28
Ici final project Introduction to the Construction Industry Final Project The Project Proposal Tutor : Miss Ann See Peng Group Members: Sam Wei Yin 0320364 Ng Huoy Miin 0319097 Prepared by : FNBE Aug 2014

Ici final project 3

  • Upload
    wyinsam

  • View
    23

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Ici final project 3

Ici final project

Introduction to the Construction Industry

Final Project

The Project Proposal

Tutor : Miss Ann See Peng

Group Members:

Sam Wei Yin 0320364

Ng Huoy Miin 0319097

Prepared by :

FNBE Aug 2014

Page 2: Ici final project 3

Ici final project

NO. Content

1. Introduction

2. Site Analysis

3. Rationale

4. Concept

5. Evaluation

6. Renovation Approval

Page 3: Ici final project 3

Ici final project

INTRODUCTION

Task:

In a group of 2 students, we are given a task to propose a small

construction project within a specific empty land. The size of the land

shall between (30mx30m)-(30mx40m) and serves one of the following

purposes:

1. Recreational Area

2. Commercial Area

3. Agricultural Area

4. Tourism Area

5. Residential Area

To do this project, students have to study types of building

development which include suggestion, rationale, benefits ,site analysis,

evaluation and the needs of the project to client and to the community.

Our group consists of two members: Sam Wei Yin and Ng Huoy Miin.

We want to propose a construction project for a Recreational Area.

Our site size: 30x40m

Location : Putra Permai(Putra Height)

Page 4: Ici final project 3

Ici final project

Brief introduction of location:

Putra Heights is a residential township in Subang Jaya, Selangor,

Malaysia. It is located in the Mukim (sub-district) of Damansara. The

township could be easily located by the tall and famous Bukit Cermin

hill in Putra Heights.

Selected site

Page 5: Ici final project 3

Ici final project

Site Analysis

After understanding the final project brief of this project, we had chosen an

empty land for this project is located between Jalan Putra Permai 10/1m and

Jalan Besar. The site is currently empty and serves no major purpose.

A top view of our site 30x40 site

Sunlight-since there is no rooftop to cover the empty land so that the sunlight is

throughout the day.

Wind direction- the wind blows from the south to the west strongly.

Human circulation- There is no people staying so that there are no circulation

within this site.

Sound-It is empty land therefore low human sound.

Page 6: Ici final project 3

Ici final project

The site has been a large vacant space and without any construction or

renovation. Hence, most areas of the site are full of grass. A site analysis shows

that the site is ideal for the construction plan due to the following reasons:

1. Surroundings with houses, people have a place to relax

2. Has good ventilation due to large open space

3. Good accessibility from any side of the area

4. Has a lot of unutilized space available for new development

Advantage

1. Provide a green environment and space for resident to relax.

2. Sports such as jogging.

3. Protect their physical and mental health.

4. Provide opportunity to meet up and know their neighbors.

5. Restore oxygen to the air and help to reduce air pollution

6. Retreat from the noise and commotion of urban environment.

7. Increase property value.

8. The closer the relationship between parent and children.

Disadvantage

1. Maintenance and development fee of the park is too high.

2. Hard to maintain

3. It may face any safety problem such as the safety of the car.

Page 7: Ici final project 3

Ici final project

Site specification

Looking East

Towards to the east from our site, it is Jalan Putra Permai 10/1m. .

Looking West

Towards to the west from our site, there are still have some empty places. And

there is a road further far, which is Jalan Besar .

Page 8: Ici final project 3

Ici final project

v

View from the north

Page 9: Ici final project 3

Ici final project

The master plan

Page 10: Ici final project 3

Ici final project

The perspective drawing of gazebo within this

recreational area.

Page 11: Ici final project 3

Ici final project

RATIONALE

Proposal:

It is proposed to use the empty land towards a landscaping of a park. The entire

site would be utilized for recreation, be remodeled into the grass with footpaths

lined with trees, shrubs and pond. Soil will be poured over the base.

