REPUBLIK INDONESIA
LAMPIRAN
LAPORAN KINERJA PELAKSANAAN
PINJAMAN DAN/ATAU HIBAH LUAR NEGERI
TRIWULAN II TAHUN 2020
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/
BADAN PERENCANAAN PEMBANGUNAN NASIONAL
i
DAFTAR ISI
DAFTAR ISI ................................................................................................................................... i
KINERJA PELAKSANAAN PROYEK PINJAMAN LUAR NEGERI ................................................. 1
TABEL NILAI TUKAR (KURS) USD TERHADAP MATA UANG ...................................................... 3
BADAN METEOROLOGI, KLIMATOLOGI DAN GEOFISIKA ........................................................................................ 5 DEVELOPMENT OF MARITIME METEOROLOGICAL INFORMATION SYSTEM (MMS) ................................. 7 SCALING-UP BMKG CLIMATE AND WEATHER SERVICE CAPACITY (SUS) ................................................ 9
BADAN PENGAWASAN KEUANGAN DAN PEMBANGUNAN ............................................................................... 11
STATE ACCOUNTABILITY REVITALIZATION PROJECT (STAR) .................................................................... 13
BADAN PENGUSAHAAN BATAM .............................................................................................................................. 15
DEVELOPMENT OF SEWERAGE SYSTEM IN BATAM ISLAND PROJECT .................................................... 17
KEMENTERIAN AGAMA .............................................................................................................................................. 19 REALIZING EDUCATION'S PROMISE - MADRASAH EDUCATION QUALITY REFORM (REP-EQR) ............ 21 THE DEVELOPMENT OF UIN MAULANA MALIK IBRAHIM MALANG (PHASE II) EAST JAVA PROJECT .... 25 THE SUPPORT TO DEVELOPMENT OF THE ISLAMIC HIGHER EDUCATION PROJECT (4 IN 1) .................. 28
KEMENTERIAN AGRARIA DAN TATA RUANG/BADAN PERTANAHAN NASIONAL ............................................... 31 PROGRAM TO ACCELERATE AGRARIAN REFORM (ONE MAP PROJECT) ............................................ 32
KEMENTERIAN DESA, PEMBANGUNAN DAERAH TERTINGGAL DAN TRANSMIGRASI ......................................... 35 INTEGRATED VILLAGE ECONOMIC TRANSFORMATION/ TRANSFORMASI EKONOMI KAMPUNG
TERPADU .................................................................................................................................................. 37
KEMENTERIAN KESEHATAN ........................................................................................................................................ 39 INDONESIA SUPPORTING PRIMARY HEALTH CARE REFORM (I-SPHERE) PROGRAM ............................. 40
KEMENTERIAN KETENAGAKERJAAN ......................................................................................................................... 43 DEVELOPMENT OF MARITIME VOCATIONAL TRAINING CENTER ........................................................... 45
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT .......................................................................... 47 ACCELERATING INFRASTRUCTURE DELIVERY THROUGH BETTER ENGINEERING SERVICES PROJECTS
(ESP) ......................................................................................................................................................... 51 INTEGRATED INFRASTRUCTURE DEVELOPMENT FOR NATIONAL TOURISM STRATEGIC AREAS
(INDONESIA TOURISM DEVELOPMENT PROJECT) ................................................................................... 54 NATIONAL URBAN DEVELOPMENT PROJECT (NUDP)............................................................................. 58 DEVELOPMENT OF TRANS SOUTH-SOUTH JAVA ROAD PROJECT .......................................................... 64 TOLL ROAD DEVELOPMENT OF BALIKPAPAN-SAMARINDA SECTION 5 PROJECT ................................ 67 TOLL ROAD DEVELOPMENT OF CILEUNYI-SUMEDANG-DAWUAN (CISUMDAWU) PHASE II ................. 68 TOLL ROAD DEVELOPMENT OF CILEUNYI-SUMEDANG-DAWUAN PHASE III .......................................... 70 TOLL ROAD DEVELOPMENT OF MANADO-BITUNG ................................................................................ 72
ii
TOLL ROAD DEVELOPMENT OF SOLO - KERTOSONO PHASE I PROJECT ............................................... 73 WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT (WINRIP) ....................................................... 74 CENTRAL SULAWESI REHABILITATION AND RECONSTRUCTION PROJECT (CSRRP) ............................... 80 EMISSION REDUCTION IN CITIES: SOLID WASTE MANAGEMENT ............................................................. 82 IKK WATER SUPPLY PROGRAM AND SMALL WATER TREATMENT PLANT FOR WATER SCARCITY AREAS85 METROPOLITAN SANITATION MANAGEMENT AND HEALTH PROJECT (MSMHP) ................................... 86 METROPOLITAN SANITATION MANAGEMENT INVESTMENT PROGRAM: SEWERAGE SYSTEM
DEVELOPMENT IN DKI JAKARTA .............................................................................................................. 89 METROPOLITAN SANITATION MANAGEMENT INVESTMENT PROJECT (MSMIP) ..................................... 91 NATIONAL SLUM UPGRADING PROJECT ................................................................................................ 94 NATIONAL SLUM UPGRADING PROJECT (NSUP) .................................................................................... 98 NATIONAL URBAN WATER SUPPLY PROJECT (NUWSP) ......................................................................... 103 SANIMAS COMMUNITY-BASED SANITATION PROJECT IN INDONESIA ................................................. 107 SECOND ADDITIONAL FINANCING TO THE THIRD WATER SUPPLY AND SANITATION FOR LOW INCOME
COMMUNITIES/COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS III) ................................... 110 BALI BEACH CONSERVATION PROJECT (PHASE 2) ............................................................................... 115 CONSTRUCTION OF KARIAN MULTIPURPOSE DAM PROJECT .............................................................. 116 COUNTERMEASURE FOR SEDIMENT IN WONOGIRI MULTIPURPOSE DAM RESERVOIR II ...................... 118 DAM OPERATIONAL IMPROVEMENT AND SAFETY PROJECT (DOISP) PHASE II ................................... 120 EMERGENCY ASSISTANCE FOR REHABILITATION AND RECONSTRUCTION (EARR) ............................. 123 ENGINEERING SERVICES FOR MULTIPURPOSE DAMS, RIVERS, AND COASTAL .................................... 129 FLOOD MANAGEMENT IN SELECTED RIVER BASIN ............................................................................... 131 INTEGRATED PARTICIPATORY DEVELOPMENT AND MANAGEMENT OF IRRIGATION PROGRAM
(IPDMIP) .................................................................................................................................................. 136 KOMERING IRRIGATION PROJECT (PHASE 3) ....................................................................................... 141 RENTANG IRRIGATION MODERNIZATION PROJECT .............................................................................. 143 STRATEGIC IRRIGATION MODERNIZATION AND URGENT REHABILITATION PROJECT (SIMURP) .......... 144 UPPER CITARUM BASIN FLOOD MANAGEMENT ................................................................................... 146 URGENT DISASTER REDUCTION PROJECT FOR MOUNT MERAPI AND LOWER PROGO RIVER AREA –
PHASE II ................................................................................................................................................... 148 URGENT REHABILITATION OF STRATEGIC IRRIGATION PROJECT FOR WESTERN REGION OF INDONESIA
................................................................................................................................................................ 150 NATIONAL AFFORDABLE HOUSING PROGRAM (NAHP) ...................................................................... 153
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN .................................................................................................. 157 ADVANCED KNOWLEDGE AND SKILLS FOR INCLUSIVE GROWTH PROJECT (AKSI) ............................ 158 DEVELOPMENT AND UPGRADING OF THE STATE UNIVERSITY OF JAKARTA (PHASE-2) ....................... 164 DEVELOPMENT OF TEACHING HOSPITAL HASANUDDIN UNIVERSITY ................................................... 166 DEVELOPMENT OF WORLD CLASS UNIVERSITY WITH SOCIO ENTREPRENEURIAL SPIRIT AT UNIVERSITAS
GAJAH MADA ........................................................................................................................................ 169 ESTABLISHMENT OF UNIVERSITY OF BENGKULU’S HOSPITAL PROJECT ................................................. 171 THE DEVELOPMENT OF FOUR HIGHER EDUCATION INSTITUTIONS PROJECT ........................................ 173 THE SUPPORT TO THE DEVELOPMENT OF HIGHER EDUCATION PROJECT (7 IN 1) ............................... 176
iii
KEMENTERIAN PERHUBUNGAN ............................................................................................................................... 179
EMERGENCY ASSISTANCE FOR REHABILITATION AND RECONSTRUCTION (EARR) ............................. 181 ENGINEERING SERVICES FOR JAKARTA MRT EAT – WEST LINE PROJECT (PHASE I) ............................. 187 JABODETABEK RAILWAYS CAPACITY ENHANCEMENT - PHASE I ......................................................... 188 PATIMBAN PORT DEVELOPMENT PROJECT (I) ..................................................................................... 189 PROCUREMENT OF TRACK MATERIAL AND TURNOUT PHASE II (1500 KM’SP AND 500 UNIT) ............. 191
KEMENTERIAN PERTAHANAN .................................................................................................................................. 193 UPGRADING MEDICAL EQUIPMENTS AND SUPPORTING FACILITIES FOR NAVAL HOSPITALS DR.
WAHYU SLAMET ..................................................................................................................................... 194 UPGRADING MEDICAL EQUIPMENTS FOR AIR FORCE HOSPITALS DODY SARJOTO .......................... 195 UPGRADING MEDICAL EQUIPMENTS FOR ARMY HOSPITALS INDONESIAN ARMY OF GATOT SUBROTO
................................................................................................................................................................ 197
KEMENTERIAN PERTANIAN ....................................................................................................................................... 199 INTEGRATED PARTICIPATORY DEVELOPMENT AND MANAGEMENT OF IRRIGATION PROGRAM
(IPDMIP) ................................................................................................................................................. 201 RURAL EMPOWERMENT AND AGRICULTURAL DEVELOPMENT SCALING-UP INITIATIVE (READSI) ...... 204 YOUTH ENTREPRENEURSHIP AND EMPLOYMENT SUPPORT SERVICE PROGRAMME (YESS) ................ 207 DEVELOPMENT OF INTEGRATED FARMING SYSTEMS IN UPLAND AREAS (UPLANDS) ......................... 210
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/ BADAN PERENCANAAN PEMBANGUNAN
NASIONAL ................................................................................................................................................................. 215 PROFESSIONAL HUMAN RESOURCES DEVELOPMENT IV ..................................................................... 217
KEMENTERIAN RISET DAN TEKNOLOGI /BADAN RISET DAN INOVASI NASIONAL ............................................. 219 RESEARCH AND INNOVATION IN SCIENCE AND TECHNOLOGY PROJECT (RISET-PRO) .................... 221
KEPOLISIAN REPUBLIK INDONESIA .......................................................................................................................... 225 INTEGRATED TRUNKING RADIO SYSTEM FOR INDONESIAN NATIONAL POLICE .................................. 227
LEMBAGA ILMU PENGETAHUAN INDONESIA ........................................................................................................ 229
CORAL REEF REHABILITATION AND MANAGEMENT PROGRAM-CORAL TRIANGLE INITIATIVE
(COREMAP-CTI) ..................................................................................................................................... 231
PT. PERTAMINA .......................................................................................................................................................... 235 LUMUT BALAI GEOTHERMAL POWER PLANT PROJECT ......................................................................... 237
PT. PLN ........................................................................................................................................................................ 239 ASAHAN HYDROELECTRIC POWER PLANT CONSTRUCTION III ............................................................ 241 GDAP (HULULAIS GEOTHERMAL POWER PLANT PROJECT (E/S)) ........................................................ 243 INDRAMAYU COAL FIRED POWER PLANT PROJECT (E/S) .................................................................... 245 JAVA-SUMATERA INTERCONECTION TRANSMISSION LINE PROJECT ................................................... 247 PANGKALAN SUSU COAL FIRED STEAM POWER PLANT ....................................................................... 249 PEUSANGAN HYDROELECTRIC POWER PLANT CONSTRUCTION PROJECT ........................................ 250 TAKALAR COAL FIRED STEAM POWER PLANT ...................................................................................... 252 TULEHU GEOTHERMAL POWER PLANT PROJECT (E/S).......................................................................... 253
iv
UPPER CISOKAN PUMPED STORAGE HYDRO ELECTRICAL POWER (1.040 MW) ................................. 255
PT. SARANA MULTI INFRASTRUKTUR (SMI)............................................................................................................... 259 ADDITIONAL FINANCING FOR INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT ............... 261 REGIONAL INFRASTRUCTURE DEVELOPMENT FUND (RIDF) .................................................................. 263
PEMERINTAH PROVINSI DKI JAKARTA..................................................................................................................... 265 CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT PHASE I (STAGE II) ............................. 267 CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT (PHASE 2) (I) ..................................... 269
LEMBAGA PINJAMAN KREDIT EKSPOR/KREDIT SWASTA ASING........................................ 271
KEMENTERIAN PERTAHANAN .................................................................................................................................. 273 PENGADAAN ALAT UTAMA SISTEM PERSENJATAAN KEMENTERIAN PERTAHANAN ............................ 275
KEPOLISIAN REPUBLIK INDONESIA .......................................................................................................................... 277 PENGADAAN ALAT UTAMA KHUSUS KEPOLISIAN REPUBLIK INDONESIA .............................................. 279
KINERJA PELAKSANAAN PROYEK PINJAMAN LUAR NEGERI
1 Badan Meteorologi, Klimatologi dan Geofisika
2 Badan Pengawasan Keuangan dan Pembangunan
3 Badan Pengusahaan Batam
4 Kementerian Agama
5 Kementerian Agraria dan Tata Ruang/Badan Pertanahan Nasional
6 Kementerian Desa, Pembangunan Daerah Tertinggal dan Transmigrasi
7 Kementerian Kesehatan
8 Kementerian Ketenagakerjaan
9 Kementerian Pekerjaan Umum dan Perumahan Rakyat
10 Kementerian Pendidikan dan Kebudayaan
11 Kementerian Perhubungan
12 Kementerian Pertanian
13 Kementerian Pertahanan
14 Kementerian PPN/Bappenas
15 Kementerian Riset dan Teknologi/ Badan Riset dan Inovasi Nasional
16 Kepolisian Republik Indonesia
17 Lembaga Ilmu Pengetahuan Indonesia
18 PT. Penjamin Infrastruktur Indonesia (PII)
19 PT. PERTAMINA
20 PT. PLN
21 PT. Sarana Multi Infrastruktur
22 Pemerintah Provinsi DKI Jakarta
23 Lembaga Penjamin Kredit Eksport/Kredit Swasta Asing
3
TABEL NILAI TUKAR (KURS) USD TERHADAP MATA UANG
No. Mata Uang Kode
Nilai *
Per 30 Juni 2020
1. Australian Dollar AUD 1,45
2. Euro EUR 0,89
3. Indonesian Rupiah IDR 14.302,00
4. Japanese Yen JPY 107,69
5. Korean Won KRW 1.196,82
*) Kurs Tengah Bank Indonesia
BADAN METEOROLOGI, KLIMATOLOGI DAN GEOFISIKA
7
DEVELOPMENT OF MARITIME METEOROLOGICAL INFORMATION SYSTEM (MMS)
Peningkatan Kapasitas Pelayanan Pemantauan Iklim dan Cuaca BMKG
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Perancis
(Natixis) 164RS1QA
31/07/2019
s/d
31/07/2025
USD 43,0 0,0 0,0 43,0 -15,3 0,0 0,0 0,0
Instansi Pelaksana
Badan Meteorologi, Klimatologi, dan
Geofisika
Lokasi Proyek
Seluruh Indonesia
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pengadaan perangkat sistem observasi
meteorologi
b. Pengadaan sistem analisa, pengolahan,
dan diseminasi informasi cuaca dan
iklim
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Perjanjian pinjaman ditandatangani pada tanggal 13 Agustus 2018, namun baru efektif mulai tanggal 31
Juli 2019. Implementasi proyek mundur dikarenakan adanya perubahan berupa pergeseran komponen
proyek antara MMS 1 dengan MMS 2 serta revisi dokumen kriteria kesiapan sehingga lelang mengalami
keterlambatan. Pengumuman pemenang lelang telah dilaksanakan pada minggu pertama Februari
2020.
BADAN METEOROLOGI, KLIMATOLOGI DAN GEOFISIKA
8
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Pengadaan barang dan jasa
Menunggu hasil review dan komitmen perusahaan-
perusahaan pelaksana STR-II (SUS-MMS 1) untuk
mewujudkan fully integrated – single platform dari
sistem yang akan dibangun pada STR-II (SUS-MMS1-
MMS2) sehingga dapat menghasilkan sistem yang
efektif dan efisien.
Sedang dilaksanakan review bersama seluruh
stakeholders proyek. Ditargetkan awal Agustus 2020
sudah dapat dimulai kembali pembahasan kontrak
MMS1.
BADAN METEOROLOGI, KLIMATOLOGI DAN GEOFISIKA
9
SCALING-UP BMKG CLIMATE AND WEATHER SERVICE CAPACITY (SUS)
Peningkatan Kapasitas Pelayanan Pemantauan Iklim dan Cuaca BMKG
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Perancis
(Natixis) 1XCJ3SRA
31/07/2019
s/d
31/07/2024
USD 20,7 0,0 0,0 20,7 -18,3 3,6 0,0 0,0
Instansi Pelaksana
Badan Meteorologi, Klimatologi, dan
Geofisika
Lokasi Proyek
Seluruh Indonesia
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pengadaan perangkat sistem observasi
meteorologi
b. Pengadaan sistem analisa, pengolahan,
dan diseminasi informasi cuaca dan
iklim
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan Scaling Up BMKG Climate and Weather Service Capacity (SUS) merupakan program lanjutan
dari project BMKG periode 2011. Total nilai proyek adalah sebesar EUR 24,45 juta dengan komposisi
pinjaman sebesar EUR 20,7 juta dan uang muka dari Rupiah Murni Pendamping (RMP) BMKG sebesar
EUR 3,25 juta atau sebesar Rp 58,7 Milyar. Pada tahun 2019 BMKG telah menyiapkan pembayaran uang
muka sebesar Rp 58,7 Milyar, namun yang dibayarkan baru sebesar Rp 55,8 Milyar. Uang muka tahap
kedua sudah terbayar sesuai dengan SP2D tanggal 20 April 2020 sebesar EUR 415.582.
BADAN PENGAWASAN KEUANGAN DAN PEMBANGUNAN
13
STATE ACCOUNTABILITY REVITALIZATION PROJECT (STAR)
Peningkatan Kualitas Pengelola Keuangan Negara (PKN) dan Aparat Internal Auditor Pemerintah (APIP) di
Instansi Pemerintah Pusat dan Daerah
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
ADB 2927-
INO
19/02/2013
s/d
31/03/2020
USD 57,8 57,4 99,4 0,3 -4,1 0,0 0,0 0,0
Pertemuan tim STAR dan ADB dengan Pengelola Program Studi di
Unviersitas Jambi
Instansi Pelaksana
Badan Pengawasan Keuangan dan
Pembangunan – Sekretariat Umum
Lokasi Proyek
Provinsi DKI, Bogor, Yogyakarta, Surabaya,
Semarang, Makassar, Jambi, Bandung,
Medan, Aceh.
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Penyelenggaraan Program Magister
(S2) dan Program Sarjana (S1) atau
Diploma IV (D4)
b. Training dan Sertifikasi JFA dan Non-
JFA
c. Pengembangan E-learning
d. International Training/Benchmarking
dan ToT
e. Pengembangan Sistem Informasi
Managemen Akuntabilitas (SIMA)
f. Piloting Cross Sectoral Evaluation
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Pelaksanaan pekerjaan ini sudah selesai dan saat ini sedang menyelesaikan Project Completion Report
(PCR).
BADAN PENGUSAHAAN BATAM
17
DEVELOPMENT OF SEWERAGE SYSTEM IN BATAM ISLAND PROJECT
Proyek Pengembangan Sistem Pembuangan Air Limbah di Pulau Batam
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Korea INA-
20
29/12/2014
s/d
30/06/2021
KRW 53.414,5 37.935,0
71,0
15.479,5
-13,6
14.085,0 6.029,0
42,8
USD 44,6 31,7 12,9 11,8 5,0
42,8
Pumping Station #1
Sumber : Badan Pengusahaan Batam
Instansi Pelaksana
Badan Pengusahaan Batam
Lokasi Proyek
Kota Batam, Provinsi Kepulauan Riau
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pengadaan dan Konstruksi : Instalasi
Pengelolaan Air Limbah (Kapasitas
20.000 m3/d), Monitoring dan Sistem
Otomasi, 5 Pumping Station, Jalur
Pembuangan 114,35 Km, Fasilitas
Pengomposan dan Utilitas, serta
Commisioning and Training.
b. Layanan konsultansi : detail desain,
mempersiapkan dokumen pelelangan
dan membantu evaluasi teknis untuk
pengadaan, pengawasan proses
konstruksi, pemantauan lingkungan
dan dampak sosial, meninjau serta
memeriksa panduan inspeksi yang
disiapkan oleh kontraktor, membantu
kegiatan kampanye dan aktivitas sosial
Project Executing Agency (PEA).
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Paket Construction Work
Progres fisik keseluruhan sampai dengan TW II 2020 sebesar 88% dengan breakdown sebagai berikut:
Pekerjaan Progress
Pemasangan Pipa 80,2 %
Stasiun Pompa 99,9 %
WWTP 95,1 %
Commision 72,8 %
BADAN PENGUSAHAAN BATAM
18
Konstruksi diharapkan dapat selesai pada bulan Desember 2020 karena masa aktif loan sampai dengan
Juni 2021. Sampai dengan TW II 2020 sudah dilakukan 6.400 dari 11.000 sambungan rumah (SR),
dikhawatirkan tidak dapat selesai 100%. BP Batam harus menyampaikan timeline dan action plan untuk
pekerjaan SR yang tersisa. Pekerjaan SR akan dilakukan pararel dengan audit BPKP terhadap realokasi
Contingency Plan untuk membayar konsultan yang diperkirakan akan selesai bulan September 2020.
Perlu pembicaraan lebih lanjut dengan Bappenas dan EDCF jika sambungan rumah tidak terselesaikan
sepenuhnya apakah akan memerlukan amandemen MoD atau Loan Agreement.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Kontrak konsultan telah berakhir pada
Oktober 2019.
b. Masih menunggu review BPKP untuk
contingency plan senilai USD 1,8 juta
untuk pembayaran konsultan.
c. Sambungan rumah hanya mencapai
6.400 sambungan dari target 11.000
sambungan. Masih terdapat kendala
penolakan dari beberapa perumahan.
a. Perpanjangan waktu kerja konsultan
selama 14 bulan sampai dengan
Desember 2020.
b. Review BPKP diperkirakan selesai pada
awal September 2020.
c. Sambungan rumah dibiayai dengan RMP
sehingga dapat dilakukan commisioning
test meskipun tidak mencapai 11.000
sambungan.
KEMENTERIAN AGAMA
21
REALIZING EDUCATION'S PROMISE - MADRASAH EDUCATION QUALITY REFORM (REP-EQR)
Meningkatkan kualitas tata kelola penyelenggaraan pendidikan dasar dan menengah di Kementerian
Agama
Lender Kode Loan Tanggal
Efektif
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta USD)
(Juta) % Target Realisasi %
Bank
Dunia 8992-ID
26/11/2019
s/d
31/12/2024
USD 250,0 0,1 0,0 249,9 -
11,6 1,4 0,1 4,2
Instansi Pelaksana
Direktorat Jenderal Pendidikan Islam –
Kementerian Agama
Lokasi Proyek
Provinsi DKI Jakarta, Nasional (34 Provinsi
di Indonesia)
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Penerapan sistem perencanaan dan
penganggaran berbasis kinerja secara
elektronik - eRKAM (Rencana Kerja
dan Anggaran Madrasah).
b. Pelaksanaan asesmen kompetensi
siswa Indonesia (AKSI).
c. Kebijakan dan pengembangan
keprofesian berkelanjutan untuk guru,
kepala madrasah, dan tenaga
kependidikan madrasah.
d. Penguatan sistem untuk mendukung
pengembangan kualitas.
KEMENTERIAN AGAMA
22
Kinerja Pelaksanaan Proyek dan Pencapaian Indikator Kinerja
(Ekuivalen juta USD)
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD)
Keuangan Fisik (%)
Realisasi
Kumulatif s/d
Desember 2019
(USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
Consultant services, training and workshops* and incremental operating costs* under part 1 of the project
1 Procurement Specialist
23,213.79 - - 27,586.21 8,422.76 30.53 - 100% 36%
2 Financial Management
Specialist 24,241.38 - - 27,586.21 8,623.88 31.26 - 100% 36%
3 Project Management
Specialist 22,965.52 - - 27,586.21 8,147.76 29.54 - 100% 35%
4
Advisor in Quality
Education and
Management
22,800.00 - - 24,827.59 7,156.38 28.82 - 100% 31%
5
Consultant Management
for e-RKAM Program, EDM
Program and Incentive
Madrasah
22,406.90 - - 24,827.59 6,756.16 27.21 - 100% 30%
6 Management Information
System Specialist 22,144.83 - - 24,827.59 3,868.83 15.58 - 100% 17%
7 EMIS Regulatory
Framework Consultant 19,917.24 - - 24,827.59 4,197.95 16.91 - 100% 21%
8
Consultant for Continuing
Proffesional Development
for Madrasah Teacher and
Education Personnel
20,048.28 - - 24,827.59 4,331.36 17.45 - 100% 22%
9 Consultant for Assessment
of Learning Competencies 18,744.83 - - 24,827.59 3,850.61 15.51 - 100% 21%
10
Quality Assurance
Consultant for e-RKAM and
EDM Application
15,293.79 - - 24,827.59 2,556.52 10.30 - 100% 17%
11 Program Assistant for
Procurement 6,096.55 - - 7,241.38 710.77 9.82 - 100% 12%
12
Senior Program Assistant
for Madrasah Learning
and Technology
Information Development
6,959.48 - - 7,241.38 766.30 10.58 - 100% 11%
13
Team Leader and
Infrastucture Management
Specialist
7,758.62 - - 11,034.48 - - - 100% 0%
14
Quality Assurance
Specialist for ERKAM
Application
6,206.90 - - 11,034.48 - - - 100% 0%
15 ERKAM Software
Developer Specialist 6,465.52 - - 11,034.48 - - - 100% 0%
16 ERKAM Software
Developer Specialist 6,362.07 - - 11,034.48 - - - 100% 0%
17 ERKAM Software
Developer Specialist 6,206.90 - - 11,034.48 - - - 100% 0%
18
Development Operations
for ERKAM System
Deployment
5,482.76 - - 11,034.48 - - - 100% 0%
19
Development Operations
for ERKAM System
Deployment
5,482.76 - - 11,034.48 - - - 100% 0%
20 Assistant Program for ERKAM
Technical Writer 3,000.00 - - 4,137.93 - - - 100% 0%
21
Senior Program Assistant for
Creative and Digital Content
Development
3,062.07 - - 4,137.93 - - - 100% 0%
22
Senior Program Assistant for
Creative and Digital Content
Development
2,731.03 - - 4,137.93 - - - 100% 0%
23
Senior Program Assistant for
Voiceover the Digital
Content in the online
2,896.55 - - 4,137.93 - - - 100% 0%
KEMENTERIAN AGAMA
23
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD)
Keuangan Fisik (%)
Realisasi
Kumulatif s/d
Desember 2019
(USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
Learning Management
System (LMS)
24
Senior Program Assistant for
Videography the Digital
Content in the online
Learning Management
System (LMS)
3,103.45 - - 4,137.93 - - - 100% 0%
25
Associate Program Assistant
for Videography the Digital
Content in the online
Learning Management
System (LMS)
2,586.21 - - 4,137.93 - - - 100% 0%
26
Associate Program Assistant
for Videography the Digital
Content in the online
Learning Management
System (LMS)
2,586.21 - - 4,137.93 - - - 100% 0%
27
Logistic Service Provider
untuk Penyusunan Regulasi
Sistem Pendataan
50,617.24 - - 51,393.10 - - - 100% 0%
28
Pengadaan Layanan
Bandwidth Data Pendidikan
Islam
118,260.17 - - 62,068.97 - - - 100% 0%
29
Pengadaan Penyedia Sistem
Komunikasi Pendukung
Layanan (Layanan Contact
Center Chatbot)
57,351.72 - - 68,965.52 - - - 100% 0%
30
Logistic Service Provider
untuk Bimbingan Teknis
Penerapan EDM dan ERKAM
bagi Tim Inti Nasional dan
Tim Inti Provinsi
121,633.62 - - 126,091.79 - - - 100% 0%
31
Logistic Service Provider
untuk Bimbingan Teknis
Penerapan EDM dan ERKAM
bagi Tim Inti
Kabupaten/Kota
291,866.64 - - 311,855.89 - - - 100% 0%
32
Logistic Service Provider
untuk Bimbingan Teknis
Penerapan EDM dan ERKAM
bagi Tim Inti
Kabupaten/Kota di 10
Provinsi
269,160.50 - - 339,601.50 - - - 100% 0%
33
Logistic Service Provider
untuk Dukungan dan
Bantuan Teknis kepada
Kabupaten/Kota dan
Provinsi dalam Menganalisis
dan Melaporkan Data
ERKAM
80,670.18 - - 87,295.50 - - - 100% 0%
Incentive Grants under Parts 1(b)(iv) and 1(b)(v) of the Project, and Block Grants under Part 3(a)(iii) of the Project
KEMENTERIAN AGAMA
24
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
Komponen 1
a. Rencana pelaksanaan Bimtek EDM dan
eRKAM mengalami beberapa kali
perubahan pendekatan, hingga akhirnya
ditetapkan secara daring untuk seluruh
target Madrasah 2020.
Komponen 3
a. Adanya pandemic covid-19
mengakibatkan perencanaan dan
pelaksanaan kegiatan waktunya relatif
pendek.
b. Ketentuan khusus penggunaan jasa profesi
bagi narasumber yang berasal dari luar
Ditjen Pendidikan Islam.
Komponen 1
a. Proses lelang LMS yang akan digunakan
untuk melaksanakan Bimtek secara
Daring dibatalkan, karena telah
ditemukan platform LMS yang telah siap
yaitu Google Suite for Education. Hal ini
telah disetujui Bank Dunia.
b. Diperlukan addendum kontrak bagi LMS
yang telah memenangkan sebagai EO
pelaksanaan Bimtek TIN, TIP dan TIK dari
yang semula dilakukan secara tatap
muka menjadi daring.
c. Diperlukan perubahan wujud bahan ajar
agar dapat digunakan secara daring.
d. Memerlukan sosialisasi Google Suite for
Education kepada TIN, TIP dan TIK
sebelum Bimtek dimulai.
Komponen 2
a. Tim yang solid dari PIC dan koordinator
dapat mengatasi kendala yang ada.
b. Dikoordinasikan secara lisan melalui
ketua PMU dan Bendahara PMU dengan
memperhatikan profil narasumber,
institusional background dan materi yang
disampaikan supaya tidak terkait dengan
tusinya sebagai mitra kerja.
KEMENTERIAN AGAMA
25
THE DEVELOPMENT OF UIN MAULANA MALIK IBRAHIM MALANG (PHASE II) EAST JAVA
PROJECT
Pengembangan UIN Maulana Malik Ibrahim Fase 2
Lender Kode Loan Tanggal
Efektif
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta USD)
(Juta) % Target Realisasi %
SFD SFD/10/739
08/07/2019
s/d
31/12/2024
USD 54,7 0,0 0,0 54,7 -
17,9 4,5 0,0 0,0
Hasil DEDC Sumber : PMU UIN Malang
Instansi Pelaksana
Direktorat Jenderal Pendidikan Islam –
Kementerian Agama
Lokasi Proyek
a. Provinsi Jawa Timur
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Construction of classroom building and
laboratories for Faculty of Medicine,
Faculty of Pharmacy, and Faculty of
Engineering.
b. Construction of Research and Data
Centre.
c. Construction of Two Ma’had Buildings.
d. Construction of Islamic Tutorial Center.
e. Land development and supporting
infrastructure.
f. Procurement of equipment and
furniture.
g. Consultant services (PMSD, EQC, ICT
consultant).
h. Post graduate program and training
development.
i. Curriculum development program.
j. Project management unit.
KEMENTERIAN AGAMA
26
Kinerja Pelaksanaan Proyek dan Pencapaian Indikator Kinerja
(Ekuivalen juta USD)
No Paket Kontrak/
Komponen
Nilai
Kontrak
KEUANGAN FISIK (%)
Realisasi
Kumulatif TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1 Civil Works a
Infrastructure
Civil works 31.77 - - - - - - - -
Infrastructure 7.39 - - - - - - - -
2 Furniture & Equipment
Furniture & Fixture 2.41 - - - - - - - -
Equipment 9.47 - - - - - - - -
3 Consultants
DEDC 0.60 - - - - - - - -
PMSC 0.73 - - - - - - - -
EQC 0.23 - - - - - - - -
ICT Consultant 0.08 - - - - - - - -
4 Post Graduate Progrm &
Training Development 4.16 - - - - - - - -
5 Curriculum Development
Program 1.09 - - - - - - - -
6 Project Management Unit 0.20 - - - - - - - -
Kemajuan Pelaksanaan Kegiatan
1. Civil Works & Infrastructure. Kegiatan dalam tahap pengajuan ulang NOL ke SFD untuk
mengakomodasi perubahan mekanisme lelang dari manual ke elektronik akibat COVID-19 serta
perubahan ketentuan K3.
2. Furniture & Equipment. Kegiatan masih dalam tahap persiapan dokumen lelang Furniture and Fixture
Consultants. Proses lelang akan dilaksanakan pada triwulan III 2020 dan ditargetkan terkontrak pada
triwulan IV 2020.
3. Consultants. Kegiatan dalam tahap pengajuan ulang NOL ke SFD terkait proses lelang konsultan
PMSC (Project Management and Supervision Consultant), EQC (Equipment Consultant), dan ICTC
(Information and Communication Technology Consultant) dalam kondisi wabah COVID-19.
4. Post Graduate Program & Training Development Program. PMU telah melakukan Pembekalan dan
Pengiriman Studi Lanjut S2/S3 (26 Orang yang sudah terseleksi dan sebagian sudah mulai proses
studi), dan Pembahasan Fast Track studi lanjut S2 beberapa program studi untuk pemenuhan SDM.
5. Curriculum Development Program. PMU sedang menyusun pedoman pengembangan kurikulum,
pengembangan kapasitas, dan pengembangan staff. Pelaksanaan pengembangan kurikulum
direncanakan akan berlangsung selama 15 bulan mulai dari Triwulan II 2020 hingga Triwulan III 2021
dan saat ini dalam tahap review rencana induk pengembangan universitas.
6. Project Management Unit. Kegiatan masih dalam tahap persiapan lelang alat PMU.
KEMENTERIAN AGAMA
27
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Pengadaan Barang dan Jasa
a. Seleksi/lelang konsultan PMSC, EQC dan
ICTC belum dapat terealisasi dikarenakan
berdasarkan dokumen lelang yang sudah
disetujui (NOL) SFD lelang dilakukan secara
manual. Dengan kondisi wabah Covid-19
sekarang ini, proses seleksi/lelang konsultan
dengan cara manual sulit untuk dilakukan.
Lain-lain
a. Seluruh kegiatan terkait dengan
Internasionalisasi Universitas, sertifikasi
maupun akreditasi Internasional, dan yang
melibatkan pakar atau personil dari luar
Negeri tidak dapat dilakukan.
b. Revisi anggaran tidak bisa dilakukan
dengan cepat, karena menunggu revisi
yang terkait Covid-19.
a. Koordinasi dan pengajuan ulang NOL ke
SFD terkait perubahan pelaksanaan
lelang dari manual ke eletronik.
a. Pelaksanaan kegiatan ditunda dan akan
menyesuaikan dengan kondisi Covid-19.
Anggaran yang telah dialokasikan untuk
kegiatan tersebut akan direvisi sesuai
dengan kebutuhan saat ini.
b. PMU dan Kementerian Agama akan
berkoordinasi secara intensif dengan
Kementerian Keuangan
KEMENTERIAN AGAMA
28
THE SUPPORT TO DEVELOPMENT OF THE ISLAMIC HIGHER EDUCATION PROJECT (4 IN 1)
Pembangunan 4 (empat) Pendidikan Tinggi Islam di Indonesia
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
IDB IND-
0164
18/05/2013
s/d
11/12/2020
USD 123,8 85,8 69,3 38,0 -24.8 6,5 31,7 100,0
Site Plan M-99 UIN Raden Fatah Palembang
Instansi Pelaksana
Direktorat Jenderal Pendidikan Islam
- Kementerian Agama
a. UIN Sumatera Utara, Medan
b. UIN Raden Fatah, Palembang
c. UIN Walisongo, Semarang
d. IAIN Mataram, Mataram
Lokasi Proyek
a. Provinsi Sumatera Utara
b. Provinsi Sumatera Selatan
c. Provinsi Jawa Tengah
d. Provinsi Nusa Tenggara Barat
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Civil works
b. Furniture and fixture
c. Equipment
d. PMSC
e. DEDC
f. EQC
g. Auditor
h. Start-up workshop
i. Curriculum development
j. Training program
k. PMU and PIU
KEMENTERIAN AGAMA
29
Kinerja Pelaksanaan Proyek dan Pencapaian Indikator Kinerja
EquivalenJuta USD
No
Paket
Kontrak/
Komponen
Nilai
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020 (Juta USD)
Realisasi
Kumulatif
TA 2020
Nilai % Target Realisas
i % Target Realisasi
1 Civil Works
Paket 1 UIN
Sumut 22,75
19,7
9 87 - 6,83 - 95,07 18,31 13,38
Paket 2 UIN
Palembang 25,47
22.0
3 86.05 - 4,56 - 99,35 13,71 0,65
Paket 3 UIN
Semarang 16,99
15.3
3 90.3 - 1,52 - 98,91 14,05 2,17
Paket 4 UIN
Mataram 21,44
20,3
6 95 - 6,34 - 100 8,82 8,82
2 Equipment
Paket 1 UIN
Sumut 5,08 1,47 29 - 3,73 - 100 100 100
Paket 2 UIN
Palembang 5,00 4,5 90 - 4,5 - 100 100 100
Paket 3 UIN
Semarang 7,04 1,97 28 - 3,16 - 74 100 74
Paket 4 IAIN
Mataram 4,17 0 0 - 0,91 - 25 100 25
3 DEDC
Paket 1 dan 2
(UIN Sumut
dan
Palembang)
0,49 0,49 100 0 0 0 100 0 0
Paket 3 dan 4
(UIN Semarang
dan Mataram)
0,39 0,39 100 0 0 0 100 0 0
4 PMSC
Paket 1 UIN
Sumut 0,47 0,33 71 - 0,08 - 95,07 18,31 13,38
Paket 2 UIN
Palembang 0,53 0,36 68 - 0,09 - 92,47 13,71 6,18
Paket 3 UIN
Semarang 0,41 0,28 68 - 0,07 - 88,12 14,05 2,17
Paket 4 IAIN
Mataram 0,54 0,38 69 - 0,08 - 100 8,82 8,82
5 EQC Paket 1 0,48 0.38 80 0 0 0 30 90 20
6 Auditor 0,20 0 0 0 0 0 0 0 0
7 Start-up
Workshop 0,02 0,02 100 0 0 0 100 0 0
8 PMU Expert
Procurement
Expert 0,07 0,07 100 0 0 0 100 0 0
Construction
Expert 0,02 0,02 100 0 0 0 100 0 0
KEMENTERIAN AGAMA
30
Kemajuan Pelaksanaan Kegiatan
1. Civil Works. Pelaksanaan kegiatan fisik sedang dilaksanakan dengan progres di UIN Sumatera Utara
sebesar 95,07% dengan target selesai pada Agustus 2020, UIN Palembang sebesar 99.35% dengan
target selesai pada Juli 2020, UIN Semarang sebesar 98.91% dengan target selesai Agustus 2020, dan
UIN Mataram sebesar 100%.
