30

Binishells construction systems: A greener, faster, more resilient and affordable way of building

Embed Size (px)

Citation preview

#1 polluter 50% OF OUR NATURAL RESOURCES USED BY BUILDINGS* 40% OF OUR ENERGY USED BY BUILDINGS* 40% OF OUR CARBON EMISSIONS FROM BUILDINGS* *National Energy Education Development Project 2012

unsafe TRADITIONAL BUILDINGS UNSAFE IN NATURAL DISASTERS* RATE OF NATURAL DISASTERS DOUBLES EVERY 10 YEARS** *Promoting Safer Building Construction . Suresh, former CMD, HUDCO, India and Human Settlements Specialist. **CRED International Disaster Database

too expensive 1 OUT OF 4 GLOBALLY IS HOMELESS (OR IN SUB-STANDARD SHELTER)* *UN Habitat

construction today…

greener safer

more affordable

permanent faster

1/3

energy used + =

no thermal bridges insulation

greener

greater safety + =

load distribution compressive strength

safer

CO2 $ 1/2 + =

less material less labor less cost & impact

more affordable

structural system natural resistance

=

permanent

+ = material application

3X

construction speed

faster

air pressure

how it works

1. anchor pneumoform to slab 4hrs 2. inflate pneumoform 45mins 3. add rebar 5hrs

4. add shotcrete 5hrs 5. allow concrete to cure 24hrs 6. finish and landscape

system 4 eco-development

system 5 low cost housing

system 6 custom design

house 200 families in 1 month

each finished home @ US$7,000 based on project and site assumptions

case study, Uganda

proposed design for two 450sq.ft units

plan 33’- 3 1/2”

section 33’- 3 1/2”

33’-

3 1/

2”

case study, Uganda

proposed design for school buildings

plan class rooms plan bathrooms

elevation

case study, Uganda

staff room storage

plan class rooms type 2 roof plan

elevations

proposed design for school buildings

case study, Uganda

Binishells Cost: > US$16/sq.ft. Time: 4 weeks for 200 homes Durability: Permanent housing Environment: Low impact

Container Cost: < US$80/sq.ft. Time: 20 week delivery + install Durability: Temporary housing Environment: High to Medium

case study, Uganda

wide endorsements

authoritative testimonials

“Binishells are the first systems I have seen which check all the boxes for both low cost and disaster relief housing.”

“Binishells have a low carbon footprint, high strength and low cost, features that all countries are now beginning to pay more attention to.”

“One of 31 names we need to know this year.” “Materials costs are significantly reduced, labor is less but (Binishells) are very strong structurally and earthquake resistant.”

1964 1973

1976 1980

1968 1972

1978

a history of innovation

launch project

Under Construction 6,000sq.ft. home in Malibu, CA

launch project

Under Construction 6,000sq.ft. home in Malibu, CA

on the boards

Planned Binishells offices and case study Los Angeles, CA

Conceptual Entertainment Art space in Los Angeles, CA

on the boards

Conceptual Music venue Art Basel Miami, FL

on the boards

Conceptual Lucas Museum Of Narrative Arts projection space Chicago, IL

on the boards

Conceptual Eco-Hotel Baja California, Mexico

on the boards

Conceptual Careyes, Mexico Villas

on the boards

executive team

Ian Hutchinson, Corporate Advisor Australian company director with wide experience in management and contacts in Asia. Mr Hutchinson is former Chairman and Senior Partner of one of Australia’s largest law firms.

Andrew Zlotnik, Legal Counsel With experience in corporate and real estate law, Mr. Zlotnik has worked as advisor and counsel to a variety of companies ranging from large scale developers to pre-funding start-ups.

Nicoló Bini, AIA CEO/President A graduate of UC Berkeley, Mr. Bini has widely publicized international design and entrepreneurial experience and specializes in construction technologies, green design and innovative construction systems.

Dr. Dante Bini, R&D The inventor of the original Binishells systems, Dr. Bini is a pioneer in Building Automation has taught and worked with the most prestigious Universities, Institutes and Contractors internationally.

Ignacio Barandiáran, PE MBA VP Engineering A graduate of Cambridge University and UC Berkeley, Mr. Barandiaran has most recently worked for 12 years at ARUP engineers on some of their banner projects on 4 continents.

Michael Prieve, Marketing & PR Having guided marketing and PR for brands like Nike, Levi’s, Microsoft, and the WWF, Mr. Prieve brings a wealth of international experience to our brand voice.

www.binishells.com