Mining Revenue-Maximizing Bundling Configuration

Loc Do*, Hady Lauw*, Ke Wang+

*Singapore Management University+Simon Fraser University

Page 2: Wang ke mining revenue-maximizing bundling configuration

Bundling

• Selling two or more items at one price

• Beneficial to consumers by lowering the overall price (compared to buying the items separately)

• Beneficial to sellers by gaining higher overall revenue (from selling more items to more consumers)

Page 3: Wang ke mining revenue-maximizing bundling configuration
Page 4: Wang ke mining revenue-maximizing bundling configuration
Page 5: Wang ke mining revenue-maximizing bundling configuration

1 2 30

2

4

6

8

10

12

14

No of consumers willing to pay the price or higher

Price

(dol

lar)

The lower the price, the more consumers willing to pay at least that price

Demand curve plots the number of consumers willing to pay at least a certain price

Page 6: Wang ke mining revenue-maximizing bundling configuration

1 2 30

2

4

6

8

10

12

14

No of consumers willing to pay the price or higher

Price

(dol

lar)

Sellerrevenue

Consumersurplus

Deadweightloss

Suppose we now fix the price at $8

Page 7: Wang ke mining revenue-maximizing bundling configuration

Willingness to Pay for Items

Consumer Willingness to Pay

Buy A at price = 8?

Seller revenue

Consumer surplus

Deadweight loss

u1 $12 ✔ $8 $4 0u2 $8 ✔ $8 0 0u3 $5 ✖ 0 0 $5Total 16 4 5

Page 8: Wang ke mining revenue-maximizing bundling configuration

Willingness to Pay for Bundles

• A function of willingness to pay for items– may incorporate discount factors for

complementary vs. substitute products– assumed to be linear sum in this talk for simplicity

Consumer

Item A Item B Bundle AB

u1 $12 $4 $16

u2 $8 $2 $10

u3 $5 $11 $16

Page 9: Wang ke mining revenue-maximizing bundling configuration

Individual Items – Revenue: $27

Consumer

WA WBPricing A

at $8Pricing B

at $11

u1 $12 $4 ✓u2 $8 $2 ✓u3 $5 $11 ✓

Page 10: Wang ke mining revenue-maximizing bundling configuration

Consumer

WA WBPricing A

at $8Pricing B

at $11

u1 $12 $4 ✓u2 $8 $2 ✓u3 $5 $11 ✓

Consumer

WA WBWAB Pricing AB at $16

u1 $12 $4 $16 ✓ ✓u2 $8 $2 $10

u3 $5 $11 $16 ✓ ✓

Components – Revenue: $27

Pure Bundling – Revenue: $32

Page 11: Wang ke mining revenue-maximizing bundling configuration

Challenges

• It works on some cases, but not for others• Challenge #1 (Data):

– Dependent on willingness to pay profile of consumers in the population

• Challenge #2 (Computation):– Combination of items in a potential bundle– For N items, up to 2N-1 potential bundles– Many possible configurations of bundles

Page 12: Wang ke mining revenue-maximizing bundling configuration

Traditional Marketing Approach to Willingness to Pay

• Relying on explicit solicitation from consumers– e.g., market research, surveys– unscalable

• Conjoint analysis:– decompose consumer preference for items to

preferences for specific features• Discrete choice theory:

– give consumer a choice of two products with different attributes, and observe the selection

Page 13: Wang ke mining revenue-maximizing bundling configuration

Key Idea

• Leverage on the wealth of consumer preference data

Page 14: Wang ke mining revenue-maximizing bundling configuration

Estimating Willingness to Pay from Ratings• Willingness to pay for an item is a function of:

– intrinsic value of the item (sales price)– extrinsic value of the item to the user (rating)

• A simple model: linear function of price and rating• Richer models: may consider features or regression

Rating Willingness to Pay

5 $12.50

4 $10.00

3 $7.50

2 $5.00

1 $2.50

Item sales price = $10Rating base = 4

Using this mapping, we find that revenue-maximizing pricing is close to Amazon’s actual pricing.

