39

lpr ppt june2011

Embed Size (px)

DESCRIPTION

CONDO FOR SALE IN AFFORDABLE PRICE.5% DOWNPAYMENT"LIPAT AGAD"HURRY AVAIL NOW!!!BEFORE PRICE INCREASE...CONTACT:09054288516 OR EMAIL@ [email protected]

Citation preview

Page 1: lpr ppt june2011
Page 2: lpr ppt june2011

Project Overview• The community that nurtures nature in urban living, Lions Park Residences that offers low-rise

condominium units, strategically located near commercial destinations, the Makati and Ortigas business districts as well as the new NAIA 3.

The lush surroundings of this urban community boast of amenities such as a multi-purpose hall, a landscaped park, a resort-type swimming pool and a playground complete with a fish pond and a butterfly garden.

It also has barbeque pits ideal for family picnics and commercial area for all your various personal needs.• Everything you need is just a few steps away from this environment-friendly community, feel secured and

at home as you choose from a Studio, 1-bedroom unit, 2-bedroom unit or 3 bedroom unit. Truly, Lions Park Residences is undoubtedly an excellent investment especially to OFWs and retirees who are looking for a place to stay or a home to retire in Manila.

• To address the needs of the home owners, the Quadrillion Property Management (QPMI), the property management team of Lions Park, offers leasing and professional management .

Realize your dream home today.

Page 3: lpr ppt june2011

Site Development Plan

W

S

N

E

Page 4: lpr ppt june2011
Page 5: lpr ppt june2011

Amenities

The Pavilion

Page 6: lpr ppt june2011

Amenities

Lap Pool & Kiddie Pool

Page 7: lpr ppt june2011

Amenities

Central Park

Koi Pond

Children’s Play area

Water Bubblers

Page 8: lpr ppt june2011

How to get there:

At Lions Park Residences, you will not

have to worry for everything is just a

few meters away. This lush community

is strategically located at Sta. Ana

Drive, Sun Valley, Parañaque City. It is

also accessibly situated near business

centers and transportation hubs, only

10-15 minutes to Makati CBD, 25-35

minutes to Ortigas CBD and 5 minutes

to the NAIA 2.

Page 9: lpr ppt june2011

Building Features

Elevated water tanks 24/7 water supply

Underground drainage & sewerage system

2.4 meter-wide corridors

2 meter-wide entrance

Elevator

Generator for common areas

Page 10: lpr ppt june2011

Affordability

Reservation fee starting at P15,000

As low as P10-15,000 monthly amortization

Flexible payment schemes

(down payment – payable up to 16 months; balance – payable up to 30 years through Pag-IBIG)

Financing through in-house, bank or PAG-IBIG.

Page 11: lpr ppt june2011

Unit Features (GOLD)RESIDENTIAL AREAA. Floor Finishes Living, Dining & Kitchen Ceramic tiles with painted baseboard Bedroom Vinyl planks with painted baseboard Toilet Unglazed ceramic tiles

B. Wall Finishes With ficemboard partitions Interior walls Painted Finish Toilet Painted paint cement finish above glazed tiles

C. Ceiling Finishes Living, Dining & Kitchen Painted plain cement finish Bedrooms Painted plain cement finish Toilet Painted ficemboard finish

D. Kitchen Modular Kitchen cabinet with stainlesssink and stainless counter top No overhead cabinet.

E. Door Entrance & Bedroom door Solid finger jointed wood with sheet

laminated and solid wood core doorjambs plus casing

Balcony door (GF only) Aluminum framed sliding glass panel Toilet door PVC door

F. Windows Aluminum windows

G. Finishing Hardware Cylindrical lockset for main and bedroomPrivacy lockset for T&B door

H. Toilet Fixtures Water closet and Lavatory “American Classic Brand” or approved equivalent Shower Faucet Complete set of shower with faucet & fittings