2. DEDC. Dokumen DED telah selesai disusun.
3. PMSC. Kegiatan sedang dilaksanakan.
4. EQC. Kegiatan sedang dalam pelaksanaan.
5. Equipment. Pelaksanaan pengadaan peralatan di UIN Sumatera Utara dan UIN Palembang telah
selesai, saat ini menunggu kesiapan gedung untuk melakukan instalasi peralatan. Proses pengadaan
peralatan di UIN Semarang telah mencapai 74%, barang telah sampai dan saat ini dalam tahap
pemasangan. Sedangkan di UIN Mataram progres masih 25%.
6. Auditor. Kegiatan sedang dalam tahap persiapan pelaksanaan
7. Start-up Workshop. Kegiatan telah selesai dilaksanakan.
8. PMU Expert. Kegiatan Procurement Expert dan Construction Expert telah selesai dilaksanakan tahun
2018. Civil Engineer Expert dan Project Management Expert telah terkontrak dan sedang melaksanakan
kegiatan sesuai dengan jadwal.
9. Soft Program. Kegiatan capacity building dan curriculum development telah selesai dilaksanakan.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Anggaran yang tersedia di DIPA 2020 tidak
mencukupi untuk membiayai kegiatan Civil
Work di tahun 2020.
b. Pemasangan peralatan di UIN Semarang
tertunda karena teknisi yang berasal dari
luar negeri tidak dapat masuk ke Indonesia.
a. PMU telah mengajukan percepatan dan
luncuran untuk memenuhi kebutuhan
biaya tersebut.
b. PMU sedang mencari teknisi dalam
negeri yang dapat memasang peralatan
tersebut dengan bimbingan teknisi
sesungguhnya yang tidak dapat masuk
ke Indonesia.
KEMENTERIAN AGRARIA DAN TATA RUANG/BADAN PERTANAHAN NASIONAL
32
PROGRAM TO ACCELERATE AGRARIAN REFORM (ONE MAP PROJECT)
Mendukung pelaksanaan reforma agraria dan implementasi Kebijakan Satu Peta (One Map Policy)
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8897-
ID
26/10/2018
s/d
31/10/2023
USD 200,0 18,0* 9,0 182,0 -24,5 0,0 15,1 0,0**
Keterangan :*Data Bank Dunia per Juli 2020
**selisih penyerapan kumulaitf per TW II 2020 dengan penyerapan kumulatif per TW IV 2019
Instansi Pelaksana
Kementerian Agraria dan Tata
Ruang/Badan Pertanahan Nasional
Lokasi Proyek
a. Provinsi Riau
b. Provinsi Jambi
c. Provinsi Sumatera Selatan
d. Provinsi Kalimantan Timur
e. Provinsi Kalimantan Tengah
f. Provinsi Kalimantan Barat
g. Provinsi Kalimantan Selatan
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Komponen 1 : Cadaster for Agrarian Reform
b. Komponen 2 : Improvement of Geospatial Data Infrastructure for Environmental and Natural Resource
Management
c. Komponen 3 : Project Management and Institutional Development
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Status Penyerapan
1. DIPA 2020 untuk keseluruhan proyek yaitu sebesar Rp 667,12 Milyar dan diproyeksikan akan
terserap hingga Rp 567 Milyar hingga akhir tahun.
2. Adapun perbandingan antara target penyerapan (PAD Bank Dunia) terhadap realisasi kumulatif
pinjaman (per Mei 2020), terdapat selisih realisasi sebesar USD 7 juta di bawah target.
KEMENTERIAN AGRARIA DAN TATA RUANG/BADAN PERTANAHAN NASIONAL
33
Status Pelaksanaan Proyek
Komponen 1: Participatory mapping and agrarian reform
a. Pendaftaran Tanah Sistematis Lengkap (PTSL)
Jumlah bidang tanah yang sudah disurvei hingga tahun 2019 yaitu sebanyak 395.000
bidang dari target 4,3 juta bidang.
Lelang pelaksanaan PTSL tahun 2020 dalam tahap penetapan pemenang dan target
kontrak bulan Juli 2020 dengan durasi 5 bulan. PTSL tahap ini akan dilaksanakan untuk
memetakan 1,3 juta bidang tanah (30% dari target proyek) di 7 provinsi.
b. Forest Boundary Demarcation
Lelang pelaksanaan pilot di 5 provinsi (Sumsel, Jambi, Kaltim, Kalteng, dan Kalsel) dalam
proses persiapan. Direncanakan pengumuman lelang pada awal Juli 2020.
Pelaksanaan di 2 provinsi lain (Riau dan Kalbar) baru akan dilaksanakan setelah ada
kesepakatan pendekatan survei gabungan antara ATR dan KLHK.
c. e-Land. Dalam proses pengadaan hardware, target kontrak bulan Juli/Agustus 2020. Hardware
ini akan digunakan untuk meningkatkan kapasitas penyimpanan data dan meningkatkan
keamanan data.
Komponen 2: Geospatial data Infrastructure for environmental and natural resource management
a. Working Map.
Sumber peta yaitu dari hasil citra satelit LAPAN yang kemudian disesuaikan melalui proses
orthorektifikasi di BIG.
Dalam proses lelang untuk 2 paket pekerjaan pengukutan Ground Control Point (GCP) di
Sumatera dan Kalimantan.
b. Strengthening Geodetic Framework (CORS). Kegiatan on going berupa penyusunan Grand
Design InaCORS. Selain itu juga sedang dalam proses penyiapan dokumen untuk lelang
peralatan dan instalasi untuk ekspansi CORS (Continuously Operating Reference Station).
c. National Spatial Data Infrastructure (NSDI). Pengadaan software dan hardware orthorektifikasi
masih dalam tahap persiapan lelang.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Potensi kendala survei lapangan untuk
PTSL akibat Covid-19.
b. Penyusunan working map terkendala
kapasitas pekerjaan BIG yang juga
menerima permintaan peta dari berbagai
instansi.
c. Penyerapan pinjaman masih rendah.
d. Pada Paket Kontrak Participatory Mapping
with Survey (PTSL-PM) Provinsi Kalimantan
Timur dan Kalimantan Tengah, pihak
ketiga tidak dapat menyelesaikan
pekerjaan.
a. BIG akan menambah software dan
hardware untuk orthorektifikasi.
b. Sebelumnya terdapat keterlambatan
pelaksanaan beberapa paket kegiatan,
termasuk untuk PTSL yang memiliki nilai
kontrak cukup besar. Namun saat ini
proses lelang sudah berjalan sehingga
penyerapan akan meningkat signifikan
setelah paket-paket terkontrak.
c. Dilakukan pemutusan kontrak.
KEMENTERIAN DESA, PEMBANGUNAN DAERAH TERTINGGAL DAN TRANSMIGRASI
37
INTEGRATED VILLAGE ECONOMIC TRANSFORMATION/ TRANSFORMASI EKONOMI
KAMPUNG TERPADU
Menyediakan akses kepada masyarakat desa sasaran untuk memperoleh manfaat dari tata kelola daerah
dan kondisi sosio-ekonomi yang lebih baik
Lender Kode Loan Masa Laku Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
IFAD
2000003165 23/12/2019
s/d
30/06/2026
USD
33,0 0,0 0,0 33,0
-8,0
0,0 0,0 0,0
2000003164 1.5 0,0 0,0 1,5 0,0 0,0 0,0
Instansi Pelaksana
Direktorat Sumber Daya Alam dan
Teknologi Tepat Guna, Direktorat Jenderal
Pembangunan dan Pemberdayaan
Masyarakat Desa (PPMD), Kementerian
Desa, Pembangunan Daerah Tertinggal
dan Transmigrasi.
Lokasi Proyek
a. Provinsi Papua (Jayawijaya, Digoel,
Yahukimo, Sarmi, Kepulauan Yapen,
Nabire, Jayapura, Keerom, Dogiyai);
b. Provinsi Papua Barat (Kab. Manokwari,
Manokwari Selatan, Pegunungan
Arfak, Raja Ampat, Fak-Fak, Kaimana,
Maybrat);
c. Provinsi Maluku (Maluku Tengah, Seram
bagian barat, Seram bagian timur);
d. Provinsi Maluku Utara (Halmahera
Barat, Halmahera Tengah, Halmahera
Selatan);
e. Provinsi NTT (Manggarai, Ngadai,
Sumba Timur).
Ruang Lingkup (Pekerjaan dan Sasaran)
1. Pemberdayaan pengelolaan potensi
sumber daya alam desa;
2. Kerjasama untuk pengelolaan potensi
sumber daya alam desa;
3. Inovasi, belajar, dan kebijakan.
Kinerja Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
KEMENTERIAN DESA, PEMBANGUNAN DAERAH TERTINGGAL DAN TRANSMIGRASI
38
Ekuivalen Juta USD
No Paket Kontrak/
Komponen
Nilai
Kontrak
Keuangan Fisik (%)
Realisasi Kumulatif TA 2020 TA 2020
Nilai % Target Realisasi % Target Realisasi
Komponen Pinjaman 2000003165
1 Works N/A 0 0 N/A 0 0 0 0
2 Goods, Services, and
Inputs N/A 0 0 N/A 0 0 0 0
3 Consultances Loan N/A 0 0 N/A 0 0 0 0
4 Training N/A 0 0 N/A 0 0 0 0
5 Operating Cost N/A 0 0 N/A 0 0 0 0
Komponen Hibah 2000003164
6 Consultancies Grant N/A 0 0 N/A 0 0 0 0
Kemajuan Pelaksanaan Kegiatan
Sosialisasi TEKAD di tingkat pusat dan daerah tertunda.
SK NPMU dan Satker. SK Satker dan OPD di 5 provinsi belum disahkan akibat restrukturisasi
kelembagaan yang menyebabkan PMU kesulitan untuk berkoordinasi dengan daerah, diantaranya
di wilayah Papua pada 9 kabupaten dan 204 desa.
DIPA yang masih diblokir menghambat sejumlah proses diantaranya : (1) Rekruitmen fasilitator desa
yang direncanakan akan dilaksanakan melalui dekonsentrasi serta konsultan di pusat dan provinsi
(TOR telah siap). Alokasi besaran honor fasilitator belum disetujui oleh Menteri Keuangan. Target awal
pada bulan November atau Desember telah terkontrak. (2) Initial deposit telah disetujui oleh IFAD
dan telah tersedia di rekening khusus. Alokasi anggaran TA 2020 senilai Rp 50.65 Milyar di tingkat
pusat dan daerah.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Administrasi
a. Pembukaan blokir DIPA.
b. Restrukturisasi kelembagaan di 5 Provinsi
TEKAD.
a. NPMU akan mengirimkan Surat
Permintaan Telaah kepada DJA dengan
melampirkan kajian SBML, beban
fasilitator (tingkat kabupaten, kecamatan,
dan desa), cakupan fasilitator serta
insentif lain selambatnya minggu ke-2
Agustus 2020.
KEMENTERIAN KESEHATAN
40
INDONESIA SUPPORTING PRIMARY HEALTH CARE REFORM (I-SPHERE) PROGRAM
Memperkuat kinerja sistem pelayanan kesehatan primer Indonesia sesuai RPJMN 2015-2019 dan Rencana
Strategis Kementerian Kesehatan 2015-2019
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8873-
ID
09/10/2018
s/d
30/04/2024
USD 150,0 49,3* 32,9 100,7 1,8 0,0 1,1** 0,0
Keterangan : *Data Bank Dunia
**data Laporan Kementerian Kesehatan
Instansi Pelaksana
Direktorat Jenderal Pelayanan Kesehatan,
Kementerian Kesehatan RI
Lokasi Proyek
a. Provinsi Maluku
b. Provinsi Nusa Tenggara Timur
c. Provinsi Papua
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Peningkatan ketersediaan, perluasan
akses dan pemanfaatan pelayanan
kesehatan oleh masyarakat di Indonesia
terutama di Provinsi Maluku, NTT dan
Papua;
b. Peningkatan mutu pelayanan kesehatan
di Indonesia, terutama di Provinsi Maluku,
NTT dan Papua;
c. Peningkatan kapasitas manajemen
kesehatan di Indonesia, terutama di
Provinsi Maluku, NTT, dan Papua
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Anggaran. I-Sphere merupakan kegiatan yang dilaksanakan dengan skema Program for Results (PfR)
sehingga pencairan pinjaman didasarkan pada ketercapaian target pada Disbursement Linked
Indicators (DLIs) yang telah ditentukan. Dalam hal ini, kegiatan I-Sphere memiliki 10 DLI dengan targetnya
masing-masing. Hingga triwulan IV 2019, dari total pinjaman USD 150 juta, initial deposit USD 37,5 juta telah
dicairkan pada 2019 (14%). DIPA 2019 Rp 281.990.000.000, terealisasi 246.471.142.660 (87,4%) dan dapat
disimpulkan bahwa skema PforR bisa lebih baik dan efektif daripada IpF karena tidak harus
menggunakan dokumen NoL dan sebagainya. Saat ini terdapat balanced Rp 52 Milyar dan terdapat
rencana penarikan Rp 400 juta di tahun 2021.
KEMENTERIAN KESEHATAN
41
Status pelaksanaan pekerjaan. Pelaksanaan masing-masing DLI yaitu sebagai berikut:
a. DLI 1: Kabupaten/Kota yang tercakup di dashboard data dan informasi kesehatan. 51 Kab/Kota
(9,92%) sudah tercakup dalam dashboard, melebihi target 2019 (5%) sehingga pencapaiannya akan
diverifikasi di tahun 2020.
b. DLI 2: Puskesmas yang menggunakan Aplikasi m-Health yang menunjang Pelaksanaan PIS-PK yang
disempurnakan. Aplikasi m-Health telah selesai dirancang. Tahap berikutnya yaitu uji coba lapangan
dan saat ini dalam tahap sosialisasi uji coba.
c. DLI 3: Puskesmas mendapatkan tingkat akreditasi yang lebih tinggi. Sebanyak 1.015 puskesmas telah
mendapatkan tingkat akreditasi yang lebih tinggi (utama dan paripurna) di tahun 2019. Pencapaian
ini akan diverifikasi pada tahun 2020.
d. DLI 4: Puskesmas yang terakreditasi (untuk tingkat Dasar dan Madya) di Kawasan Indonesia Timur.
Sebanyak 214 puskesmas telah menerima akreditasi tingkat Dasar dan Madya di Maluku, Papua, dan
NTT pada tahun 2019. Pencapaian ini akan diverifikasi pada tahun 2020.
e. DLI 5: Komisi akreditasi pelayanan kesehatan tingkat pertama (KAFKTP) berfungsi sebagai komisi
independen. Roadmap, rencana bisnis dan anggaran, serta AD/ART KAFKTP sebagai komisi
independen sudah disusun, namun pelaksanaannya masih menunggu arahan lebih lanjut terkait
perubahan kebijakan KAFKTP.
f. DLI 6: Kabupaten/Kota bermasalah yang menghasilkan rencana tahunan. Modul dan kurikulum
pelatihan perencanaan pembangunan kesehatan sudah disusun. Adapun pelaksanaan pelatihan
yang tertunda pada 2019 akan dilaksanakan pada tahun 2020.
g. DLI 7: Penugasan khusus tenaga kesehatan. Secara kumulatif, sebanyak 768 tim telah diberikan
penugasan khusus. Pencapaian ini akan diverifikasi pada tahun 2020.
h. DLI 8: Fasilitas pelayanan primer dapat mengimplementasikan Kapitasi JKN berdasarkan indikator
kinerja. Baru akan dimulai pada tahun ketiga I-SPHERE.
i. DLI 9: Kabupaten/Kota yang menunjukkan peningkatan minimal setengah dari indikator kinerja
dalam penetapan DAK-Non Fisik. Rancangan Pedoman Pengalokasian DAK Nonfisik Bidang
Kesehatan telah disusun, dalam proses finalisasi formula perhitungan insentif bagi Kabupaten/Kota
sesuai dengan capaian indikator program prioritas nasional. Secara paralel dilakukan pengumpulan
data dasar DAK Nonfisik berbasis kinerja.
j. DLI 10: Jumlah provinsi yang menerapkan sistem rujukan terpadu dan terintegrasi. Aplikasi SISRUTE
telah selesai disusun dan telah dilakukan uji coba di 5 provinsi. DLI ini akan menjadi salah satu DLI
yang diverifikasi pada tahun 2020
Capaian Kinerja.
Fisik.
a. Rumah Sakit Ambon telah terbangun berupa Gedung dengan 8 lantai seluas 36.000 m2, pada tahun
2019 telah mendapatkan izin operasional dan sejak tanggal 28 Mei 2020 sudah melayani pasien
Covid-19;
b. Rumah Sakit Kupang telah menyelesaikan sertifikasi tanah pada tahun 2019 dan direncanakan akan
dilakukan lelang fisik pada bulan Oktober 2020 dimana target operasional pada tahun 2023;
c. Rumah Sakit Wamena telah menyelesaikan sertifikasi tanah pada tahun 2019. Saat ini sedang dalam
proses lelang pekerjaan fisik dan pelaksanaan konstruksi fisik direncanakan pada tahun 2021. Operasi
Rumah Sakit Wamena direncanakan pada tahun 2024;
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
KEMENTERIAN KESEHATAN
42
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Pandemi Covid-19 menyebabkan
pencapaian target DLI dan pelaksanaan
verifikasi oleh BPKP mengalami kendala
sehingga verifikasi oleh BPKP belum dapat
dilaksanakan.
b. Pinjaman dengan modalitas Program for
Results (PforR) belum sepenuhnya di Back
up dengan peraturan/ketentuan yang
spesifik.
c. DLI 2: Adanya keterlambatan dalam uji
coba aplikasi m-Health.
d. DLI 5: Adanya perubahan kebijakan
pimpinan sehingga memerlukan arahan
lebih lanjut untuk penyelesaian
pencapaian target.
e. DLI 6: Adanya keterlambatan
pelaksanaan pelatihan perencanaan
pembangunan kesehatan
Kabupaten/Kota untuk dapat menyusun
rencana tahunan.
f. DLI 9: Belum tercapainya proses
kesepakatan formula pengalokasian DAK
Nonfisik antara WB dengan Kemenkes.
a. Sedang dibahas tindak lanjut untuk
pelaksanaan verifikasi mix (online dan
offline) atau alternatif pelaksanaan
verifikasi.
b. DLI 2: Mendorong perencepatan
pelaksanaan uji coba
c. DLI 5: Mendorong percepatan perumusan
perubahan kebijakan oleh pimpinan.
d. DLI 6: Mendorong percepatan
pelaksanaan pelatihan.
e. DLI 9: Percepatan pengesahan pedoman
pengalokasian DAK nonfisik.
f. Percepatan penyelesaian capaian target
DLI 2018 dan 2019 yang tertunda.
KEMENTERIAN KETENAGAKERJAAN
45
DEVELOPMENT OF MARITIME VOCATIONAL TRAINING CENTER
Pembangunan gedung, Pengadaan Peralatan Pelatihan, Pegembangan Modul dan Pelatihan Instruktur
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Austria 237575
21/02/2020
s/d
30/04/2023
EUR 12,4 0,0
0,0
12,4
-11,2
7,4 0.0
0,0
USD 13,9 0,0 13,9 8,3 0,0
Instansi Pelaksana
Kementerian Ketenagakerjaan (Direktur
Jenderal Pembinaan Pelatihan dan
Produktivitas)
Lokasi Proyek
Balai Besar Pengembangan Latihan Kerja
Medan, (BBPLK Medan), Sumatera Utara
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pengadaan Peralatan Kejuruan
Pariwisata dan Kejuruan Joinery
b. Konstruksi Gedung
c. Pelatihan Instruktur
d. Pengembangan Program, Modul,
dan Training Management
Kinerja Pelaksanaan Proyek dan Pencapaian Indikator Kinerja
Ekuivalen juta EUR
No Paket Kontrak/ Komponen
Alokasi
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020
Realisasi
Kumulatif
Nilai % Target Realisasi %
1 Pengadaan Peralatan 7,52 - - - - - -
2 Konstruksi Gedung 2,70 - - - - -
3 Pelatihan Infrastruktur 0,39 - - - - - -
4 Pengembangan Program, Modul,
dan Training Management 1,76 - - - - - -
KEMENTERIAN KETENAGAKERJAAN
46
Kemajuan Pelaksanaan Kegiatan
Kegiatan Development Maritime Vocational Training Center merupakan kegiatan yang dilaksanakan oleh
Balai Latihan Kerja (BLK) di beberapa kota dan dibawah tanggung jawab Kementerian Ketenagakerjaan.
Kegiatan ini dibiayai pinjaman Pemerintah Austria dengan skema soft loan (0% interest). BLK Medan
mendapatkan alokasi pinjaman sebesar EUR 12,400,000 (ekuivalen Rp 204,600,000,000) dari total nilai
pinjaman EUR 39,882,493 yang dialokasikan untuk 3 lokasi BLK (Medan, Serang, Makassar). Saat ini belum
ada penyerapan di kegiatan BLK Medan, dikarenakan DIPA 2020 baru selesai proses buka blokir.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Administrasi
Anggaran PHLN yang ada dalam DIPA 2020 BBPLK
Medan masih terblokir sampai dengan bulan Mei
2020. Proses buka blokir mengalami kendala karena
prioritas dari Kementerian Keuangan adalan
penanganan Covid-19.
Revisi buka blokir anggaran PHLN DIPA 2020 BBPLK
Medan telah selesai pada tanggal 20 Mei 2020
dengan nomor DS.0306-4810-1201-1056. Kemudian,
revisi anggaran di Direktorat Pelaksana Anggaran
terkait cara pembayaran dan tempat
pembayaran serta pengaktifan kode loan telah
selesai pada tanggal 29 Juni 2020 dengan nomor
DS.5064-4712-1094-3315.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
51
ACCELERATING INFRASTRUCTURE DELIVERY THROUGH BETTER ENGINEERING SERVICES
PROJECTS (ESP)
Penguatan Kapasitas Kementerian PUPR untuk Mengefisiensikan Desain dan Implementasi Investasi Publik yang
DIbangun oleh Kementerian PUPR
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
ADB 3455-
INO
21/12/2016
s/d
29/04/2022
USD 148,2 19,8 13,4 128,4 -52,5 20,7 4,9 23,6
Instansi Pelaksana
Kementerian Pekerjaan Umum dan
Perumahan Rakyat:
a. Direktorat Jenderal Cipta Karya
b. Direktorat Jenderal Bina Marga
c. Direktorat Jenderal Sumber Daya Air
Lokasi Proyek
Aceh, Sumatera Utara, Jambi, Sumatera
Barat, Sumatera Selatan, Kepulauan Riau,
Lampung, Jawa Tengah, DI Yogyakarta,
Jawa Timur, Bali, Kalimantan Barat,
Kalimantan Selatan, Kalimantan Tengah,
Kalimantan Utara, Sulawesi Selatan, Sulawesi
Utara, Sulawesi Tenggara, Nusa Tenggara
Barat, Nusa Tenggara Timur.
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Perkuatan kapasitas Kementerian PUPR dalam perencanaan dan pelaksanaan pembangunan
infrastruktur publik.
b. Peningkatan kualitas dan percepatan start-up kesiapan proyek infrastruktur Kementerian Pekerjaan
Umum dan Perumahan Rakyat, dengan lingkup kegiatan meliputi FS, DED, AMDAL/UKL/UPL, dan
TFAC.
c. Penguatan kapasitas Kementerian Pekerjaan Umum dan Perumahan Rakyat dalam manajemen
investasi publik.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
52
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No Komponen/Lingkup/Paket Kontrak Status/Kemajuan Pelaksanaan Capaian Indikator Kinerja
Ruang Lingkup 1
Peningkatan kualitas dan percepatan start-up kesiapan proyek infrastruktur Kementerian Pekerjaan Umum dan Perumahan
Rakyat, dengan lingkup kegiatan meliputi FS, DED, AMDAL/UKL/ UPL, dan TFAC
1 Ditjen SDA Lelang 12 paket Telah terkontrak 16 dari 26
paket pekerjaan
2 Ditjen Bina Marga Lelang 5 paket Telah terkontrak 4 dari 10 paket
pekerjaan
3 Ditjen Cipta Karya Lelang 3 paket Telah terkontrak 8 dari 10 paket
pekerjaan
4 Ditjen Pembiayaan Infrastruktur Lelang 4 paket
Ruang Lingkup 2
Penguatan kapasitas Kementerian Pekerjaan Umum dan Perumahan Rakyat dalam manajemen investasi publik
1 Capacity building Dilaksanakan 9 kegiatan capacity
building di Ditjen Bina Marga
2 Pelatihan Dilaksanakan 7 kali pelatihan
persiapan FS dan LARP di Ditjen CK
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
Pelaksanaan paket pekerjaan berpotensi
mengalami keterlambatan akibat Covid-19.
EA akan mengawasi proses lelang lebih ketat untuk
mengejar target lelang selesai akhir tahun 2020. EA
perlu memastikan agar pinjaman dapat selesai
sebelum closing date agar tidak ada
perpanjangan lagi, mengingat grace periode
proyek ini hanya selama 3,5 tahun.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
54
INTEGRATED INFRASTRUCTURE DEVELOPMENT FOR NATIONAL TOURISM STRATEGIC AREAS
(INDONESIA TOURISM DEVELOPMENT PROJECT)
Meningkatkan wisatawan asing, wisatawan domestik, pendapatan negara dalam bentuk valuta asing,
ketenagakerjaan, dan daya saing pariwisata melalui pembangunan destinasi wisata prioritas yang
terintegrasi.
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8861-
ID
23/11/2018
s/d
31/12/2023
USD 300,0 2,7 0,9 297,3 -
30,5 7,2 0,0 0,0
*Data LPKPHLN Kementerian PUPR TW II 2020, Data LKP TW I 2020 bersumber dari data Bank Dunia
Instansi Pelaksana
a. Badan Pengembangan Infrastruktur
Wilayah Kementerian PUPR;
b. Deputi Pengembangan Destinasi
Pariwisata Kementerian Pariwisata;
c. Ditjen Bina Marga Kementerian PUPR;
d. Ditjen Cipta karya Kementerian PUPR;
e. Deputi Pengembangan Industri dan
Kelembagaan Kementerian
Pariwisata;
f. Deputi Perencanaan Penanaman
Modal BKPM.
Lokasi Proyek (Provinsi)
a. Provinsi Sumatera Utara (Danau Toba)
b. Provinsi DIY dan Jawa Tengah
(Borobudur)
c. Provinsi NTB (Lombok)
d. Provinsi DKI Jakarta.
Ruang Lingkup (Pekerjaan dan Sasaran)
1. Komponen 1 : Meningkatkan Kapasitas Kelembagaan untuk Memfasilitasi Pengembangan Pariwisata
Terpadu dan Berkelanjutan;
2. Komponen 2 : Meningkatkan Kualitas Jalan dan Akses Pelayanan Dasar;
3. Komponen 3 : Mendorong Partisipasi Lokal dalam Perekonomian Sektor Pariwisata;
4. Komponen 4 : Meningkatkan Lingkungan yang Kondusif untuk Masuknya Investasi Swasta dan Usaha
ke Bidang Pariwisata.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
55
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
I Component 1
1.1 Integrated Planning and Coordination
Tourism Development
Project Management
Support Batch 1 & 2
7,22 1,55 21,4 1,85 0,00 0 - 100% 0%
Integrated Tourism Master
Plan for
BorobudurYogyakarta-
Prambanan
0,85 0,29 34,1 0,67 0,00 0 - 100% 0%
Integrated Tourism Master
Plan for Lombok 0,40 0,42 100 - 0,00 0 - 0% 0%
Integrated Tourism Master
Plan for Toba
(Loan Portion)
0,025 0,00 0 0,02 0,00 0 - 100% 0%
Unesco Program
Consulting Services 0,050 0,00 0 0,05 0,00 0 - 100% 0%
Market Analysis and
Demand Assesments to
Support the Development
of Integrated Tourism
Destinations: Borobudur-
Prambanan-Yogya
0.27 0,00 0 0,05 0,00 0 - 20% 0%
Market Analysis and
Demand Assesments to
Support the Development
of Integrated Tourism
Destinations: Komodo-
Labuan Bajo
0,29 0,00 0 0,06 0,00 0 - 20% 0%
Integrated Tourism Master
Plan for BromoTengger-
Semeru
0,22 0,00 0 0,07 0,00 0 - 20% 0%
Integrated Tourism Master
Plan for KNP-Labuan
Bajo
0,28 0,00 0 0,05 0,00 0 - 20% 0%
Integrated Tourism Master
Plan for Wakatobi 0,27 0,00 0 0,05 0,00 0 - 20% 0%
1.2
Sustainable Tourism
Observatory (STO)
Program
Developing Roadmap of
Sustainable Tourism
Development (STDev)
- 0,08 - - 0,00 0 - - 0%
Peer Learning of
Sustainable Tourism
Observatory (STO)
Programs and Advocacy
on
Sustainable Tourism
Destination (STD)
0,07 0,12 100 0,07 0,00 0 - 100% 0%
Sustainable Tourism
Observatory Lake Toba 0,14 0,09 64,2 0,14 0,00 0 - 100% 0%
Sustainable Tourism
Observatory
BorobudurYogyakarta-
Prambanan
0,14 0,09 64,2 0,14 0,00 0 - 100% 0%
Sustainable Tourism
Observatory Lombok 0,14 0,08 64,2 0,14 0,00 0 - 100% 0%
II Component 3
3.1 Skill Development
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
56
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
Competency-based
Standard, qualification
frameworks, and related
curriculum packages
Development in Toba, B-
Y-P
(BorobudurYogyakarta-
Prambanan) & Lombo
1,81 0,00 0 1,81 0,00 0 - 100% 0%
Training for Stakeholders's
Tourism Personel in
Toba, B-Y-P (Borobudur-
YogyakartaPrambanan)
& Lombok
0,69 0,00 0 0,69 0,00 0 - 100% 0%
BI Annual Tourism Forum 0,21 0,00 0 0,21 0,00 0 - 100% 0%
3.2 Firm Capabilities
Training & Development
for Online Marketing
Skills & Quality & Services
in Toba, B-Y-P
(Borobudur-Yogyakarta-
Prambanan) & Lombok
0,30 0,00 0 0,29 0,00 0 - 100% 0%
Purchasing of Data and
Analysis From Digital
Platform
0,19 0,00 0 0,19 0,00 0 - 100% 0%
3.3 Community Engagement
Tourism Awareness
Campaign for Community
in
Toba, B-Y-P (Borobudur-
YogyakartaPrambanan)
& Lombok
0,23 0,00 0 0,23 0,00 0 - 100% 0%
Monitoring and Evaluation
Survey Satisfaction
For All Project in Toba, BYP
and Lombok
0,21 0,00 0 0,21 0,00 0 - 100% 0%
Review Sadar WIsata 0,19 0,00 0 0,19 0,00 0 - 100% 0%
Pengadaan dan Implementasi Paket
a. 8 paket di komponen 1 telah terkontrak.
b. Komponen 2 belum ada paket terkontrak, terjadi perubahan beberapa paket akan dibiayai
APBN.
c. 3 paket di komponen 3 sudah persiapan lelang.
Perencanaan dan Penganggaran
Untuk tahun 2021, Kementerian PUPR menganggarkan Rp. 500 miliar. Angka ini tergolong kecil karena
adanya penundaan pembiayaan kegiatan yang didanai dari pinjaman pada tahun 2019 karena tidak
adanya NOL dari Bank Dunia untuk beberapa kegiatan. Kegiatan tersebut akhirnya didanai melalui
Rupiah. Atas kondisi tersebut, kemungkinan akan ada luncuran anggaran dari tahun 2019.
Pembebasan Lahan dan Safeguard
Pembangunan jembatan Tano Ponggol dibatalkan karena tidak memenuhi kriteria Bank Dunia.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
57
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Pengadaan Barang dan Jasa
Pengadaan dan implementasi paket terkendala
NoL Bank Dunia.
Perencanaan dan Penganggaran
Blokir DIPA Anggaran untuk pembiayaan
2 ITMP (ITMP Borobudur – Yogyakarta –
Prambanan dan ITMP Lombok) dan PMS
yang dibiayai menggunakan loan telah
dibuka.
NoL terbit untuk AWP Komponen 2
pada tanggal 15 Juli 2019 subject to the
detailed comments per sub-project.
Desain Kegiatan
ITMP Borobudur belum selesai.
Berdasarkan hasil pertemuan dengan
WB, beberapa paket di bawah
komponen 2 akan dibiayai
menggunakan APBN (jembatan jonggol
dan BIL-Mandalika sekitar RP 1,5 Triliun).
Telah dilakukan pertemuan antara PUPR dan Bank
Dunia.
Perencanaan dan Penganggaran
Penyiapan proses pembayaran progres
kegiatan 2 ITMP dan PMS.
Memastikan sub proyek di dalam AWP
Komponen 2 masuk di dalam dokumen
ITMP yang disusun oleh konsultan.
Desain kegiatan
Perlu kejelasan rencana kegiatan tahun
2020 serta rencana realokasi karena
beberapa paket akan dibiayai melalui
APBN.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
58
NATIONAL URBAN DEVELOPMENT PROJECT (NUDP)
Perencanaan dan pemrograman pembangunan kota yang terpadu serta penyusunan prioritas program
investasi modalnya (capital investment)dapat ditingkatkan
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia 8976-
ID
15/11/2019
s/d
31/12/2024
USD 49,6 0,0 0,0 49,6 -
12,2 0,3 0,0 0,0
Instansi Pelaksana
Badan Pengembangan Infrastruktur
Wilayah Kementerian PUPR;
Lokasi Proyek (Provinsi)
a. Kota Semarang
b. Kota Surakarta
c. Kota Denpasar
d. Kota Balikpapan
e. Kota Banjarmasin
f. Metropolitan Bandung
Ruang Lingkup (Pekerjaan dan Sasaran)
1. Peningkatan kelembagaan dan kebijakan nasional perkotaan.
2. Perencanaan terpadu untuk pembangunan perkotaan.
3. Pengembangan kapasitas pengelolaan keuangan kota.
4. Dukungan pelaksanaan proyek.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
59
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1 Component 1: Pengembangan kelembagaan dan kebijakan nasional perkotaan
1.1
Penguatan kapasitas
platform koordinasi
lintas kementerian bidang
perkotaan
Pelatihan kepemimpinan
dan kolaborasi - - - - - - - - -
Penyiapan mekanisme
tim kerja pengembangan
perkotaan
- - - - - - - - -
Platform nasional
transformasi perkotaan - - - - - - - - -
1.2
Dukungan terhadap
penyusunan Kebijakan
Nasional Perkotaan
dalam mendukung
pembangunan
perkotaan yang terpadu
Cities Positioning Study
(studi posisi kota) - - - - - - - - -
Economic Strategy Study
(kajian strategi
ekonomi)
- - - - - - - - -
1.3
Perumusan Rencana
Strategi Nasional
Infrastruktur Perkotaan
Rencana strategis
infrastruktur perkotaan
nasional mengacu pada
kebijakan perkotaan
nasional
- - - - - - - - -
2
Component 2:
Perencanaan Terpadu
untuk Pembangunan
Perkotaan
2.1
Dukungan Penguatan
Data dan Informasi
Serta Kapasitas
Kelembagaan Bagi Tata
Kelola Data
Peningkatan kualitas,
produksi, pengelolaan
dan pemeliharaan data
- - - - - - - - -
Fasilitas mekanisme
berbagi data (data
sharing) melalui
penyusunan kerangka
tata kelola data
- - - - - - - - -
Pengembangan dan
instalasi platform data
terintegrasi
- - - - - - - - -
Inventarisasi dan
pengembangan aset
infrastruktur secara luas
bagi kota-kota peserta
NUDP
- - - - - - - - -
2.2 Dukungan Perencanaan
Spasial yang Terpadu
Kajian analitis strategis
untuk mengintegrasikan
perencanaan sosial-
ekonomi dan
perencanaan
tata ruang
- - - - - - - - -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
60
Penyiapan Kerangka
Kerja Pengembangan
Spasial (Spatial
Development Framework
- SDF)
- - - - - - - - -
Penyiapan Kerangka
Kerja Kawasan Strategis
(Strategic Area
Frameworks - SAF)
- - - - - - - - -
Peninjauan kembali
peraturan dan pedoman
penyusunan RTRW dan
RDTR dalam rangka
internalisasi SDF dan SAF
- - - - - - - - -
2.3
Dukungan Penyusunan
Rencana
Pembangunan Kawasan
Prioritas (Priority
Area Development Plan -
PADP)
Rencana Pembangunan
Kawasan Prioritas - - - - - - - - -
2.4
Penyusunan
Perencanaan dan
Penganggaran
Investasi (Capital
Investment Planning - CIP)
Sebagai Perangkat
Penyusun Prioritas dan
Sistem Pemantauan
Diagnosis e-planning dan
hubungannya dengan
CIP
- - - - - - - - -
Kerangka CIP di tingkat
kota - - - 0,22 0,00 0 0% 5% 0%
Dukungan langsung
dalam pelaksanaan
kerangka CIP
- - - - - - - - -
Tinjauan regulasi untuk
memperkuat hubungan
CIP dengan RPJMD dan
RKPD
- - - - - - - - -
3
Component 3:
Pengembangan kapasitas
pengelolaan keuangan
kota
3.1
Penilaian Tingkat Kota
Atas Kapasitas
Keuangan dan
Manajemen Proyek
Penyediaan menu dan
kegiatan peningkatan
kapasitas kelembagaan
dan personil
pemerintahan daerah
- - - - - - - - -
3.2
Peningkatan Kapasitas
Untuk Akses Kepada
Alternatif Sumber
Pembiayaan
Peningkatan kapasitas bagi
kota yang terlibat
dalam NUDP
- - - - - - - - -
4 Component 4: Dukungan
pelaksanaan proyek
Project Management
Support (PMS) - - - - - - - - -
Technical Management
Consultant (TMC) - - - - - - - - -
Oversight Service Providers
(OSP) 0,89 - - 0,12 0,00 0 0% 10% 0%
Event Organizers (EO)
Kemajuan Pelaksanaan Kegiatan
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
61
Komponen 1
Paket termasuk ke dalam komponen di bawah Kementerian PPN/Bappenas dibiayai melalui APBN (Rp
32,4 Milyar), sudah terkontrak dan sedang on progress mengerjakan komponen 1.
