14
www.sungard.co.uk Mobile Infrastructure and Long-term Solutions This presentation is designed to be amended before presentation to customers. You may want to remove all references to cost (indicated in red) which are included for the benefit of account managers. Full details are included in the Workplace Price guide.

SunGard Mobile Infrastructure and long-term solutions

Embed Size (px)

DESCRIPTION

MOBILE: If you can’t come to us, we’ll come to you! SunGard can deliver self-contained mobile units equipped with power, air conditioning and PBXs to house key IT staff and recovery servers to your own site or a pre-determined recovery location. Your mobile unit could be with you in as little as 8 hours and kept for up to 13 weeks. The Mobile Infrastructure Package provides short-term support when an incident has occurred which affects the normal operation of your business but which is not serious enough to require a full transfer to one of our fixed disaster recovery sites. Typically this might mean where there has been a minor fire, limited water damage or loss of electricity through an incident such as fire, explosion or flooding. The service comprises:•Portable Accommodation and Storage Units •Mobile Air Conditioning Units •Power Distribution Units •Diesel Generators and UPS •Portable Structured Cabling•Compatibility•We advise customers to ensure that the equipment supplied by SunGard is capable of connecting into their environment.LONG TERM:Survive a building loss without having to relocateThe immediate response to an incident that affects the workplace is to move your key staff to one of SunGard's workplace recovery centres to ensure that your business continues to operate. Our state-of-the-art business recovery centres are strategically located throughout Britain. However, when your premises are going to be out of action for more than three months SunGard can deliver an alternative workplace. The units can be delivered within 24 hours – 5 days, depending on their size, for indefinite use. The modular buildings can house up to 300 office staff or a data centre and are designed for customers who either own land or can obtain permission to install temporary buildings on site. The facility can be fitted out with all the office technology and telephony you need, along with power and air conditioning.From delivery of PCs and servers to a complete office environmentSunGard's long-term recovery products offer the UK's most advanced range of facilities and services to ensure that your business survives. Servers, PCs and communications, including data and telephony, can be pre-configured to your requirements and delivered to these temporary offices for even faster recovery.

Citation preview

Page 1: SunGard Mobile Infrastructure and long-term solutions

www.sungard.co.uk

Mobile Infrastructure andLong-term SolutionsThis presentation is designed to be amended before presentation to customers. You may want to remove all references to cost (indicated in red) which are included for the benefit of account managers. Full details are included in the Workplace Price guide.

Page 2: SunGard Mobile Infrastructure and long-term solutions

2© 2010 SunGard. | www.sungard.co.uk

What are Mobile Infrastructure and Long-term Solutions?

Mobile Infrastructure Solutions

Solutions delivered in 48 hours or less and designed to mitigate the effects of a disaster.

Long-term Solutions

Computer Equipment Room (CER) or Workplace constructed on your car park, over 5–20 days and available

for long periods (up to 2 years or more).

Page 3: SunGard Mobile Infrastructure and long-term solutions

3© 2010 SunGard. | www.sungard.co.uk

Long-term Solutions

Modular, high specification construction

1,000–13,700 sq ft of CER (63–344 kW cooling)

30–300 positions of Workplace Recovery

…or a combination ofWorkplace Recovery and CER

Erected within 5–20 days

Occupation for up to 2 years (longer with planning permission)

Minimal site preparation required

Initial survey included

Regularly tested

Cost-effective (£2,000 to £25,000 pa)

No invocation charge (cost +15% administration charge).

Page 4: SunGard Mobile Infrastructure and long-term solutions

4© 2010 SunGard. | www.sungard.co.uk

Long-term Site Requirements

Site requirements Reasonably level site Hard standing Access for articulated vehicles Access for 25T crane Space for external air-conditioning

units, access ramps and generator

Optional preparation Power Communications Foundation pads (for green field sites) Planning permission.

Page 5: SunGard Mobile Infrastructure and long-term solutions

5© 2010 SunGard. | www.sungard.co.uk

Long-term Construction Process

Foundations laid outand levelled

Flat pack units (4 per truck) lifted into position.

Page 6: SunGard Mobile Infrastructure and long-term solutions

6© 2010 SunGard. | www.sungard.co.uk

Wall panels installed

Air-conditioning units positioned and connected.

Long-term Construction Process (continued)

Page 7: SunGard Mobile Infrastructure and long-term solutions

7© 2010 SunGard. | www.sungard.co.uk

Long-term Construction Process (continued)

Raised floor installed

Small power installed(workplace only)

Cat6 structured cabling(workplace only).

Page 8: SunGard Mobile Infrastructure and long-term solutions

8© 2010 SunGard. | www.sungard.co.uk

Long-term Construction Process (continued)

Furniture installed(workplace only)

Ramps and access stairs installed

Total erection time – 5 to 20 days.

Page 9: SunGard Mobile Infrastructure and long-term solutions

9© 2010 SunGard. | www.sungard.co.uk

Mobile Infrastructure Package

Mitigates the effects of a disaster

Survey at an additional charge

Air-conditioning units (2.9kW to 63kW)

Power distribution units

Generators (6KVA–1000KVA)

Portable accommodation units

Cat6 structured cabling

Delivered within 12 hours

Cost-effective (£3,000 pa)

No invocation charge (cost +15% administration charge).

Page 10: SunGard Mobile Infrastructure and long-term solutions

10© 2010 SunGard. | www.sungard.co.uk

Mobile UPS

400KVA containerised UPS

2 x 60KVA UPS (can be run in parallel to create 120KVA)

Delivered within 24 hours

No invocation charge (cost +15% administration charge)

Cost-effective(1,500 to £4,000 pa)

No invocation charge (cost +15% administration charge).

Page 11: SunGard Mobile Infrastructure and long-term solutions

11© 2010 SunGard. | www.sungard.co.uk

Mobile Workplace

2 or 3 volumetric units deliveredwithin 24–36 hours

15 or 20 position desks and chairs

Integral air conditioning

Pre-installed Cat5e structuredcabling and small power

Avaya Prologix PBX with 15 or 20analogue extensions

Wireless intruder alarm system

Containerised 50kVA powergenerator set (for 4 weeks)

Cost-effective (£3,000 or £4,000 pa)

No invocation charge (cost +15% administration charge).

Page 12: SunGard Mobile Infrastructure and long-term solutions

12© 2010 SunGard. | www.sungard.co.uk

Mobile Midrange Recovery Unit

Included within the Mobile Infrastructure Package but available separately

200 sq ft stand alone unit, complete with air-conditioning

Delivered within 24 hours

Cost-effective (£900 pa)

No invocation charge (cost +15% administration charge).

Page 13: SunGard Mobile Infrastructure and long-term solutions

13© 2010 SunGard. | www.sungard.co.uk

Mobile Bank Branch provided for major Scottish bank

Incident control solution for Health & Safety Executive.

Bespoke Solutions

Page 14: SunGard Mobile Infrastructure and long-term solutions

14© 2010 SunGard. | www.sungard.co.uk

Thank You