SPE Applied Technology Workshop (ATW) “Integrated Project Management: Innovative Approaches for a New Era ” 25 – 28 March 2012 ● Phuket, Thailand Project Planning – Challenging the Limits By Harjono Zainal Abidin, Syed Mohd Alwi & Sharazain Noordin 1 PMO INTEGRATED OPERATIONS (IO) FOR E&P By Harjono Zainal Abidin, Syed Mohd Alwi & Sharazain Noordin Oil & Gas Business Systems Group MESINIAGA BHD

Integrated Operations io-PMO

Embed Size (px)

DESCRIPTION

Integrated Operations for Oil & Gas Industry using a Project Management Office concept to simplify work processes & data management by Harjono Zainal Abidin, Syed Mohd Alwi & Ramly Khairuddin - Subject Matter Experts at MESINIAGA Bhd - Presented at SPE Applied Technology Workshop 27 March 2012.

Citation preview

Page 1: Integrated Operations io-PMO

SPE Applied Technology Workshop (ATW)“Integrated Project Management: Innovative Approaches for a New Era ”

25 – 28 March 2012 ● Phuket, Thailand

Project Planning – Challenging the Limits

By Harjono Zainal Abidin, Syed Mohd Alwi & Sharazain Noordin

1

PMO INTEGRATED OPERATIONS (IO) FOR E&P

By Harjono Zainal Abidin, Syed Mohd Alwi & Sharazain Noordin

Oil & Gas Business Systems Group

MESINIAGA BHD

Page 2: Integrated Operations io-PMO

THIS CASE STUDY:

Business model

� NewCo E&P

– Multi-party JV

� Marginal Oilfield

– RSC

Project Environment

RISKS?

Volatile market

$

Oil price?

� Fast-track to production

– 12 months?

2

What’s different with:

� Oldco E&P

� PSC Shallow/Deepwater

� Development …

� 5 or 10 Years to production

$

Currency?

Page 3: Integrated Operations io-PMO

Adopt

Program & Project Management

Applied to:

Exploration & Production

Oil/Gas field Development

By NewCo operator

P2M

PROGRAM

MANAGER

Key Issues:

� People!

– Organization & Structure

– Leadership & Teamwork

� Process!

– Planning, Monitor & Control

– Contracts & Procurement

� Technology?

PROJECT

MANAGER

Production

PROJECT

MANAGER

Development

PROJECT

MANAGER

Exploration

Silo’s?

Page 4: Integrated Operations io-PMO

Program Manager’s Point of View

PROJECT

A

PROJECT

B

PROJECT

C

4

Code CONTROL METRICS A B C

Scope OK OK X

Time X OK X

Cost OK OK X

Page 5: Integrated Operations io-PMO

JOB NO SCOPE START END COST 1 2 3 4 5 6 7 8 9

PROJECT A $

Geological Data $

Field Dev Plan $

Drilling $

PROJECT B

Conceptual Eng

Detailed Engineering $

Procurement $

PROJECT B $

Fabrication $

MASTER PLAN Level 1 Program

FORECAST

Potential delay!

Fabrication $

Platform A $

Platform B $

Platform C $

Installation $

PROJECT C $

Production $

1st Oil

5

Page 6: Integrated Operations io-PMO

P2M

Project Manager’s Point of View

EXECUTE

PROJECT LIFECYCLE

6

INITIATE

PLAN

EXECUTE

CLOSE

TIME

RE

SOU

RC

ES

Project

Charter

Archive

Project

Documents

Accept

Project

Deliverables

Project

Management

Plan

Project

Data

CONTROL

Metrics

Page 7: Integrated Operations io-PMO

JOB NO SCOPE START END COST 1 2 3 4 5 6 7 8 9

INITIATION

Geological Data $

Field Dev Plan $

Drilling $

PLANNING

Engineering $

Procurement $

EXECUTION

Fabrication $

MASTER PLAN Level 2 - 3 Project

Project Data

Granularity

Level 4 – 5?

How to manipulate data

& forecast

performance?

Platform A $

Platform B $

Platform C $

Installation $

Hook-up &

Commissioning

$

Handover to

production

$

CLOSE-OUT

Review As-Builts $

Archive $

7

Page 8: Integrated Operations io-PMO

IO Data Framework

MASTER PLAN

Based on contractual commitments

CONTRACT DOCS

Purchase orders

DATA:Drawings

3D

8

3D

2D

SPECIFICATIONS

PROCEDURES

Vendor Data

Progress Reports

Daily

Monthly

Quarterly

Forecasts!

Page 9: Integrated Operations io-PMO

IO Contractual Framework

MONITOR & CONTROL IN DETAIL!

Level 1

Owner

Level 2

Consultants

Design & Construction

Engineering

Sta

nd

ard

Pro

ject

Co

ntr

act

Tota

l Pro

ject

Co

ntr

act

Eco

-sys

tem

In Reality Fast-Tracking requires

Command & Control!Fast-tracking has performance limits!

Impact on Safety …

Steep

9

Engineering

Level 3

Contractors

Specialized Vendors

Level 4

Sub-contractors

Level 5

Vendors/Suppliers

Sta

nd

ard

Pro

ject

Co

ntr

act

Tota

l Pro

ject

Co

ntr

act

Eco

Steep

Progress

S-curves

indicate

likelihood of

Safety

incidents

Page 10: Integrated Operations io-PMO

Program Management Office

1. People

2. Process

3. Technology

Real time Info - Structure

IO Program Management Office…

Legal

Project

ManagerEXPLORATION

FinanceCloud

Computing

Key Features

� Collaboration

� Communication

� Data Management

– Automation

– Process Orchestration

– Analytics

• Trending/Data Mining

10

PMO

EXPLORATION

Project

ManagerDEVLOPMENT

Project

ManagerPRODUCTION

Contracts

Procurement

SAFETY