Komponen 2, 3, dan 4
Paket di bawah Kementerian PUPR belum dilaksanakan lelang dan saat ini sedang menyiapkan dokumen
lelang.
Paket di bawah Kementerian Dalam Negeri (SUPD II) sudah terkontrak sejumlah 3 paket.
Rekening Khusus
Rekening khusus sudah dibuka pada 5 Juni 2020.
Kelembagaan/Organisasi
Beberapa Dokumen yang sedang dalam proses penyiapan:
1. SK Organisasi masih dalam tahap finalisasi karena ada penyesuaian hasil restrukturisasi unit
organisasi di Kementerian PUPR.
2. Dokumen POM dan Penyusunan Rencana Kerja masih perlu disepakati bersama CPMU sehingga
akan ada Kick Off Meeting.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Administrasi
Terdapat restrukturisasi organisasi di Kementerian
PUPR sehingga SK Organisasi perlu dilakukan
penyesuaian sehingga belum dapat
ditandatangani.
Saat ini sedang diproses.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
64
DEVELOPMENT OF TRANS SOUTH-SOUTH JAVA ROAD PROJECT
Pembangunan Akses Jalan Lintas Selatan Jawa
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
IDB IDN-
1012
07/11/2017
s/d
20/01/2024
USD 15,0 2.4 15,9 12,6 -26,7 3,0 0,0 0,0
31/05/2018
s/d
03/02/2023
USD 235,0 19,6 8,3 215,4 -36,2 36,6 0,0 0,0
Lokasi Lot 4 Legundi-Planjan, DI Yogyakarta
Instansi Pelaksana
Kementerian Pekerjaan Umum dan
Perumahan Rakyat - Direktorat Jenderal
Bina Marga
Lokasi Proyek
a. Provinsi Jawa Tengah
b. Provinsi Jawa Timur
c. Provinsi DI Yogyakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Civil works
b. Consulting Services and Training
Kinerja Pelaksanaan Proyek
Ekuivalen Juta USD
No Paket Kontrak/
Komponen
Nilai
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020
Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1 Civil Works
Jawa Tengah
Lot 1 (Tambakreja-
Bantarsari) 7,07 1,65 23,34 1,79 0,99 56,37 22,47 86,29 22,47
Lot 2 (Jladri-
Karangbolong-
Tambakmulyo)
3,99 0,53 13,28 1,07 0,53 50,24 21,78 38 21,78
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
65
No Paket Kontrak/
Komponen
Nilai
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020
Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
DI Yogyakarta
Lot 3 (Jembatan
Kretek 2) 42,51 0 0,00 7,14 0 0 0 - 0
Lot 4 (Legundi-
Planjan) 5,17 0,49 9,48 2,86 0 0 20,02 100 20,02
Lot 5 (Jerukwudel-
Baran-Duwet) 14,44 2,78 19,25 3,57 1,39 39,75 28,53 52,23 28,53
Jawa Timur
Lot 6 (Prigi-
Tulungagung-Klatak-
Brumbun)
59,7 3,32 5,56 10,71 3,32 31,43 0 - 2,78
Lot 7 (Tulungagung-
Serang-Malang) 28,33 2,35 8,30 3,57 2,35 66,87 0 - 7,02
Lot 8
(Jarit-Puger) 14,28 2,76 19,33 3,57 1,34 38,25 16,84 31,94 16,84
Lot 9
(Sp. Balekamabang –
Kedungsalam)
12,95 1,63 12,59 3,57 0,11 3,25 9,75 67,90 9,75
2 Consulting Services
and Training
Project Management
Consultant 4,41 0,88 19,95 0,97 0,34 35,74 - - -
Start Up Workshop &
Familiarization Visit 0,01 0,01 100,00 0,03 0 0 100 100 100
Project Supervision
Consultant-
Semarang
2,73 0,26 9,52 1,07 0 0 - - -
Project Supervision
Consultant-
JawaTimur
4,5 0 0,00 1,07 0 0 - - -
Kemajuan Pelaksanaan Kegiatan
1. Civil Works.
a. Lot 1. Sedang dalam pelaksanaan kegiatan. Progres fisik telah mencapai 22,47%
b. Lot 2. Sedang dalam pelaksanaan kegiatan. Progres fisik telah mencapai 21,78%. Saat ini masih
dalam proses variation order (MC-0). Diperlukan penyelidikan dan analisis untuk penentuan jenis
batuan dari bukit yang ada di lokasi.
c. Lot 3. Dokumen PQ dan Desain telah mendapatkan NOL dari IsDB, saat ini dalam tahap persiapan
pengumuman lelang.
d. Lot 4. Progres fisik telah mencapai 20,02%. Saat ini masih dalam proses MC-0 karena terdapat
perubahan volume galian batu keras.
e. Lot 5. Saat ini masih dalam proses MC-0 yang membutuhkan proses pemindahan utilitas PT. PLN dan
pipa PDAM serta perubahan volume galian batu. Progres fisik telah mencapai 28,53%..
f. Lot 6. Saat ini dalam tahap Proses Field Engineering, tetapi masih terkendala - curah hujan yang
tinggi. Progres fisik telah mencapai 2,78%.
g. Lot 7. Progres fisik telah mencapai 7,02% namun terdapat perbedaan trase DED dengan trase ROW
pembebasan (IPPKH), sehingga akan berpotensi melakukan perobahan trase sekitar 62 titik lokasi.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
66
h. Lot 8. Progres fisik telah mencapai 16,84%. Proses MC-0 dan Justifikasi Teknik dalam proses
pembahasan di Balai Besar Pelaksanaan Jalan VIII Surabaya. Desain dan Perhitungan biaya
Penggantian Jembatan Paseban I yang - putus akibat banjir sampai saat ini belum selesai.
i. Lot 9. Progres fisik telah mencapai 9,75%, pelaksanaan di lapangan saat ini mengalami deviasi
keterlambatan - 23,549 % yang disebabkan kurangnya tenaga kerja akibat pengaruh wabah Covid
19, curah - hujan yang tinggi, serta perubahan volume galian batu keras.
2. Consulting Services and Training.
a. Project Management Consultant (PMC). Sedang dalam pelaksanaan kegiatan.
b. Project Supervision Consultant – Semarang (PSC 1). Sedang dalam pelaksanaan kegiatan.
c. Project Supervision Consultant – Jawa Timur (PSC 2). Kegiatan sedang dalam tahap lelang. Saat ini
menunggu NoL dari IsDB untuk revisi draf kontrak perjanjian kerja.
d. Start up workshop. Kegiatan telah dilaksanakan pada tanggal 23 April 2019.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Waktu pelaksanaan bantuan
pengawasan PSC-1 ke Lot 8 dan Lot 9
akan berakhir pada tanggal 4 April 2020,
sedangkan proses PSC-2 belum selesai
sehingga akan menghambat proses
pekerjaan untuk Lot 6, Lot 7, Lot 8 dan Lot
9.
b. Terdapat kendala galian batu pada Lot 4,
5, dan 9 yang menyebabkan dibutuhkan
tambahan peralatan ke lapangan.
c. Terdapat jembatan runtuh pada ruas Lot 8
yang menghambat pelaksanaan
pekerjaan proyek.
d. Keterlambatan penyelesaian pekerjaan
fisik di seluruh lot karena wabah Covid-19.
a. PSC-1 telah mengajukan surat
perpanjangan waktu pelaksanaan
bantuan pengawasan ke PPK
Pengawasan selama 90 (Sembilan puluh)
hari agar dapat melanjutkan proses
Pelaksanaan pekerjaan di Lot 6, Lot 7, Lot
8 dan Lot 9).
b. Dilakukan koordinasi dan amandemen
kontrak variation order pada Lot 4, 5, dan
9.
c. Jembatan ini tidak termasuk di dalam
output proyek, namun runtuhnya
jembatan menghambat pelaksanaan
proyek. PMU berkoordinasi dengan IsDB
untuk potensi memasukkan pekerjaan
jembatan tersebut di dalam proyek TSS.
d. Menteri PUPR telah mengeluarkan instruksi
No. 02/IN/M/2020 tentang Protokol
Pencegahan Penyebaran Corona Virus
Disease 2019 (COVID-19) dalam
penyelenggaraan Jasa Konstruksi.
Kontraktor diminta partisipasinya dalam
penanggulangan penyebaran virus
Corona-19. PMU menyusun scenario
pelaksanaan proyek dengan protocol
kesehatan sehingga proyek tetap dapat
dilaksanakan dan meminimalisir potensi
keterlambatan.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
67
TOLL ROAD DEVELOPMENT OF BALIKPAPAN-SAMARINDA SECTION 5 PROJECT
Proyek Pembangunan Jalan Bebas Hambatan Balikpapan – Samarinda
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
RR
Tiongkok
PBC (2015)
42 TOTAL
(385)
30/09/2016
s/d
30/09/2021
USD 53,4 37,1 69,4 16,4 -5,6 16,2 0,0 0,0
Sumber : Kementerian PUPR
Instansi Pelaksana
Direktorat Jenderal Bina Marga,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
Balikpapan – Samarinda, Provinsi Kalimantan
Timur
Ruang Lingkup (Pekerjaan dan Sasaran)
Jasa Konstruksi : Pembangunan Jalan Bebas
Hambatan Balikpapan – Samarinda Seksi V
Ruas Jalan Km 13 - Sepinggan Balikpapan
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Progres pekerjaan konstruksi utama telah mencapai 100 %, sedangkan Progres keuangan mencapai 70 %.
Terdapat 4 lokasi yang masih dikerjakan diantaranya 3 lokasi longsoran dan 1 lokasi frontage. Pekerjaan
longsoran dilakukan bersama dengan BUJT. Diperlukan penambahan waktu pekerjaan karena terdampak
terhambatnya suplai material dan sumber daya manusia karena pandemi covid.
Alokasi tahun 2020 akan menghabiskan seluruh sisa loan yang masih ada. Penyerapan TW II 2020 masih nol
karena kontraktor belum mengajukan pembayaran. Tertundanya pengajuan pembayaran IPC bulan April-
Desember 2019 karena keterlambatan persetujuan amandemen kontrak No. 8 dan no. 9 dari CEXIM pada
tanggal 10 Januari 2020. Pengajuan IPC No. 16-18 sedang dalam proses di internal PUPR.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
68
TOLL ROAD DEVELOPMENT OF CILEUNYI-SUMEDANG-DAWUAN (CISUMDAWU) PHASE II
Proyek Pembangunan Jalan Bebas Hambatan Cileunyi-Sumedang-Dawuan
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
RR
Tiongkok
2016 1 TTL
389
30/09/2016
s/d
30/09/2021
USD 219,4 170,3 77,6 49,1 2,6 42,9 31,7 73,9
Sumber : Kementerian PUPR
Instansi Pelaksana
Direktorat Jenderal Bina Marga,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
Kabupaten Sumedang, Provinsi Jawa Barat
Ruang Lingkup (Pekerjaan dan Sasaran)
Jasa Konstruksi: Pembangunan Jalan Bebas
Hambatan Cileunyi-Sumedang-Dawuan
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Sampai dengan TW II 2020, lahan yang belum bebas hanya sebesar 4% dengan lokasi sporadis disekitar
konstruksi galian tinggi dan timbunan tinggi yang memiliki panjang sekitar 3,5 km. Lahan tersebut
merupakan lokasi kritis rawan longsor dengan resistensi warga yang besar. Sebagian besar warga
menolak harga yang diajukan, dibutuhkan bantuan dari BPN dan Jasamarga. Kontrak akan habis pada
bulan September 2020 sehingga memerlukan perpanjangan waktu sampai Agustus 2021.
Dibutuhkan penambahan nilai kontrak (amandemen 6) untuk kebutuhan operasional, konstruksi, dan
review desain sebesar Rp 320 Milyar. Saat ini loan yang tersisa (dengan selisih kurs) sebesar Rp 136 Milyar
sehingga terdapat kekurangan sebesar RP 183 Milyar.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
69
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Pembebasan Lahan
a. Terdapat ±5 % lahan belum bebas yang
menghambat pelaksanaan konstruksi
terutama terdapat pada lokasi-lokasi kritis
seperti galian dalam dan timbunan tinggi
dalam Desa Sirnamulya dan Desa
Mulyasari.
b. Terdapat total 83 bidang pada Desa,
Sirnamulya, Mulyasari, Margamukti yang
telah dilakukan SPP senilai Rp 28 Milyar
namun belum dilakukan pembayaran oleh
BUJT PT. CKJT.
c. Dibutuhkan penambahan loan karena
amandemen melebihi nilai kontrak.
a. Dibutuhkan percepatan pelaksanaan
pengadaan lahan terutama pada lokasi-
lokasi kritis tersebut.
b. Mendorong CKJT untuk dapat melakukan
pembayaran SPP yang telah diajukan.
c. Akan dikoordinasikan lebih lanjut dengan
pimpinan, namun tidak disarakankan
untuk additional loan, lebih baik
menggunakan Rupiah Murni (RM).
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
70
TOLL ROAD DEVELOPMENT OF CILEUNYI-SUMEDANG-DAWUAN PHASE III
Proyek Pembangunan Jalan Bebas Hambatan Cileunyi-Sumedang-Dawuan Fase III
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
RR
Tiongkok
2018 14
TTL 471
10/09/2018
s/d
11/09/2023
USD 130,4 61,5 47,2 68,9 11,1 71,7 13,9 19,4
Sumber : Kementerian PUPR
Instansi Pelaksana
Direktorat Jenderal Bina Marga,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
Kabupaten Sumedang, Provinsi Jawa
Barat
Ruang Lingkup (Pekerjaan dan Sasaran)
Jasa Konstruksi : Pembangunan Jalan
Bebas Hambatan Cileunyi-Sumedang-
Dawuan sepanjang 10,57 km
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Sampai dengan TW II 2020, lahan yang bebas telah mencapai 89%. Pembebasan lahan difokuskan pada
lahan dengan kondisi kritis seperti di Interchange Cileunyi. Terdapat lahan yang belum dapat dilakukan
pekerjaan sama sekali sepanjang 1,7 km di Desa Cilayung dan Mekarsari. Interchange Cileunyi
merupakan gerbang masuk awal Tol Cisumdawu sehingga perlu diselesaikan terlebih dahulu untuk dapat
mengoperasikan ruas jalan lainnya yang telah selesai. Untuk Interchange Cileunyi ditargetkan dapat
bebas pada akhir Agustus 2020, proses kasasi ke MA telah dibantu oleh Kementerian ATR/BPN.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
71
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Pembebasan lahan
a. Terdapat ±10 % lahan belum bebas yang
menghambat pelaksanaan konstruksi
terutama terdapat pada lokasi-lokasi kritis
seperti Interchange Cileunyi dan 1,7 Km
Mainroad.
b. Terdapat Surat Permintaan Pembayaran
(SPP) sebesar Rp 210 Milyar yang telah
dilakukan untuk 177 bidang pada Desa
Cileunyi, Cibeusi, Cilayung namun belum
dilakukan pembayaran oleh BUJT PT. CKJT.
a. Dibutuhkan percepatan pelaksanaan
pengadaan lahan terutama pada lokasi-
lokasi kritis tersebut.
b. Mendorong CKJT untuk dapat melakukan
pembayaran SPP yang telah diajukan.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
72
TOLL ROAD DEVELOPMENT OF MANADO-BITUNG
Proyek Pembangunan Jalan Bebas Hambatan Manado - Bitung
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
RR
Tiongkok
2016 7 TTL
395
30/09/2016
s/d
30/09/2022
USD 78,1 74,6 95,5 3,5 33,0 7,5 4,2 55,7
Sumber : Kementerian Pekerjaan Umum dan Perumahan Rakyat
Instansi Pelaksana
Direktorat Jenderal Bina Marga,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
Manado - Bitung, Provinsi Sulawesi Utara
Ruang Lingkup (Pekerjaan dan Sasaran)
Jasa Konstruksi: Pembangunan Jalan
Bebas Hambatan Manado – Bitung
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja Fisik
Progres fisik kegiatan ini telah mencapai 100% pada tanggal 13 September 2019. Retensi 1 dan retensi 2
senilai Rp 58,78 Milyar telah dibayarkan CEXIM pada tanggal 13 Februari 2020. SP3 belum terbit karena
masih menunggu revisi DIPA di internal Kementerian PUPR.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
73
TOLL ROAD DEVELOPMENT OF SOLO - KERTOSONO PHASE I PROJECT
Proyek Pembangunan Jalan Bebas Hambatan Solo – Kertosono
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
RR
Tiongkok
201539
TTL
382
30/09/2016
s/d
30/09/2021
USD 198,8 189,8 95,5 9,0 20,5 21,8 14,4 65,9
Sumber : Kementerian Pekerjaan Umum dan Perumahan Rakyat
Instansi Pelaksana
Direktorat Jenderal Bina Marga,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
Saradan – Kertosono, Provinsi Jawa Timur
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pembangunan jalan utama ruas
Saradan – Kertosono sepanjang 37,39
km;
b. Pembangunan jembatan di 15 lokasi
dengan panjang total 659 meter;
c. Pembangunan jalan akses sepanjang
1,32 km
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Pekerjaan konstruksi telah selesai sejak tanggal 31 Juli 2019. IPC no. 24 dan IPC no. 26 sebesar Rp 202,5
Milyar sudah dibayarkan oleh CEXIM namun belum terbit SP3. SP3 dan penyiapan dana pendamping RMP
sebesar 12,54 Milyar masih menunggu revisi DIPA yang masih dalam proses review di internal Kementerian
PUPR.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
74
WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT (WINRIP)
Peningkatan dari pemanfaatan yang efektif dari ruas jalan nasional terpilih sepanjang koridor Sumatera
bagian barat dengan menurunkan biaya pengguna jalan
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia 8043-ID
12/03/2012
s/d
28/02/2021
USD 250,0 209,4 83,8 40,6 -8,8 17,3 3,5 20,5
Kondisi Jalan paket 8 di batas kota Pariaman - Manggopoh
(Sumatera barat)
Instansi Pelaksana
Direktorat Jenderal Bina Marga,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
a. Provinsi Bengkulu
b. Provinsi Lampung
c. Provinsi Sumatera Barat
d. Provinsi Sumatera Utara
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Bagian 1 : Perbaikan dan Perluasan Kapasitas dari Jalan Nasional
b. Bagian 2 : Dukungan Implementasi
c. Bagian 3 : Pengembangan Kelembagaan Sektor Jalan
d. Bagian 4 : Kesiagaan untuk Tanggap Risiko Bencana
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1 Civil Works
Krui - Biha 10,29 - - 0,00 0,00 0 100% 100% 100%
Padang Sawah - Sp Empat
(Including Air Gadang
Bridge)
17,07 - - 0,00 0,00 0 100% 100% 100%
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
75
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
Manggopoh - Padang
Sawah 12,65 - - 0,00 0,00 0 100% 100% 100%
Ipu - Bantal 14,64 - - 0,00 0,00 0 100% 100% 100%
Simpang Rampa - Poriaha 8,49 - - 0,00 0,00 0 100% 100% 100%
Ps Pedati - Kerkap 8,17 - - 0,00 0,00 0 100% 100% 100%
Indrapura - Tapan 8,99 - - 0,00 0,00 0 100% 100% 100%
Bts. Kota Pariaman -
Manggopoh 26,07 - - 0,00 0,00 0 100% 100% 100%
Bantal - Mukomuko 18,18 - - 0,00 0,00 0 100% 100% 100%
Kambang - Indrapura 24,42 - - 0,00 0,00 0 100% 100% 100%
Sp Rukis - Tj Kemuning 21,09 - - 0,00 0,00 0 100% 100% 100%
Sibolga - Batas TapSel 14,17 - - 0,00 0,00 0 100% 100% 100%
Seblat - Ipuh 14,58 - - 0,00 0,00 0 100% 100% 100%
Sp.Gunung Kemala - Pg.
Tampak 14,60 - - 0,00 0,00 0 100% 100% 100%
Lais- Bintunan 3,06 - - 0,00 0,00 0 100% 100% 100%
Lubuk Alung - Sicincin 7,86 - - 0,00 0,00 0 100% 100% 100%
Lubuk Alung -Kuraitaj 4,45 - - 0,00 0,00 0 - - -
14. Painan -Kambang 14,78 - - 0,00 0,00 0 100% 100% 100%
21A. Lubuk Alung -Kuraitaj 5,77 - - 0,00 0,00 0 100% 100% 100%
Eskalasi - -
05A. Simpang Rampa –
Poriaha 5,36 - - 2,11 0,58 27,4 71,87% 100% 71,87%
14. Painan-Kambang - - - 0,00 0,00 0 100% 100% 100%
15. Sibolga – Batas TapSel - - - 0,00 0,00 0 100% 100% 100%
16. Seblat Ipuh - - - 0,00 0,00 0 100% 100% 100%
2 Goods, Non Consulting
Services Under Part 2
CTC 6,02 - - 0,50 0,12 24 - - -
DSC 6,68 - - 0,84 0,19 22,6 - - -
TA SLOPE 0,46 - - 0,00 0,00 0 - - -
IOC 0,34 - - 0,069 0,016 23,2 - - -
CSC Sulawesi Tengah 0,96 - - 0,67 0,099 14,8 - - -
3 Goods, Non Consulting
Services Under Part 3
Capacity Buiding for DGH
Environment/ Risk Mitigation
and
Road Saftey Unit
- - - 0,00 0,00 0 - - -
4 Goods, Non Consulting
Services Under Part 4
RR-1 Rehabilitasi dan
Rekonstruksi Tompe - Dalam
Kota
palu -Surumana
10,38 - - 9,11 1,70 18,7 30,74% 100% 30,74%
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
76
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
RR-2 Rehabilitasi dan
Rekonstruksi Palupi - Simoro 4,60 - - 3,94 0,83 21,1 41,75% 100% 41,75%
Status pelaksanaan pekerjaan.
a. Dari 22 paket Civil Works, 18 paket telah selesai, 1 paket terminated, dan 3 paket sedang dalam
pengerjaan. Dari 18 paket yang telah selesai, 8 diantaranya sudah PHO dan 10 lainnya FHO.
b. Dari 4 paket Technical Assistance, 1 paket telah selesai dan 3 paket lainnya sedang dalam
pengerjaan.
c. Saat ini sedang dalam pengerjaan Paket 05-A (Pengamanan tebing Simpang Rampa-Poriaha), Paket
RR-01 (Palu), dan Paket RR-02 (Palu).
d. Paket RR-01 Palu rencana PHO 2021 Januari 2021, Paket RR-02 Palu rencana PHO 27 November 2020,
Paket 05A Sibolga rencana PHO 21 Juni 2020 akan tetapi diperkirakan selesai Oktober 2020.
e. Terdapat rencana penambahan pekerjaan untuk Road Safety Improvement Project yang awalnya
sempat dibatalkan dan dipertimbangkan untuk memperpanjang closing date pinjaman.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
a. P5, P14, P15, P16, dan P21 sudah PHO, sisa
pembayaran progres fisik dan eskalasi
belum teralokasikan dalam DIPA 2020.
b. P5A sedang dalam pelaksanaan dan
diperkirakan selesai pada akhir Oktober
2020. Alokasi anggaran TA 2020 masih
kurang untuk pembayaran progres fisik.
c. Proses persetujuan revisi DIPA berjalan
lambat karena diprioritaskan untuk
penanganan Covid-19.
d. Pengerjaan Paket 05A (Pengamanan
Lereng Tebing Simpang Rampa - Poriaha)
Progres fisik terhambat oleh
pembatasan pengadaan tenaga kerja
terampil (baik lokal maupun yang
didatangkan) terkait dengan
pengendalian Covid-19.
Diperlukan 8 tim kerja di lapangan
namun hanya tersedia 4 tim kerja dan
belum dapat ditambah lagi.
e. Pengerjaan Paket RR-01 (Palu)
Keterlambatan pekerjaan asphalt
pavement akibat keterlambatan
produksi & kekurang peralatan finisher
dan saat ini sudah ditambah 1 unit.
a. Untuk pembayaran ekskalasi yang belum
teralokasikan di DIPA 2020, butuh untuk
diskusi dengan BPKP.
b. Pengerjaan RR-01 dan RR-02 (Palu)
Selokan pasangan batu diganti
dengan beton precast.
Dicari tenaga kerja terampil lokal.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
77
Progres pekerjaan yang menggunakan
padat karya sudah terkena dampak
Covid-19 akibat kekurangan tenaga
terampil dari Pulau Jawa, total progres
yang terpengaruh oleh ketersediaan
tenaga terampil sebesar 54%.
f. Pengerjaan Paket RR-02 (Palu)
Progres pekerjaan yang menggunakan
padat peralatan masih belum
terpengaruh oleh dampak Covid-19.
Progres pekerjaan yang menggunakan
padat karya sudah terpengaruh oleh
dampak Covid-19 akibat kekurangan
tenaga terampil yang didatangkan
dari Pulau Jawa, total progres yang
terpengaruh oleh ketersediaan tenaga
kerja terampil sebesar 53%.
Precast girder dari Surabaya juga
belum sempat dikirim ke Palu akibat
PSBB di Surabaya.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
80
CENTRAL SULAWESI REHABILITATION AND RECONSTRUCTION PROJECT (CSRRP)
Meningkatkan kualitas hidup masyarakat terdampak bencana di Provinsi Sulawesi Tengah dengan pemulihan
kembali fasilitas pendidikan, kesehatan, dan hunian tetap, serta mengurangi potensi kehilangan nyawa, mata
pencaharian, dan aset jika terjadi bencana kembali di masa depan
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia 8979-ID
30/06/2020
s/d
30/06/2024
USD 150,0 0,0 0,0 150,0 0,0 0,3 0,0 0,0
Instansi Pelaksana
Direktorat Jenderal Cipta Karya,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
Provinsi Sulawesi Tengah
Ruang Lingkup (Pekerjaan dan Sasaran)
1. Rehabilitasi dan rekonstruksi fasilitas pendidikan dan kesehatan dengan kualitas yang lebih baik dan
tangguh bencana.
2. Pembangunan hunian tetap di area permukiman baru dengan kualitas yang lebih baik dan tangguh
bencana.
3. Program pendampingan perumahan masyarakat.
4. Implementasi dan sosialisasi pembangunan fasilitas tangguh bencana.
5. Pembentukkan dan penggunaan MIS (Management and Information System), Website, dan
mekanisme penanganan keluhan.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
81
Kinerja Pelaksanaan Proyek
1. Pengadaan TMC, PMS dan fasilitator OSP sedang dalam proses lelang.
2. Telah ditetapkan SK Organisasi.
3. DIPA 2020 sebesar Rp 9,9 Milyar digunakan untuk manajemen konsultan dan fasilitator OSP yang saat
ini sedang dalam proses lelang (Komponen Ditjen PP).
4. Pagu Anggaran tahun 2021 sebesar Rp 132,27 Milyar yang akan digunakan untuk pembangunan fisik
(Komponen Ditjen PP).
5. Pagu Anggaran tahun 2021 sebesar Rp 0,35 Milyar (Komponen Ditjen Cipta Karya).
6. Kemajuan progress persiapan
a. Kementerian PUPR telah mengirimkan surat ke DJPPR Kementerian Keuangan terkait
Pemenuhan Additional Conditions for Effectivenes pada tanggal 12 Mei 2020 dan saat ini
telah disetujui.
b. Kementerian Keuangan telah menyampaikan salinan LA CSRRP pada tanggal 10 Juni 2020.
c. Loan sudah teregister per tanggal 12 Juni 2020.
d. Loan efektif per tanggal 30 Juni 2020.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Administrasi
Terdapat prasyarat dari Bank Dunia untuk
pemenuhan pengefektifan pinjaman terkait ToR
audit ESMF.
a. Sudah ditindaklanjuti oleh Kementerian
PUPR dan saat ini Kementerian PUPR
sedang mempersiapkan surat untuk
disampaikan ke Bank Dunia.
b. Dokumen ESMF CSRRP telah dikeluarkan
oleh Kementerian PUPR.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
82
EMISSION REDUCTION IN CITIES: SOLID WASTE MANAGEMENT
Pengelolaan Sampah Padat dalam Upaya Pengurangan Emisi di Kota-kota di Indonesia
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jerman
(KfW)
2010
66
471
02/05/2013
s/d
30/06/2021
EUR 75,0 43,8
58,4
31,2
-29,4
30,3 8,8
29,0
USD 84,3 49,2 35,1 34,1 9,9
Instansi Pelaksana
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
a. Kota Jambi
b. Kota Malang
c. Kabupaten Jombang
d. Kabupaten Sidoarjo
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Penyusunan DED untuk penutupan TPA yang ada dan pembangunan TPA baru untuk Kota Jambi,
Kota Malang, Kabupaten Jombang.
b. Pembangunan TPA baru di Kota Jambi, Kota Malang, Kabupaten Jombang, Kabupaten Sidoarjo,
Kota dan Kabupaten Pekalongan.
c. Supervisi pembangunan TPA baru di Kota Jambi, Kota Malang, Kabupaten Jombang, Kabupaten
Sidoarjo, serta Kota dan Kabupaten Pekalongan.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
83
Kinerja Pelaksanaan Proyek
Equivalen juta EUR
No Paket Kontrak/ Komponen
Nilai
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020
Realisasi
Kumulatif
Nilai % Target Realisasi %
1 Consulting Services 5,03 3.8 75,5
2
Construction Work:
a. Kota Jambi
(29/06/2018 – 10/02/2020)
b. Kota Malang
(29/06/2018 – 24/01/2020)
c. Kabupaten Sidoarjo
(29/06/2018 – 24/01/2020)
d. Kabupaten Jombang
(18/06/2020-31/12/2021)
14,2
14,3
23,3
11,1
8,5
10,3
18,7
1,2
59,8
72,2
80,2
10,8
-
-
-
72,2
82,1
87,9
2,28
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Seluruh peralatan terkait sorting-composting serta leachate treatment plant sudah tiba di pelabuhan.
Saat ini menunggu pengeluaran alat oleh Bea Cukai.
Untuk lelang alat berat yang sebelumnya sempat gagal lelang akan ada pembahasan dengan KfW
untuk menggunakan e-Catalogue.
Implementation Consultant
Konsultan telah dikontrak tanggal 29 April 2015 dengan masa kerja 61 bulan.
Telah menyelesaikan DED pembangunan TPA di 4 lokasi.
Dalam tahap finalisasi Dokumen Tender untuk penutupan TPA eksisting.
Konstruksi TPA Kota Jombang
Telah terkontrak pada tanggal 29 Mei 2020. SPMK (Surat Perintah Mulai Kerja) dapat dilakukan 14 hari
setelah tanda tangan kontrak dan sudah dilakukan pembayaran uang muka sebesar Rp 19,987,500,000,-
pada tanggal 3 Juli 2020.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
84
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Administrasi
a. Kebijakan pembatasan ijin masuk traveler
untuk negara Jerman dan kebijakan
tambahan, Pemerintah Indonesia terkait
perlintasan orang dari dan ke Indonesia
yang dapat menyebabkan pekerjaan
terlambat karena tidak tersedianya
tenaga kerja asing di lokasi proyek.
b. Ada kemungkinan untuk perpanjangan
waktu pelaksanaan pekerjaan
pembangunan TPA sampah di Kota
Malang, Kota Jambi, dan Kab.Sidoarjo
dari tanggal kontrak (30 Juni 2020).
a. Pihak kontraktor sedang mengurus
perizinan ke kantor imigrasi mengenai
garansi Tenaga Asing. Surat garansi
diperkirakan akan keluar akhir Agustus
2020. Setelah keluar surat garansi, di lokasi
proyek akan melakukan instalasi di
beberapa TPA selama 5-6 minggu. Total
Tenaga Asing adalah 30 orang.
b. Solusi alternatif ketika surat garansi tidak
dapat dikeluarkan oleh kantor imigrasi
maka akan dilakukan remote install.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
85
IKK WATER SUPPLY PROGRAM AND SMALL WATER TREATMENT PLANT FOR WATER SCARCITY
AREAS
Menyediakan Akses Pelayanan Air Minum Bagi Masyarakat di 34 Lokasi Di Indonesia
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Hongaria HS002
16000
01/08/2016
s/d
03/08/2020
USD 36,4 36,3 99,6 0,2 1,9 0,0 0,0 0,0
Instansi Pelaksana
Kementerian Pekerjaan Umum dan
Perumahan Rakyat (Direktorat Jenderal
Cipta Karya)
Lokasi Proyek
Di 34 lokasi di yang berada di:
a. Provinsi Aceh
b. Provinsi Sumatera Utara
c. Provinsi Sumatera Barat
d. Provinsi Sumatera Selatan
e. Provinsi Jawa Timur
f. Provinsi Jawa Barat
g. Provinsi D.I Yogyakarta
h. Provinsi Sulawesi Tengah
i. Provinsi Banten
j. Provinsi Gorontalo
k. Provinsi Jambi
Ruang Lingkup (Pekerjaan dan Sasaran)
Pembangunan Instalasi Pengolahan Air (IPA) berikut peralatan Mechanical Electrical di 36 lokasi dengan
kapasitas 20 Liter/Detik dan 40 Liter/Detik.
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Pelaksanaan pekerjaan kegiatan ini sudah selesai dengan baik, saat ini pelaksana proyek sedang
menyelesaikan Project Completion Report (PCR).
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
86
METROPOLITAN SANITATION MANAGEMENT AND HEALTH PROJECT (MSMHP)
Peningkatan Akses Layanan Air Limbah yang lebih baik di Kota Medan dan Yogyakarta serta pengurangan
polusi lingkungan air permukaan dan air tanah dangkal.
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
ADB 2654-
INO
22/11/2010
s/d
31/12/2020
USD 33,7 28,8 85,4 4,9 -9,6 3,5 0,6 15,8
Catatan : nilai actual setelah dikurangi partial cancellation, NOL ADB 3 Maret 2020
.
Proyek MSMHP di Medan
Sumber : Kunjungan Lapangan Bappenas
Instansi Pelaksana
a. Satuan Kerja Pengembangan
Penyehatan Lingkungan Permukiman
Pusat
b. Satuan Kerja Pengembangan
Penyehatan Lingkungan Permukiman
Sumatera Utara
c. Satuan Kerja Pengembangan
Penyehatan Lingkungan Permukiman
Daerah Istimewa Yogyakarta
Lokasi Proyek
a. Kota Medan - Provinsi Sumatera Utara
b. Kota Yogyakarta, Kabupaten Sleman,
Kabupaten Bantul - Provinsi DI
Yogyakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pengerahan masyarakat untuk
peningkatan kesehatan dan hygiene
(sanitasi berbasis masyarakat).
b. Pembangunan prasarana saluran air
limbah (pekerjaan sipil dalam skala
besar).
c. Dukungan implementasi proyek.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
87
Kinerja Pelaksanaan
Ekuivalen Rp Milyar
No
Komponen/
Lingkup
Kegiatan*
Nilai
Kontrak
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
Ruang Lingkup 1
Pengerahan masyarakat untuk peningkatan kesehatan dan higiene (sanitasi berbasis masyarakat)
1
Communal
sanitation
facilities
N/A N/A N/A N/A N/A N/A N/A
Ruang Lingkup 2
Pembangunan prasarana saluran air limbah (pekerjaan sipil dalam skala besar)
1
Package 1
Sewerage
system
Yogyakarta ph 1
Telah
selesai
pada Sept
2014
- - 100 - - 100
2
Package 2
Sewerage
system
Yogyakarta ph 2
Telah
selesai
pada
Maret 2014
- - 100 - - 100
3
Package 3
Sewerage
system
Yogyakarta
CCTV
Telah
selesai
pada Nov
2011
- - 100 - - 100
4
Package 1
Sewerage
system Medan
WWTP
Telah
selesai
pada Sept
2013
- - 100 - - 100
5
Package 2
Sewerage
system Medan
WWTP
Optimization
Telah
selesai
pada Des
2014
- - 100 - - 100
6
Package 3
Sewerage
system Medan
Expansion Zone
9
Telah
selesai
pada Des
2014
- - 100 - - 100
7
Package 4
Sewerage
System Medan
Expansion Zone
10 & 11
131,84 4,37 0,47 80,78 100 73,06 73,06
8
Package 5
Sewerage
system Medan
Expansion Zone
12
N/A N/A N/A N/A N/A N/A N/A
Ruang Lingkup 3
Dukungan implementasi proyek
1
Project
Implementation
Support
Consultant
Telah
selesai
pada Juni
2016
- - 100 - - 100
2
Project
Management
and
Construction
Supervision
Consultant
8,57 0,3 0,08 4,89 100 87,77 87,77
Ket: Kurs USD 1 = Rp 14.500,-
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
88
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No Komponen/Lingkup/
Paket Kontrak
Status/
Kemajuan Pelaksanaan
Capaian
Indikator Kinerja
Ruang Lingkup 1
Pengerahan masyarakat untuk peningkatan kesehatan dan higiene (sanitasi berbasis masyarakat)
1 Communal sanitation facilities Pelaksanaan Telah terlaksana di 52
community based
sanitation di
Yogyakarta
Telah terlaksana di 23
community based
sanitation di Medan
Ruang Lingkup 2
Pembangunan prasarana saluran air limbah (pekerjaan sipil dalam skala besar)
1 Sewerage System Medan (Zone 10&11) Konstruksi Telah terbangun jaringan
rumah sebanyak 9.280 di
Medan dan 15.031 di
Yogyakarta
Ruang Lingkup 3
Dukungan implementasi proyek
1 Project Management and Construction Supervision
Consultant
Pelaksanaan Sedang dalam
pelaksanaan manajemen
dan supervisi
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
89
METROPOLITAN SANITATION MANAGEMENT INVESTMENT PROGRAM: SEWERAGE SYSTEM
DEVELOPMENT IN DKI JAKARTA
Pembangunan jaringan pipa air limbah di Provinsi DKI Jakarta
Lender
Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
565
23/06/2014
s/d
23/06/2021
JPY 1.968,0 1.009,5
51,3
958,5
-34,7
27,8 26,1
93,9
USD 18,3 9,4 8,9 0,3 0,2
Instansi Pelaksana
Direktorat Jenderal Cipta Karya,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
Provinsi DKI Jakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Penyusunan DED jaringan perpipaan
air limbah DKI Jakarta Zona 1
b. Reviu skema pembiayaan
pembangunan IPAL Zona 1
c. Advisory Pilot Project (Ground Breaking)
DKI Jakarta Zona 1. (DED hibah dari
JICA)
d. Tender Assistance kegiatan
pembangunan Jaringan Pipa Air
Limbah DKI Jakarta Zona 1
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Pelaksanaan pekerjaan untuk proyek IP-565 ini akan fokus pada Zona 1 yang meliputi Kecamatan Gambir,
Sawah Besar, Senen, Menteng, Tanah Abang, Matraman, Grogol Petamburan, Taman Sari, Tambora, Setia
Budi, dan Penjaringan. Kegiatan Engineering Services for Sewerage System Development in DKI Jakarta
(loan JICA IP-565) tanda tangan kontrak pada tanggal 7 Juli 2017, dengan Nama Kontraktor/Konsultan
Yachiyo Engineering. Terdapat Addendum II yang ditandatangan pada tanggal 17 Januari 2018.
Capaian fisik pekerjaan sampai dengan Juni 2020 adalah sekitar 87%.
