Ventures, McNally
Bharat, GE, Harbin Bofa, EGAT, Global Sun Wind & Power, etc.)
# Selecting and reviewing projects for imminent development.
# Working with Vietnamese MOIT to select 2nd-phase projects.
# Cooperating with institutional investors, strategic alliance, and
government agencies to arrange capital for projects.
# Ensuring availability of necessary technologies and technical
services as needed through international partners .
# Preparing to commit supply for IPP s future usage when needed.
Established June 1982
Trading Symbol: PHIL
CHALLENGES IN COAL MINING AND IPP DEVELOPMENT
# Regulatory uncertainties.
# Finding good projects and right local partners.
# Securing adequate, timely and appropriate capital.
# Engaging optimum international partners and suppliers.
# Learning curve associated with new market entry.
# Building sustainable competitive advantage.
# Managing expectations of all stakeholders.
Established June 1982
Trading Symbol: PHIL
LESSONS LEARNED AND CLOSING THOUGHTS
# Take the long view.
# Be patient and keep learning.
# Mind the economics.
# Build long-term relationships.
# Take advantage of technological advances.
# Strive for a greener planet.
# Be a change agent (keep trying).
Established June 1982
Trading Symbol: PHIL
THANK YOU!
Contact info:
Henry Fahman
Tel: +1-714-642-0571
Email: [email protected]
Website: www.phigroupinc.com