Upload
zero-wait-state
View
1.492
Download
4
Embed Size (px)
DESCRIPTION
A short company history with product information on Agile PLM and a detailed description of Zero Wait-State's implementation approach highlighting the Oracle Accelerate methodology.
Citation preview
Successfully Implementing Agile PLM
Agenda
– About Zero Wait-State– About Agile– Zero Wait-State Implementation Approach– Discovery Plan Example– Oracle Accelerate– Summary
About Zero Wait-State
• Operating since 1999• Over 150 customers both small and
large• Partnerships with key technology and
service providers• The Premier Oracle Agile Partner• Extensive background in PLM
deployment and integration
PLM Provides Visibility & Expedites Processes
4
Greater Executive Process Visibility Portfolio Management
Tracking, Status Reporting & Analytics
DesignPartners
Suppliers& ExternalManufacturingPartners
Internal ManufacturingPlants
QMS-SOP/DHF/DMR/Regulatory/Quality(ECOs, Approvals, BOMs, Items, SOP’s, AML, Doc’s
Datasheets, Designs, Drawings, Artwork, Labeling, Packaging)
QA & R/A
Product Development
Operations
Sales &Marketing
International
Central Repository Single record of the truthIntegrated to Oracle ERP
Sourcing &Procurement
Internal Groups
Internal &External Partners
collaboration collaboration
DevelopConcept Plan Validate Launch Sustain EOL
Agile Product Governance & ComplianceProduct & program compliance against standards & regulatory requirements
Compliance Office
Agile Product Portfolio Management
Integrated product, program, resource & portfolio management
Executives & Program Office
Closed-loop product quality management across the extended enterprise
QualityProfessionals
Agile Product Cost Management
Product sourcing and lifecycle cost & risk management
Procurement Professionals
Agile Enterprise VisualizationNative document collaborative visualization across the global enterprise
Cross-Enterprise
Agile Engineering Collaboration
Engineering desktop integration & collaboration
Development& Engineering
Agile ProductCollaboration
Eng., Operations & Supply Chain
Enterprise product record visibility, management & collaboration
Agile Quality Management
Agile PLM Modules
Agile Engineering Collaboration• Engineering Collaboration provides capability for
– Design Integration - Capture and control engineering design data, a primary source of the product record; Manage both work-in-process and released changes
– Design Collaboration – Directly visualize, markup and collaborate on native design data– Design Publication - Automate the creation and modification of the product structure
• Engineering Collaboration contains– Engineering Collaboration platform – 2D MCAD, 3D MCAD and ECAD Connectors– Team Data Management options
• EC integrates with other Agile PLM solutions– Agile Product Collaboration for item and change
management – Agile Enterprise Visualization for viewing & markup of
design data across the organization– Agile Product Portfolio Management for linking designs to projects– Agile Product Cost Management for material costs and supply certainty– Agile Product Governance & Compliance for managing product compliance with required
specifications such as RoHS, REACH, FDA, ISO, etc.