Basic Design and Preliminary Cost Estimation telah selesai. DED Pompa Zona 6 telah selasai, DED IPAL telah
selesai, dan DED jaringan juga telah selesai. Ke – 3 DED tersebut sudah finalisasi (Finalisasi ini terlambat
karena DED jaringan mengalami keterlambatan akibat ada survei ulang di 3 lokasi yang mengakibatkan
penyesuaian). Penyesuaian ini membutuhkan durasi yang lebih lama dari perkiraan awal karena lokasi
survey ulang ditemukan rute-rute yang berhimpitan dengan jaringan lainnya seperti MRT, LRT dan lain-lain.
Pada periode laporan ini Pelaksana Kegiatan telah menyelesaikan tahapan perencanaan rencananya
dan akan melaksanakan tender. Terkait Proses perizinan, diantaranya :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
90
a. Izin AMDAL, Ketetapan Rencana Kota (KRK), dan Izin Trase Jaringan Perpipaan sudah diterbitkan
oleh DPMPTSP.
b. Perizinan IIPAL, IPPJU, Izin Dewatering dan IMB sedang dalam proses pengajuan di DPMPTSP
disertai rekomendasi teknis dari masing-masing dinas terkait.
Proses pengajuan izin sempat terkendala situasi Pandemi Covid-19 dimana PTSP DKI Jakarta turut
melaksanakan work from home, sehingga proses pengajuan izin mengalami keterlambatan. Balai PPWJM
telah mengirimkan surat agar proses perizinan dapat diakomodasi dan masuk dalam prioritas selama
masa pandemi.
Terdapat 8 tenaga ahli asing yang berkerja selama periode pendampingan tender dan saat ini
keseluruhan tenaga ahli tersebut kembali ke Negara Jepang. Konsultan perencana sedang memproses
visa 7 tenaga ahli asing yang dimobilisasi kembali ke Indonesia dalam waktu dekat, mengingat KBRI sudah
dapat memproses izin untuk tenaga ahli yang bekerja di Proyek Strategis Nasional (PSN).
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
91
METROPOLITAN SANITATION MANAGEMENT INVESTMENT PROJECT (MSMIP)
Peningkatan Kualitas Pengelolaan Air Limbah Masyarakat Urban Kota di Jambi, Pekanbaru, Cimahi, dan
Makassar
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
ADB 3123-
INO
09/07/2014
s/d
31/12/2020
USD 80,0 7,4 9,3 72,6 -53,8 3,5 0,5 13,8
AIF 8280-
INO
09/07/2014
s/d
31/12/2020
USD 40,0 0,0 0,0 40,0 -63,1 3,5 0,0 0,0
Catatan : Kurs Rp 13.400,-
Sumber: Kementerian Pekerjaan Umum dan Perumahan Rakyat
Instansi Pelaksana
a. Satuan Kerja Pengembangan
Penyehatan Lingkungan Permukiman
Pusat
b. Satuan Kerja Pengembangan
Penyehatan Lingkungan Permukiman
Jambi
c. Satuan Kerja Pengembangan
Penyehatan Lingkungan Permukiman
Riau
d. Satuan Kerja Pengembangan
Penyehatan Lingkungan Permukiman
Jawa Barat
e. Satuan Kerja Pengembangan
Penyehatan Lingkungan Permukiman
Sulawesi Selatan
Lokasi Proyek
a. Kota Jambi, Provinsi Jambi
b. Kota Pekanbaru, Provinsi Riau
c. Kota Makassar, Provinsi Sulawesi
Selatan
d. Provinsi DKI Jakarta
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
92
Ruang Lingkup (Pekerjaan dan Sasaran)
Ruang Lingkup Pinjaman ADB Ordinary Capital Resources (OCR) dan ASEAN Infrastructure Fund (AIF):
1. Pengembangan infrastruktur untuk sistem wastewater off-site.
2. Institusionalisasi project implementation support.
Ruang Lingkup hibah DFAT:
1. Penyiapan DED untuk Instalasi Pengolahan Air Limbah (IPAL) dan jaringan sanitasi di Makassar.
2. DED dan biaya modal untuk limbah cair, IPAL, dan supervisi konstruksi di Palembang.
Kinerja Pelaksanaan Proyek
dalam juta USD
No Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
Ruang Lingkup 1
Pengembangan infrastruktur untuk sistem wastewater off-site.
Kota Jambi
1
Wastewater
Treatment Plant in
Jambi (B1)
11,95 2,58 - - - - -
2
Construction of
Sewerage and
Wastewater
Collection
including Pumping
Station - East
Catchment (B2)
17,69 6,12 - - - - -
Kota Pekanbaru
1
Wastewater
Treatment Plant in
Pekanbaru (B1)
12,85 3,14 - - - - -
2
Pekanbaru
Sewerage &
Transfer Package
NC (AIF)
19,63 5,51 - - - - -
Kota Makassar
1
Wastewater
Treatment Plant in
Makassar (B1)
15,72 3,74 - - - - -
2
Makassar
Sewerage &
Transfer Package
NC (B2)
12,91 4,43 - 2,58 34,29 3,93 3,93
Ruang Lingkup 2
Institusionalisasi project implementasion support
1
Project
Implementation
Support
Consultant
11,09 0,61 - 3,43 5,48 1,37 22,77
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
93
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No Komponen/Lingkup/Paket Kontrak Status/Kemajuan Pelaksanaan Capaian Indikator Kinerja
Ruang Lingkup 1
Pengembangan infrastruktur untuk sistem wastewater off-site.
Kota Jambi
1 Wastewater Treatment Plant in Jambi (B1) Lelang Rencana kontrak Oktober 2020
2
Construction of Sewerage and Wastewater
Collection including Pumping Station - East
Catchment (B2)
Lelang Proses penetapan Menteri.
Rencana kontrak Agustus 2020.
Kota Pekanbaru
1 Wastewater Treatment Plant in Pekanbaru
(B1) Lelang
Tahap evaluasi teknis. Rencana
kontrak Oktober 2020.
2 Pekanbaru Sewerage & Transfer Package NC
(AIF) B2 Lelang
Proses penetapan Menteri.
Rencana kontrak Agustus 2020.
Kota Makassar
1 Wastewater Treatment Plant in Makassar (B1) Proses lelang
Proses review draft financial BER
oleh ADB. Rencana kontrak
September 2020
2 Makassar Sewerage & Transfer Package NC
(AIF) B2 Konstruksi
Ruang Lingkup 2
Institusionalisasi project implementasion support
1 Project Implementation Support Consultant Implementasi
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Pengadaan Barang dan Jasa
Pelaksanaan lelang mengalami keterlambatan
karena Covid-19.
Lain-lain
a. Pelaksanaan konstruksi di Makassar
sempat dihentikan karena lokasi masuk
zona merah.
b. Pemasangan pipa Boring Auger belum
dapat dilaksanakan dikarenakan operator
mesin jacking dari Malaysia tidak dapat
dimobilisasi akibat lockdown.
Dilakukan reschedule jadwal lelang. CPMU dan
Satker melakukan monitoring dan berkoordinasi
dengan Pokja.
a. Pekerjaan telah dilanjutkan pada bulan
Juni 2020 dengan pembatasan waktu
pelaksanaan, area kerja, dan jumlah
pekerja.
b. Pelaksana kegiatan mengkaji alternatif
lain berupa perubahan metode
pemasangan pipa menjadi galian
terbuka.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
94
NATIONAL SLUM UPGRADING PROJECT
Penanganan Kota Tanpa Kumuh (KOTAKU)
Lender Kode Loan Masa Laku Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
IsDB
IND-0174
18/09/2016
s/d
04/05/2021
USD 8,0 2,9 36,8 5,1 -45,0 2,7 0,0 0,0
IND-0175
18/09/2016
s/d
09/05/2021
USD 311,8 192,6 61,8 119,3 -19,8 109,5 0,0 0,0
IND-0176
18/09/2016
s/d
22/11/2021
USD 10,0 2,7 26,8 7,3 -46,2 9,5 0,0 0,0
Hasil Kegiatan di Kelurahan Seutui, Banda Aceh
Instansi Pelaksana
Direktorat Jenderal Cipta Karya –
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
a. Satuan Kerja Pusat
b. Satuan Kerja Penataan Pembangunan
dan Lingkungan Permukiman Provinsi
Lokasi Proyek
a. Aceh
b. Sumatera Utara
c. Sumatera Barat
d. Riau
e. Jambi
f. Sumatera Selatan
g. Bengkulu
h. Lampung
i. Kepulauan Bangka Belitung
j. Kepulauan Riau
k. DKI Jakarta
l. Jawa Barat
m. Banten
n. Kalimantan Barat
o. Kalimantan Utara
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
95
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Membangun/mengembangkan kelembagaan masyarakat (BKM) yang aspiratif, akuntabel dan
mampu memberikan pelayanan kepada masyarakat miskin perkotaan serta memperkuat proses
pengambilan keputusan lokal;
b. Mendorong pemerintah daerah untuk memfasilitasi kebutuhan masyarakat miskin, melalui
penguatan kemitraan dengan masyarakat;
c. Meningkatkan akses bagi masyarakat miskin perkotaan ke pelayanan sosial, prasarana dan sarana,
pendanaan usaha ekonomi, dan lain-lain;
d. Mendorong terwujudnya pembangunan lingkungan permukiman terpadu melalui implementasi tata
kepemerintahan yang baik dan berorientasi pada kepentingan masyarakat miskin.
Kemajuan Proyek dan Pencapaian Indikator Kinerja
Ekuivalen Juta USD
No Paket Kontrak/ Komponen Nilai
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020
Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1 Block Investment for Slum Alleviation and Prevention
IND-174 (Vocational
Training di BLK) 2,24 1.70 75.89 0,03 0 0 31 - -
IND-175 (BDI PLPBK dan BDI
Skala Kawasan) 192,8 132.58 68.77 36,23 2,46 6,80 65 - -
IND-176 9,5 0.99 10.42 5,97 0,19 3,19 0 - -
2 Building Community Institutions and Local Government
IND-174 (Feasibility Studies
for Sustainable Livelihood) 0,75 0.11 14.67 0 0 0 0 - -
IND-175 (Pelatihan
Masyarakat Reguler dan
Pelatihan Dasar)
78 43.04 55.18 7,22 2,24 31,10 75 - -
3
Knowledge Generation
and Reverse Linkage (IND-
174)
4,61 1.61 34.92 2,04 0,09 4,87 18 - -
4
Management, Design, and
Supervision Consultancy
(IND-175)
29,8 32.15 107.89 8,31 2,39 28,78 97 - -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
96
Kemajuan Pelaksanaan Kegiatan
Porsi IND-0174 (Service Ijarah):
Kemajuan pelaksanaan untuk masing-masing paket kontrak/kegiatan adalah sebagai berikut:
1. Block Investment for Slum Allevation and Prevention – Vocational Training di BLK. Kegiatan sudah
selesai dilaksanakan
2. Building Community Institutions and Local Government - Feasibility Studies for Sustainable
Livelihood.
Dokumen Feasibility Study telah selesai disusun.
3. Knowledge Generation and Reverse Linkage. Kegiatan shortcourse dan publikasi sudah mendapat
persetujuan Menteri. Kegiatan paket study and review mission akan dilakukan dengan
melaksanakan e-learning pelatihan kepada PIU dan peserta pelatihan. Untuk shortcourse akan
direncanakan dilaksanakan di 2021 setelah dampak pandemi Covid 19 selesai.
Porsi IND-0175 (Istisna’a):
Kemajuan pelaksanaan untuk masing-masing paket kontrak/kegiatan adalah sebagai berikut:
1. Block Investment for Slum Allevation and Prevention – BDI PLBK dan BDI Skala Kawasan. Proses
pencairan di semua lokasi kota/kabupaten memiliki progres 99,18% atau Rp. 810,8 Milyar. Realisasi
pencairan dana untuk paket yang sudah terkontrak (Kota Banda Aceh, Kota Pangkal Pinang, Kab
Pringsewu, Kota Tanjung Pinang, Kota Tarakan, Kab Tangerang, Kota Serang, Kab Bangka, Kota
Singkawang, Kota Pontianak) berjalan sesuai jadwal sedangkan Kota Pidie, Kota Batam, Kota
Priaman, Kota Tanjung Balai, Kota Solok, Kota Padang Panjang, Kota Lhokseumawe, Kota Langsa,
Kota Pekanbaru, Pandeglang masih dalam proses lelang.
2. Building Community Institutions and Local Government – Pelatihan Masyarakat Reguler dan
Pelatihan Dasar. Pekerjaan masih berjalan sesuai jadwal, namun saat ini sedang dikaji ulang agar
pelaksanaan dapat juga dilakukan secara online sehingga tidak mengumpulkan banyak orang.
Diperlukan revisi DIPA TA 2020 pada komponen ini.
3. Management, Design, and Supervision Consultancy. Pekerjaan masih berjalan sesuai jadwal.
Diperlukan revisi DIPA untuk percepatan anggaran TA 2020.
Porsi IND-0176 (ISFD loan):
1. Block Investment for Slum Alleviation and Prevention. Kegiatan dalam tahap pelaksanaan. Saat ini
dalam proses pemberkasan di semua lokasi kegiatan sesuai DIPA Revisi Tambah TA 2020 pada
DIPA Satker PPW Provinsi.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
97
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Kegiatan sosialisasi akan mundur
beberapa bulan karena masa Work From
Home masih berlangsung sehingga proses
pembahasan amandemen harus
mengikuti protokol Covid-19 khususnya
terkait social distancing.
b. Pelaksanaan kegiatan IBM Skala
Lingkungan dikerjakan secara swakelola
oleh masyarakat, sehingga dengan
adanya pembatasan sosial skala besar
akan dilakukan penyesuaian dengan
protokol penganan pandemi Covid-19
sesuai kondisi di masing-masing
Kabupaten/Kota.
c. Alokasi dana pada DIPA TA 2020 masih
berada di DIPA Kementerian, sehingga
harus dilakukan Revisi dan penambahan
alokasi ke DIPA Balai PPW Provinsi.
a. Percepatan amandemen kegiatan
sosialisasi yang ada pada kontrak OC
dan NMC serta rescheduling timeline
kegiatan di TA 2020.
b. Telah diterbitkan Surat Edaran Direktur
PKP tentang Pencegahan Penyebaran
Coronavirus Disease-19 (Covid-19)
dalam Pelaksanaan Program KOTAKU
sebagai pedoman dalam
pelaksanaan kegiatan sesuai kondisi di
masing-masing Kabupaten/Kota.
c. Sedang dilakukan percepatan revisi
DIPA TA. 2020 dan sosialisasi penyiapan
berkas pencairan dan teknis
pelaksanaan kegiatan sesuai protokol
covid-19 dengan tetap
mempertimbangkan keamanan di
lokasi pandemi covid-19.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
98
NATIONAL SLUM UPGRADING PROJECT (NSUP)
Mendukung Pemerintah Indonesia untuk Memastikan bahwa Penduduk Miskin Perkotaan di Kelurahan Peserta
Memperoleh Manfaat dari Perbaikan Tata Kelola Lokal dan Kondisi Hidup
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8636-
ID
11/10/2016
s/d
22/03/2022
USD 216,5 100,4 46,4 116,1 -21,9 48,6 7,5 15,5
AIIB 0004-
IDN
11/10/2016
s/d
22/03/2022
USD 216,5 100,4 46,4 116,1 -21,9 48,6 7,5 15,5
Kampung Heritage Kajoetangan, Kota Malang
Sumber: Kunjungan Lapangan, Juli 2019
Instansi Pelaksana
Direktorat Jenderal Cipta Karya,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
a. Nangroe Aceh Darussalam
b. DI Yogyakarta
c. Jawa Tengah
d. Jawa Timur
e. Bali
f. Nusa Tenggara Timur
g. Nusa Tenggara Barat
h. Kalimantan Tengah
i. Kalimantan Selatan
j. Kalimantan Timur
k. Sulawesi Barat
l. Sulawesi Utara
m. Sulawesi Tengah
n. Sulawesi Selatan
o. Maluku
p. Maluku Utara
q. Gorontalo
r. Papua
s. Papua Barat
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
99
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Penyediaan dan Perbaikan prasarana/sarana lingkungan permukiman, sosial, dan ekonomi melalui
kegiatan padat karya;
b. Penyediaan sumber daya keuangan melalui dana bergulir dan kredit mikro untuk mengembangkan
kegiatan ekonomi masyarakat miskin;
c. Peningkatan kapasitas masyarakat dan pemerintah lokal melalui penyadaran kritis, pelatihan
keterampilan usaha, manajemen organisasi dan keuangan, serta penerapan tata keperintahan yang
baik.
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
I Kategori 1
BLM 62,0 63,0 100 0,00 - -
Skala Lingkungan 61,62 62,79 100 - - - - 100% 0%
Skala Pencegahan 0,42 0,23 54,7 - - - - 0% 0%
2 Kategori 2 28,53 27,06 94,8 23,58 5,47 23,1
Infrastruktur Skala Kota 2,53 2,01 79,4 16,31 2,25 13,7 - 100% 21,71%
Jawa Tengah 0,49 - - 4,12 - -
DIY 0,51 0,51 100 1,39 0,74 53,2
NTB 0,10 - - 0,98 0,17 17,3
NTT - - - - - -
Gorontalo 0,15 0,16 100 0,52 - -
Sulawesi Selatan 0,18 - - - - -
Sulawesi Tenggara 1,05 1,14 100 3,27 1,73 52,9
Kalimantan Selatan - - - - 0,41 -
Maluku Utara - - - - - -
Papua 0,21 0,20 0,95 0,78 0,30 38,4
Jasa Konsultan Pusat 7,77 7,04 90,6 3,42 1,16 833,9 - 100% 34,22%
Pembayaran
Gaji/BOP/FCT 14,12 13,72 97.1 3,86 0,97 25,1 - 100% 26,19%
Pelatihan Masyarakat 4,11 4,28 100 - - - - 0% 0%
3 Kategori 3 6,5 2,73 42 25,04 2,06 8,2 - 100% 8,5%
Rehab Rekon Pasca
Bencana Sulawesi Tengah 6,5 2,73 42 25,04 2,06 8,2
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
100
Progress Kinerja
NUSP
1. Total lokasi padat karya NSUP sebanyak 2.800 kelurahan (lokasi regular dan tambahan) yang terdiri
dari 1.400 kelurahan untuk tahun 2020, 1000 kelurahan untuk tahun 2021 dan 400 kelurahan untuk
tahun 2022 dengan alokasi untuk infrastruktur skala lingkungan sebesar Rp. 1 Milyar/Kelurahan setiap
tahunnya.
2. Terdapat potensi sisa dana dari skala kawasan sebesar USD 15 juta yang akan digunakan untuk
mengatasi permasalahan yang ada terkait dengan pandemic Covid-19 diantaranya untuk
pelaksanaan kegiatan padat karya dan percepatan cash for work untuk peningkatan pendapatan
melalui pemeliharaan terbangun program KOTAKU.
3. Potensi alokasi hibah dari DFAT sebesar USD 5,5 juta. Saat ini sedang dalam proses di internal
Bappenas (menunggu rekomendasi dari sektor dan konfirmasi pembiayaan).
4. Kementerian PUPR mengusulkan untuk melakukan realokasi dana kegiatan skala kawasan sekitar USD
15 juta yang akan digunakan untuk membiayai kegiatan padat karyadan cash for work melalui
komponen 3.2.
5. Usulan perpanjangan masa laku kegiatan NSUP yang semula closing date pada tanggal 31 Maret
2022 diperpanjang hingga 31 Desember 2022 (9 Bulan) dan telah disetujui oleh Kementerian
Keuangan.
CERC Sulteng
a. Pada tahun 2020, direncanakan kegiatan akan dilaksanakan di 369 kelurahan dengan dana NSUP
CERC sebesar USD 100 juta
b. Terdapat potensi sisa dana sebesar USD 17 juta yang akan dimanfaatkan untuk kegiatan padat
karya. Kementerian PUPR telah memiliki SE penanganan KOTAKU pasca Covid-19 dengan
menggunakan potensi sisa dana tersebut.
c. Bank Dunia melalui suratnya Nomor CD- 088/WB/IV/2020 tanggal 30 April 2020 menyetujui usulan
perpanjangan masa efektif kegiatan CERC - NSUP menjadi 31 Desember 2020. Perpanjangan
kegiatan NSUP-CERC sampai dengan 31 Desember 2020 disebabkan oleh beberapa penyiapan
proyek yang membutuhkan waktu lebih lama dari yang direncanakan, antara lain: (a) penetapan
lahan untuk hunian tetap (huntap) dari Pemerintah Daerah; (b) dinamika status kondisi lahan; (c)
pembebasan lahan untuk huntap oleh masing-masing pemerintah kota; (d) proses penyiapan
LARAP, serta (e) pelaksanaan penilaian kerusakan bangunan secara detail.
d. Perpanjangan CERC telah disetujui oleh Kementerian Keuangan.
Pekerjaan untuk kegiatan CERC hingga Desember 2020 meliputi:
1) Rencana pembangunan Huntap Tahap I-A sebesar 630 unit (Duyu : 230 unit, Pombewe : 400 unit)
dengan alokasi sebesar Rp 24 M.
2) Rencana pembangunan Huntap Tahap I-B (Huntap Satelit Loru; Huntap Satelit Lambara; Huntap
Satelit Salua; Huntap Satelit Ganti; Huntap Satelit Lompio).
3) Konstruksi sambungan rumah (SR) untuk 1.800 rumah di Tondo-1 dan 230 rumah di Balaroa huntap
satelit.
4) Konstruksi sistem penyediaan air untuk 400 unit rumah di Pombewe.
5) Rehabilitasi Rumah Sakit Undata fase I-b.
6) Rehabilitasi Rumah Sakit Anutapura fase I-b.
7) Rehabilitasi Rumah Sakit Torabelo di Sigi fase I.
8) Rehabilitasi Universitas Tadulako dan konstruksi bangunan multifungsi.
9) Rehabilitasi fasilitas sekolah dasar.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
101
10) Rehabilitasi infrastruktur perumahan melalui KOTAKU sebanyak 32 desa di Nusa Tenggara Barat.
Perencanaan dan Penganggaran
a) Terdapat potensi sisa dana sebesar USD 17 juta yang akan dimanfaatkan untuk kegiatan padat karya
(Komponen 3.2).
b) Alokasi tahun 2021 sebesar Rp 99,8 M yang akan diserap menjelang loan berakhir (Komponen Ditjen
Cipta Karya).
c) Alokasi tahun 2021 sebesar Rp 1,29 M yang akan digunakan untuk pekerjaan fisik (Komponen Ditjen
PP).
d) Usulan pagu anggaran tahun 2021 sebesar Rp 4,61 M untuk komponen Kementerian ATR/BPN diambil
dari kegiatan One Map. Tahun 2021 direncanakan akan dilakukan kegiatan penguatan
kelembagaan pertanahan dalam penanganan kumuh dan dukungan implementasi KOTAKU.
e) Alokasi hibah dari DFAT sebesar USD 5,5 juta untuk penanganan warga terdampak Covid-19. Saat ini
sedang dalam proses internal Bappenas. Adapun calon lokasi penerima hibah DFAT sebanyak 14
lokasi.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
a. Adanya alokasi hibah dari DFAT sebesar
USD 5,5 juta untuk penanganan warga
terdampak Covid-19. Kementerian PUPR
telah menetapkan rencana lokasi untuk
pelaksanaan kegiatan ini di 14
desa/kelurahan yang tersebar di seluruh
Indonesia dan terdapat tambahan 50 lokasi
untuk lokasi terdampak Covid-19.
b. Terdapat potensi sisa dana skala kawasan
sebesar USD 15 juta. Potensi sisa dana ini
dikarenakan adanya kawasan-kawasan
yang pada awalnya masuk ke dalam
kategori kumuh menjadi tidak kumuh,
sehingga terdapat dana yang tersisa dari
alokasi anggaran awal.
NUSP
Kawasan-kawasan yang pada awalnya masuk
dalam kategori kumuh menjadi tidak kumuh
sehingga menyebabkan adanya potensi sisa dana
dari skala kawasan.
CERC Sulteng
a. Terdapat potensi sisa dana sebesar USD 17
juta.
b. Masalah kesiapan lahan di Kota Palu yang
menyebabkan pelaksanaan CERC menjadi
mundur.
a. DUK dan DIPK telah disampaikan ke
Direktorat Ketersedian Infrastruktur
Perumahan Kementerian PUPR dan
direncanakan akan digunakan untuk
kegiatan pemenuhan air minum dan
sanitasi. Selain itu, proposal kegiatan
juga telah disiapkan.
b. KemenPUPR mengajukan usulan untuk
realokasi dari Komponen 3.1
(Infrastructure for City Level) sebesar USD
15 juta ke Komponen 3.2 (Padat Karya at
Community Level).
c. Usulan perpanjangan masa laku
kegiatan NSUP yang semula closing date
pada tanggal 31 Maret 2022
diperpanjang hingga 31 Desember 2022
(9 Bulan).
NUSP
Kementerian PUPR mengajukan usulan untuk
melakukan realokasi dari Komponen 3.1 sebesar
USD 15 juta ke Komponen 3.2.
CERC Sulteng
a. Kementerian PUPR mengajukan usulan
realokasi dana dari Komponen 5
(Contingency for Disaster Response)
sebesar USD 17 juta ke Komponen 3.2
(Padat Karya at Community Level)
b. Kementerian PUPR telah mengajukan
usulan perpanjangan kegiatan NSUP-
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
102
CERC hingga 31 Desember 2020, dan
telah mendapatkan persetujuan dari
Bank Dunia, Bappenas dan Kementerian
Keuangan.
c. Akibat adanya Covid-19, Kementerian
PUPR mengajukan kembali usulan
perpanjangan masa laku kegiatan CERC
yang semula dijadwalkan selesai pada
tanggal 31 Desember 2020 diperpanjang
hingga 30 Juni 2021 (6 Bulan).
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
103
NATIONAL URBAN WATER SUPPLY PROJECT (NUWSP)
Meningkatkan akses dan kualitas pelayanan air minum perpipaan bagi masyarakat di wilayah perkotaan
Masyarakat Berpenghasilan Rendah (MBR) dan non-MBR dan meningkatkan kapasitas dan kinerja Pemerintah
Daerah dan PDAM dalam memberikan pelayanan air minum.
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8872-
ID
28/08/2018
s/d
31/12/2022
USD 100,0 1,9 1,9 98,1 -40,5 8,0 1,4 17,7
Keterangan : Lokasi rencana pelaksanaan kegiatan NAHP di
Kota Banjarmasin per Agustus 2018.
Instansi Pelaksana
a. Direktorat Cipta Karya, Kementerian
Pekerjaan Umum dan Perumahan
Rakyat
b. Direktorat Jenderal Bina
Pembangunan Daerah,
Kementerian Dalam Negeri
c. Pemerintah Daerah
Lokasi Proyek (Provinsi)
a. Kalimantan Barat
b. Sumatera Utara
c. Kalimantan Timur
d. Bengkulu
e. Jawa Timur
f. Jawa Barat
g. Jawa Tengah
h. Sulawesi Selatan
i. Aceh
j. Kalimantan Selatan
k. Bali
l. Nusa Tenggara Timur
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Perbaikan dan peningkatan akses masyarakat terhadap layanan air minum perpipaan di wilayah
perkotaan terpilih melalui penguatan kapasitas dan kinerja PDAM;
b. Peningkatan kapasitas dan sumber daya manusia dan mendorong peningkatan investasi di tingkat
pemerintah daerah untuk air minum perkotaan;
c. Perbaikan/penyempurnaan kebijakan dan strategi Pemerintah di sektor air minum perkotaan,
pengembangan kapasitas sistem pemantauan dan evaluasi dalam rangka meningkatkan efektivitas
dan efisiensi, serta investasi yang lebih tepat sasaran.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
104
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD
Juta)
Keuangan Fisik (%)
Realisasi
Kumulatif
(USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
CPMU NUWSP
1 Komponen 1: Investment Support lor Urban Water Supply Infrastructure Development
Kota Dumai 2,94 - - - - - - - -
Kab. Bengkalis 0,85 - - - - - - - -
Kab. Deli Serdang 1,70 - - - - - - - -
Kab. Bengkulu Tengah 2,31 - - - - - - - -
Kab. Sukabumi 1,21 - - - - - - - -
Kab. Sukoharjo (Galak) 1,15 - - - - - - - -
Kab. Sukoharjo (Tawangsari) 1,12 - - - - - - - -
Kota Blitar 1,04 - - - - - - - -
Kab. Ponorogo 1,35 - - - - - - - -
Kab. Lamongan 1,50 - - - - - - - -
Kab. Tanah Laut 2,32 - - - - - - - -
Kota Bitung 2,96 - - - - - - - -
Monev Prov. Riau 7,39 - - - - - - - -
Perjadin ke Jakarta Prov.
Riau 4,20 - - - - - - - -
Monev Prov. Kalsel 5,95 - - - - - - - -
Monev Prov. Sulut 5,42 - - - - - - - -
2 Komponen 2: Technical Assistance and Capacitv Building for Local Governments and PDAMs
Consultan Services TACT -
Dit. PSPAM 2,98 0,28 9,3 0,79 0,28 35 34,6% 100% 34,6%
3
Komponen 3: Advisory and
Policy Develooment Support
tor
Central Government
- - - - -
4 Komponen 4 : Project Imolementation and Management Support
Central Management
Consultant (CMC) 2,22 0,21 9,4 0,46 0,21 45,6 44,5% 100% 44,5%
Regional Management and
Advisory Consultant (RMAC)
I
4,09 0,40 9,7 0,90 0,40 44,5 44,0% 100% 44,0%
Regional Management and
Advisory Consultant (RMAC)
II
3,40 0,31 9,1 0,79 0,31 39,2 39,8% 100% 39,8%
Individual Advisory
Consultant 0,007 0,00 - 0,007 0,00 - 0% 100% 0%
CPIU NUWSP
1 Komponen 2 : Technical Assistance and Capacitv Building for Local Governments and PDAMs
TACT - LG (CPIU Bangda) 1,85 0,52 28,1 0,55 0,18 32,7 - 100% 31,9%
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
105
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD
Juta)
Keuangan Fisik (%)
Realisasi
Kumulatif
(USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
Komponen 4 : Project Imolementation and Management Support
Coordination Meeting/Workshop/Training
Regional Development
Planning Synchronization
Assistance
0,12 0,00 - 0,12 0,00 - - 100% 0%
Coordination Meeting on
Evaluation of the
Implementation of Business
Planning and Budget Work
Planning (RKA) of BUMD
Regarding the Provision of
Basic Water Supply Services
0,14 0,00 - 0,14 0,00 - - 100% 0%
Performance Evaluation
Meeting of NUWSP T.A 2020 0,069 0,00 - 0,069 0,00 - - 100% 0%
2 Consultant
PT Minaret Kusumawadi 0,24 0,13 54 0,15 0,044 29,3 - 100% 29%
Individual Advisory
Consultant 0,018 0,00 - 0,009 0,00 - - 100% 0%
IOC and Secretarial Support 0,069 0,013 19 0,068 0,013 19,1 - 100% 20,1%
Kemajuan Pelaksanaan Kegiatan
Fisik
a) Saat ini telah teridentifikasi 12 lokasi yang akan mengikuti kegiatan pada TA 2020 dan selesai pada TA
2021.
b) 1 dari 12 lokasi tersebut sudah lelang (Riau), 4 lokasi sedang dalam finalisasi dokumen lelang (Gatak
Sukoharjo, Tawangsari Sukoharjo, Blitar, Ponorogo), 6 lokasi sedang dalam tahap penyiapan
dokumen perencanaan dan kelengkapan RC (Bengkalis Riau, Deli Serdang, Sukabumi, Tanah Laut,
Bitung, Bengkulu Tengah), dan 2 lokasi lelang dini (Lamongan, saat Pemda dan PDAM sedang
mengulang proses penyusunan dokumen perencanaan, dan Tirtanadi Sumut saat ini sedang
melakukan pemenuhan RC terkait kelengkapan teknis dan perubahan lokasi pelaksanaan).
c) Rencana paket fisik untuk untuk TA 2021 adalah 24 lokasi (12 lokasi bantuan stimulan, 12 lokasi
bantuan teknis), saat ini belum mulai lelang dan sedang dalam tahap penilaian proposal teknis.
Non Fisik
1) Konsultan TACT, CMC, RMAC I dan RMAC II telah terkontrak.
2) Konsultan TACT terkontrak pada tanggal 31 Januari 2020.
3) Konsultan CMC terkontrak pada tanggal 31 Januari 2020.
4) RMAC I dan RMAC II terkontrak pada tanggal 25 Februari 2020.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
106
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Status At-Risk.
b. Paket Fisik Komponen I
12 paket yang direncanakan dilelang pada
bulan Juni-Juli 2020, yang sudah pengumuman
lelang hanya 8 paket, sedangkan sisanya 4
Paket belum lelang yaitu Kab. Sukabumi, Kab.
Deli Serdang, Kab. Bengkulu Tengah, dan Kota
Bitung.
c. Manajemen Keuangan
Anggaran untuk TA 2020 telah teralokasi
melalui penerbitan Revisi DIPA III 2.
Anggaran paket Kab. Bengkulu Tengah
dihapus pada Revisi DIPA III, akan
dimasukan lagi dengan menerbitkan
kembali pada Revisi DIPA IV.
d. Konsultan CMC
Addendum durasi Kontrak Semula 37
bulan menjadi 35 bulan.
Keterlambatan penarikan termin Maret-
Juni 2020 karena penggantian rekening
manajemen.
Akan diadakan addendum penambahan
tenaga ahli dan tenaga pendukung.
e. Konsultan RMAC 1 dan 2
Kendala administrasi untuk penarikan
bulan Maret-Juni 2020.
Covid-19 mengakibatkan pembekalan FA
tidak dapat dilakukan secara tatap muka.
f. Dokumen perencanaan yang disusun oleh
Pemda dan PDAM dari daerah tidak
memenuhi kelayakan teknis dan terlambat dari
timeline.
g. Verifikasi usulan kegiatan ke lapangan untuk 24
lokasi TA 2021 belum dapat dilaksanakan
karena Covid-19.
a. Perencanaan percepatan fisik dan non-fisik di
TA 2021, ditargetkan status minimal behind
schedule pada TW III TA 2021.
b. Monitoring deadline pengumuman lelang →
Koordinasi dengan PPIU dan BP2JK Provinsi
untuk percepatan terhadap 4 paket yang
belum selesai lelang tersebut.
c. Manajemen keuangan
Monitoring dan evaluasi penyerapan TA
2020 sesuai jadwal.
Persiapan Revisi DIPA IV.
d. Konsultan CMC
Percepatan addendum kontrak terhadap
pemotongan durasi dan penambahan
personil.
Termin pada bulan Maret - Mei 2020 telah
cair pada tanggal 9 Juli 2020.
Termin pada bulan Juni 2020 dalam
proses.
e. Konsultan RMAC 1 dan 2
Penarikan termin bulan Maret-Mei 2020
sudah cair per tanggal 2 Juli 2020,
penarikan termin bulan Juni 2020 sedang
dalam proses.
Pembekalan FA menggunakan dana
APBN murni dan dilaksanakan secara
online.
f. Konsultan RMAC I dan II melakukan
pendampingan intensif agar dokumen
perencanaan layak teknis dan pelaksanaan
lelang sesuai target.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
107
SANIMAS COMMUNITY-BASED SANITATION PROJECT IN INDONESIA
Peningkatan Kualitas Sanitasi Berbasis Masyarakat
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
IDB IND-
0167
29/10/2014
s/d
12/06/2020
USD 100,0 70,7 70,7 29,3 -30,2 1,3 0,0 0,0
Sanimas IsDB Kota Bogor
Sumber : Kementerian PUPPR
Instansi Pelaksana
Direktorat Jenderal Cipta Karya –
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
a. Satuan Kerja Pengembangan
Infrastruktur Permukiman Kabupaten/
Kota
b. Satuan Kerja Direktorat Penataan
Pembangunan Lingkungan Permukiman
c. Satuan Kerja Direktorat Bina Program
Lokasi Proyek
a. Provinsi Aceh
b. Provinsi Sumatera Utara
c. Provinsi Sumatera Barat
d. Provinsi Riau
e. Provinsi Jambi
f. Provinsi Sumatera Selatan
g. Provinsi Bengkulu
h. Provinsi Lampung
i. Provinsi Bangka Belitung
j. Provinsi Jawa Barat
k. Provinsi DKI Jakarta
l. Provinsi Banten
m. Provinsi Kalimantan Barat
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Provision of Community Sanitation Infrastructure
b. Consulting Services
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
108
Kinerja Pelaksanaan Proyek dan Pencapaian Indikator Kinerja
Ekuivalen Juta USD
No Paket Kontrak/
Komponen
Nilai
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020
Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1
Provision of
Community
Sanitation
Infrastructure
62,44* 54.69 87,58 0 0 0 95,7 7,3 3
2 Consultancy Services
National
Project
Management
Consultant
(NPMC)
1,54 1.27 82.47 0,27 0,21 77,77 99,96 1,9 1,86
Regional
Project
Management
Consultant
(RPMC) I
1,80 1.79 99.44 0,008 0,1 1250 99,97 0,4 0,37
Regional
Project
Management
Consultant
(RPMC) II
1,57 1.53 97.45 0,04 0,1 250 100 0,1 0,37
Regional
Project
Management
Consultant
(RPMC) III
1,65 1.47 89.09 0,17 0,18 105,8
8 100 0 0,01
Regional
Project
Management
Consultant
(RPMC) IV
1,51 1.47 97.35 0,03 0,17 566,6
6 100 0 0
Monitoring and
Evaluation
Consultant
0,44 0.26 59.09 0,18 0 0 60 40 0
Keterangan : *terdapat perubahan nilai kontrak
Kemajuan Pelaksanaan Kegiatan
1. Provision of Community Sanitation Infrastructure. Secara kumulatif dari tahun awal pelaksanaan
proyek, kegiatan telah selesai dilakukan di 1.799 lokasi dari target 1.800 lokasi. Saat ini masih terdapat
150 lokasi yang masih dalam tahap pelaksanaan kegiatan.
2. Consultancy Services. Konsultan NPMC, RPMC I, RPMC II, RPMC III, RPMC IV, dan konsultan monitoring
and evaluation saat ini dalam proses pelaksanaan kegiatan.
3. Audit. Komponen audit akan dilaksanakan BPKP menggunakan alokasi anggaran Kementerian PUPR.
Saat ini sedang dalam tahap pelaksanaan kegiatan.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
109
4. Project Completion Report. PMU sedang menyusun PCR dari kegiatan ini dengan target penyelesaian
sebelum Juni 2020.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Administrasi
Terdapat keterlambatan penyelesaian pekerjaan
fisik sampai dengan tahun 2020, sehingga
diperlukan perpanjangan kontrak untuk 25 orang
Tenaga Ahli Manajemen Kabupaten/Kota (TAMK)
untuk mendampingi penyelesaian pekerjaan di
lapangan.