Page 15: Wang ke mining revenue-maximizing bundling configuration

Modeling More Realistic Adoption Behaviors

15

Willingness to Pay = $10

Page 16: Wang ke mining revenue-maximizing bundling configuration

Determination of “Optimal” Price

• Find the price that optimizes the expected revenue of an item or a bundle

• Discretized price levels– computation through bucketing strategies

Page 17: Wang ke mining revenue-maximizing bundling configuration

Bundle Configuration Problem• Given:

– a set of M users– a set of N items– M x N matrix of willingness to pay for items

• willingness to pay for bundles implicitly modeled by a function– a positive integer k (maximum size of a bundle)

• Find:– a partitioning of the N items– each sub-partition is of size no larger than k– resulting in the highest total revenue

17

Page 18: Wang ke mining revenue-maximizing bundling configuration

Assumptions

• Revenue maximization objective– Profit maximization if marginal cost is known– Incorporate other factors e.g., consumer surplus

• Single unit demand– can be relaxed if demanded quantity is known

• No budget constraint• No supply constraint

Page 19: Wang ke mining revenue-maximizing bundling configuration

Matching (graph theory)

• A set of edges without common vertices– maximum: most number of edges– maximum weight: highest total edge weights

Page 20: Wang ke mining revenue-maximizing bundling configuration

Optimal Solution for k = 2 with Graph Matching

Consumer

Item ApA = 10

Item BpB = 10

Item CpC = 10

Bundle ABpAB = 14.5

Bundle ACpAC = 12

Bundle BCpBC = 12

u1 $10.0 $10.0 $2.0 $20.0 $12.0 $12.0

u2 $10.0 $4.5 $10.0 $14.5 $20.0 $14.5

u3 $4.5 $10.0 $10.0 $14.5 $14.5 $20.0

A B

C

20 20

20

36 36

43.5

(a) Input Graph (b) Maximum Weight Matching

A B

C20

43.5

Page 21: Wang ke mining revenue-maximizing bundling configuration

How about for k = 3 and beyond?

Maximum weight hypergraph matching is NP-hard

A B

C

20 20

20

36 36

43.5

66

Consumer

Item ApA = 10

Item BpB = 10

Item CpC = 10

Bundle ABpAB = 14.5

Bundle ACpAC = 12

Bundle BCpBC = 12

Bundle ABCpABC = 22

u1 $10.0 $10.0 $2.0 $20.0 $12.0 $12.0 $22.0

u2 $10.0 $4.5 $10.0 $14.5 $20.0 $14.5 $24.5

u3 $4.5 $10.0 $10.0 $14.5 $14.5 $20.0 $24.5

A B

C

66

Page 22: Wang ke mining revenue-maximizing bundling configuration

3-uniform hypergraph

A B

C

Maximum matching on 3-uniform hypergraph is known to be NP-hard

C D

E

Page 23: Wang ke mining revenue-maximizing bundling configuration

Bundle Configuration is NP-hard for k ≥ 3

A B

C

3-uniform hypergraph matching is an instance of 3-sized bundle configuration problem

A B

C

1 1

1

2 2

2

3 + e

Page 24: Wang ke mining revenue-maximizing bundling configuration

How about for k = 3 and beyond?

Maximum weight hypergraph matching is NP-hard

A B

C

20 20

20

36 36

43.5

66

Consumer

Item ApA = 10

Item BpB = 10

Item CpC = 10

Bundle ABpAB = 14.5

Bundle ACpAC = 12

Bundle BCpBC = 12

Bundle ABCpABC = 22

u1 $10.0 $10.0 $2.0 $20.0 $12.0 $12.0 $22.0

u2 $10.0 $4.5 $10.0 $14.5 $20.0 $14.5 $24.5

u3 $4.5 $10.0 $10.0 $14.5 $14.5 $20.0 $24.5

A B

C

66

Page 25: Wang ke mining revenue-maximizing bundling configuration

Heuristic#1: Iterative Graph Matching (k=2)