© 2006 PTC 7
Specific OperationalImprovement Areas
17.5% reduction in product costs75% reduction in ECO cycle times25-35% reduction in design cycles10-15% reduction in time-to-volume cycles30-40% reduction in part duplicates and introduction of new parts15-25% reduction in part search times (improving engineering efficiency)
Source: AberdeenGroup, Product Innovation Agenda Benchmark Report
Macro Financial Benefits Available To SMBs
High Level Potential Operational Improvement Areas
8
Example Customer ROI• Faster Time-To-Market — reduced by 25% • Increased Efficiency — improved by 30% • Reduced ECO Cycle Time — from 5 days down to 2
• 70% decrease in customer quote time• 87% reduction in document control costs • Lower costs due to 45% increase in supplier participation on bids
• Increased productivity, exceeding expectations by 25%. • Reduced change package cycle time by 30+ days. • Increased Visibility & Access to controlled docs by 30%+
• Managed to double gross margins • Went to a fully outsourced model in 18 months • Increased visibility & leverage of $1B in spend & 280 suppliers
• Reduced new product introductions process from 45 to 7 days • Reduced Costs: Lowered development costs • Increased Efficiency: Streamlined product development processes
Zero Wait-State Approach
Customer Engagement Model
Critical Path: Discovery
The goal of the discovery phase is to clearly identify the right customer specific solution through a consistent, repeatable process
•Identify the overall goals required for product determination•Leverage established processes to gather data and identify and quantify critical product development wait states•Recommend solutions to resolve delays
Consistent Results
12
Maximize Return on Technology Investment
Product Development Consulting
Accelerate Adoption and
Boost Productivity
Discovery Sessions
Assess Value Opportunities & Define the Best Execution Plan
Proven Deployment ApproachEnsure Widespread Adoption of Changes while Minimizing Cost
EducationImplementation
Best-in-Class Processes
Typical Value Drivers that Determine Initiatives
V A L U E
Growth
Profitability
Grow market share with customer-focused products
Improve ability to fulfill demand
Develop and define new markets
Design to realize a price premium
Lower product cost
Lower lifecycle cost
1
2
3
4
5
6
ZWS Discovery Plan for SuccessZero Wait-State Discovery Plan
Step # Steps and Details Time Frame Responsibility Results
1 Initial Meeting – Introduction to ZWS, determine business fit March 5th All Completed
2 Discovery Preparation / Deliver Schedule – determine executive and technical participants,
review Discovery Plan, schedule Executive Discovery SessionMarch 13th ZWS In Process
3 Executive Discovery Session – understand business initiatives relating to Product Development,
review Technical Discovery expectations, long term and short term goals, financial impacts, Product Development Process map
TBD Executive Team / ZWS
4 Technical Discovery Session – understand current Product Development Process, qualify/quantify
process “wait states”, view current technology systems, interview selected personnelWithin a week Technical Team/ ZWS
5 Executive Results Presentation – review business initiatives, present Technical Discovery
findings, Product Development Process plan, ROI, case studies/references, implementation planWithin 2 weeks Executive Team/ ZWS
6 Technical Validation Project – demonstrations, benchmark study(if needed), references Within 2 weeks Technical Team / ZWS
7 Proposal and Sign Contracts – finalize scope of work, determine implementation start date, review
contracts and pricing, financing options and payment schedulesTBD
Finance or Purchasing / ZWS
8 Success Criteria Definition & Implementation– mutually agree on success criteria,
implementation projectTBD All
15
• Rapid Deployment• Best Practices• Custom FitIndustry Focused
Complete• Comprehensive• Integrated• Scalable
Easy to Own
• Easy to Buy• Easy to Implement• Easy to Use• Easy to Maintain• Easy to Adapt
Solutions for Small and Medium Businesses
Fast time to ROI
www.oracle.com/solutions/mid/accelerate.html
16
• Best Practices based on extensive domain knowledge
• Tailored instruction based on design roles to ensure quick adoption
Industry Focused
Complete• A Turnkey Solution for Rapid
Implementation of EC• Provides all necessary
elements to incorporate CAD data into Agile
Easy to Own
• Automated Tools streamline configuration
• Fixed Price, Fixed Scope minimize up front time investments
Solutions for Small and Medium Businesses
Zero Wait-State Introduces:Oracle Accelerate for Engineering Collaboration
www.oracle.com/solutions/mid/accelerate.html
Oracle EC Accelerate Case Study
EC Planning Workshop
Utilize Configuration tools to automate EC Deployment
Validate system settings with test data and train users
EC Implementation for Red Digital
Highlights• Production ready in 3 weeks• High Adoption rate• Minimal errors in testing stages
Summary
• ZWS Leverages Best In Class PLM Solutions(Agile) for rapid deployment to shorten time to value
• ZWS utilizes Oracle Accelerate approach to deploy “Best Practices” based processes to ensure client success
• ZWS resources have extensive experience in all aspects of PLM and have been involved in major Agile deployments throughout North America
“ If you can’t describe what you are doing as a process, you don’t know what you’re doing.”
W. Edwards Deming