Usulan perpanjangan kontrak tenaga TAMK telah
disetujui oleh IsDB menggunakan alokasi dana
contingencies.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
110
SECOND ADDITIONAL FINANCING TO THE THIRD WATER SUPPLY AND SANITATION FOR LOW
INCOME COMMUNITIES/COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS III)
Untuk meningkatkan jumlah penduduk perdesaan yang belum terlayani dan berpendapatan rendah untuk
dapat mengakses layanan air dan sanitasi yang lebih baik dan berkelanjutan serta mempraktikan perilaku
higienis yang lebih baik melalui pengarusutamaan yang bersifat programatik dan scaling-up dari suatu
pendekatan berbasis masyarakat
Lender Kode
Loan Masa Laku
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8578-
ID
22/08/2016
s/d
31/12/2020
300,0 239,3 79,8 60,8 -8,7 85,3 5,5 6,4
PAMSIMAS Partispasi World Urban Forum di Kuala Lumpur
Sumber: http://pamsimas.org/
Instansi Pelaksana
a. Direktorat Jenderal Cipta Karya,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
b. Direktorat Jenderal Bina
Pembangunan Daerah, Kementerian
Dalam Negeri
c. Direktorat Jenderal Pemerintahan
Desa, Kementerian Dalam Negeri
d. Direktorat Jenderal Pembangunan dan
Pemberdayaan Masyarakat dan Desa,
Kementerian Desa, Daerah Tertinggal,
dan Transmigrasi
e. Direktorat Jenderal Penanggulangan
Penyakit dan Penyehatan Lingkungan,
Kementerian Kesehatan
Lokasi Proyek
33 Provinsi
Ruang Lingkup (Pekerjaan Dan Sasaran)
a. Community Empowerment, Local and Village Institutional Development
b. Improving Hygiene and Sanitation Behavior and Services
c. Water Supply and Public Sanitation Infrastructure
d. District and Village Incentives
e. Implementation Support and Project Management
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
111
Alokasi Pinjaman Berdasarkan Komponen
Ekuivalen Juta USD
No Kategori Alokasi Dana
(Juta USD)
1 Community Empowerment, Local and Village Institutional
Development 140,07
2 Improving Hygiene and Sanitation Behavior and Services 29,48
3 Water Supply and Public Sanitation Infrastructure 62,97
4 District and Village Incentives 6,00
5 Implementation Support and Project Management 61,53
Total 300,00
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Status Pencapaian Indikator Kinerja. Dari total 16 KPI, terdapat 5 KPI yang belum mencapai target yaitu:
a. KPI 1 mengenai jumlah tambahan orang yang mempunyai akses yang berkelanjutan terhadap
fasilitas air minum yang layak baru tercapai 18.943.516 orang dari target capaian 22.943.516
orang sehingga masih terdapat gap sebanyak 3.156.484 orang.
b. KPI 3 mengenai persentase desa/kelurahan dengan sarana air minum yang layak yang dikelola
dan dibiayai secara efektif baru tercapai 83,03% dari target capaian 90% sehingga masih
terdapat gap 6,97%.
c. KPI 11 mengenai jumlah desa yang melampaui kriteria-kriteria proyek dan memperoleh
tambahan dana hibah baru mencapai 2.979 desa dari target 4.649 desa sehingga masih
terdapat gap 1.670 desa.
d. KPI 12 mengenai persentase kabupaten/kota yang melampaui kriteria kinerja proyek dan
memperoleh tambahan dana hibah mencapai 42,71% dari target 50% di tahun 2020 sehingga
masih terdapat gap 7,29%.
e. KPI 15 mengenai persentase target sekolah yang mempunyai fasilitas sanitasi yang layak dan
menerapkan pola hidup bersih sehat (PHBS) baru tercapai 87,45% dari target 95% sehingga
masih terdapat gap 7,55%.
Untuk pelaksanaan BLM 2019 masih terdapat desa yang belum selesai (228 desa) sehingga belum
dimasukkan ke dalam perhitungan KPI, Kementerian PUPR juga telah menyiapkan dana serta tambahan
desa baru untuk dibangun sarana fisiknya untuk meningkatkan pencapaian indikator kerja.
Progress Kegiatan.
1. Kementerian PUPR telah menyampaikan usulan amandemen LA (perpanjangan dan realokasi) dan
GA (perpanjangan dan penambahan nilai), saat ini usulan sudah disampaikan dari Bappenas ke
Kementerian Keuangan.
2. Kegiatan di lapangan masih berjalan, paralel dengan proses amandemen pinjaman dan hibah.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
112
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
a. Penerbitan Juknis Pelaksanaan Program
Pamsimas terkendala Covid-19.
b. Non-Consulting Service
Terjadi penundaan gaji konsultan
karena terdapat kesalahan kode
KPPN untuk RMP paket kontraktual
loan yang berporsi (80-20) pada
Revisi DIPA I.
Alokasi untuk paket FAS di
beberapa provinsi sudah tidak
mencukupi sehingga mengalami
keterlambatan pembayaran gaji
fasilitator.
Kegiatan workshop dan training
belum terlaksana karena dengan
adanya Pandemi Covid-19, maka
kegiatan-kegiatan yang bersifat
mengumpulkan banyak orang
untuk sementara ditunda.
a. Mempercepat proses penerbitan Juknis
Pelaksanaan Program Pamsimas dalam
Masa Pandemi Covid-19.
b. Non Consulting Service
Menunggu DIPA Revisi III terbit.
Menunggu DIPA Revisi III terbit.
Penyesuain KAK dan RAB paket
konsultan (Rakor, konsinyasi,
pelatihan, dll) yang awalnya dengan
metoda tatap muka menjadi
metoda jarak jauh.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
115
BALI BEACH CONSERVATION PROJECT (PHASE 2)
Konservasi pantai di Bali
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
575
27/07/2017
s/d
27/07/2025
JPY 9.855,0 0,0
0,0
9.855,0 -
36,6
434,6 0,0
0,0
USD 91,5 0,0 91,5 4,0 0,0
Instansi Pelaksana
Direktorat Jenderal Sumber Daya Air,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
Provinsi Bali
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pekerjaan Konsultansi
b. Pekerjaan Sipil untuk konservasi pantai
di Bali
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Loan JICA IP-575 kegiatan Bali Beach Conservation – Phase II merupakan kelanjutan dari kegiatan Bali
Beach Conservation – Phase I (BBC- I) yang pelaksanaannya selesai pada tahun 2009. Lingkup pekerjaan
BBC I adalah pekerjaan sipil untuk mencegah erosi dan rehabilitasi pantai yang rusak di pantai Sanur,
Nusa Dua, Kuta dan Pura Tanah Lot dan jasa konsultansi. Sedangkan, pekerjaan BBC II mencakup
pekerjaan sipil untuk konservasi pantai Candisasa, Kuta Utara – Legian – Seminyak – Canggu – Nusa Dua
dan Tanjung Benoa, dan Jasa Konsultansi.
Loan IP-575 efektif pada Juli 2017. Hingga periode laporan Triwulan II tahun anggaran 2020 belum ada
realisasi penyerapan dan pekerjaan fisik dilapangan karena Pelaksana Kegiatan masih melaksanakan
procurement (dalam proses PQ). Kegiatan IP-575 mengalami kegagalan PQ sebanyak 3 kali. Proses PQ
yang berjalan saat ini adalah PQ yang ke 4. Dari hasil PQ yang terakhir terdapat dua perusahaan
konsultan yang ikut serta dalam lelang. Pada periode laporan ini, sedang dalam tahap permohonan
concurrence.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
116
CONSTRUCTION OF KARIAN MULTIPURPOSE DAM PROJECT
Proyek Pembangunan Bendungan Karian
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Korea INA-
19
14/02/2012
s/d
14/06/2022
KRW 109.426,0 71.467,0
65,3
37.959,0
-15,8
16.995,0 2.102,0
12,4
USD 91,4 59,7 31,7 14,2 1,8
Ciuyah Tunnel
Sumber : Kementerian Pekerjaan Umum dan Perumahan Rakyat
Instansi Pelaksana
Direktorat Jenderal Sumber Daya Air,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
Kabupaten Lebak, Provinsi Banten
Ruang Lingkup Pekerjaan
a. Memasok air baku untuk perkotaan
dan Industri di Kota Tangerang
Banten sebesar 9,1 m3/detik
b. Pasokan tambahan untuk air baku
untuk perkotaan dan industri kota
Serang, Cilegon dan tambahan air
irigasi Daerah Irigasi Ciujung (23.000
hektar)
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Paket Jasa Konsultan
Waktu pelaksanaan konstruksi akan selesai pada September 2021 dan harus ditambah dengan masa
impounding selama 12 bulan namun loan akan berakhir pada April 2022.
Paket Konstruksi
Diperlukan masa pemeliharaan selama 2 tahun setelah masa pelaksanaan sehingga akan melebihi masa
efektif loan pada April 2022.
Paket Hydromechanical Works
Terdapat wacana kebutuhan dana tambahan untuk dapat menyelesaikan pembangunan Ciuyah
Tunnel. Kebutuhan dana tambahan akan diproses melalui loan baru.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
117
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Waktu pelaksanaan konstruksi akan selesai
pada bulan September 2021 dan harus
ditambah dengan masa impounding
selama 12 bulan namun loan akan
berakhir pada April 2022.
b. Masa pemeliharaan selama 2 tahun
setelah masa pelaksanaan akan melebihi
masa efektif loan pada April 2022.
c. Diperlukan penambahan dana untuk
menyelesaikan pembangunan Ciuyah
Tunnel sampai Booster Pump.
a. Konsultan supervisi akan mengajukan
Addendum 8 penyesuaian waktu
pengawasan konstruksi sampai dengan
September 2021 dan persiapan
impounding sampai dengan September
2022.
b. Kementerian PUPR akan menyiapkan
usulan perpanjangan loan INA-19.
c. Saat ini additional loan Karian telah
diproses untuk masuk dalam BB 2020-2024.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
118
COUNTERMEASURE FOR SEDIMENT IN WONOGIRI MULTIPURPOSE DAM RESERVOIR II
Konservasi Daerah Tangkapan Air
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA) IP-567
23/06/2014
s/d
23/06/2021
JPY 4.954,0 2.503,1
50,5
2.450,9
-35,5
289,4 128,7
44,5
USD 46,0 23,2 22,8 2,7 1,2
Kunjungan Lapangan Kementerian PPN/Bappenas bersama
Kementerian Keuangan
Instansi Pelaksana
a. Direktorat Jenderal Sumber Daya
Air, Kementerian Pekerjaan Umum
dan Perumahan Rakyat
b. Balai Besar Wilayah Sungai
Bengawan Solo
c. SNVT Pelaksanaan Jaringan Sumber
Daya Air Bengawan Solo
d. PPK Prasarana Konservasi Sumber
Daya Air
Lokasi Proyek
Provinsi Jawa Tengah
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pembangunan Spilway, pengadaan
dan pemasangan pintu spilway,
pengadaan kapal keruk, dan
pembangunan check dam.
b. Konservasi Daerah Tangkapan Air
Keduang
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Proyek IP-567 ini terdiri dari dua paket jasa konstruksi dan satu paket jasa konsultan. Dua Paket Jasa
Konstruksi yaitu Paket 2.1 (Construction of Closure Dike and Overflow Dike) dan Paket 2.2 Konservasi
Daerah Tangkapan Air K. Keduang (II).
Paket konsultan supervisor terkontrak pada tanggal 15 September 2016, capaian fisik hingga Maret 2020
sekitar 86%. Paket 2.1 (Construction of Closure Dike and Overflow Dike) terkontrak pada tanggal 17 Juni
2016, capaian fisik telah mencapai 100% di periode laporan triwulan II 2020.
Paket 2.2 Konservasi Daerah Tangkapan Air K. Keduang (II) hingga periode laporan ini belum terkontrak.
Pada Rapat Koordinasi Pemantauan Pinjaman Hibah Luar Negeri di Bappenas, Pelaksana Proyek
menginformasikan bahwa Paket 2.2 rencananya akan dibatalkan, karena permasalahan kondisi
lapangan (alur sungai berpindah-pindah). Namun, masih menunggu keputusan akhir pembatalan Paket
2.2. Surat usulan pembatalan check dam telah disampaikan kepada Direktorat Pembina. Sampai dengan
periode laporan ini, usulan pembatalan kegiatan Paket 2.2 masih dibahas di internal Kementerian PUPR.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
119
Watershed Conservation Slice II. Kegiatan ini telah tanda tangan kontrak pada bulan Oktober 2018.
Terdapat 4 Paket untuk kegiatan Water Conservation slice II. Capaian fisik masing-masing paket sampai
dengan Juni 2020 adalah sebagai berikut; Paket 3.1 capaian fisiknya sekitar 100%, Paket 3.2 capaian
fisiknya sekitar 68%. Paket 3.3 dan Paket 3.4 pada periode laporan ini telah mencapai 100%.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
120
DAM OPERATIONAL IMPROVEMENT AND SAFETY PROJECT (DOISP) PHASE II
Meningkatkan Keamanan dan Fungsi Bendungan Dilokasi yang Terpilih, serta Memperkuat Kapasitas Operasi
dan Manajemen Keamanan Bendungan
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8711-
ID
04/08/2017
s/d
30/06/2023
USD 125,0 18,1 14,5 106,9 -34,7 7,1 1,9 26,2
AIIB 0410-
IDN
04/08/2017
s/d
30/06/2023
USD 125,0 18,1 14,5 106,9 -34,7 7,1 1,9 26,2
Salah satu komponen peralatan Fixed Cone Valve dalam
proses fabrikasi
Sumber : Dokumentasi Kunjungan Lapangan Bappenas
Instansi Pelaksana
a. Direktorat Jenderal Sumber Daya Air,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
b. Deputi Bidang Sarana dan Prasarana,
Kementerian PPN/Bappenas
Lokasi Proyek
a. Provinsi Aceh
b. Provinsi Lampung
c. Provinsi Kalimantan Timur
d. Provinsi Sulawesi Selatan
e. Provinsi Jawa Timur
f. Provinsi Jawa Barat
g. Provinsi Jawa Tengah
h. Provinsi DI Yogyakarta
i. Provinsi Nusa Tenggara Barat
j. Provinsi Nusa Tenggara Timur
k. Provinsi Bali
l. Provinsi Maluku
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Dam Operational and Safety Improvement Works and Studies
b. Operations and Maintanance Improvement and Capacity Building
c. Reservoir Sedimentation Mitigation
d. Dam Safety Institutional Improvement
e. Project Management
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
121
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1
Dam Operational and
safety Improvement
Works
134,94 25,35 18,8 13,75 3,13 23 - - -
2 0 & M Improvement and
Capacity Building 19,24 1,59 8,26 0,2 0,17 85 - - -
3 Reservoir Sedimentation
Mitigation 45,90 2,65 5,8 0,1 0,07 70 - - -
4 Dam Safety Assurance
Institutional 20,68 0,86 4,2 - 0,16 - - - -
5 Project Management 29,24 1,99 6,8 0,23 0,22 96,7 - - -
Progress Kinerja
1. Dari total 140 dam, saat ini telah ditangani dan direhabilitasi 38 dam. AWP yang disetujui oleh
Bank Dunia pada tahun 2020 adalah IDR 2.385.025 triliun.
2. Saat ini telah dilakukan proses revisi AWP 2020 oleh PMU, dengan total 85 paket pekerjaan
bernilai Rp.1,48 Triliun. Sebelumnya AWP 2020 telah disetujui oleh World Bank dan telah terbit
conditional NOL pada tanggal 30 Agustus 2019, namun masih memerlukan revisi dan perbaikan
AWP pada Balai Bendungan, BWS Sumatera 1.
3. Revisi DIPA sedang disusun. DIPA tahun yang telah ada Rp.167 Milyar. Revisi DIPA yang sedang
disusun Rp. 813 Milyar.
4. Terkait desain kegiatan, Guideline untuk penilaian risk score masih multitafsir dan perlu
dipertajam serta paket kegiatan dominan Consulting Services dan legalisasi hasil desain untuk
rehabilitasi memerlukan persetujuan pendapat dari Komisi Keamanan Bendungan. Oleh karena
itu, dibentuk PIC untuk mengawal proses legalisasi desain tersebut.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Pengadaan dan Implementasi Paket
a. Belum adanya NoL dari Bank Dunia untuk
harmonisasi dokumen lelang, khususnya
untuk konstruksi dapat menghambat
pelaksanaan proyek. Diharapkan CPMU
dapat segera berkoordinasi dengan Bikon
untuk mengusulkan harmonisasi SPSE 4.3.
Budget Request belum disampaikan.
b. Readiness criteria (TOR/KAK. HPS,
Spesifikasi Teknis) untuk lelang belum
lengkap.
c. Terjadi perubahan jadwal pengumuman
lelang yang signifikan sehingga
berimplikasi pada perubahan target
kontrak.
d. Gagal Seleksi karena tidak ada peminat (1
Pengadaan dan Implementasi Paket
a. Budget request dari Balai di daerah agar
segera disampaikan.
b. Medorong PIU dan CPIU untuk
mempercepat penyelesaiaan Dokumen
Teknis agar dapat diselesaikan Bidding
Document.
c. Pecepatan proses seleksi di Pokja 3P2JK
dan percepatan proses NoL.
d. Balai mengusulkan penggabungan paket
gagal seleksi dengan paket kontrak
berjalan.
Perencanaan dan Penganggaran
a. Perlu dilakukan percepatan
b. Percepatan proses revisi DIPA dan proses
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
122
paket CS NT1).
Perencanaan dan Penganggaran
a. Progres pelaksanaan di awal lambat
karena tahapan business process yang
panjang sehingga menyebabkan
keterlambatan dari timeline yang telah
ditetapkan dan penyerapan menjadi
lambat.
b. Keterlambatan dalam penandatanganan
kontrak karena dana tidak ada di DIPA
2019 dan AWP 2020.
c. Pelelangan jasa konsultansi metode CQS
belum terakomodir dalam SPSE ICB 3.6
maupun SPSE 4.3, sehingga proses
pelelangan harus menggunakan metode
lainnya (QCBS ICB).
d. Perubahan instansi yang melakukan
pelelangan ke Bina Konstruksi
membutuhkan waktu penyelesaian
terutama dalam kegiatan PHLN yang
sudah ditentukan dalam project
management manual.
usulan revisi AWP 2020 serta
mengupayakan agar proses revisi DIPA
segera terealisasi.
c. Perlu harmonisasi sistem lelang.
d. Diperlukan training dari World Bank
kepada BP2JK terkait metode lelang
World Bank.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
123
EMERGENCY ASSISTANCE FOR REHABILITATION AND RECONSTRUCTION (EARR)
Rehabilitasi dan Rekonstruksi Pasca Bencana
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
ADB 3793-
INO
04/11/2019
s/d
30/09/2023
Instansi Pelaksana
a. Direktorat Jenderal Sumber Daya Air
b. Direktorat Jenderal Cipta Karya
Lokasi Proyek
Provinsi Sulawesi Tengah
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Human Settlement and associated infrastructure reconstructed and upgraded
b. Water resources infrastructure rehabilitation and reconstructed
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
dalam juta USD
No Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
Ruang Lingkup 1
Human Settlement and associated infrastructure reconstructed and upgraded
Reconstruction of Islamic University in Palu
1
Works for
reconstruction of
Islamic University of
- - - - -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
124
No Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
Palu
Rehabilitation and Reconstruction of water supply and sanitation infrastructure
1
Works for
construction of
water treatment
plant for Omu
- - - - -
2
Water supply
distribution
networks and
household
connections for
Palu City (23.000
HSC)
- - - - -
3
Water supply
distribution
networks and
household
connections in Sigi
Regency (12.000
HSC)
Consultancy for PIUs DGHS
1
Project
Management and
Supervision
Consultant (PMSC)
- - - - -
Project Coordination
1
Bridging consultant
for start-up
activities
(individual)
-
2 Expert panel
Ruang Lingkup 2
Water resources infrastructure rehabilitation and reconstructed
Reconstruction and modernization of Gumbasa irrigation system
1
Works (DB) for
Gumbasa irrigation
reconstruction
(6968 hectares)
- - - - -
2
Rehabilitation and
Reconstruction of
Gumbasa Irrigation
System (Weir and
Main Canal
BGKn.7 ~ BGKn.24 -
2695 Hectares)
3
Rehabilitation and
Reconstruction of
Gumbasa Irrigation
System (Main
Canal BGKn.24~
bgkN.42 - 2458
Hectares)
4
Rehabilitation and
Reconstruction of
Gumbasa Irrigation
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
125
No Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
System (Weir and
Main Canal
BGKn.42 ~ BGKn.54
- 1815 Hectares)
5
Rehabilitation D.I.
Gumbasa Weir
and Groundsill
Construction
6
Work for Tertiary
channels of
Gumbasa Irigation
System (BGKn. 1
~BGKn. 7)
7
Community
Assistant Staff and
Community
Consulting
Meeting (BGKn. 1
~BGKn. 7)
Upgrading of raw water supply systems
1 Works for Wuno
intake construction - - - - -
2
Works for
PASIGALA raw
water transmission
system
rehabilitation
- - - - -
3 Works for Paneki
intake construction
Construction of coastal protection
1 Works for coastal
protection - - - - -
2
Rehabilitation and
Reconstruction of
Palu Coastal
Protection, Central
Sulawesi
17,11 17,11 0,00 0,00 100 44,83 44,83
3
Supervision Consult
of Palu Coastal
Protection, Central
Sulawesi
0,05 0,05 0,00 0,00 100 0,00 0,00
Consultancy for PIUs DGWR
1
Consulting
services:
Management and
construction
supervision of
Water Resource
Infrastructure
- - - - -
2
Hydrometeorologi
cal and telemetric
equipment
3
Ground water
equipment (new
package) 2 Paket
4 Project
Implementation
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
126
No Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
Unit Balai
Project Coordination
1
Project
Management
Consultant
-
2
Bridging consultant
for start-up
activities
(individual)
(DGWR)
3 Expert panel
(DGWR)
4
Capacity building
to better design
resilient
infrastructure
(DGWR)
5 Implementing Unit
Ket: Kurs USD 1 = Rp 14.500,-
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No Komponen/Lingkup/Paket Kontrak Status/Kemajuan Pelaksanaan Capaian Indikator Kinerja
Ruang Lingkup 1
Human Settlement and associated infrastructure reconstructed and upgraded.
Reconstruction of Islamic University in Palu
1 Works for reconstruction of Islamic University
of Palu Menunggu hasil DED
Rehabilitation and Reconstruction of water supply and sanitation infrastructure
1 Works for construction of water treatment
plant for Omu Menunggu hasil DED
2
Water supply distribution networks and
household connections for Palu City (23.000
HSC)
Menunggu hasil DED
3
Water supply distribution networks and
household connections in Sigi Regency
(12.000 HSC)
Menunggu hasil DED
Consultancy for PIUs DGHS
1 Project Management and Supervision
Consultant (PMSC)
Project Coordination
1 Bridging consultant for start-up activities
(individual)
2 Expert panel
Ruang Lingkup 2
Water resources infrastructure rehabilitation and reconstructed
Reconstruction and modernization of Gumbasa irrigation system
1 Works (DB) for Gumbasa irrigation
Menunggu hasil DED
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
127
No Komponen/Lingkup/Paket Kontrak Status/Kemajuan Pelaksanaan Capaian Indikator Kinerja
reconstruction (6968 hectares)
2
Rehabilitation and Reconstruction of
Gumbasa Irrigation System (Weir and Main
Canal BGKn.7 ~ BGKn.24 - 2695 Hectares)
Menunggu hasil DED
3
Rehabilitation and Reconstruction of
Gumbasa Irrigation System (Main Canal
BGKn.24~ bgkN.42 - 2458 Hectares)
Menunggu hasil DED
4
Rehabilitation and Reconstruction of
Gumbasa Irrigation System (Weir and Main
Canal BGKn.42 ~ BGKn.54 - 1815 Hectares)
Menunggu hasil DED
5 Rehabilitation D.I. Gumbasa Weir and
Groundsill Construction Menunggu hasil DED
6 Work for Tertiary channels of Gumbasa
Irigation System (BGKn. 1 ~BGKn. 7) Pengusulan ke dalam OWP/AWP
7 Community Assistant Staff and Community
Consulting Meeting (BGKn. 1 ~BGKn. 7)
Upgrading of raw water supply systems
1 Works for Wuno intake construction
Menunggu hasil DED
2 Works for PASIGALA raw water transmission
system rehabilitation Menunggu hasil DED
3 Works for Paneki intake construction
Menunggu hasil DED
Construction of coastal protection
1 Works for coastal protection
Menunggu hasil DED
2 Rehabilitation and Reconstruction of Palu
Coastal Protection, Central Sulawesi Implementasi
3 Supervision Consult of Palu Coastal
Protection, Central Sulawesi Implementasi
Consultancy for PIUs DGWR
1
Consulting services: Management and
construction supervision of Water Resource
Infrastructure
Lelang Review hasil evaluasi shortlist
oleh ADB
2 Hydrometeorological and telemetric
equipment Persiapan lelang
3 Ground water equipment (new package) 2
Paket Persiapan lelang
4 Project Implementation Unit Balai
Project Coordination
1 Project Management Consultant
2 Bridging consultant for start-up activities
(individual) (DGWR)
3 Expert panel (DGWR)
4 Capacity building to better design resilient
infrastructure (DGWR)
5 Implementing Unit
Permasalahan/KendalaYang Dihadapi Tindak Lanjut
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
128
Pengadaan Barang dan Jasa
Beberapa paket pengadaan barang belum mulai
lelang karena menunggu revisi DIPA.
EA dapat menggunakan advanced procurement
dengan catatan tanda tangan kontrak baru dapat
dilakukan setelah DIPA selesai revisi.
Lain-lain
Belum terdapat penyerapan meskipun beberapa
perkejaan sudah berjalan karena proses revisi DIPA
masih berlangsung.
Melakukan koordinasi dengan direktorat pembina
terkait revisi DIPA.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
129
ENGINEERING SERVICES FOR MULTIPURPOSE DAMS, RIVERS, AND COASTAL
Desain irigasi, bendungan, dan sungai
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Korea INA-
22
15/02/2019
s.d
15/05/2022
KRW 36.013,0 0,0
0,0
36.013,0
-15,5
223,7 0,0
0,0
USD 30,1 0,0 30,1 0,2 0,0
Instansi Pelaksana
Kementerian Pekerjaan Umum, Ditjen
Sumber Daya Air
Lokasi Proyek
a. Matenggeng Dam, Jawa Tengah
b. Semantok Dam, Jawa Timur
c. Muara Juloi Dam, Kalimantan tengah
d. Way Apu Dam, Maluku
e. Memberamo Dam, Papua
f. Urumuka Dam, Papua
g. Baliem Dam, Papua
h. Siak River, Riau
i. Batam and Bintan Island, Kepri
j. Bangka Island, Bangka
k. Cipunagara River, Jawa Barat
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Master Plan
b. Feasibility Study
c. Detail Design
d. AMDAL
e. LARAP
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan ini memiliki 9 paket konsultan sebagai berikut:
1. Paket 1 Matenggeng Multipurpose Dam
2. Paket 2 Cipunagaran River Basin Flood Management subproject in West Java Province
3. Paket 3 Muara Juloi Multipurpose Dam in Central Kalimantan Province
4. Paket 4 Memberamo Multipurpose Dam in Papua Provinces
5. Paket 5 Urumuka Multipurpose Dam in Papua Provinces
6. Paket 6 Baliem Multipurpose Dam in Papua Provinces
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
130
7. Paket 7 Siak River Basin Flood Management in Riau Province
8. Paket 8 Batam and Bintan Island Flood Management in Kepulauan Riau Province
9. Paket 9 Bangka Island Flood Management in Bangka Belitung Province
Untuk Paket 3 Muara Juloi, PQ telah selesai dan dalam proses approval bidding document di EDCF. Paket
lainnya masih dalam proses di Balai Pelaksana Pemilihan Jasa Konstruksi (BP2JK). Proses PQ paket yang lain
dapat dilakukan sesuai review RFP dari EDCF.
Rencana pelaksanaan biaya (RPB) proyek ini berubah dari yang ditetapkan di loan agreement sehingga
PUPR harus mengupdate MoD sesuai dengan perubahan detail rencana biaya pada loan agreement.
Kementerian PUPR telah mengusulkan perpanjangan validity period kegiatan INA-22 berupa
perpanjangan batas waktu pengadaan jasa konsultan selama 6 bulan dan perpanjangan masa efektif
loan agreement selama 20 bulan. Saat ini masih dalam proses internal Bappenas.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
131
FLOOD MANAGEMENT IN SELECTED RIVER BASIN
Peningkatan Keisapan dalam Mengelola dan Mengurangi Risiko Banjir
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
ADB 3440-
INO
09/12/2016
s/d
30/06/2023
USD 108,7 23,9 21,9 84,9 -32,3 16,0 4,0 25,0
Pelatihan Community Facilitator dan District Consultant
Sumber : https://www.fmsrb.org/
Instansi Pelaksana
a. Kementerian Pekerjaan Umum dan
Perumahan Rakyat – Direktorat
Jenderal Sumber Daya Air
b. Kementerian Dalam Negeri – Direktorat
Jenderal Bina Pembangunan Daerah
c. Kementerian Pertanian – Direktorat
Jenderal Sarana dan Prasarana
Pertanian
d. Kementerian PPN/Bappenas –
Direktorat Pengairan dan Irigasi
Lokasi Proyek
a. Wilayah Sungai Cidanau – Ciujung –
Cidurian
b. Wilayah Sungai Ambon – Seram
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Enchanced Planning for Flood Risk Management
b. Improved Land Management and Upgraded Flood Infrastructure
c. Echanced Capacity for Community Based Flood Risk Management (CBFRM)
d. Improved Policy, Coordination and Capacity
Kinerja Pelaksanaan Proyek
No Paket Kontrak/
Komponen
Nilai
Kontrak Fisik (%) Keuangan (Juta USD)
(juta USD) Realisasi
Kumulatif
TA 2020 Realisasi
Kumulatif
TA 2020
Target Realisasi Target Realisasi
1 Civil Works by BBWS 3 Cis (Cidanau-CIujung-CIdurian)
CW 01: Construction of
Ciujung Flood Dike, Right
Bank 11 km
16,33 3,36 1,06 0,97 54,49 70.05 29.44
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
132
No Paket Kontrak/
Komponen
Nilai
Kontrak Fisik (%) Keuangan (Juta USD)
(juta USD) Realisasi
Kumulatif
TA 2020 Realisasi
Kumulatif
TA 2020
Target Realisasi Target Realisasi
CW 02: Construction of
Ciujung Flood Dike, Left
Bank 11 km
16,46 2,94 5,35 0,54 60,98 64.65 35.70
CW 03: Dyke from up to
toll and after the toll 0,00 0,00 0,00 0,00
Pamayaran River
Dredging and Dyke 0,00 0,00 0,00 0,00
Upper Pamayaran River,
Rangkas Bitung 0,00 0,00 0,00 0,00
Upgrading D/Stream
Ciujung and Cidurian
Rivers
0,00 0,00 0,00 0,00
2 Civil Works by BWS Maluku
CW 04: Construction o
Batu Merah Check Dam 1,02 0,00 0,15 0,00 0,00 0,00 0,00
Batu Merah River
Normalization 0,00 0,00 0,00 0,00 0,00 0,00
Way Ruhu River
Normalization 0,00 0,00 0,00 0,00 0,00 0,00
Way Ruhu Rivermouth
Dredging 0,00 0,00 0,00 0,00 0,00 0,00
Normalization of other
rivers 0,00 0,00 0,00 0,00 0,00 0,00
3 Equipment
Equipment by BBWS 3 Cis 100.00 Sudah tercapai
Equipment by BBWS
Maluku 100.00 Sudah tercapai
Equipment by Dit River
and Coastal (RC) 100.00 Sudah tercapai
4 Consulting Services by Dit RC
CS 01: Flood Risk
Management and
Engineering Services
5,87 2,02 1,04 0,64 25,72 15.49 0,00
CS 02: Project
Implementation
Management Services
1,49 0,65 0,31 0,04 40.49 18.35 0,00
CS08-A1: External Social
Safeguard Monitoring
for 3Cis
0,05 100,00 Sudah tercapai
CS 08-A2: External Social
Safeguard Monitoring 0,00 0,00 0,00 0,00 0,00 0,00
CS 09: Social surveys
(IOL) 0,00 0,00 0,00 0,00 0,00 0,00
CS 10: AMDAL 0,00 0,00 0,00 0,00 0,00 0,00
CS 11: CBFRM support
and facilitation 0,00 0,00 0,00 0,00 0,00 0,00
5 Consulting Services by BBWS 3 Cis
CS 12: External
environment safeguard
monitoring
0,00 0,00 0,00 0,00 0,00 0,00
6 Consulting Services by BWS Maluku
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
133
No Paket Kontrak/
Komponen
Nilai
Kontrak Fisik (%) Keuangan (Juta USD)
(juta USD) Realisasi
Kumulatif
TA 2020 Realisasi
Kumulatif
TA 2020
Target Realisasi Target Realisasi
CS08-B: External Social
Safeguard Monitoring 0,00 0,00 0,00 0,00 0,00 0,00
CS 13: External
Environment Safeguard
Monitoring
0,00 0,00 0,00 0,00 0,00 0,00
7 Consulting Services by Bappenas
CS 04: IME Consultant 0,71 0,06 0,19 0,06 0,00 27,76 0,00
8 Consulting Services by Kementerian Pertanian
CS 05: Consulting
Services for Farmland
Management &
Sustainable Agriculture
Practices
1,00 0,56 0,29 0,06 49,1 29,9 0,00
9 Consulting Services by Kementerian Dalam Negeri
CS 06: Consulting
Services for Institutional
Development for CBFRM
3,79 2,41 0,95 0,14 60 25,19 0,00
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No Komponen/Lingkup/
Paket Kontrak
Status/
Kemajuan Pelaksanaan
Capaian
Indikator Kinerja
1 Civil Works by BBWS 3 Cis (Cidanau-CIujung-CIdurian)
CW 01: Construction of
Ciujung Flood Dike,
Right Bank 11 km
Konstruksi
CW 02: Construction of
Ciujung Flood Dike, Left
Bank 11 km
Konstruksi
CW 03: Dyke from up to
toll and after the toll Perencanaan lelang
Pamayaran River
Dredging and Dyke
Upper Pamayaran
River, Rangkas Bitung
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
134
No Komponen/Lingkup/
Paket Kontrak
Status/
Kemajuan Pelaksanaan
Capaian
Indikator Kinerja
Upgrading D/Stream
Ciujung and Cidurian
Rivers
2 Civil Works by BWS Maluku
CW 04: Construction o
Batu Merah Check
Dam
Konstruksi
Konstruksi dimulai setelah hasil uji
sedimen di lokasi Cek Dam baru
keluar
CW4B: Upgrade of
Rinjani Retention Basin,
Normalization and
Parapet Wall in lower
Batu Merah
Persiapan lelang
Way Ruhu River
Normalization
Way Ruhu Rivermouth
Dredging
Normalization of other
rivers
3 Equipment
Equipment by BBWS 3
Cis
Equipment by BBWS
Maluku
Equipment by Dit River
and Coastal (RC)
4 Consulting Services by Dit RC
CS 01: Flood Risk
Management and
Engineering Services
Implementasi
-
CS 02: Project
Implementation
Management Services
Implementasi
CS08-A1: External Social
Safeguard Monitoring
for 3Cis
Telah selesai pada 16 September
2019.
CS 08-A2: External
Social Safeguard
Monitoring
Telah selesai pada 16 September
2019.
CS 09: Social surveys
(IOL)
CS 10: AMDAL
CS 11: CBFRM support
and facilitation
5 Consulting Services by BBWS 3 Cis
CS 12: External
environment safeguard
monitoring
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
135
No Komponen/Lingkup/
Paket Kontrak
Status/
Kemajuan Pelaksanaan
Capaian
Indikator Kinerja
6 Consulting Services by BWS Maluku
CS08-B: External Social
Safeguard Monitoring
CS 13: External
Environment Safeguard
Monitoring
7 Consulting Services by Bappenas
CS 04: IME Consultant Implementasi
8 Consulting Services by Kementerian Pertanian
CS 05: Consulting
Services for Farmland
Management &
Sustainable Agriculture
Practices
Verifikasi dan Validasi Poktan serta Survei
dan Investigasi untuk Desain (SID) sudah
dilakukan dan mengidentifikasi 250
kegiatan yang akan dilaksanakan.
9 Consulting Services by Kementerian Dalam Negeri
CS 06: Consulting
Services for Institutional
Development for
CBFRM
Fasilitasi pelatihan Desain Partisipatif dan
Manajemen Kelompok kepada KMSB
Pendampingan KMSB dalam perbaiki
Rencana Kegaiatan Masyarakat (RKM)
Fasilitasi peningkatan 42 TPM yang
bertanggungjawab mendampingi 114
KMSB
Permasalahan/KendalaYang Dihadapi Tindak Lanjut
Lain-lain
a. CS 05-MOA: Sebagian besar konsultan
untuk monitoring supervisi, verifikasi, dan
validasi Poktan SID hingga 2020 sudah
berhenti sehingga dikhawatirkan proses
monitoring tidak dapat berjalan optimal.
b. CW01 dan CW02: Konstruksi terhambat
akibat curah hujan yang masih tinggi.
a. CS 05-MOA: Perlu dilakukan proses
rekrutmen TA konsultan atau dilakukan
penguatan CPIU Kementan untuk dapat
mendukung pelaksanaan monitoring.
b. Kontraktor melakukan pekerjaan lain
sambil menunggu tanah siap untuk
dibangun.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
136
INTEGRATED PARTICIPATORY DEVELOPMENT AND MANAGEMENT OF IRRIGATION
PROGRAM (IPDMIP)
Penguatan sistem dan kapasitas kelembagaan irigasi pertanian yang berkelanjutan, perbaikan pengelolaan,
operasi, dan pemeliharaan irigasi, serta perbaikan infrastruktur irigasi baik kewenangan pusat, provinsi maupun
kabupaten.
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
ADB
3529-
INO
08/09/2017
s/d
30/06/2023
USD 500,0 153,9 30,8 346,1 -17,6 18,4 96,9 100,0
8327-
INO
08/09/2017
s/d
30/06/2023
USD 100,0 30,9 30,9 69,2 -17,5 3,7 19,8 100,0
Instansi Pelaksana
a. Executing agency: Kementerian
Pekerjaan Umum dan Perumahan
Rakyat – Direktorat Jenderal Sumber
Daya Air
b. Implementing agency: Kementerian
Pertanian – Sekretariat Badan
Penyuluhan dan Pengembangan
SDM Pertanian, Kementerian Dalam
Negeri – Ditjen Bangda, Bappenas,
Pemprov, Pemkab
Lokasi Proyek
Terletak pada 719 daerah irigasi di 74
kabupaten yang tersebar di 16 Provinsi
yaitu NAD, Sumatera Utara, Sumatera
Barat, Sumatera Selatan, Lampung, Jawa
Barat, Jawa Timur, Jawa Tengah,
Kalimantan Barat, Kalimantan Selatan,
Sulawesi Utara, Sulawesi Tengah, Sulawesi
Selatan, dan NTB, NTT.
