Upload
matt594542
View
333
Download
0
Embed Size (px)
DESCRIPTION
Citation preview
Utilizing Oracle eAMQuality Plans
to StorePdM Data
Vibration
M. Clemens
Step 1: Create Specification for Vibration Parameters
Link with Asset Group and Collection Plan
M. Clemens
Step 2: Create Vibration Elements for Specification
M. Clemens
Step 3: Merge Specification and Quality Plan Elements
From Spec
From Plan
All prompts are able to be customized to data-specific terms (IPS-PK)This is what shows on the screen.
M. Clemens
Step 4: Create Rules for Specification Exceedance (Optional)
Can range from a dialogue pop up box to an automated Work Request
M. Clemens
Step 5: Create Activity to Collect Vibration Analysis Data
M. Clemens
Step 6: Associate Activity with Asset Group/Asset
M. Clemens
Step 7: Generate Work Order or PM Work Order against Asset using the Vibration Analysis Activity
M. Clemens
Vibration Results Can be Entered on the Quality Plan Tab of the Work Order Against the Asset
M. Clemens
Enter Variables from the List of Values and Enter Vibration Data as Discrete Values
M. Clemens
OR___ Access Quality Plan from the Asset Module (No Work Order Required)
Locate Asset from the Hierarchy View (Drill-down)
Go to Quality
M. Clemens
Select Appropriate Quality Plan (Motor Vibration Analysis)
M. Clemens
…….And Enter Quality Results (Vibration Data)
Ability to attach Vibration Reports from Vendor HERE
M. Clemens
Select “View Quality Results”
To Access Historical Vibration Results, Navigate from this Page to Quality Results
M. Clemens
Results of All Data Collection Appear on this Screen with Ability to Filter Results
Attachments Indicated
M. Clemens
OR ___ Enter Data Directly in eAM Quality Manager (Core)
Select Plan
M. Clemens
Entering Data Directly in eAM Quality Manager (Core)
Find Vibe Specification
M. Clemens
Also Allows Data Entry in List View Without Creating a Work Order
Select Diagnoses
M. Clemens
And User-Defined Actions are Enabled in eAM Quality Manager
M. Clemens
Utilizing Oracle eAMQuality Plans
to StorePdM Data
Oil Analysis
M. Clemens
Step 1: Create Activity GS5SYST-OIL-ANALYSIS-PD
Step 2: Create Quality Plan GS5_SYST_OIL_ANALYSIS_PD
Step 3: Attach Quality Plan GS5_SYST_OIL_ANALYSIS_PD to Activity GS5SYST-OIL-ANALYSIS-PD
Step 4: Attach Activity GS5SYST-OIL-ANALYSIS-PD to Asset CRAN-SE-15-TON
Step 5: Create Work Order against Asset CRAN-SE-15-TON, attach Activity GS5SYST-OIL-ANALYSIS-PD, Enter Quality Results in GS5_SYST_OIL_ANALYSIS_PD
OREnter Quality Results manually in EAM Core
OREnter Quality Results manually without a Work
Order in SSM through the Asset Drilldown window to Quality
This Quality Plan Created Without a Specification
M. Clemens
Create Activity to Store Oil Analysis Data, Link to Asset Group and Asset
M. Clemens
Create Quality Plan to Capture Oil Analysis Data
M. Clemens
Enter Oil Analysis Data on the Quality Tab of the WO Against the Asset
Ability to attach Oil Analysis Reports from Vendor HERE
M. Clemens
Or as Described Earlier, in the Asset Drilldown Quality Tab without a WO
M. Clemens
Select Appropriate Quality Plan and Enter Data
M. Clemens
All Quality Plan Results can be Accessed in Discoverer
M. Clemens
And Exported to Excel for Customized Summary Reports
M. Clemens