I. Electrical Complete outlet and lighting devices with circuit breaker

Page 12: lpr ppt june2011

Floor Plans

46.08 sq.m, 2 BR & 2 T&B

Page 13: lpr ppt june2011

Floor Plans

Page 14: lpr ppt june2011

Floor Plans

Page 15: lpr ppt june2011

Floor Plans

ALPACA Š GROUND BUILDING LAYOUT with GARDEN UNITS (OLD)

Page 16: lpr ppt june2011

Floor Plans

Page 17: lpr ppt june2011
Page 18: lpr ppt june2011

Floor Plans

Elephant Building 

6 storeys Ground floor with trellis facing the parkTypical building layout

Page 19: lpr ppt june2011

ELEPHANT MODEL UNIT

Page 20: lpr ppt june2011

Floor Plans

Page 21: lpr ppt june2011

Commercial BuildingFloor Plan

 Terms & Conditions: (dp in 14 months)

Pagibig financing – 10/90 scheme Bank financing – 20/80 scheme In House Financing –20/80 no discount , complete PDCS Giraffe Building / Commercial Units 

Typical Ground Floor Plan (Commercial Units)106.04 49.73 49.73 49.73 61.8475.2062.6062.7546.2243.84

Price is Php 50,000 per square – Thru accredited Bank financing (BPI, Veterans, LBC)

Terms: 20% Downpayment in 18 months, 80% loan financing  

Requirements:Submit the following to the Head Office c/o Sales Operations Group

Reservation Fee of Php 30,000 non refundableLetter of Intent indicating nature of businessBusiness Plan

Retail Business NeededBeauty SalonMedical ClinicDay Care CenterWater StationLaundry Coffee ShopBakery

Page 22: lpr ppt june2011

OVERVIEW OF PAVILION& CENTRAL PARK

Page 23: lpr ppt june2011

As of June 2011

Page 24: lpr ppt june2011

As of June 2011

Page 25: lpr ppt june2011

Construction Updates – Pool

SWIMMING POOL BRIDGE OVERKOI POND

Page 26: lpr ppt june2011

Construction Updates – Pavilion

STAIRS GOING UP GROUND FLOOR

2ND FLOOR

Page 27: lpr ppt june2011

Construction Updates – Central Park

ENTRY POINTS

WATER FEATURES (BUBBLERS)

KOI PONDCHILDREN’S PLAY AREA

Page 28: lpr ppt june2011

Construction Updates

BUTTERFLY BLDG.

CAMEL BLDG.

BISON BLDG.

CODFISH BLDG.

ANTELOPE BLDG.

Page 29: lpr ppt june2011

Construction Updates – Dolphin Building

Page 30: lpr ppt june2011

Construction Updates – Dolphin Building

Page 31: lpr ppt june2011

Construction Updates- Fox Parking Lot

Covered walkway ongoing construction

Page 32: lpr ppt june2011

Awarding of Alpaca to CE Construction

Page 33: lpr ppt june2011

Alpaca Building - Topping Off

Led by the ff: LPR Site Engineer Arnel Silvano, LPR Property Manager Ms. Nina Yamson, Marketing Supervisor Ms. Lei Macasaet-Pacheo, LPR Project Director Mr. Mike Pacheo, CDCH Architect Beth

Vidal and CECON Engineer Robert Suggang

Page 34: lpr ppt june2011

Construction Updates – Alpaca Building

As of June 2011

Page 35: lpr ppt june2011

Interior of Alpaca Building

Page 36: lpr ppt june2011

TOILET AND BATH

KITCHEN AREA

Page 37: lpr ppt june2011

FIRE HOSE CABINET

ELEVATOR HALLWAY CEILING

Page 38: lpr ppt june2011

ON-GOING RECONSTRUCTION OF PRESSURIZATION BLOWER

ROOM

CLEARING OF ELEPHANT AREA AND CONVERSION INTO TEMPORARY PARKING AREA

Page 39: lpr ppt june2011

Thank You!