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Penguatan kerangka kelembagaan pertanian berkelanjutan.
b. Perbaikan sistem dan kapasitas pengelolaan, operasi, dan pemeliharaan irigasi.
c. Peningkatan infrastruktur jaringan irigasi.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
137
Kinerja Pelaksanaan Proyek
dalam milyar rupiah
No Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
A PUSAT
1 NPMU (PJSDA) 60,07 7 2,69 20,59 0 0 N/A
2 NPIU Irigasi dan Rawa 87,63 20 0,34 3,41 0 0 N/A
3 NPIU Bina OP 403,40 15 4,41 34,43 0 0 N/A
4 NPIU Bina Bangda 108,72 18,11 6,82 68,42 0 0 30
5 BPPSDM (NPIU Pertanian) 953,01 - 2,87 31,22 0 0 N/A
6 Bappenas 21,00 - 0,81 8,17 0 0 N/A
BALAI
1 BWS Sumatera I (Banda
Aceh) 132,34 7,25 1,30 28,04 0 0 N/A
2
BWS Sumatera II (Medan)
a. Desain Rehabilitasi 11.145 Ha
67,63 8,67 0,59 17,98
99 66 66
b. Desain Rehabilitasi 12.358 Ha
99 71 71
c. Konsultan pendukung 44 30 30
d. Kegiatan lain non kontrak 0 0 N/A
3 BWS Sumatera V (Padang) 158,16 10,48 5,65 32,12 0 0 N/A
4 BWS Sumatera VIII
(Palembang dan Babel) 385,71 23,72 6,18 44,54 0 0 N/A
5 BBWS Mesuji Sekampung
(Lampung) 254,97 7,83 - 25,49 0 0 N/A
6
BBWS Cidanau-Ciujung-
Cidurian (Serang)
a. SID-DI Kewenangan Pusat
218,42 8,77 1,57 13,28
100 36 36
b. SID-DI Kewenangan Kabupaten
100 108 108
c. Konsultan pendukung 30 22 22
d. Kegiatan lain non kontrak 0 0 N/A
7 BBWS Cimanuk
Cisanggarung (Cirebon) 103,11 7,27 2,84 23,73 0 0 N/A
8 BBWS Citarum (Bandung) 60,71 6,14 1,19 11,80 0 0 N/A
9
BBWS Citanduy (Banjar)
a. SID Rehabilitasi di Manganti di Kab Cilacap
156,14 8,14 2,23 26,25
0 0 N/A
b. SID Rehabilitasi di Lakbok Utara di Kab Ciamis
0 0 0
c. SID Rehabilitasi di kewenangan Provinsi
0 0 0
d. Konsultan pendukung 0,14 0,14 0,14
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
138
e. Kegiatan lain non kontrak 100 100 100
10 BBWS Ciliwung Cisadane
(Jakarta) 149,14 0,79 - 3,22 0 0 N/A
11 BBWS Serayu Opak
(Yogyakarta) 82,08 8,26 1,19 12,67 0 0 N/A
12 BBWS Pemali Juana
(Semarang) 619,35 7,14 0,59 25,58 0 0 N/A
13 BBWS Bengawan Solo
(Surakarta)
a. SID di kewenangan pusat
214,66 8,68 0,03 27,23
72 28 28
b. SID di kewenangan
provinsi 74 37 37
c. SID di kewenangan
kabupaten 93 51 51
d. Penyusunan PSETK 49 0 N/A
e. Konsultan pendukung 33 20 20
f. Kegiatan lain non kontrak 0 0 N/A
14
BBWS Brantas (Surabaya)
a. SID Rehabilitasi daerah
irigasi Siman
335,57 6,58 44,65
57 55 55
b. SID Modernisasi daerah
irigasi Bondoyudo 61 61 61
c. SID Rehabilitasi daerah
irigasi kewenangan pusat 78 77 77
d. SID Rehabilitasi daerah
irigasi kewenangan
provinsi
71 69 69
e. SID Rehabilitasi daerah
irigasi kewenangan
kabupaten
59 57 57
f. SID Rehabilitasi daerah
irigasi Siman Kab 0 0 N/A
g. Konsultan pendukung 15 15 15
h. Kegiatan lain non kontrak 0 0 N/A
15 BWS Nusa Tenggara I
(Mataram) 222,51 10,23 2,45 27,04 0 0 N/A
16 BWS Nusa Tenggara II
(Kupang) 76,25 3,96 - 20,59 0 0 N/A
17
BWS Kalimantan I
(Pontianak)
a. SID di kewenangan pusat
di Kab Sambas
78,85 24,01 0,09 17,65
100 100 100
b. SID di kewenangan pusat
dan kabupaten 100 100 100
c. Konsultan pendukung 35 35 35
d. Kegiatan lain non kontrak 0 0 N/A
18 BWS Kalimantan II
(Banjarmasin) 375,82 48,98 1,05 27,53 0 0 N/A
19 BWS Sulawesi I (Manado) 138,78 33,45 0,82 25,70 0 0 N/A
20 BWS Sulawesi III (Palu) 98,41 10,76 3,84 22,20 0 0 N/A
21 BBWS Pompengan
Jeneberang (Makassar) 195,06 6,59 2,14 33,98 0 0 N/A
B ON GRANTING
1 Provinsi 913,24 83,28 - 84,01
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
139
2 Kabupaten 2310,57 177,54 - 125,59
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja (DLI)
Porsi ADB
Sistem pencairan pinjaman dengan modalitas RBL berdasarkan hasil (Disbursement-Link Indicator/DLI) dan
bukan berdasarkan belanja. Penyerapan keuangan (disbursement) akan dilakukan apabila DLI telah
tercapai dan terverifikasi dengan penghitungan secara pro-rata antara OCR 83,3% dan AIF 16,7%.
DLI Indikator Capaian Indikator Kinerja
Outcome: Keberlanjutan dan lebih produktifnya irigasi pertanian di 74 Kabupaten di 16 Provinsi
DLI-1
Pada Tahun 2021, kinerja irigasi (IKSI) di areal
program meningkat sebesar 15% dari angka
baseline
10 Paket pekerjaan IKSI sudah terkontrak.
Membutuhkan Revisi DIPA (percepatan) dari 7
Miliar menjadi 71 Miliar, saat ini masih dibahas
secara internal di Ditjen SDA KemenPUPR.
Komponen 1: Penguatan Kapasitas Kelembagaan dan sistem irigasi pertanian yang berkelanjutan
DLI-2
Panduan teknis dan perencanaan sistem
pengairan dan irigasi ditingkatkan pada tahun
2019
BBWS Sumatera I
Penyusunan panduan kegiatan pelatihan
BBWS Sumatera II
Penyusunan buku panduan dan aplikasi
program
DLI-3
Komisi Irigasi (KOMIR) dioperasionalkan untuk
meningkatkan kapasitas kelembagaan dalam
hal integrasi dan koordinasi antara
pengembangan infrastruktur irigasi dengan
pengembangan pertanian
DLI-4
Setidaknya 74 Rencana Pengembangan dan
Pengelolaan Daerah Irigasi (RP2I) ditetapkan
oleh Bupati
Penyusunan Modul dan Juklak Teknis.
RP2I adalah dokumen turunan renstra irigasi
yang disahkan oleh Bupati. Pendekatan
kepada Bupati dilaksanakan Bersama Ditjen.
SDA dan Ditjen. Bangda.
BWS Sumatera I:
Kegiatan sosialisasi panduan RP2I saat ini masih
menunggu penetapan revisi DIPA Satker OP
BBWS Bengawan Solo:
Kegiatan RP2I sedang berkoordinasi dengan
Pusat terkait materi dan proses revisi DIPA.
BWS Sumatera II:
Menunggu penetapan revisi DIPA
BBWS Bengawan Solo:
sedang berkoordinasi dengan NPIU terkait
materi dan proses revisi DIPA.
Komponen 2: Peningkatan Pengelolaan dan OP Irigasi
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
140
DLI-5 Pengelolaan Aset Irigasi (PAI) ditingkatkan untuk
2,5 juta Ha daerah irigasi pada 2021
BBWS Citanduy:
Kegiatan OP masih menunggu penetapan
revisi DIPA
DIPA BBWS Brantas:
Kegiatan OP (fisik) sudah mulai dilaksanakan
namun belum terdapat penyerapan karena
masih menunggu penetapan revisi DIPA.
BBWS Citanduy:
Proses usulan revisi DIPA
BBWS Brantas:
Mempersiapkan KAK dan RAB termasuk untuk
kegiatan pelatihan-pelatihan.
DLI-6
Pengelolaan Jaringan Tersier Irigasi efektif
dengan dioperasionalkannya 4.500
Perkumpulan Petani Pengguna Air (P3A) pada
2021
Data P3A untuk verifikasi BPKP sudah disederhanakan
dan telah dituangkan dalam pedoman verifikasi DLI.
Perlu inventarisasi P3A ke dalam 3 kategori: “belum
dibentuk, belum beroperasi dan sudah beroperasi”.
Inventarisasi akan dilakukan setelah verifikasi oleh BPKP.
Saat ini BPKP masih melakukan inventarisasi P3A dengan
total target 2902 P3A
DLI-7
Peningkatan penilaian yang mengintegrasikan
pembangunan pertanian dan infrastruktur
(PSETK), dilakukan untuk setidaknya 719 daerah
irigasi pada 2021
BBWS Brantas
Saat ini sedang dalam proses pelelangan dan
penyiapan Tim Direksi Teknis
Komponen 3: Peningkatan Infrastruktur Jaringan Irigasi
DLI-8
Pada 2021, infrastruktur daerah irigasi yang
direhabilitasi bertambah seluas 500.000 Ha di
lokasi IPDMIP
NPIU IRW sedang melengkapi kekurangan
kelengkapan dokumen Screening Safeguard
dan Berita Acara Serah Terima FHO untuk
91.000 Ha yang belum memenuhi validasi ADB.
Verifikasi target DLI 8 untuk tahun 2018 sedang
dalam proses.
Kegiatan rehabilitasi belum bisa terlaksana
karena masih menunggu hasil kegiatan Survey
Investigation Design/SID yang ditargetkan
dapat terselesaikan semuanya ditriwulan III
2020, sehingga pelaksanaan rehabilitasi dapat
berjalan ditriwulan IV 2020.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
UMUM
DIPA 2020 yang teralokasi belum sesuai kebutuhan
dalam AWP 2020.
PUSAT
Terdapat 3 paket konsultan (NPIU Irigasi dan Rawa,
LIDAR, NPIU Bina OP) gagal lelang karena masalah
administrasi.
BALAI
Pandemi COVID-19 mengulur waktu pemrosesan
lelang.
UMUM
Mengajukan revisi DIPA. Saat ini dalam proses
persetujuan.
PUSAT
PMU koordinasi dengan pokja BP2JK dan lelang
ulang.
Administrasi paket LIDAR sudah selesai dan akan
dilakukan lelang ulang.
BALAI
Lelang ulang dengan perubahan jadwal.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
141
KOMERING IRRIGATION PROJECT (PHASE 3)
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
574
27/07/2017
s/d
27/07/2025
JPY 15.896,0 0,0
0,0
15.896,0 -
36,6
721,3 0,0
0,0
USD 147,6 0,0 147,6 6,7 0,0
Instansi Pelaksana
Direktorat Jenderal Sumber Daya Air,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
Kabupaten Ogan Komering Ulu Timur dan
Kabupaten Ogan Komering Ilir, Provinsi
Sumatera Selatan
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pekerjaan konsultansi
b. Pekerjaan konstruksi Irigasi Komering
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan ini merupakan kelanjutan dari kegiatan sebelumnya (Kegiatan Komering Irrigation Project Stage
II yang berakhir 28 Januari 2018) dengan lokasi di Provinsi Sumatera Selatan yang mencakup dua
kabupaten, yaitu Kabupaten Ogan Komering Ulu Timur dan Kabupaten Ogan Komering Ilir dengan total
area seluas 8.500 Ha.
Loan IP-574 efektif pada Juli 2017. Hingga periode laporan Triwulan II 2020 belum ada pekerjaan fisik
dilapangan dan belum ada realisasi penyerapan dana pinjaman karena Pelaksana Kegiatan masih
melaksanakan Procurement Pekerjaan Konsultan (dalam pengadaan) dalam tahap evaluasi dokumen
teknis. Proses pengadaan sampai dengan saat ini adalah menunggu persetujuan hasil evaluasi teknis oleh
Direktorat Irwa untuk disubmit ke JICA dan mendapat persetujuan oleh JICA. Rencana terkontrak pada
tahun anggaran 2020.
Terdapat beberapa perusahaan yang masuk shortlist yaitu:
1. NIPPON KOEI CO.,Ltd Ass - PT. Kwarsa Hexagon - PT. Indec Internusa - PT. Inakko Internasional
Konsulindo - PT. Yodya Karya (Persero);
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
142
2. Euroconsult Mott Mac Donald Ass - Oriental Consultants Global CO.,Ltd - PT. Bina Buana Raya -
PT. Sarana Bhuana Jaya - PT. Caturbina Guna Persada - PT. Multimera Harapan - PT. Jasapatria
Gunatama.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
143
RENTANG IRRIGATION MODERNIZATION PROJECT
Rehabilitasi menyeluruh di daerah irigasi Rentang
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA) IP-573
27/07/2017
s/d
27/07/2026
JPY 48.237,0 7,0
0,0
48.230,0 -
32,5
1.397,9 7,0
0,5
USD 447,9 0,1 447,8 13,0 0,1
*Persentase Penarikan = 0,01
Instansi Pelaksana
Direktorat Jenderal Sumber Daya Air,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Lokasi Proyek
Provinsi Jawa Barat
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Rehabilitasi Irigasi Rentang
b. Pekerjaan Konsultansi
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan Rentang Irrigation Modernization Project (RIMP) bertujuan untuk mendukung program
ketahanan pangan yang menjadi prioritas RPJMN 2015-2019. Kegiatan ini akan melakukan rehabilitasi
secara menyeluruh daerah irigasi Rentang sekaligus memanfaatkan ketersediaan air dari Waduk
Jatigede sehingga dapat meningkatkan produktivitas pertanian.
Paket Consulting Services. Belum terkontrak hingga 13 Juli 2020, menunggu Penetapan Pemenang dari
Menteri PUPR.
Paket konstruksi. Kegiatan ini terdiri dari beberapa pekerjaan antara lain 3 paket jaringan primer dan 6
paket jaringan sekunder. Paket ini telah terkontrak pada tanggal 18 Mei 2020. Namun sampai dengan
akhir Juni 2020 belum dapat menarik uang muka dan memulai pekerjaan, karena belum ada Notice to
Proceed dari JICA .
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
144
STRATEGIC IRRIGATION MODERNIZATION AND URGENT REHABILITATION PROJECT (SIMURP)
Meningkatkan pelayanan irigasi dan memperkuat pengelolaan irigasi di lokasi yang terpilih
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8891-
ID 23/08/2018
s/d
30/06/2024
USD 250,0 6,0 2,4 244,0 -29,3 4,4 0,1 2,5
AIIB USD 250,0 6,0 2,4 244,0 -29,3 4,4 0,1 2,5
Instansi Pelaksana
a. Kementerian Pekerjaan Umum dan
Perumahan Rakyat
b. Kementerian Pertanian
c. Kementerian Dalam Negeri
Lokasi Proyek (Provinsi)
a. Provinsi Sumatera Selatan
b. Provinsi Sumatera Utara
c. Provinsi Jawa Barat
d. Provinsi Jawa Tengah
e. Provinsi Jawa Timur
f. Kalimantan Tengah
g. NTB
h. Sulawesi Selatan
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Komponen A : Rehabilitasi Sistem Irigasi dan Drainase Mendesak
b. Komponen B : Modernisasi Sistem Irigasi dan Drainase Strategis
c. Komponen C : Jasa Manajemen Proyek dan Konsultasi
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Pelaksanaan Kegiatan. Proses pengadaan yang sedang berproses ada 8 paket, 8 dokumen tender sudah
mendapat NOL, 8 dokumen tender sudah disubmit, 3 paket started tender calls, 1 dokumen evaluasi
sudah submit. Paket pekerjaan sipil untuk DI Pamukkulu akan terkontrak bulan Juni atau Juli. Paket
pekerjaan unuk DI Jurang Batu dan Bendung Cikeusik akan terkontrak bulan Agustus.
Percepatan pelaksanaan paket konstruksi dalam rangka respon Covid-19:
a. DI. Pamukkulu 826 Ha
b. DI. Jurang Batu 700 Ha
c. DI. Talang 1.768 Ha
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
145
d. DI. Kedung Putri 870 Ha
e. DIR. Karang Agung Hilir 1.270 Ha
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Paket Civil Work
a. Proses pengadaan mengalami
keterlambatan/ada pengunduran
jadwal sekitar 1-2 bulan dari jadwal
semula.
b. Diperlukan lelang ulang karena
perbedaan dokumen lelang lama
dengan baru.
c. Proses NoL WB untuk mulai pelelangan.
Paket Non Civil Work
a. 2 paket tahap proses revisi REOI.
b. Paket sudah terbit NoL dari WB dan saat
ini sedang persiapan untuk pelelangan,
ada perubahan SK Pokja karena ada
penggantian Ketua Pokja.
c. Diperlukan revisi DIPA (anggaran yang
ada dalam DIPA 2020 belum sesuai
kebutuhan dalam AWP 2020).
Paket Civil Work
a. Penjadwalan lelang ulang.
b. Percepatan pelelangan ulang.
c. Mendorong percepatan penerbitan NoL.
Paket Non Civil Work
a. Mendorong percepatan proses evaluasi.
b. Percepatan pengumuman pelelangan.
c. Percepatan proses pengajuan revisi DIPA.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
146
UPPER CITARUM BASIN FLOOD MANAGEMENT
Rehabilitasi Hulu Sungai Citarum
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
559
25/07/2013
s/d
25/07/2021
JPY 3.311,0 2.070,2 62,5
1.240,8 -24,1
156,2 68,0 43,5
USD 30,7 19,2 11,5 1,5 0,6
Sumber: Kementerian Pekerjaan Umum dan Perumahan Rakyat
Instansi Pelaksana
a. Direktorat Jenderal Sumber Daya Air,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
b. Balai Besar Wilayah Sungai Citarum
Lokasi Proyek
Provinsi Jawa Barat
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pekerjaan perbaikan di area yang
telah ditentukan di beberapa sungai
antara lain : Sungai Citarum Hulu,
Cimande, Cikeruh, Cikijing
b. Daerah Aliran Sungai (DAS) Cirasea
untuk pembangunan check dam dan
check dam kecil di lokasi tersebar (24
desa).
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan ini terdiri dari satu Paket Consulting Services dan empat paket civil works. Paket Consulting
Services kegiatan Upper Citarum Basin Flood Management (loan JICA IP-559) terkontrak pada Triwulan IV
2015. Paket Cimande, Cikijing dan Cikeruh tanda tangan kontrak pada tanggal 10 Agustus 2016, dan
persetujuan diterima pada tanggal 21 Oktober 2016. Sementara untuk Paket Citarum terkontrak 27
Agustus 2017. Terdapat beberapa perkembangan pada paket pekerjaan proyek ini, diantaranya :
Citarum Upstream Sub-project (River improvement from Kantren to Majalaya (5.45 km) and
construction of river structures). Progres pembebasan lahan telah mencapai 100%. Progres
pekerjaan fisik dilapangan pada Triwulan II 2020 sekitar 80%.
Cimande Sub-project (River improvement from Langensari to Rancapanjang (9.51 km) and
construction of river structures). Seluruh lahan telah bebas. Progres fisik pekerjaan dilapangan
sampai dengan akhir Juni 2020 sekitar 80%.
Cikijing Sub-project (River improvement from Tanggeung to Cikijing (6.68 km) and construction of
river structures).
Progres fisik pekerjaan dilapangan sampai dengan akhir Juni 2020 sekitar 90%. Terdapat
pekerjaan tambahan pada paket ini. Pekerjaan ini akan bersinggungan dengan Ditjen
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
147
Perkeretaapian sehingga, revisi Desain memerlukan persetujuan Ditjen Perkeretaapian. Revisi
desain telah 100% dan sedang dalam tahap pelaksanaan.
Cikeruh Downstream Sub-project (River improvement from Ranca Kamuning to Ranca Bango
Village (2,50 km) and construction of river structures). Lahan untuk kegiatan ini telah bebas
seluruhnya. Capaian fisik pekerjaan dilapangan sekitar 70%.
Loan JICA IP-559 mengalami perpanjangan masa berlaku selama satu tahun (Juli 2020 sampai
dengan Juli 2021).
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
148
URGENT DISASTER REDUCTION PROJECT FOR MOUNT MERAPI AND LOWER PROGO RIVER
AREA – PHASE II
Pengendalian Bencana Banjir Lahar
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
566
23/06/2014
s/d
23/06/2021
JPY 5.111,00 4.704,5
92,0
406,5
6,0
453,0 100,7
22,2
USD 47,5 43,7 3,8 4,2 0,9
Sumber: Monumen Peremian Pembangunan Paket II
Instansi Pelaksana
a. Direktorat Jenderal Sumber Daya Air,
Kementerian Pekerjaan Umum dan
Perumahan Rakyat
b. Balai Besar Wilayah Sungai Serayu
Opak
c. PPK Pengendalian Banjir Lahar Gunung
Merapi/SNVT PJSA Serayu Opak/BBWS
Serayu Opak
Lokasi Proyek
Provinsi Jawa Tengah dan Yogyakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pekerjaan Konstruksi dan Pengadaan
Peralatan
b. Pengembangan Kelembagaan dan
Pemberdayaan Masyarakat
c. Pembangunan Saluran Pengelak Banjir
Lahar dan Kantong Penampung
Material Lahar
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Terdiri dari tiga paket pekerjaan, dan sudah terkontrak seluruhnya. Paket Consulting Services Urgent
Disaster Reduction Project for Mount Merapi and Lower Progo River Area II, Paket ICB Civil Works Package
No. 1 (Construction of Diversion Channel in Putih River) dan ICB Civil Works Package No. 2 : Construction of
Sand Pocket in Gendol River.
Paket ICB Civil Works Package No. 1 (Construction of Diversion Channel in Putih River) terkontrak pada
tanggal 18 November 2015, capaian fisik telah mencapai 100% pada September 2017,dan telah
melaksanakan PHO pada November 2017.
Paket ICB Civil Works Package No. 2 : Construction of Sand Pocket in Gendol River kontrak 24 Februari
2016, paket ini telah selesai di tahun 2018, PHO telah dilaksanakan pada Februari 2018. Pekerjaan
tambahan pada kegiatan IP-566 yaitu LCB Civil Works Package Additional : Construction and
Rehabilitation of Urgent Sabo Facilities in Mt. Merapi Area, telah tanda tangan kontrak pada tanggal 4
oktober 2018. Progres fisik dilapangan telah 100% pada Maret 2020.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
149
Paket Consulting Services Urgent Disaster Reduction Project for Mount Merapi and Lower Progo River Area
II, capaian fisiknya hingga akhir Juni 2020 sekitar 98% (termasuk dengan pekerjaan tambahan). Terdapat
LCB Civil Works Package Additional : Construction of Urgent Sabo Facilities in Magelang Regency in Mt.
Merapi Area pada triwulan ini masih menunggu penerbitan Revisi DIPA. Setelah persetujuan revisi DIPA
terbit, maka dilanjutkan proses tender. Untuk penyiapan dokumen tender telah selesai.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
150
URGENT REHABILITATION OF STRATEGIC IRRIGATION PROJECT FOR WESTERN REGION OF
INDONESIA
Rehabilitasi Jaringan Irigasi di Lampung dan Banten
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Korea INA-
23
06/09/2019
s.d
06/09/2025
KRW 116.634,7 0,0
0,0
116.634,7
-13,6
93,2 0,0
0,0
USD 97,5 0,0 97,5 0,1 0,0
Instansi Pelaksana
Kementerian Pekerjaan Umum, Ditjen
Sumber Daya Air
Lokasi Proyek
a. Provinsi Lampung: Rawa Sragi, Rawa
Pisang, dan Marga Batin
b. Provinsi Banten: Cibaliung
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Jasa Konsultan
b. Rehabilitasi Jaringan Irigasi Cibaliung
c. Pembangunan Jaringan Irigasi Baru di
Rawa Pisang
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Desain Rawa Sragi dan Rawa Pisang sudah dikonsultasikan dengan Gubernur Lampung dan
menggunakan DED yang sudah ada. Desain wilayah Cibaliung diusulkan untuk menggunakan DED yang
sudah ada dan sudah ditanggapi EDCF untuk mereview DED tersebut. Review DED sesuai dengan MoD
tahun 2016 akan dilakukan tanpa menunggu konsultan dikontrak terlebih dahulu. Proses kontrak konsultan
sudah sampai pada shortlist PQ yang telah disetujui pihak EDCF sehingga Kementerian PUPR dapat
melanjutkan tahap bidding selanjutnya.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
153
NATIONAL AFFORDABLE HOUSING PROGRAM (NAHP)
Meningkatkan akses rumah tangga berpendapatan rendah terhadap perumahan terjangkau melalui
dukungan teknis dan pembiayaan
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8717-
ID
24/01/2018
s/d
31/03/2021
USD 450,0 136,4 30,3 313,6 -46,1 180,4 13,9 7,7
Catatan *Data dari LPKPHLN TW II 2020, data penarikan di LKP TW 2020 besumber dari Data dari Explanatory Notes Mei 2020
Sumber : www.nahppupr.com
Instansi Pelaksana
Direktorat Jenderal Pembiayaan
Perumahan, Kementerian Pekerjaan
Umum dan Perumahan Rakyat
Lokasi Proyek (Provinsi)
a. Sumatera Utara
b. Riau
c. Sumatera Barat
d. Sumatera
Selatan
e. Lampung
f. Bengkulu
g. Bangka Belitung
h. Banten
i. Jawa Barat
j. DKI Jakarta
k. Jawa Tengah
l. DI Yogyakarta
m. Jawa Timur
n. Nusa Tenggara
Barat
o. Nusa Tenggara
Timur
p. Kalimantan
Selatan
q. Sulawesi Utara
r. Sulawesi Barat
s. Sulawesi
Selatan
t. Sulawesi
Tenggara
u. Maluku Utara
v. Papua Barat
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Peningkatan akses pembiayaan perumahan terjangkau dengan produk pembiayaan yang
dirancang dan dilaksanakan untuk rumah tangga berpendapatan rendah yang bekerja pada sektor
formal dan informal;
b. Peningkatan jumlah persediaan rumah layak huni yang dibangun dan diperbaiki secara swadaya
melalui perbaikan sistem penyaluran bantuan dan bantuan teknis untuk perbaikan kualitas;
c. Penguatan iklim perumahan terjangkau melalui reformasi dan dukungan teknis kepada pemangku
kepentingan dan Lembaga sektor perumahan.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
154
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1 Mortgage-Linked Down Payment Assistance under Part 1(a)
Penyaluran BP2BT Tahun
2020 - 14,69 - 86,88 0,27 0,31 - 32,1% 45,5%
2 Home Improvement Assistance under Part 2(a)
Penyaluran BSPS Tahun
2020 - 101,29 - 69,28 12,64 18,24 - 62,1% 164,38%
3 Goods, non-consulting services, consultants' services
Ditjen Pembiayaan Perumahan, Kementerian Pekerjaan Umum dan Perumahan Rakyat
BP2BT Facilitation
Management Services 3,85 0,62 16,1 0,79 0,06 7,59 - 100% 8,2%
Consultant Advisory
Services for NAHP Project
Management
0,94 0,15 15,9 0,30 0,82 100 - 100% 55,4%
Grand Design Housing
and Real Estate System
(HREIS)
1,07 0,10 9,34 0,44 0,075 17,04 - 100% 29,1%
Capacity Development
and Reform Regulation of
Secondary
0,49 0,00 - 0,36 0,00 0 - 100% -
PPP Affordable Housing 0,54 0,00 - 0,53 0,00 0 - 100% 0%
Ditjen Perumahan
BSPS Facilitators FY 2020
BSPS Facilitators
Assistance - 1,62 - 7,75 0,22 2,83 - 100% 5,7%
BSPS Facilitator
Coordinators Assistance - 0,60 - 6,06 0,00 0 - 100% 0%
BSPS Operational
Expenditure FY 2020
Project Implementation
Unit (PIU) NAHP
Consultant Management
0,82 0,20 24,3 1,69 0,00 0 - 100% 0%
Housing Policy
Recommendation in
Preparation for Housing
Grand
- 0,00 - 5,8 - - - 100% 66,7%
Affordable Supply-Side
Housing Provisioning
Study: Strengthening
0,64 0,13 20,3 0,27 0,15 55,6 - 100% 81,57%
Ditjen Bina Bangda
Policy Strenghtening and
Local Government
Capacity Building
1,79 0,00 - 0,89 0,32 35,96 - 100% 70,67%
Kemajuan Pelaksanaan Kegiatan
Implementasi
1. Komponen BP2PT: telah disalurkan/ dilaksanakan untuk 5.181 unit rumah (5,21%).
2. Komponen BSPS: telah disalurkan/ dilaksanakan untuk 87.734 unit rumah (60,37%).
3. Telah diusulkan amandemen dengan pertimbangan adanya penambahan alokasi pada
kategori-1 dilakukan dalam rangka membiayai kenaikan harga satuan bantuan yang
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
155
sebelumnya Rp 27 Juta menjadi Rp 40 Juta per unit rumah sebagaimana tercantum dalam
Kepmen PUPR No. 587/KPTS/M/2019.
4. Meskipun diusulkan mendapat penambahan alokasi sekitar USD 14 juta namun terjadi penurunan
target yang semula 102.500 unit menjadi 77.000 unit yang disebabkan oleh kenaikan harga
satuan bantuan. Sedangkan penambahan alokasi pada kategori-2 meningkatkan jumlah target
dari semula 140.000 unit menjadi 155.000 unit.
Perencanaan dan Penganggaran
Dari usulan amandemen tersebut terdapat realokasi pemanfaatan dana menjadi: pemanfaatan potensi
sisa anggaran yang tidak terserap dari kategori-3 (barang dan jasa) sebesar USD 35 Juta direalokasi ke
kategori-1 (BP2BT) sebesar USD 14 juta (40%) dan ke kategori-2 (BSPS) sebesar USD 21 juta (60%).
Rencana Restrukturisasi
Terdapat rencana restrukturisasi pinjaman berupa perpanjangan pinjaman, realokasi pinjaman, dan
perubahan target kegiatan, dengan rincian sebagai berikut:
a. Dari alokasi kategori 3 sebesar USD 70 juta, yang dapat terserap diestimasikan sebesar USD 31 juta
sehingga terdapat sisa pinjaman pada alokasi kegiatan ini.
b. Sisa alokasi tersebut rencananya akan direalokasi ke kategori 1 dan kategori 2 sehingga terdapat
perubahan target unit sebagai berikut:
Kategori 1: Perubahan target dari 102.500 unit menjadi 75.702 unit namun dengan
penambahan alokasi per unit dari sebelumnya USD 27 juta menjadi USD 40 juta.
Kategori 2: Penambahan target dari sebelumnya sebanyak 140.000 unit menjadi 154.749
unit.
c. Kategori 1 dan Kategori 2 akan dilaksanakan hingga bulan Desember 2021, sedangkan untuk
Kategori 3 akan dilaksanakan hingga bulan Februari 2022. Untuk mengakomodasi pelaksanaan
kegiatan tersebut, dibutuhkan perpanjangan masa berlaku pinjaman yang diestimasi hingga
bulan Februari 2022.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Direncanakan akan dilakukan
restrukturisasi proyek NAHP berupa
perpanjangan selama 1 tahun, serta
realokasi dari komponen 3 (potensi sisa
dana sebesar USD 43,7 juta) ke komponen
1 dan 2.
b. Belum sepakatnya Kementerian PUPR dan
Bank Dunia terkait target BP2T maupun
BPBS karena masih adanya isu kualitas
bangunan baik BP2BT maupun BSPS.
Administrasi
c. Perlu disusun SK BSPS agar kegiatan BSPS
dapat berjalan
a. Pihak EA sedang menyiapkan rencana
restrukturisasi Naskah Perjanjian Pinjaman
Luar Negeri. Explanatory sedang
disiapkan.
b. BP2T
Untuk BP2BT, akan dilakukan
pentahapan dalam pencapaian
target (target BP2BT di 2020 adalah
sebanyak 68.554 unit) dimana di
tahap 1 sebesar 12.500 unit. Jika
pemenuhan kualitas konstruksi
mencapai minimal 70%, maka dapat
dilanjutkan pada pencapaian target
sisanya. Selain itu, untuk memastikan
kualitas konstruksi oleh MK, diperlukan
lembar tambahan berupa check list
fungsi. Untuk BSPS, dengan target
sebesar 56.000, di tahap 1 akan
dikerjakan 14.000 unit dan tahap 2
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
156
target sebesar 42.000 unit.
Mengimplementasikan metoda
Rapid Assessment kedalam tahapan
pengawasan yang dilakukan oleh
konsultan MK (BP2BT) dan oleh
coordinator fasilitator (BSPS) dan KMP
(BSPS) untuk melakukan monev
terhadap MK dan Korfas.
Menugaskan konsultan NCS (BP2BT)
dan KMP (BSPS) untuk melakukan
monev untuk memastikan bahwa MK
dan Korfas melakukan pengawasan
yang diharapkan
Melaksanakan pemantauan secara
intensif sehingga pengawasan di
poin b dapat berjalan efektif.
Mengundang Bank Dunia menjadi
bagian dari tim pemantauan.
Apabila selama proses pelaksanaan
konstruksi dijumpai penggunaan
bahan, campuran baku & metode
pelaksanaan yang tidak sesuai, tim
berwenang untuk memerintahkan
penggantian atau perbaikan.
c. SK BSPS tahap 1 target Maret 2020, tahap
2 target Juni 2020.
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
158
ADVANCED KNOWLEDGE AND SKILLS FOR INCLUSIVE GROWTH PROJECT (AKSI)
Mendukung sistem pendidikan tinggi Indonesia dalam memberikan keterampilan dan pengetahuan lanjutan
guna mendukung pertumbuhan ekonomi yang inklusif dan berkelanjutan sebagai bagian dari strategi
reformasi pendidikan tinggi jangka panjang
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
ADB 3749-
INO
08/04/2019
s/d
30/06/2024
USD 200,0 2,1 1,1 197,9 -22,4 2,5 0,0 0,0
Instansi Pelaksana
Kementerian Pendidikan dan
Kebudayaan - Direktorat Jenderal
Pendidikan Tinggi
Lokasi Proyek
Universitas Malikussaleh (Unimal),
Universitas Riau (Unri), Universitas Jambi
(Unja), Universitas Pendidikan Indonesia
(UPI)
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pengembangan fasilitas pengajaran
dan riset, prasarana pendukung,
dan pengadaan peralatan
b. Pembangunan dan peningkatan
kualitas, termasuk program gelar dan
non-gelar untuk para dosen dan staf
universitas
c. Pengembangan kurikulum akademik
dan sistem manajemen guna
meningkatkan proses pengajaran
riset
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
159
Kinerja Pelaksanaan Proyek
dalam juta USD
Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
UNIVERSITAS MALIKUSSALEH (UNIMAL)
Civil works 28,7 0 0 0 N/A N/A N/A
Equipment and furniture 7,28 0 0 0 N/A N/A N/A
ICT 1,99 0 0 0 N/A N/A N/A
Publication 2,99 0,07 0 0,21 N/A N/A N/A
Consulting services 2,08 0,96 0,008 0,008 N/A N/A N/A
Study and workshop - 0,06 0,086 0,087 N/A N/A N/A
Administration etc 0,20 0,04 0,02 0,28 N/A N/A N/A
UNIVERSITAS JAMBI (UNJA)
Civil works 38,0 - 0 N/A N/A N/A N/A
Equipment and
Furniture 8,50 - 0 N/A N/A N/A N/A
ICT - - 0 N/A N/A N/A N/A
Degree and Non-
degree training - - 0 N/A N/A N/A N/A
Consulting Services
i. PMSC 1,74
0,13 0 N/A N/A N/A N/A
j. DEDC N/A
- 0 N/A N/A N/A N/A
Study and workshop - - 0 N/A N/A N/A N/A
Operational cost 0,10 - 0 N/A N/A N/A N/A
UNIVERSITAS RIAU (UNRI)
Civil works 31,15 - 0 N/A N/A N/A N/A
Equipment and
Furniture 13,97 - 0 N/A N/A N/A N/A
ICT - - 0 N/A N/A N/A N/A
Training, International
Seminar and
Publication
- - 0 N/A N/A N/A N/A
Consulting Services 1,69
a. PMSC N/A - 0 N/A 100 15 15
b. DEDC N/A - 0 N/A 100 5 5
Study and workshop - - 0 N/A N/A N/A N/A
Operational cost 0,13 - 0 N/A N/A N/A N/A
UNIVERSITAS PENDIDIKAN INDONESIA (UPI)
Civil works - 0 N/A N/A N/A N/A
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
160
Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
UNIVERSITAS MALIKUSSALEH (UNIMAL)
a. CWP-01 4,96
b. CWP-02 0,12
Equipment and
Furniture 9,04 - 0 N/A N/A N/A N/A
IT (Software license
service) 2,03 - 0 N/A N/A N/A N/A
Training, International
Seminar and
Publication
- - 0 N/A N/A N/A N/A
Consulting Services 1,60 0,4 0 N/A N/A N/A N/A
Study and workshop - 0,2 0 2,01 N/A N/A N/A
Operational cost 0,10 0,02 0 0,32 N/A N/A N/A
PMU
PMU 0,35 0,01 0,06 N/A N/A N/A
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No Komponen/Lingkup/
Paket Kontrak
Status/
Kemajuan Pelaksanaan
Capaian
Indikator Kinerja
Ruang Lingkup 1
Pengembangan fasilitas pengajaran dan riset, prasarana pendukung, dan pengadaan peralatan
Consulting Service
PMU Pusat
1 Project Management Consultant
(PMC)
Lelang Penyesuaian lelang akibat restrukturisasi EA.