A B

C

20 20

20

36 36

43.5

(1a) Input Graph (1b) Output Matching

Iteration #1

A B

C20

43.5

C

AB

20

43.5

66 ABC66

(2a) Input Graph (2b) Output Matching

Iteration #2

Page 26: Wang ke mining revenue-maximizing bundling configuration

Heuristic #2: Greedy Algorithm

• Begin with a configuration of individual items (i.e., bundles of size 1)

• Iterate till no more revenue gain:– For each pair of bundles

• Compute the expected revenue gain– Merge the pair with highest gain into a new bundle

Page 27: Wang ke mining revenue-maximizing bundling configuration

Heuristic #1: Iterative Matching

Heuristic #2: Greedy Algorithm

In each iteration, only one new bundle is

formed.

In each iteration, up to N/2 new bundles are

formed.

O(MN2) for revenue computation.

O(N2.5) for matching.

O(MN2) for revenue computation.

O(N2log N) for greedy.

Page 28: Wang ke mining revenue-maximizing bundling configuration

Bundling Strategies

A ✓

B

AB

✓✓

IndividualComponents

PureBundling

MixedBundling

Page 29: Wang ke mining revenue-maximizing bundling configuration

Consumer

WA WBWAB Pricing AB at $16

u1 $12 $4 $16 ✓ ✓u2 $8 $2 $10

u3 $5 $11 $16 ✓ ✓

Pure Bundling – Revenue: $32

Consumer

WA WBWAB Pricing A at $8

Pricing AB at $16

u1 $12 $4 $16 ✓ ✓u2 $8 $2 $10 ✓u3 $5 $11 $16 ✓ ✓

Mixed Bundling – Revenue: $40

Page 30: Wang ke mining revenue-maximizing bundling configuration

Data• User preferences as indicated by ratings• Amazon ratings on books (UIC)• 4,449 users, and 5,028 items

30

Rating Frequency Percentage

5 52,811 49%

4 31,499 29%

3 14,356 13%

2 5,841 5%

1 3,784 3%

Total 108,291 100%

Item Price Frequency Percentage

<= $5 57 1%

$5.01 - $10 2,464 49%

$10.01 - $15 1,280 25%

$15.01 - $20 994 20%

$20.01 - $25 140 3%

> $25 93 2%

Total 5,028 100%

Page 31: Wang ke mining revenue-maximizing bundling configuration

Metrics

• Revenue coverage– total possible revenue = sum all willingness to pay– percentage of total possible revenue that is captured– up to 100%

• Revenue gain– compare to revenue from selling items (no bundles)– percentage gain of bundling over non-bundling

Page 32: Wang ke mining revenue-maximizing bundling configuration

Methods

• Mixed bundling:– MixedMatching– MixedGreedy– MixedFreqItemset (baseline)

• Pure bundling:– PureMatching– PureGreedy– PureFreqItemset (baseline)

Page 33: Wang ke mining revenue-maximizing bundling configuration
Page 34: Wang ke mining revenue-maximizing bundling configuration

Revenue Gain vs. Time

Page 35: Wang ke mining revenue-maximizing bundling configuration

Scalability

Page 36: Wang ke mining revenue-maximizing bundling configuration

Comparison to Optimal Solution (ILP)

Method N = 10 N = 15 N = 20 N = 25

PureMatching 78.1 77.8 77.9 77.2

PureGreedy 78.1 77.8 77.9 77.2

Optimal (ILP) 78.1 77.8 77.9 -

Revenue Coverage (percent)

Method N = 10 N = 15 N = 20 N = 25PureMatching 0.01 0.01 0.01 0.02

PureGreedy 0.07 0.10 0.13 0.16

Optimal (ILP) 0.20 4.60 235.38 -

Running Time (seconds)

Page 37: Wang ke mining revenue-maximizing bundling configuration

Conclusion

• Willingness to pay:– mining consumer preferences from ratings data

• Bundle configuration:– NP-hard for k ≥ 3– Graph matching and greedy algorithms

• Future work:– Generalization to non-monetary utility functions