Reasons:

Why we proposed to build a recreation area?

We found that the place lacks of green space for residents to interact with green

environment. From the site, we also found that is it too concrete and lack facilities

that serve the residential. Therefore, the action to renovate the site with natural

approach is necessary.

Why we chose Putra Permai our site for this project?

This site is an empty space and is available for people to access to the site. The

site is currently purposeless and being a recreation site would be a good purpose

for the site.

Page 12: Ici final project 3

Ici final project

Concept

The whole concept of this recreational area

design is to let people to rest, relax and chill in

a green space with several facilities provided

there. This recreational area is divided into

two part along with a walkway for people

jogging and walk. The center is a pond that for people to appreciate the beautiful

views and feed fish. This recreational area has a lot of wooden benches, people

can just sit down and enjoy the peaceful and the scenery of the recreational area.

There are two gazebos in this recreational area for people chill and rest.

Hardscape

Wooden benches

Wooden benches will be provided in each section of the residential area. So,

there will be sufficient space for people to rest and chill.

Page 13: Ici final project 3

Ici final project

Stainless steel dustbin

This elegant and modern recycling station is a great piece of furniture for any

modern public area. Made of high quality 304 stainless steel and decorated with

FSC certified pine wood. It is perfectly suitable outdoor use.

It is equipped with 3 interior bins made of durable sheet metal. Customized with

labels and stickers on the front body for an efficient and easy waste sorting and

recycling. Easy fix into the ground.

gazebo

a gazebo is structure with roof where people can rest and chill at there. We

provided a gazebo in size of 4mx 4m.

Page 14: Ici final project 3

Ici final project

Softscape

Mimosa

Mimosa .It scientific name is Albizia Julibrissin. Pink. Main Bloom Time of this

mimosa at early summer, early spring, late summer, late spring, mid-summer, mid

spring. It cans growth until 12m. This could give a shady area to visitor.

Mondo Grass

This Mondo grass does well in filter sunlight. It will produce purple colour flower.

Give a nice view to this park when it reaches it blossom time.

Page 15: Ici final project 3

Ici final project

Palm Tree

Palm tree give better view and more shady area to this park.

Dwart English Boxwood

Dwart English Boxwood is a slow growing plant. It is small, rounded shrub form

tufts of growth resembling a clound unsheared.

Page 16: Ici final project 3

Ici final project

EVALUTION

Material used and price:

No Material Unit Quantity Price(RM) 1 Tree No. 51 15300

2 Shrub No. 22 2500

3 Groundcover No. 30 600 4 Grass m2 650 19500

5 Precast concrete m2 120 1200 6 Gazebo No. 2 10000

7 pond No. 1 20000

8 maintenance month 24 36000 TOTAL 105,100

Page 17: Ici final project 3

Ici final project

Renovation approval form by MPSJ

Before construction phase, we have to get the permit of construction or

renovation by the government by submitting an approval form. The attachment

files after these pages are the approval forms that we prepared before

construction.

Page 18: Ici final project 3

Ici final project

Page 19: Ici final project 3

Ici final project

Page 20: Ici final project 3

Ici final project

Page 21: Ici final project 3

Ici final project

Page 22: Ici final project 3

Ici final project

Page 23: Ici final project 3

Ici final project

Page 24: Ici final project 3

Ici final project

Page 25: Ici final project 3

Ici final project

Page 26: Ici final project 3

Ici final project

Page 27: Ici final project 3

Ici final project

Page 28: Ici final project 3

Ici final project

Conclusion

The trend toward greenery is now extended in many places .More green spaces

should be provided to resident to relieve their stress of work and studies.

However, it is not enough to have just a piece of green land that without any

function. This new proposal of recreational area can satisfy the demand of

residents where a place to chill, fun and exercise. It is sure that the recreational

area can change the residential area to be more active and enlighten it to become

a better environment.