2 Invidual Consultant-
Procurement Specialist
Persiapan lelang
3 Individual Consultant- Civil Engineer Persiapan lelang
Universitas Jambi
4 CSJ-01: Project Management
Supervision Consultant (PMSC)
Lelang
5 CSJ-02: Detailed Engineering Design
for 6 buildings
Lelang
Universitas Malikussaleh
6 CSM-01: Project Management
Supervision Consultant (PMSC)
Lelang Prakualifikasi
7 CSM-02 Equipment Design Consultant Persiapan lelang
8 CSM-03: Academic & Training
Program Consultant
Persiapan lelang
Universitas Riau
9 CSR-01: Project Management
Supervision Consultant (PMSC)
Lelang Finalisasi RfP
Universitas Pendidikan Indonesia
10 CSP-01: Project Management
Supervision Consultant (PMSC)
Lelang Proses negosaisi ulang akibar perubahan durasi dan
nilai kontrak
Civil Work
Universitas Jambi
11 CWJ-02: Construction of 6 (six) Persiapan lelang
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
161
No Komponen/Lingkup/
Paket Kontrak
Status/
Kemajuan Pelaksanaan
Capaian
Indikator Kinerja
Buildings of Integrated Classrooms
12 CWJ-04: Water Treatment System at
Mendalo
Persiapan lelang
Universitas Malikussaleh
15 CWM-02: Completing unfinished
building and changing Admin Building
to Central Library and Student Activity
Centrum
Persiapan lelang
16 CWM-03: Construction of Lecture
Building
and Laboratory at Bukit Indah and
Reuleut Campus, Administration
Office, and General Building
Persiapan lelang
17 CWM-04: Supporting Infrastructure
and Facilities in Bukit Indah Campus
and Reuleut Campus
Persiapan lelang
Universitas Riau
18 CWR-01: Construction of Integrated
Classroom, Integrated Laboratory,
Health Study Complex, Student
Center,
Persiapan lelang
19 CWR-02: Construction of IT Center,
University Main Library, University
Training Center
Persiapan lelang
20 CWR-03: Construction of Food
Science Center, Postgraduate
Center, Boat House and marine
Center
Persiapan lelang
21 CWR-04: BOT Infrastructure Persiapan lelang
Universitas Pendidikan Indonesia
22 CWP-01: Construction of FPTK Building,
COE TVET Building, PPPG Buildeing,
supporting building
Lelang Proses penerbitan NOL ADB untuk hasil BER
23 CWP-02: Construction of School
Buildings for FPEB, FPSD, and Post
Graduate
Persiapan lelang
Furniture
Universitas Jambi
24 Pengadaan Furniture Kantor dan
Laboratorium
Persiapan lelang
Universitas Malikussaleh
25
Universitas Riau
26 FR-01: Office Furniture 1 (integrated
class room, integrated laboratories,
health study complex)
Persiapan lelang
27 FR-02: Office Furniture 2 (Boat house &
marine centre, post graduate centre,
IT Centre, University main library)
student centre, university training
centre, food science centre)
Persiapan lelang
Universitas Pendidikan Indonesia
28 FR-01: Furniture 1 (a. Integrated
classroom, product showroom FPTK, b.
Integrated classroom, laboratory,
workshop and studio FPTK, c.
Supporting for COE of TVET
“Professional certification centre &
competence assessment centre, TVET
research and dev, d. Business
incubator and partnerships, e. PPPG)
Persiapan lelang
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
162
No Komponen/Lingkup/
Paket Kontrak
Status/
Kemajuan Pelaksanaan
Capaian
Indikator Kinerja
29 FR-02: Furniture 2 (Post Graduate
Building, FPEB Building, FPSD Building)
Persiapan lelang
Ruang Lingkup 2
Pengembangan fasilitas pengajaran dan riset, prasarana pendukung, dan pengadaan peralatan/equipment
Equipment
Universitas Jambi
30 Pengadaan Equipment Kantor dan
Laboratorium
Persiapan lelang
Universitas Malikussaleh
31
Universitas Riau
32 EQR-01: Equipment for Research and
teaching lab,microteaching
laboratories
Persiapan lelang
33 EQR-02: Equipment for Research boat,
truck and boat house
Persiapan lelang
34 EQR-03: Equipment for laboratories
(food science)
Persiapan lelang
35 EQR-04: Equipment for multimedia &
extension and improvement of ICT
Infrastructure
Persiapan lelang
Universitas Pendidikan Indonesia
36 EQR-01: Equipment for Classroom and
Laboratory FPEB, Post Graduate, FPSD,
FPTK, COE TVET (Automotive
Engineering Education, Industrial
Otomation and Robotics Engineering
Education, Logistic Engineering,
Renewable Energy Engineering
Education, Food Industrial
Technology, Industrial Chemical
Engineering, Teaching Industry)
Persiapan lelang
Degree and Non degree Training
Universitas Jambi
37 Degree Training-GOI Berjalan Proses pemberangkatan terkendala Covid-19. 1
orang direncanakan berangakat bulan Agustus
2020 dan 2 orang direncakan berangkat pada
bulan Oktober.
38 Internship and in-house training - GOI Persiapan Seleksi peserta internship dan in-house training
Universitas Malikussaleh
39 Degree Training-ADB Berjalan Proses seleksi calon peserta program Doktoral
(menunggu LoA)
40 Non degree
(training for lab assistant-GOI, ONDT
for lecturer-ADB, ONDT for Adm staff-
ADB, DNDT for lecturer-ADB, DNDT for
Adm staf-ADBf, English language
training-ADB, International
conference-GOI, research
collaboration-ADB)
Persiapan Terhambat Covid-19
Universitas Riau
40 Workshop kurikulum OBE -GOI Berjalan
41 a. Student research grant -GOI
b. International research collaboration-ADB
Persiapan
42 a. Academic and language
proficiency improvement for overseas
PhD preparation - GOI
b. Management on integrated
laboratory training-GOI
Persiapan
43 International and Domestic seminar Persiapan
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
163
No Komponen/Lingkup/
Paket Kontrak
Status/
Kemajuan Pelaksanaan
Capaian
Indikator Kinerja
for Lecture-ADB
Universitas Pendidikan Indonesia
42 (1)Pengembangan bahan
pembelajaran. (2) Finalisasi of 4
proposal program studi baru (3)
Pengembangan bahan uji
kompetensi (4) Pengembangan - GOI
Persiapan
43 Revision of new study program
establishment proposal. (2) Propose
minimal accreditation to BAN PT-GOI
Persiapan
Ruang Lingkup 3
Pengembangan kurikulum akademik dan sistem manajemen guna meningkatkan proses pengajaran riset
Universitas Jambi
44 Curriculum Development Program
Universitas Malikussaleh
44
Universitas Riau
45 ICT (Software, Licenses, Services)
Universitas Pendidikan Indonesia
46 IT (Data center, Network
infrastructure, Server and storage)
47 Penyusunan Panduan
Pengembangan Kurikulum Prodi, 7
penelitian terapan luar negeri dan
penyusunan panduan, evaluasi, dan
penetapan Proposal Penelitian
Permasalahan/KendalaYang Dihadapi Tindak Lanjut
Lain-lain
Proyek di keempat PIU mengalami kendala
pelaksanaan akibat pandemic COVID-19 yang
membatasi mobilitas individu, berdampak pada
lelang konsultan dan soft component.
a. Melaksanakan evaluasi secara individual
dan koordinasi lelang melalui vicon serta
jika diperlukan pertemuan fisik hanya
melibatkan personil pokja dalam jumlah
terbatas.
b. Koordinasi dengan para pihak terkait
penundaan keberangkatan peserta studi
dan potensi dialihkan pada tahun 2021.
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
164
DEVELOPMENT AND UPGRADING OF THE STATE UNIVERSITY OF JAKARTA (PHASE-2)
Pengembangan Universitas Negeri Jakarta Fase 2
Lender Kode Loan Tanggal
Efektif
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta USD)
(Juta) % Target Realisasi %
SFD SFD/11/740
13/06/2019
s/d
31/12/2024
USD 32,7 0,0 0,0 32,7 -
18,9 8,3 0,0 0,0
DEDC UNJ
Sumber :PMU UNJ
Instansi Pelaksana
Direktorat Jenderal Sumber Daya Iptek
Dikti – Kementerian Riset, Teknologi, dan
Pendidikan Tinggi
Lokasi Proyek
a. Provinsi DKI Jakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Construction of four new building
b. Construction of Center for
Development of Character Education
c. Procurement of new furniture and
fixture for instalment for those five
buildings
d. Campus infrastructure
e. Academic programs
f. Project management unit
g. Consultant services
Kinerja Pelaksanaan Proyek dan Pencapaian Indikator Kinerja
(Ekuivalen juta USD)
No Paket Kontrak/
Komponen
Nilai
Kontrak
KEUANGAN FISIK (%)
Realisasi
Kumulatif TA 2020 (Juta USD)
Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1 Civil work 28.20 - - - - -
2 Furniture & Fixtures 1.49 - - 0,35 0 0 - - -
3 Project Management Unit
PMU Equipment 0.01 0.01 100 - - - 100 100 100
PMU Salaries/Operational
Expenses 0.06 - - - - - - - -
4 Consultant Services
DEDC 0.48 0.21 43.35 0,03 0 0 - - -
PMSC 0.43 0.04 10.52 0,07 0 0 - - -
5 Training of Faculty/Staff 3.13 - - - - - - - -
International Training 2.28 0.01 0.57 - - - - - -
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
165
No Paket Kontrak/
Komponen
Nilai
Kontrak
KEUANGAN FISIK (%)
Realisasi
Kumulatif TA 2020 (Juta USD)
Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
In-country Training 0.65 0.01 6.35 - - - - - -
Short-term Training 0.18 - - - - - - - -
6 ICT Based Curriculum
Development 1.20 - - - - - - - -
Kemajuan Pelaksanaan Kegiatan
1. Civil Work. Kegiatan dalam tahap persiapan lelang. Ditargetkan proses lelang akan dimulai pada
triwulan III 2020. Proses demolition gedung tahap pertama sudah dilaksanakan, untuk tahap ke dua
akan dilaksanakan pada Agustus 2020.
2. Furniture & Fixtures. Proses pengadaan kegiatan akan dilakukan pada tahun 2021.
3. Project Management Unit. Kegiatan sedang dalam pelaksanaan.
4. Consultant Services. DEDC dan PMSC telah terkontrak. DEDC telah menyelesaikan pekerjaannya dan
sedang menunggu pembayaran. PMSC telah melakukan mobilisasi alat.
5. Training of Faculty/Staff. Kegiatan dalam tahap persiapan dokumen administrasi bagi 60 dosen yang
akan menempuh pendidikan doktoral (20 orang international training dan 40 orang in-country
training). Keberangkatan peserta telah dimulai dari awal tahun 2020 hingga akhir tahun 2020
menyesuaikan dengan jadwal universitas yang dituju.
6. ICT Based Curriculum Development. Kegiatan dalam tahap penyusunan pedoman pelaksanaan.
Kegiatan akan mulai dilaksanakan pada tahun triwulan IV 2020.
Permasalahan/KendalaYang Dihadapi Tindak Lanjut
Lain-lain
Anggaran RMP yang tersedia dalam DIPA 2020
tidak mencukupi untuk pembayaran PMSC dan
DEDC.
PMU sedang melakukan koordinasi secara intensif
untuk mempercepat proses revisi anggaran
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
166
DEVELOPMENT OF TEACHING HOSPITAL HASANUDDIN UNIVERSITY
Pembangunan Rumah Sakit Universitas Hasanuddin Makassar
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
KfW 2099
18 111
01/11/2017
s/d
30/11/2021
EUR 33,2 1,7 5,1
31,5 -60,1
0,0 0,0 0,0
USD 37,3 1,9 35,4 0,0 0,0
Kondisi Gedung RS Unhas
Instansi Pelaksana
Kementerian Riset, Teknologi, dan
Pendidikan Tinggi (Direktorat Jenderal
Sumberdaya Ilmu Pengetahuan, Teknologi,
dan Pendidikan Tinggi)
Lokasi Proyek
Universitas Hasanuddin, Makassar
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Penyelesaian konstruksi gedung B, C, dan D
b. Pengadaan dan pemasangan peralatan medis dan non medis termasuk pelatihan penggunaan alat
c. HMIS dan sistem telemedicine termasuk layanan insidensial dan pemeliharaan pasca jaminan
d. Pengkajian rinci / tinjauan desain dan gambar arsitekur dan struktural untuk pekerjaan sipil
e. Dukungan untuk koordinasi, pengawasan, pemantauan, dan evaluasi proyek
f. Dukungan untuk persiapan tender, pelaksanaan, evaluasi, dan pemberian kontrak
g. Jaminan kualitas pelaksanaan pekerjaan proyek
h. Manajemen implementasi proyek
i. Manajemen proyek (administratif & keuangan)
j. Koordinasi kegiatan pelatihan
k. Pelaporan
l. Dukungan untuk akreditasi RS Unhas
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
167
Kinerja Pelaksanaan Proyek
Equivalen Juta USD
No Paket Kontrak/ Komponen
Alokasi
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020
Realisasi
Kumulatif
Nilai % Target Realisasi %
1 Consultant Services 1,5 0,7 46,6
2 Construction Work 12,6 0,5 4,0
3 Equipment 13.2 0,9 6,8
4 Telemedicine 1,1 0,1 9,0
5 Project Management (PIU) RMP
(dalam
milyar) - -
6 Human Resources RMP
(dalam
milyar) - -
7 Contigency 3,0 0,2 6,6
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Alokasi DIPA 2020 untuk kegiatan RS Unhas masih terblokir. Berikut daftar komponen yang akan direvisi:
a. Consultant Services: Rp 9,493,500,000 (revisi Rp 7,508,835,650)
b. Construction Work: Rp 7,450,254,000 (revisi Rp 16,380,000,000)
c. Medical Equipment: Rp 33,706,587,000 (revisi Rp 60.015.685.000)
d. Telemedicine: tidak ada revisi anggaran
Pelaksanaan program di Triwulan II tahun 2020:
1. Jasa Konsultan:
Saat ini tidak ada konsultan yang berada di lokasi proyek karena kondisi Covid-19. Mereka juga
memperoleh larangan pergi ke luar negeri oleh pemerintahnya.
2. Construction Work:
Telah melalui tahap evaluasi dokumen teknis dan keuangan serta telah diajukan ke KfW untuk
persetujuan NOL. Diperkirakan akan terkontrak pada bulan September 2020 atau paling lambat
Oktober 2020.
3. Equipment:
Medical Equipment Lot 1 terdiri atas 2 lot (Lot 1 retender = progres fisik 80%, akan selesai pada bulan
Mei 2020. Lot 2 = sudah selesai di bulan April 2020)
4. Telemedicine:
Sebelumnya terjadwal selesai pada bulan Juli 2020 tetapi karena keadaan pandemi Covid-19,
pekerjaan ini diharapkan selesai pada bulan Oktober 2020.
5. Human Resources:
Degree training: tidak ada penambahan peserta didik baru dan hanya menyelesaikan sisa studi.
Non-degree training: kemungkinan besar mengalami kendala karena pandemi Covid-19.
6. Contigency:
Sudah terpakai Rp 4,038,927,750 untuk Consultant Services.
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
168
Permasalahan/KendalaYang Dihadapi Tindak Lanjut
Lain-lain
Sebagian alat (Medical Equipment) tidak dapat
diadakan sebab ada sebagian anggaran yang
direalokasi ke komponen konstruksi.
Pengadaan alat akan diadakan secara bertahap
dengan menggunakan berbagai sumber dana lain
yang tersedia. Sebagai tambahan informasi, pada
tanggal 27 April 2020 KfW berkirim surat kepada
Deputi Bidang Pendanaan Pembangunan
Bappenas terkait dana hibah Covid-19 sebesar EUR
10 juta untuk kegiatan pinjaman RS Universitas
Hasanuddin dan RS Universitas Brawijaya, masing-
masing EUR 5 juta. Nantinya jika dimungkinkan dana
hibah tersebut bisa digunakan untuk pengadaan
peralatan RS Unhas yang disesuaikan dengan scope
terkait Covid-19.
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
169
DEVELOPMENT OF WORLD CLASS UNIVERSITY WITH SOCIO ENTREPRENEURIAL SPIRIT AT
UNIVERSITAS GAJAH MADA
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA) IP-576
13/03/2018
s/d
13/03/2025
JPY 8.309,0 1.122,3
13,5
7.186,7
-19,3
1.086,6 0,0
0,0
USD 77,2 10,4 66,7 10,1 0,0
Pekerjaan paket 3
Sumber: PMU UGM
Instansi Pelaksana
a. Direktorat Jenderal Pendidikan Tinggi,
Kementerian Riset, Teknologi, dan
Pendidikan Tinggi
b. Universitas Gajah Mada
Lokasi Proyek
Provinsi Daerah Istimewa Yogyakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Consulting services
b. Civil Works
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Loan IP-576 efektif tanggal 13 Maret 2018. Kegiatan ini terdiri dari satu paket konsultan, empat paket
konstruksi dan 5 paket pengadaan peralatan. Sampai dengan periode laporan ini pelaksana kegiatan
telah menyelesaikan pekerjaan satu paket yaitu Paket-2 (Pembangunan Gedung Law Learning Center
(LLC) Fakultas Hukum, telah dilakukan BAST pada tanggal 21 September 2019). Terdapat beberapa
perkembangan pada paket-paket pekerjaan proyek ini, diantaranya :
Paket 1: Pembangunan SGLC dan ERIC. Untuk kegiatan ini masih terkendala ijin menteri terkait
pembangunan gedung lebih dari 11 lantai. PIU terus berkoordinasi dengan Kementerian PUPR
dan Ditjen Dikti. Pembuatan Rencana Umum Pengadaan (RUP) sempat terkendala karena
Sistem Perencanaan Pengadaan Barang dan Jasa (SIRENBAJA). Kemndikbud tidak dapat
mengakomodir pengadaan multiyears, namun saat ini sistem telah berhasil diupgraded oleh
Kemendikbud. Terkait RUP Paket 1 baru dapat dibuat pada tanggal 24 Juni 2020. PIU UGM
proaktif berkoodinasi dengan dinas terkait perizinan IMB Paket 1
Paket 2: Pembangunan Law Learning Center (LLC). Konstruksi Paket 2 telah selesai 100% dan
Sertifikat Green Building EDGE LLC sudah diterima pada tanggal 10 Februari 2020 dan sudah
tercantum dalam website edgebuildings.com/projects pada tanggal 21 Maret 2020.
Paket 3 (Pembangunan AGLC, ASLC dan IFFLC) telah tanda tangan kontrak 8 Oktober 2019
dengan WIKA-WG-KSO, nilai kontrak Rp114 Milyar. DIPA 2020 belum dibuka bintangnya sampai
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
170
dengan Juni 2020 sehingga tagihan Konstruksi masih belum dapat dikeluarkan. PIU UGM proaktif
menyampaikan konfirmasi ke Kemendikbud dan mengikuti proses reviu APIP sebagai sarana
membuka bintang DIPA TA 2020. Progres fisik pekerjaan di lapangan sampai dengan Juni 2020
sekitar 16%.
Paket 4 pembangunan 4 gedung (Pembangunan TILC, DLC, APSLC, dan FRC) tanda tangan
kontrak 6 November 2019 dengan PT. PP (persero), nilai kontrak Rp 236 Milyar. Progres fisik sampai
dengan Juni 2020 sekitar 3%.
Paket 5 (Pengadaan peralatan FRC TILC). Pre Bid Metting ICB01 paket 5 yang seharusnya
dilaksanakan tanggal 16 Maret 2020 ditiadakan karena dampak wabah Covid-19 sesuai surat
nomor 178/PIU/III/2020. Penyampaian informasi berupa pengumuman dan Frequenly Asked
Question (FAQ) terkait proses lelang ICB01 paket 5 dikirimkan ke peserta lelang melalui email.
Peserta lelang mengajukan pertanyaan klarifikasi mulai tanggal 16 Maret 2020. Jadwal
pengadaan peralatan paket 5 mundur karena dampak wabah Covid-19. PIU UGM membuat
penyesuaian jadwal pengadaan peralatan paket 5 dengan mempertimbangkan dampak
wabah Covid-19 dan jadwal pelaksanaan konstruksi paket 3 dan 4 yang mundur.
Paket 6 (Pengadaan peralatan ASLC, IFFLC, dan AGLC). Pre Bid Metting ICB01 paket 6,
seharusnya dilaksanakan tanggal 16 Maret 2020 ditiadakan, karena dampak wabah Covid-19
sesuai surat nomor 178/PIU/III/2020. Jadwal pengadaan peralatan paket 6 mundur karena
dampak wabah Covid-19. PIU UGM membuat penyesuaian jadwal pengadaan peralatan paket
6 dengan mempertimbangkan dampak wabah Covid-19 dan jadwal pelaksanaan konstruksi
untuk paket 3 dan 4 yang akan mundur.
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
171
ESTABLISHMENT OF UNIVERSITY OF BENGKULU’S HOSPITAL PROJECT
Proyek Pembangunan Rumah Sakit Universitas Bengkulu
Lender Kode Loan Tanggal
Efektif
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman Belum
Ditarik
(Juta)
PV
TA 2020 (Juta USD)
(Juta) % Target Realisasi %
SFD SFD/12/756
11/02/2020
s/d
31/12/2023
USD 22,3 0,0 0,0 22,3 -
9,9 0,9 0,0 0,0
Lokasi existing sebelum demolish
Instansi Pelaksana
Kementerian Pendidikan dan
Kebudayaan Republik Indonesia
Lokasi Proyek
a. Provinsi Bengkulu
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pembangunan Rumah Sakit Universitas
Bengkulu tipe C seluas 14.950 m2, 6
lantai dengan total jumlah tempat
tidur untuk pasien sebanyak 120 kasur.
b. Pembangunan 7 (tujuh) sistem
layanan spesialistis yang terdiri dari 4
(empat) bagian mayor, yakni layanan
di bidang Bedah, Penyakit Dalam,
Kesehatan Anak, dan Obstetri-
Ginekologi, serta 3 (tiga) layanan
minor yakni layanan Radiologi,
layanan Patologi Klinik, dan layanan
Anestesi.
c. Pembangunan laboratorium
pembelajaran seluas 4.905 m2, 3 lantai
yang terletak di sekitar Rumah Sakit
Universitas Bengkulu.
d. Pembangunan sarana dan prasarana
Rumah Sakit Universitas Bengkulu.
e. Penyediaan infrastruktur sistem
manajemen rumah sakit berbasis
teknologi informasi.
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
172
❖ Kinerja Pelaksanaan Proyek dan Pencapaian Indikator Kinerja
(Ekuivalen juta USD)
No Paket Kontrak/ Komponen Nilai
Kontrak
KEUANGAN FISIK (%)
Realisasi
Kumulatif TA 2020 (Juta USD)
Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1 Civil work 12,91 - - - - - - -
2 Equipment and Furnitures
Procurement 6,09 - - - -
3 Human Resources
Development 2,11 - - - -
4 Consultancy 1,23 - - - -
5 Environmental Impact 0,03 - - - -
6 PMU Office Management 0,31 - - - -
❖ Kemajuan Pelaksanaan Kegiatan
1. Civil Work. Proses demolition gedung telah dilaksanakan menggunakan dana dari pemerintah
daerah.
2. Equipment and Furnitures Procurement. Kegiatan direncanakan akan dilaksanakan pada tahun 2022.
3. Human Resources Development. Saat ini sedang dilakukan penyeleksian kandidat penerima degree
dan non degree training. Telah didapatkan short listed kandidat yang dapat mengikut seleksi lanjut,
saat ini para kandidat sedang melakukan pendaftaran pada universitas tujuan.
4. Consultancy. SFD telah memberikan NoL untuk TOR dokumen lelang Detail Engineering Design
Consultant (DEDC). Saat ini dalam penyusunan dokumen lelang.
5. Environmental Impact. Kegiatan sedang dilaksanakan menggunakan PNPB universitas.
6. PMU Office Management. SFD telah memberikan NoL untuk TOR dokumen lelang Project Management
Supervision Consultant (PMSC). Saat ini dalam penyusunan dokumen lelang.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Administrasi
a. DIPA Proyek UNIB saat ini masih berada di
Kementerian, belum dialihkan ke DIPA
UNIB.
b. Terdapat kekurangan alokasi anggaran
untuk DEDC dan PMSC sebesar Rp 2,6
Miliar. Ditargetkan kedua konsultan
terkontrak pada TA 2020.
a. PMU sedang berkoordinasi dengan Ditjen
Dikti untuk pemrosesan pengalihan DIPA
UNIB.
b. PMU melalui Kemendikbud berkoordinasi
dengan Kemkeu untuk pengajuan
percepatan anggaran.
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
173
THE DEVELOPMENT OF FOUR HIGHER EDUCATION INSTITUTIONS PROJECT
Pengembangan Empat Institusi Pendidikan Tinggi
Lender Kode
Loan
Tanggal
Efektif
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta USD)
(Juta) % Target Realisasi %
IDB IDN-
1008
06/11/2016
s/d
12/06/2021
USD 13,9 8,8 63,1 5,1 -16,2 2,3 0,4 18,6
12/11/2018
s/d
22/11/2023
USD 162,6 88,1 54,2 74,5 21,7 16,2 7,9 48,8
Gedung Kuliah Bersama Universitas Negeri Malang
Instansi Pelaksana
Direktorat Jenderal Sumber Daya Iptek
Dikti – Kementerian Riset, Teknologi, dan
Pendidikan Tinggi
a. Universitas Mulawarman
b. Universitas Negeri Malang
c. Universitas Sultan Ageng Tirtayasa
d. Universitas Jember
Lokasi Proyek
a. Provinsi Kalimantan Timur
b. Provinsi Jawa Timur
c. Provinsi Banten
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Peningkatan kualifikasi dan
kompetensi tenaga pendidik dan
kependidikan
b. Pengembangan kurikulum
c. Membangun konsorsium riset
d. Peningkatan kualitas lingkungan
belajar mengajar
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
174
Kemajuan Pelaksanaan Kegiatan
(Ekuivalen juta USD)
No Paket Kontrak/ Komponen Nilai
Kontrak
KEUANGAN FISIK (%)
Realisasi
Kumulatif TA 2020 (Juta USD)
Realisasi
Kumulatif
TA. 2020
Nilai % Target Realisasi % Target Realisasi
Service Ijara
1 Staff Development 9,11 - - - - - - - -
2 Project Management
Equipment Consultant
(PMEC)
1,47 - - - - - - - -
3 Project Supervision Consultant (PSC)
PSC 1 0,77 0.2 25.1 - - - 75 - -
PSC 2 0,83 0,2 26.0 - - - 75 - -
4 Support to PMU 0,3 0 0 - - - 100 - -
5 Star Up Workshop and
Review Visit 0,08 - - - - - 100 - -
Istisna'a
1 Construction of New Building
UNEJ 22,7 10.1 44.6 5,66 - - 96,65 87,97 96,65
UM 26,6 10.9 41.2 2,83 - - 95,21 87,64 95,21
UNMUL 24,0 9.3 38.7 5,10 - - 95,14 95,05 95,14
UNTIRTA 32,6 17.9 55 2,61 - - 90,06 93,84 90,06
2 Infrastructure 10,6 - - - - - - - -
3 Equipment 31,7 - - - - - - - -
Kemajuan Pelaksanaan Kegiatan
1. Civil Works. Pekerjaan fisik sedang dalam pelaksanaan dengan progres fisik rata-rata diatas 90%,
ditargetkan dapat selesai 100% pada bulan November 2020.
2. DEDC. Pekerjaan telah selesai dilaksanakan melalui pendanaan PNBP universitas.
3. PMC. Sedang dalam pelaksanaan kegiatan.
4. EQC. Proses pekerjaan Equipment Consultant (EQC) masih dalam tahapan bidding document.
5. PSC. Sedang dalam pelaksanaan kegiatan.
6. Soft Component:
a. Research and Training Grant. Sedang dalam pelaksanaan kegiatan di masing-masing PIU. Saat
ini dalam tahap evaluasi laporan akhir.
b. Degree Program. Sedang dalam pelaksanaan kegiatan di masing-masing PIU dengan total
keseluruhan tenaga pelajar yang mendapatkan degree program sebanyak 82 orang di 4
universitas.
c. Staff Development. Sedang dalam pelaksanaan kegiatan di masing-masing PIU dengan
penerima kegiatan sebanyak 583 orang di 4 universitas.
d. Curriculum Development. Pengembangan desain kurikulum sudah selesai dilaksanakan
7. Furniture & Fixtures. Pengadaan komponen furniture and fixture akan dilaksanakan setelah kegiatan
EQC selesai dilaksanakan.
.
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
175
Permasalahan/KendalaYang Dihadapi Tindak Lanjut
Administrasi
DIPA T.A. 2020 terblokir karena perubahan
nomenklatur Kementerian sehingga tidak dapat
melakukan pencairan dana untuk pembayaran
kegiatan civil work dan soft component.
Lain-lain
Adanya pandemi Covid-19 menyebabkan
pelaksanaan staff development tertunda hingga
kondisi pandemi Covid-19 mereda/berakhir.
Proses pembukaan blokir DIPA diperkirakan akan
selesai pada triwulan III 2020. PMU akan
berkoordinasi dengan Kementerian Keuangan
terkait percepatan pembukaan blokir.
Pelaksanaan staff development menyesuaikan
dengan situasi dan kondisi dari negara tempat studi
dilaksanakan.
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
176
THE SUPPORT TO THE DEVELOPMENT OF HIGHER EDUCATION PROJECT (7 IN 1)
Pembangunan 7 (Tujuh) Pendidikan Tinggi di Indonesia
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
IDB IND-168
14/04/2014
s/d
30/06/2021
USD 174,0 153.6 88,3 20,4 2,1 12,2 0,0 0,0
SFD SFD/9/612
15/09/2014
s/d
30/03/2021
USD 35,0 22,1 63,1 12,9 -25,4 2,9 0,0 0,0
Gedung yang telah selesai dibangun di Universitas Syiah Kuala
Instansi Pelaksana
Direktorat Jenderal Pembelajaran dan
Kemahasiswaan – Kementerian Riset,
Teknologi, dan Pendidikan Tinggi
a. Universitas Negeri Surabaya
b. Universitas Negeri Yogyakarta
c. Universitas Negeri Gorontalo
d. Universitas Negeri Tanjungpura
e. Universitas Sam Ratulangi
f. Universitas Lambung Mangkurat
g. Universitas Syiah Kuala
Lokasi Proyek
a. Provinsi Jawa Timur
b. Provinsi DI Yogyakarta
c. Provinsi Gorontalo
d. Provinsi Kalimantan Barat
e. Provinsi Sulawesi Utara
f. Provinsi Kalimantan Selatan
g. Provinsi Aceh
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Construction of new buildings
b. Renovation
c. Supporting infrastructure
d. Furniture and fixture
e. Curriculum development program
f. Equipment
g. Training program (staff development)
h. E-learning (including digital library)
i. Books and journal
j. Research grants
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
177
k. Detailed Engineering Design Consultant (DEDC)
l. Project Management and Supervision Consultant (PMSC)
m. Equipment Consultant (EQC)
n. Project Implementation Unit (PIU)
o. Financial Auditing
p. PMU Experts
q. Start-up Workshop/Mid-Term Review
Kinerja Pelaksanaan Proyek dan Pencapaian Indikator Kinerja
(Ekuivalen juta USD)
No Paket Kontrak/ Komponen Nilai
Kontrak
KEUANGAN FISIK (%)
Realisasi
Kumulatif TA 2020 (Juta USD) Realisasi
Kumulatif
TA. 2020
Nilai % Target Realisasi % Target Realisasi
1 DEDC
IsDB – Unsrat dan UNG 0,35 0,35 100 0 0 0 100 0 0
IsDB – Untan dan Unlam 0,34 0,34 100 0 0 0 100 0 0
IsDB – Unesa dan UNY 0,46 0,46 100 0 0 0 100 0 0
SFD – Unsyiah 0,19 0,19 100 0 0 0 100 0 0
2 PMSC
IsDB – Unsrat dan UNG 0,53 0,52 98,55 0 0 0 90 10 0
IsDB – Untan dan Unlam 0,65 0,63 98,33 0 0 0 100 0 0
IsDB – Unesa dan UNY 0,61 0,60 98,57 0 0 0 100 0 0
SFD – Unsyiah 0,31 0,24 78,46 0,05 0 0 90 10 0
3 EQC
IsDB – Unsrat dan UNG
0,74 0.56 75.8 0,06 0 0
80
20 0 IsDB – Untan dan Unlam 80
IsDB – Unesa dan UNY 80
SFD – Unsyiah 0,12 0.09 78.2 0,02 0 0 100 0 0
4 Financial Audit Consultant 0,17 0,11 67,34 0,04 0 0 70 30 0
5 Pengadaan PMU Expert
Procurement Specialist 0,06 0,05 73.04 0 0 0 100 0 0
Financial Management
Specialist 0,09 0.06 79,73 0,002 0 0 100 0 0
Information and
Communication
Technology Specialist
0,07 0,06 85,16 0 0 0 100 0 0
Civil Engineering Specialist 0,07 0,04 71,85 0,001 0 0 100 0 0
6 Start-up Workshop &Mid
term Review 0,11 0,11 100 0 0 0 100 0 0
7 Construction of New
Building
UNESA 24.4 23.27 96.18 0 0 0 100 0 0
UNY 20.86 20.05 96.13 0 0 0 100 0 0
UNG 21.91 21.17 96.59 0 0 0 100 0 0
UNSRAT 16.30 12.75 78.22 2,58 0 0 100 0 0
UNTAN 21,65 20.64 95.33 0 0 0 100 0 0
UNLAM 28,95 27,67 95,56 0 0 0 100 0 0
UNSYIAH 24,44 21,34 87,30 2,30 0 0 100 0 0
9 Equipment
UNESA 2,74 0.28 10.38 2,7 0 0 100 0 0
UNY 2,56 2,61 101,73 0 0 0 100 0 0
UNG 4,48 3,71 82,89 0,77 0 0 100 0 0
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
178
No Paket Kontrak/ Komponen Nilai
Kontrak
KEUANGAN FISIK (%)
Realisasi
Kumulatif TA 2020 (Juta USD) Realisasi
Kumulatif
TA. 2020
Nilai % Target Realisasi % Target Realisasi
UNSRAT 4,83 0.45 9,38 3,58 0 0 100 0 0
UNTAN 1,45 1,45 100 0 0 0 100 0 0
UNLAM 4,08 2,07 50,74 1,93 0 0 100 0 0
UNSYIAH 5,22 4,56 87,36 0,47 0 0 100 0 0
10 E-learning
UNESA 0,14 0,10 70,40 0,05 0 0 100 0 0
UNSRAT 0,11 0 0 0,11 0 0 0 0 0
UNLAM 0,17 0 0 0,17 0 0 100 0 0
UNTAN 0,16 0,17 108,47 0 0 0 100 0 0
UNG 0,17 0 0 0,17 0 0 100 100 100
Kemajuan Pelaksanaan Kegiatan
Adapun kemajuan untuk paket-paket kegiatan adalah sebagai berikut:
1. DEDC. Kegiatan telah selesai dilaksanakan.
2. PMSC. Konsultan telah terkontrak, saat ini dalam pelaksanaan kegiatan.
3. EQC. Konsultan telah terkontrak, saat ini dalam pelaksanaan kegiatan.
4. FAC. Pelaksanaan audit untuk porsi IsDB sedang dalam pelaksanaan. Sedangkan untuk porsi SFD,
audit dilakukan oleh BPKP. Laporan audit tahun 2019 telah diselesaikan, saat ini sedang dalam proses
revisi untuk dicetak.
5. Individual Consultants. Konsultan dalam pelaksanaan kegiatan.
6. Civil Work. Kegiatan pekerjaan fisik seluruh universitas telah selesai 100%. Saat ini sedang dalam masa
pemeliharaan.
7. Equipment. Kegiatan telah selesai dilaksanakan.
8. E-learning. Paket pengadaan untuk UNTAN, UNLAM, UNESA, dan UNG telah terkontrak dan telah
selesai dilaksanakan. Paket pengadaan UNSRAT dalam pelaksanaan.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Administrasi
Terdapat restrukturisasi di Kementerian Riset
Teknologi dan Pendidikan Tinggi dan Kementerian
Pendidikan dan Kebudayaan. Restrukturisasi
tersebut menyebabkan terkuncinya anggaran
untuk proyek ini. PMU mengajukan perpanjangan
closing date untuk porsi IsDB dan SFD.
Proses perbaikan anggaran sedang dilakukan di
Kementerian Keuangan. Usulan PMU untuk
melakukan perpanjangan closing date untuk porsi
IsDB dan SFD telah disetujui.
KEMENTERIAN PERHUBUNGAN
181
EMERGENCY ASSISTANCE FOR REHABILITATION AND RECONSTRUCTION (EARR)
Rehabilitasi dan Rekonstruksi Pasca Bencana
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
ADB 3792-
INO
04/11/2019
s/d
30/09/2023
USD 109,8 0,0 0,0 109,8 -16,8 0,0 0,0 0,0
Instansi Pelaksana
a. Direktorat Jenderal Sumber Daya Air
b. Direktorat Jenderal Cipta Karya
Lokasi Proyek
Provinsi Sulawesi Tengah
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Human Settlement and associated
infrastructure reconstructed and
upgraded
b. Water resources infrastructure
rehabilitation and reconstructed
Kinerja Pelaksanaan Proyek
Equivalen Juta USD
No Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
Ruang Lingkup 1
Human Settlement and associated infrastructure reconstructed and upgraded
Reconstruction of Islamic University in Palu
1
Works for
reconstruction of
Islamic University of
Palu
- - - - -
Rehabilitation and Reconstruction of water supply and sanitation infrastructure
1
Works for
construction of
water treatment
plant for Omu
- - - - -
KEMENTERIAN PERHUBUNGAN
182
No Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
2
Water supply
distribution
networks and
household
connections for
Palu City (23.000
HSC)
- - - - -
3
Water supply
distribution
networks and
household
connections in Sigi
Regency (12.000
HSC)
Consultancy for PIUs DGHS
1
Project
Management and
Supervision
Consultant (PMSC)
- - - - -
Project Coordination
1
Bridging consultant
for start-up
activities
(individual)
-
2 Expert panel
Ruang Lingkup 2
Water resources infrastructure rehabilitation and reconstructed
Reconstruction and modernization of Gumbasa irrigation system
1
Works (DB) for
Gumbasa irrigation
reconstruction
(6968 hectares)
- - - - -
2
Rehabilitation and
Reconstruction of
Gumbasa Irrigation
System (Weir and
Main Canal
BGKn.7 ~ BGKn.24 -
2695 Hectares)
3
Rehabilitation and
Reconstruction of
Gumbasa Irrigation
System (Main
Canal BGKn.24~
bgkN.42 - 2458
Hectares)
4
Rehabilitation and
Reconstruction of
Gumbasa Irrigation
System (Weir and
Main Canal
BGKn.42 ~ BGKn.54
- 1815 Hectares)
5
Rehabilitation D.I.
Gumbasa Weir
and Groundsill
Construction
KEMENTERIAN PERHUBUNGAN
183
No Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
6
Work for Tertiary
channels of
Gumbasa Irigation
System (BGKn. 1
~BGKn. 7)
7
Community
Assistant Staff and
Community
Consulting
Meeting (BGKn. 1
~BGKn. 7)
Upgrading of raw water supply systems
1 Works for Wuno
intake construction - - - - -
2
Works for
PASIGALA raw
water transmission
system
rehabilitation
- - - - -
3 Works for Paneki
intake construction
Construction of coastal protection
1 Works for coastal
protection - - - - -
2
Rehabilitation and
Reconstruction of
Palu Coastal
Protection, Central
Sulawesi
17,11 17,11 0,00 0,00 100 44,83 44,83
3
Supervision Consult
of Palu Coastal
Protection, Central
Sulawesi
0,05 0,05 0,00 0,00 100 0,00 0,00
Consultancy for PIUs DGWR
1
Consulting
services:
Management and
construction
supervision of
Water Resource
Infrastructure
- - - - -
2
Hydrometeorologi
cal and telemetric
equipment
3
Ground water
equipment (new
package) 2 Paket
4
Project
Implementation
Unit Balai
Project Coordination
1
Project
Management
Consultant
-
2
Bridging consultant
for start-up
activities
KEMENTERIAN PERHUBUNGAN
184
No Komponen/
Lingkup Kegiatan
Nilai
Alokasi
Keuangan Fisik
TA 2020 Realisasi
Kumulatif
TA 2020 %Realisasi
Kumulatif Target Realisasi %Target %Realisasi
(individual)
(DGWR)
3 Expert panel
(DGWR)
4
Capacity building
to better design
resilient
infrastructure
(DGWR)
5 Implementing Unit
Catatan : 1 USD = Rp 14.500,-
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No Komponen/Lingkup/Paket Kontrak Status/Kemajuan Pelaksanaan Capaian Indikator Kinerja
Ruang Lingkup 1
Human Settlement and associated infrastructure reconstructed and upgraded.
Reconstruction of Islamic University in Palu
1 Works for reconstruction of Islamic University
of Palu Menunggu hasil DED
Rehabilitation and Reconstruction of water supply and sanitation infrastructure
1 Works for construction of water treatment
plant for Omu Menunggu hasil DED
2
Water supply distribution networks and
household connections for Palu City (23.000
HSC)
Menunggu hasil DED
3
Water supply distribution networks and
household connections in Sigi Regency
(12.000 HSC)
Menunggu hasil DED
Consultancy for PIUs DGHS
1 Project Management and Supervision
Consultant (PMSC)
Project Coordination
1 Bridging consultant for start-up activities
(individual)
2 Expert panel
Ruang Lingkup 2
Water resources infrastructure rehabilitation and reconstructed
Reconstruction and modernization of Gumbasa irrigation system
1 Works (DB) for Gumbasa irrigation
reconstruction (6968 hectares) Menunggu hasil DED
2
Rehabilitation and Reconstruction of
Gumbasa Irrigation System (Weir and Main
Canal BGKn.7 ~ BGKn.24 - 2695 Hectares)
Menunggu hasil DED
3
Rehabilitation and Reconstruction of
Gumbasa Irrigation System (Main Canal
BGKn.24~ bgkN.42 - 2458 Hectares)
Menunggu hasil DED
4 Rehabilitation and Reconstruction of
Gumbasa Irrigation System (Weir and Main Menunggu hasil DED
KEMENTERIAN PERHUBUNGAN
185
No Komponen/Lingkup/Paket Kontrak Status/Kemajuan Pelaksanaan Capaian Indikator Kinerja
Canal BGKn.42 ~ BGKn.54 - 1815 Hectares)
5 Rehabilitation D.I. Gumbasa Weir and
Groundsill Construction Menunggu hasil DED
6 Work for Tertiary channels of Gumbasa
Irigation System (BGKn. 1 ~BGKn. 7) Pengusulan ke dalam OWP/AWP
7 Community Assistant Staff and Community
Consulting Meeting (BGKn. 1 ~BGKn. 7)
Upgrading of raw water supply systems
1 Works for Wuno intake construction
Menunggu hasil DED
2 Works for PASIGALA raw water transmission
system rehabilitation Menunggu hasil DED
3 Works for Paneki intake construction
Menunggu hasil DED
Construction of coastal protection
1 Works for coastal protection
Menunggu hasil DED
2 Rehabilitation and Reconstruction of Palu
Coastal Protection, Central Sulawesi Implementasi
3 Supervision Consult of Palu Coastal
Protection, Central Sulawesi Implementasi
Consultancy for PIUs DGWR
1
Consulting services: Management and
construction supervision of Water Resource
Infrastructure
Lelang Review hasil evaluasi shortlist
oleh ADB
2 Hydrometeorological and telemetric
equipment Persiapan lelang
3 Ground water equipment (new package) 2
Paket Persiapan lelang
4 Project Implementation Unit Balai
Project Coordination
1 Project Management Consultant
2 Bridging consultant for start-up activities
(individual) (DGWR)
3 Expert panel (DGWR)
4 Capacity building to better design resilient
infrastructure (DGWR)
5 Implementing Unit
KEMENTERIAN PERHUBUNGAN
186
Permasalahan/KendalaYang Dihadapi Tindak Lanjut
Administrasi
a. Belum terdapat penyerapan meskipun
beberapa perkerjaan sudah berjalan
karena proses revisi DIPA masih
berlangsung.
a. Melakukan koordinasi dengan direktorat
pembina terkait revisi DIPA.
b. Beberapa paket pengadaan barang
belum mulai lelang karena menunggu
revisi DIPA.
b. EA dapat menggunakan advanced
procurement dengan catatan tanda
tangan kontrak baru dapat dilakukan
setelah DIPA selesai revisi.
KEMENTERIAN PERHUBUNGAN
187
ENGINEERING SERVICES FOR JAKARTA MRT EAT – WEST LINE PROJECT (PHASE I)
E/S Kegiatan Pembangunan MRT Jakarta Lintas Timur – Barat (FaseI)
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA) IP-569
31/03/2016
s/d
31/03/2022
JPY 1.919,0 0,0
0,0
1.919,0
-70,8
69,4 0,0
0,0
USD 17,8 0,0 17,8 0,6 0,0
,
Sumber: Kementerian Perhubungan
Instansi Pelaksana
Direktorat Jenderal Perkeretaapian,
Kementerian Perhubungan
Lokasi Proyek
Provinsi DKI Jakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Penyusunan dokumen data teknis
untuk penetapan trase Mass Rapid
Transit (MRT) lintas Timur-Barat
b. Menyiapkan dokumen Basic Design
MRT Jakarta Lintas Timur – Barat
c. Assitance Tender, menyiapkan
dokumen pelelangan dan
mendampingi Pokja dalam proses
pelelangan untuk pekerjaan konstruksi.
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan MRT East-West Line ini masuk dalam Proyek Strategis Nasional (PSN) pembangunan infrastruktur
kereta api dalam kota sehingga perlu percepatan pelaksanaan. Kegiatan ini melintasi tiga provinsi yaitu
Provinsi DKI Jakarta, Banten dan Jawa Barat. Diusulkan pelaksanaan Studi dan BED pada kegiatan MRT
East – West Line dari koridor Balaraja - Cikarang sepanjang 87,7 Km melalui hanya satu tahapan. Progres
kegiatan pada periode Triwulan I 2020 adalah Penyampaian Shortlist Konsultan kepada JICA. Pada
periode laporan ini kegiatan ini dalam tahap evaluasi technical proposal dari Shortlist (3 peserta).
Selanjutnya akan dimintakan NOL dari JICA. Kegiatan IP-569 ini telah dianggarkan di tahun anggaran
2020, sesuai dengan trilateral meeting.
KEMENTERIAN PERHUBUNGAN
188
JABODETABEK RAILWAYS CAPACITY ENHANCEMENT - PHASE I
Pengembangan Perkeretaapian Komuter di Wilayah JABODETABEK
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
563
23/06/2014
s/d
20/06/2021
JPY 16.322,0 0,0
0,0
16.322,0
-86,1
6,9 0,0
0,0
USD 151,6 0,0 151,6 0,1 0,0
Sumber : Kementerian Perhubungan
Instansi Pelaksana
a. Direktorat Jenderal Perkeretaapian,
Kementerian Perhubungan
b. Satuan Kerja Pengembangan dan
Peningkatan Fasilitas Keselamatan
Perkeretaapian
Lokasi Proyek
JABODETABEK
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Enginering Service Stage
b. Consulting Assistance Services Stage
c. Supervisory Stage
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Hingga saat ini belum ada progress fisik pekerjaan. Ditjen Pekeretaapian mengirimkan surat ke JICA
(Nomor KU.101/B.254/DJKA/11/15 tanggal 26 November 2015), yang menyatakan bahwa pekerjaan sipil
pada fase I berupa konstruksi depo Depok dan workshop tidak dapat dilaksanakan karena adanya
Perpres penugasan kepada PT. KAI (Persero). Oleh karena itu kegiatan IP-563 diusulkan untuk dilanjutkan
ke fase 2 berupa peningkatan sistem persinyalan, ATP dan elektrifikasi.
Kementerian Perhubungan semula ingin mengajukan pembatalan loan ini, namun pembatalan tersebut
belum diajukan karena Kementerian Perhubungan berencana mengusulkan perubahan lingkup
pekerjaan proyek ini. Usulan perubahan ruang lingkup tersebut disampaikan Kementerian Perhubungan
kepada JICA. Pada bulan Februari 2017 (setelah 1,5 Tahun) Kementerian Perhubungan menerima surat
balasan yang menjelaskan bahwa perubahan lingkup tidak dapat dilakukan, dan harus kembali ke ruang
lingkup awal. Setelah diskusi dan koordinasi dengan pihak-pihak terkait Kegiatan IP-563 akan tetap
dijalankan.
Sampai dengan periode laporan Triwulan I 2020, masih dalam proses penyusunan Explanotary Notes
untuk perubahan scope yaitu Phase 1 menjadi Phase 2 yang sampai dengan periode laporan ini masih
dalam tahap pematangan data, terutama untuk data yang diminta oleh JICA, DJPPR dan Bappenas.
KEMENTERIAN PERHUBUNGAN
189
PATIMBAN PORT DEVELOPMENT PROJECT (I)
Pembangunan Pelabuhan Patimban (I)
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
577
13/03/2018
s/d
13/03/2026
JPY 118.906,0 43.819,7
36,9
75.086,4
8,1
20.239,9 6.450,6
31,9
USD 1.104,1 406,9 697,2 187,9 59,9
Konstruksi Pembangunan Jalan Akses (PILE SLAB No.6 (Sta. 7+475
– 8+226))
Sumber: Kunjungan Lapangan Bappenas
Instansi Pelaksana
Direktorat Jenderal Perhubungan Laut,
Kementerian Perhubungan
Lokasi Proyek
Desa Patimban, Kabupaten Subang, Jawa
Barat
Ruang Lingkup (Pekerjaan dan Sasaran)
c. Consulting Services
d. Civil Works: Pekerjaan Konstruksi
Pembangunan Pelabuhan Patimban
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan Pembangunan Pelabuhan Patimban (I), JICA Loan IP-577 efektif tanggal 13 Maret 2018. Tujuan
dari Kegiatan Pembangunan Pelabuhan Patimban adalah untuk memperkuat kapasitas logistik
pelabuhan di area Jakarta Metropolitan dan meningkatkan perekonomian daerah, untuk meningkatkan
traffic demand melalui pembangunan pelabuhan laut dan akses internasional di Kabupaten Subang,
Provinsi Jawa Barat.
Progres fisik pekerjaan sampai dengan Juni 2020, sebagai berikut:
1. Package 1 (Terminal for Phase 1-1, Dredging for Basin, Temporary Construction Bridge).
Capaian fisik di lapangan sampai dengan Juni 2020 sekitar 59%. Adanya gelombang tinggi di area
konstruksi, sehingga mengganggu pelaksanaan pekerjaan instalasi strut member, pierhead, pc
beam. Pelaksana kegiatan paket 1 akan berkoordinasi dengan pelaksana Paket konstruksi lainnya,
mengupayakan segera memulai pekerjaan breakwater dan seawall pada sisi Timur Laut guna
mengurangi dampak gelombang tinggi di area konstruksi Paket 1.
2. Package 2 (Revetment, Breakwater, Dredging for Access Chanel).
Terkontrak 30 November 2018, Nama Kontraktor Toyo-Adhi Karya-Wakachiku JO, dengan nilai kontrak
JPY 14.537.140.000,-. Capaian fisik pekerjaan dilapangan sampai dengan Juni 2020 sebesar 34%.
Mobilisasi material pada Paket 2 belum dapat dilakukan secara optimal karena manajemen
kendaraan yang diizinkan untuk melewati Jalan Akses Sementara dan Trestle oleh masing-masing
paket belum disepakati.
KEMENTERIAN PERHUBUNGAN
190
3. Package 3 (Connecting Bridge, Utility within Access Road Facilities).
Paket ini mengalami proses lelang ulang karena negosiasi harga tidak mencapai kesepakatan.
Pelaksanaan lelang ulang dilaksanakan dengan melakukan perubahan Eligible Nationality dalam
dokumen Loan Agreement dan Exchanges of Notes. Perubahan ini telah disetujui oleh JICA. Capaian
fisik pekerjaan dilapangan sampai dengan Juni 2020 sebesar 3%.
4. Package 4 Pembangunan Jalan Akses Pelabuhan Patimban.
Pekerjaan ini dilaksanakan oleh Direktorat Jenderal Bina Marga, Kementerian Pekerjaan Umum dan
Perumahan Rakyat. Total panjang jalan yang akan dibangun sekitar 8,2 Km (Pile Slab: 5,9 Km, Flyover:
1,6 Km, Flexible Pavement: 0,7 Km). Capaian fisik terhadap kontrak sampai dengan Juni sekitar 90%.
Pembebasan lahan telah selesai, namun keterlambatan terus terakumulasi sampai dengan akhir
kontrak, sehingga dibutuhkan perpanjangan waktu kontrak. Pada periode laporan ini, pelaksana
kegiatan masih menunggu persetujuan addendum kontrak no.2 perihal perpanjangan waktu.
5. Package 8 (Consulting Services for Port Related Facilities Development).
Dalam proses persiapan negosiasi harga. Bidder : OCG - Nippon Koei - Ides in assoc. with Raya
Survey -Rayasurverindo - Indra Karya JV. Telah dilakukan pembahasan amandemen kontrak Paket 8
untuk penambahan inspektor dan penambahan lingkup pekerjaan yang terdiri dari:
i) Tendering Assistance Paket 3;
ii) Pekerjaan detail desain perkuatan exsisting Jetty;
iii) External monitoring; dan
iv) Addendum AMDAL Pelabuhan Patimban.
Amandemen Kontrak Paket 8 telah mendapat persetujuan dari JICA. Selanjutnya akan dilakukan
pembahasan Draft Amandemen Kontrak dengan Biro Hukum, Kementerian Perhubungan.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Pengadaan lahan
Masih terdapat masalah-masalah teknis di
lapangan (misalnya: proses pembebasan lahan)
yang mengakibatkan terhambatnya progres
pelaksanaan pekerjaan di lapangan.
Lain-lain
Penyebaran coronavirus (covid-19) di Indonesia,
berdampak pada keterbatasan mobilisasi material
dan personel untuk pelaksanaan pekerjaan
konstruksi.
Berkoordinasi intensif dengan pihak Kementerian
Perhubungan (Instansi yang melaksanakan
Pengadaan Lahan) agar dilakukan prioritas
pembebasan lahan.
Melakukan upaya pencegahan penyebaran di
lingkungan proyek dengan mengendalikan
mobilisasi pekerja maupun barang konstruksi,
pengecekan kesehatan dan kebersihan
lingkungan kerja.
KEMENTERIAN PERHUBUNGAN
191
PROCUREMENT OF TRACK MATERIAL AND TURNOUT PHASE II (1500 KM’SP AND 500 UNIT)
Proyek pengadaan Track Material dan Turnout Tahap II
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
RR
Tiongkok
EXIM PBC
411
24/01/2017
s/d
24/01/2020
USD 175,1 175,1 100,0 0,0 -14,4 0,0 0,0 0,0
Sumber: Kementerian Perhubungan
Instansi Pelaksana
Direktorat Jenderal Perkeretaapian,
Kementerian Perhubungan
Lokasi Proyek
Jakarta Pusat, Provinsi DKI Jakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pengadaan Rel UIC 54 Sebanyak 1500
Km'sp Setara dengan 120.000 Batang.
b. Pengadaan Wesel Lengkap dengan
Aksesoris dan Bantalannya Sebanyak
500 Unit.
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja Fisik
Proyek ini telah selesai 100 % pada TW IV 2019. Penyerapan juga telah mencapai 100 %. Diperlukan alokasi
tambahan dari APBN untuk kelanjutan pekerjaan pemasangan rel.
KEMENTERIAN PERTAHANAN
194
UPGRADING MEDICAL EQUIPMENTS AND SUPPORTING FACILITIES FOR NAVAL HOSPITALS
DR. WAHYU SLAMET
Peningkatan Pelayanan Kesehatan Rumah Sakit Angkatan Laut
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Austria N/A
10/12/2018
s/d
10/12/2020
EUR 12,0 5,7
47,5
6,3
-30,2
12,0 5,7
47,5
USD 13,5 6,4 7,1 13,5 6,4
Instansi Pelaksana
a. Kementerian Pertahanan
b. TNI Angkatan Laut
Lokasi Proyek
a. Rumah Sakit Angkatan Laut dr.Wahyu
Slamet
b. Kota Bitung, Sulawesi Utara
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pengadaan dan instalasi peralatan
kesehatan
Peralatan Kamar Bedah
Peralatan Persiapan dan
Pemulihan
Peralatan Sterilisasi
Peralatan Radiologi/Imaging
Peralatan Poliklinik Spesialis
Peralatan Gawat Darurat
b. Pelatihan penggunaan dan pelatihan
pemeliharaan/perawatan
c. Garansi
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan Rumah Sakit Angkatan Laut dr.Wahyu Slamet bertujuan untuk melengkapi dan memodernisasi
peralatan kesehatan beserta sarana dan prasarana penunjangnya. Pada tanggal 23 Agustus 2018
kegiatan ini telah terkontrak dengan no.kontrak: TRAK/6307/PLN/VIII/2018/AL dengan nilai sebesar EUR
12,000,000. Porsi rupiah murni sebesar EUR 1,800,000 telah digunakan untuk pembayaran uang muka. Saat
ini kegiatan RSAL dr.Wahyu Slamet sedang dalam tahap proses produksi. Hingga triwulan II 2020 kegiatan
ini telah menyerap sebesar EUR 5,703,334 atau 47% dari total nilai pinjaman.
KEMENTERIAN PERTAHANAN
195
UPGRADING MEDICAL EQUIPMENTS FOR AIR FORCE HOSPITALS DODY SARJOTO
Peningkatan Pelayanan Kesehatan Rumah Sakit Angkatan Udara
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Austria N/A
10/12/2018
s/d
10/12/2020
EUR 12,5 3,8
30,4
8,7
-47,3
10,0 1,3
13,0
USD 14,1 4,3 9,8 11,2 1,5
Instansi Pelaksana
a. Kementerian Pertahanan
b. TNI Angkatan Udara
Lokasi Proyek
a. Rumah Sakit Angkatan Udara Dody
Sarjoto
b. Makassar, Sulawesi Selatan
Ruang Lingkup (Pekerjaan dan Sasaran)
1. Pengadaan alat kesehatan dan pendukungnya, yang terdiri dari :
Unit Pelayanan Medik Umum
Unit Gawat Darurat
Unit Penyakit Dalam
Unit Pelayanan Anak
Unit Bersalin
Unit Bedah Central
Unit Pelayanan Gigi dan Mulut
Unit THT
Unit Mata
Unit Radiologi
Unit Kamar Operasi Gawat Darurat
Unit ICU dan ICCU
Unit Fisioterapi
Unit Laboratorium
Unit CSSD
KEMENTERIAN PERTAHANAN
196
Unit Urologi
Peralatan Bedah
Peralatan Penunjang lainnya
2. Proyek manajemen, instalasi dan uji coba
3. Pelatihan
4. Garansi dan perawatan
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan Rumah Sakit Angkatan Udara Dody Sarjoto bertujuan untuk melengkapi dan memodernisasi
peralatan kesehatan beserta sarana dan prasarana penunjangnya. Saat ini kegiatan sedang dalam
tahap proses produksi. Hingga triwulan II 2020 kegiatan RSAU Dody Sarjoto telah melakukan penyerapan
pinjaman sebesar EUR 3,867,250 atau telah menyerap 30% dari total pinjaman sebesar EUR 12,5 juta.
KEMENTERIAN PERTAHANAN
197
UPGRADING MEDICAL EQUIPMENTS FOR ARMY HOSPITALS INDONESIAN ARMY OF GATOT
SUBROTO
Peningkatan Mutu Pelayanan Medis Bidang Kedokteran Nuklir dan Terapi Radiasi
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Austria N/A
02/10/2019
s/d
02/10/2022
EUR 135,0 33,7
25,0
101,3
0,1
45,0 33,7
74,9
USD 151,8 37,9 113,9 50,6 37,9
Instansi Pelaksana
a. Kementerian Pertahanan
b. TNI Angkatan Darat
Lokasi Proyek
a. Rumah Sakit Angkatan Darat Gatot
Subroto,
b. DKI Jakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pengadaan peralatan kedokteran/kesehatan Kedokteran Nuklir dan peralatan penunjang pada
Pusat Kedokteran Nuklir dan Terapi Radiasi (Center for Nuclear Medicine and Radiation Therapy).
b. Instalasi dan uji coba peralatan medis/kesehatan dan peralatan penunjang medis dan lainnya pada
Pusat Kedokteran Nuklir dan Terapi Radiasi (Center for Nuclear Medicine and Radiation Therapy).
c. Penyusunan perencanaan dan supervisi atas pembentukan Pusat Kedokteran Nuklir dan Terapi
Radiasi (Center for Nuclear Medicine and Radiation Therapy).
d. Pelatihan penggunaan dan perawatan peralatan serta pengoperasian Pusat Kedokteran Nuklir dan
Terapi Radiasi (Center for Nuclear Medicine and Radiation Therapy).
KEMENTERIAN PERTAHANAN
198
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan Rumah Sakit RSPAD Gatot Subroto bertujuan untuk melengkapi dan memperbaharui peralatan
kesehatan kedokteran nuklir dan terapi radiasi yang ada saat ini dengan perlatan kesehatan serta sarana
dan prasarana penunjang yang modern serta berteknologi canggih.
Kegiatan ini telah terkontrak pada tanggal 26 Oktober 2018 dengan no.kontrak: TRAK/514/X/2018/AD
dengan nilai EUR 135 juta. Dari total nilai proyek EUR 135 juta, porsi pinjaman adalah sebesar EUR 114,75
juta dan porsi rupiah murni sebesar EUR 20,25 juta yang menjadi uang muka proyek. Uang muka proyek
telah dibayarkan. Saat ini proyek dalam tahap proses produksi. Hingga triwulan II 2020 kegiatan ini telah
menyerap EUR 33,750,000 atau 25% dari total nilai pinjaman.
KEMENTERIAN PERTANIAN
201
INTEGRATED PARTICIPATORY DEVELOPMENT AND MANAGEMENT OF IRRIGATION
PROGRAM (IPDMIP)
Penguatan sistem dan kapasitas kelembagaan irigasi pertanian yang berkelanjutan, perbaikan pengelolaan,
operasi, dan pemeliharaan irigasi, serta perbaikan infrastruktur irigasi.
Lender Kode Loan Masa Laku Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
IFAD
2000001445
(Pinjaman) 13/02/2017
s/d
31/03/2023
USD
98,5 2,7 2,7 95,8 -37,6 10,2 0,8 8,1
2000001446
(Hibah) 1,5 0,6 41,3 0,9 0,3 0,1 28,1
Diskusi di daerah irigasi target IPDMIP, Kabupaten Barito Koala,
Provinsi Kalimantan Selatan, dalam rangka pelaksanaan misi
supervisi IPDMIP tanggal 2 – 18 Mei 2018 (sumber foto: IFAD,
2018)
Instansi Pelaksana
a. Kementerian Pertanian – Badan
Penyuluhan dan Pengembangan
Sumber Daya Manusia Pertanian
b. Bappenas – Direktorat Pengairan dan
Irigasi
Lokasi Proyek
a. Aceh (Kab. Bireuen, Kab. Aceh Timur, Kab. Aceh Utara, Kab. Aceh Besar);
b. Provinsi Sumatera Utara (Kab. Simalungun, Kab. Humbang Hasundutan, Kab. Asahan, Kab. Tapanuli
Tengah);
c. Provinsi Sumatera Barat (Kab. Pesisir Selatan, Kab. Pasaman Barat, Kab. Limapuluh Kota, Kab.
Pasaman, Kab. Sijunjung);
d. Provinsi Sumatera Selatan (Kab. Lahat, Kab. Banyuasin, Kab. Musi Banyuasin, Kab. Muara Enim, Kab.
Ogan Komering Ulu Selatan, Kab. Empat Lawang, Kab. Musi Rawas);
e. Provinsi Lampung (Kab. Mesuji, Kab. Tulang Bawang, Kab. Lampung Tengah, Kab. Tanggamus, Kab.
Pesawaran);
f. Provinsi Banten (Kab. Pandeglang, Kab. Serang);
g. Provinsi Jawa Barat (Kab. Sumedang, Kab. Majalengka, Kab. Sukabumi, Kab. Ciamis, Kab. Kuningan,
Kab. Indramayu, Kab. Garut);
h. Provinsi Jawa Tengah (Kab. Cilacap, Kab. Banyumas, Kab. Pati, Kab. Pekalongan, Kab. Purworejo,
Kab. Banjarnegara, Kab. Kebumen);
KEMENTERIAN PERTANIAN
202
i. Provinsi Jawa Timur (Kab. Tuban, Kab. Jombang, Kab. Jember, Kab. Lumajang, Kab. Madiun, Kab.
Kediri, Kab. Lamongan, Kab Ngawi, Kab. Bojonegoro);
j. Provinsi Kalimantan Barat (Kab. Kayong Utara, Kab. Sambas, Kab. Kubu Raya, Kab. Ketapang);
k. Kalimantan Selatan (Kab. Tanah Bumbu, Kab. Barito Kuala, Kab. Tapin, Kab. Hulu Sungai Tengah);
l. Nusa Tenggara Barat (Kab. Lombok Timur, Kab. Lombok Tengah);
m. Nusa Tenggara Timur (Kab. Manggarai Timur, Kab. Manggarai Barat, Kab. Dompu, Kab. Bima);
n. Sulawesi Selatan (Kab. Bone, Kab. Soppeng, Kab. Sidenreng Rappang, Kab. Pinrang, Kab. Wajo);
o. Sulawesi Tengah (Kab. Banggai, Kab. Poso, Kab. Toli Toli, Kab. Bolaang Mongondow);
p. Sulawesi Utara (Kab. Bolaang Mongondow, Kab. Minahasa Selatan).
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Komponen 1 Penguatan kebijakan dan kerangka kelembagaan untuk pertanian beririgasi;
b. Sub-Komponen 4.1 Peningkatan produktivitas dan layanan pertanian;
c. Sub-Komponen 4.2 Peningkatan akses dan layanan pasar; dan
d. Sub-Komponen 4.3 Perbaikan layanan keuangan.
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Ekuivalen Juta USD
No Paket Kontrak/
Komponen
Nilai
Kontrak
Keuangan Fisik (%)
Realisasi Kumulatif TA 2020 TA 2020
Nilai % Target Realisasi % Target Realisasi
Komponen Pinjaman IFAD 2000001445
Pengadaan Jasa Konsultan Internasional
1 Project Management
Advisor 0.29 0.29 100 0.14 0.05 35 100 34.69
2 Sistem Pertanian 0.21 0.20 97 0.11 0.01 10 100 10.48
3 Spesialis Rantai Nilai 0.22 0.13 56.49 0.11 0.02 21 100 20.80
4 Spesialis Keuangan
Perdesaan 0.19 0.19 79.77 0.09 0.04 50 100 49.80
Pengadaan Jasa Konsultan Nasional
1
Pkt:Sp.Sistem
Pertanian,
Sp.Penyuluhan,
Sp.Rantai Nilai, Sp.Keu
Perdesaan
3.49 0.92 26.25 0.92 0 0 100 0
2 Jasa Konsultan Lainnya 0.21 0.23 100 0.1 0.03 27 100 27.14
3 Individual On-Granting N/A 0.15 N/A 0.15 0 0 100 0
Pengadaan Staf Pendukung 0.04 0.05 91.09 0.3 0.01 39 100 38.74
Bimtek Pengelolaan
Kesuburan Lahan N/A 0.16 N/A 0.16 0.13 84 100 87.77
Pengadaan Benih Padi Pokok N/A 0.09 N/A 0.04 0.01 35 100 34.52
KEMENTERIAN PERTANIAN
203
Rice Seed Modernization
Study N/A 0.11 N/A 0.11 0 0 100 0
Pelatihan u/ Tenaga Penyuluh N/A 0.08 N/A 0.08 0.003 4 100 4.37
Pelatihan u/ Ketua Kelompok
Tani N/A 0.05 N/A 0.04 0 0 100 0
Pelatihan untuk Rumah
Tangga Petani Terpilih N/A 004 N/A 0.04 0 0 100 0
Worskhop Penggalian Minat
Lembaga Layanan Keuangan N/A 0.004 N/A 0.003 0 0 100 0
Workshop Penyusunan AWPB
dan Rencana Pengadaan
IPDMIP
N/A 0.004 N/A 0.004 0.003 77 100 76.77
Workshop Rekonsiliasi
Keuangan On-Granting N/A 0.05 N/A 0.05 0 0 100 0
Penguatan Melalui Informasi
dan Teknologi N/A 0.57 N/A 0.57 0 0 100 0
Komponen Hibah IFAD 2000001446
Swakelola KMC dan PIhak 3 -
IPDMIP N/A 0.62 41.33 0.32 0.09 28.13 100 28.71
Kemajuan Pelaksanaan Kegiatan
▪ Procurement. (1) 7 konsultan regional telah terkontrak per Juli 2020. Untuk regional Kalimantan Barat
dan Kalimantan Selatan masih diproses. (2) Diharapkan dapat dilakukan advance procurement
terkait Inisiatif Kostratani. Adapun kebutuhan untuk pelaksanaan kegiatan pada tahun 2020 ialah
senilai 7,9 Milyar rupiah.
▪ Pelaksanaan sejumlah kegiatan melalui metode daring seperti pelatihan kepada penyuluh dilakukan
dengan metode e-learning sehubungan dengan pandemic COVID-19 sejak awal tahun anggaran
berjalan. Penyesuaian pelaksanaan kegiatan berbasis digitalisasi juga dilaksanakan oleh KMC IPDMIP
dan pusat.
KEMENTERIAN PERTANIAN
204
RURAL EMPOWERMENT AND AGRICULTURAL DEVELOPMENT SCALING-UP INITIATIVE
(READSI)
Memberdayakan rumah tangga perdesaan, baik secara individu maupun kelompok, dengan keterampilan,
rasa percaya diri dan sumber daya untuk meningkatkan pendapatan dari sektor pertanian dan non-pertanian
serta taraf hidup secara berkelanjutan.
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif
Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
IFAD
2000001960
(Pinjaman) 08/01/2018
s/d
31/03/2023
USD
39,9 3,9 9,8 36,0
0,0
0,3 0,3 100,0
2000001959
(Hibah) 1,0 0,0 0,0 1,0 0,0 0,0 0,0
Instansi Pelaksana
a. Kementerian Pertanian – Badan
Penyuluhan dan Pengembangan
Sumber Daya Manusia Pertanian
b. Bappenas – Direktorat Pangan dan
Pertanian
Lokasi Proyek
6 Provinsi, 18 Kabupaten, 342 Desa
a. Gorontalo (Pahuwato, Bone Bolango,
Gorontalo);
b. Sulawesi Selatan (Luwu, Luwu Utara,
Luwu Timur);
c. Sulawesi Tenggara (Kolaka, Kolaka
Utara, Konawe);
d. Sulawesi Tengah (Poso, Parimo, Buol,
Toli Toli, Banggai);
e. Kalimantan Barat (Sambas, Sanggau);
f. Nusa Tenggara Timur (Kupang, Belu)
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pekerjaan (Works);
b. Layanan konsultansi dan non-
konsultansi;
c. Barang;
d. Pelatihan dan lokakarya;
e. Bantuan masyarakat (matching
grants);
f. Biaya operasional.
KEMENTERIAN PERTANIAN
205
Komponen Proyek
a. Pengembangan pertanian dan penghidupan di perdesaan
b. Peningkatan pelayanan penyuluhan, penyediaan sarana produksi, dan pemasaran
c. Tersedianya dukungan kebijakan dan strategi pembangunan
d. Manajemen pengelolaan program
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Ekuivalen Juta USD
No Paket Kontrak/ Komponen Nilai
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020 TA 2020
Nilai % Target Realisasi % Target Realisasi
Komponen Pinjaman 2000001960
1 Administrasi Kegiatan N/A 0.02 N/A 0 0 0 N/A 0
2
2020 Pembayaran
Pendamping dan Fasilitator
Desa
N/A 0.3 N/A 0.68 0.30 44.73 N/A 25
3 2020 Administrasi Kegiatan N/A 0.007 N/A 0.03 0.007 26.39 N/A 25
4 2020 Persiapan Kegiatan
READSI N/A 0.02 N/A 0.03 0.02 74.72 N/A 40
5
2020 Pembayaran jasa
Konsultan Community
Mobilization for Villages
Agriculture and Livelihood
Development
N/A 0.12 N/A 0.26 0.12 46.07 N/A 25
6
2020 Pengadaan IT
Equipment dan Office
Equipment
N/A 0.006 N/A 0.007 0.005 72.05 N/A 50
7 2020 Honor Staf Admin dan
Pendukung Program READSI N/A 0.01 N/A 0.02 0.01 45.14 N/A 25
8
2020 Pelatihan Agronomi
Kakao Kerja Sama READSI –
PT MARS
N/A 0.008 N/A 0.04 0.008 23.4 N/A 0
9 Pembayaran Jasa Konsultan N/A 0.03 N/A 0.05 0.03 51.23 N/A 0
10
2020 Perencanaan,
Konsolidasi, Sosialisasi,
Monitoring Evaluasi, dan
Pendampingan Program
READSI
N/A 0.07 N/A 0.3 0.07 23.4 N/A 45
11 2020 Master TOT N/A 0 N/A 0.009 0 0 N/A 0
12
2020 Pelatihan Bisnis Kakao
untuk Petani Kerjasama
READSI – PT MARS
N/A 0 N/A 0.03 0 0 N/A 0
Komponen Pinjaman 2000001960
1 N/A N/A N/A N/A N/A N/A N/A N/A N/A
Kemajuan Pelaksanaan Kegiatan
Transformasi kegiatan diinisiasi melalui digitalisasi dan pelaksanaan sistem daring agar kegiatan terlaksana
pada triwulan II TA 2020. Secara umum terjadi peningkatan pada pelaksanaan kegiatan READSI.
KEMENTERIAN PERTANIAN
206
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Kegiatan Pelatihan Bisnis kakao untuk
Petani dan Pelatihan Agronomi 2020 Kerja
Sama READSI – PT MARS tidak dapat
terlaksana sebagaimana ditargetkan
dikarenakan pandemi COVID-19.
Pelatihan Agronomi baru dilaksanakan
untuk 1 angkatan.
b. Kegiatan Perencanaan, Konsolidasi,
Sosialisasi, Monitoring Evaluasi dan
Pendampingan Program READSI secara
langsung terkendala COVID-19.
c. Kegiatan Master ToT tertunda
pelaksanaannya hingga 2021.
a. Merancang konsep Blended Learning
Business Training Puslatan Bersama MARS
dan BBPP Batangkaluku.
b. Inisiatif untuk melakukan pertemuan
secara daring.
KEMENTERIAN PERTANIAN
207
YOUTH ENTREPRENEURSHIP AND EMPLOYMENT SUPPORT SERVICE PROGRAMME (YESS)
Pemuda desa mendapatkan mata pencaharian yang stabil dan cukup melalui pekerjaan dan kewirausahaan
di sektor berbasis pertanian.
Mitra
Pembangunan
Kode
Pinjaman
dan Hibah
Masa Laku
Nilai
Pinjaman
dan Hibah
(Juta USD)
Penarikan
Kumulatif
Pinjaman dan
Hibah Belum
Ditarik
(Juta)
PV TA 2020 (Juta)
(Juta) % Target Realisasi %
IFAD
2000002604
(Pinjaman) 17/06/2019
s.d
31/12/2025
55,3 0,4 0,7 54,9 -
15,2
0,7 0,2 25,0
2000002603
(Hibah) 2,0 0,0 0,0 2,0 0,0 0,0 0,0
Instansi Pelaksana
Kementerian Pertanian – Badan Penyuluhan
dan Pengembangan Sumber Daya Manusia
Pertanian
Lokasi Proyek
4 Provinsi, 15 Kabupaten
a. Kalimantan Selatan;
b. Sulawesi Selatan;
c. Jawa Barat;
d. Jawa Timur.
Komponen Proyek
a. Transisi pemuda perdesaan ke
lapangan pekerjaan;
b. Kewirausahaan pemuda pedesaan;
c. Investasi untuk pemuda pedesaan;
d. Lingkungan yang mendukung pemuda
pedesaan.
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Ekuivalen Juta USD
No Paket Kontrak/ Komponen Nilai
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020 TA 2020
Nilai % Target Realisasi % Target Realisasi
1 Study and Standard Design for
Teaching Factory (TEFA) N/A 0.01 N/A 0.01 0.01 100 100 100
2 Improved PWMP N/A 0.003 N/A 0.03 0.003 9.62 100 0
3 National Workshop on Rural
Youth and Youth Employment N/A 0 N/A 0.03 0 0 100 0
KEMENTERIAN PERTANIAN
208
No Paket Kontrak/ Komponen Nilai
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020 TA 2020
Nilai % Target Realisasi % Target Realisasi
4 Senior TVET and Transition to
Work Specialist N/A 0 N/A 0.02 0 0 100 0
5 Sallary for Project Management
Support N/A 0.02 N/A 0.04 0.02 40.3 100 3
6
Capacity Building to NPMU and
PPIUs (Pelatihan untuk Tim
Pengadaan Barang dan Jasa)
N/A 0.008 N/A 0.016 0.008 50 100 58
7 Project Planning and Oversight N/A 0.17 N/A 0.17 0.17 100 100 85
8 Penyusunan Kegiatan dan
Anggaran N/A 0.02 N/A 0.002 0.02 877 100 0
9 Baseline Survey N/A 0 N/A 0.04 0 0 100 0
10 Koordinasi Meeting Pelaksanaan
YESS N/A 0.01 N/A 0.03 0.01 44.95 100 33
11 Pembinaan dan Pengawalan N/A 0.02 N/A 0.07 0.02 29.42 100 0
12 Biaya Operasional Kantor NPMU N/A 0.01 N/A 0.03 0.01 51.11 100 3
13 Biaya Operasional Kendaraan
NPMU N/A 0.0006 N/A 0.002 0.0006 25.24 100 10
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
a. Revisi DIPA. NPMU sedang memproses usulan top up untuk pelaksanaan tambahan kegiatan pada
tahun anggaran PPIU dan NPMU senilai Rp 23,358,432,000. Alokasi anggaran tersebut akan
dialokasikan untuk pembiayaan kegiatan sebagai berikut : (1) Peingkatan Fasilitas P4S/BPP; (2)
Developing Promotion of Rural Youth Programme; (3) Forum Multi-Stakeholder (District Multi-
Stakeholder); (4) Peningkatan Implementasi PWMP; (5) Peningkatan Fasilitas Lab/TEFA; (6) Workshop
Validasi Business Motivation Pathways; (7) Membangun Jejaring Kerja BDSP melalui Mobilizer; dan (8)
Assessment Identifikasi CP-CL.
b. Workshop Start Up. Workshop direncanakan akan dilaksanakan pada Oktober 2020.
KEMENTERIAN PERTANIAN
209
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Pengadaan barang dan jasa
Terjadi gagal lelang pada Paket Kontrak Senior TVET
and Transition to Work Specialist.
Lain-lain
Penyesuaian/realokasi beberapa kegiatan, yang
berimbas pada penyesuaian struktur anggaran dan
kegiatan (revisi DIPA/POK) diakibatkan pendemi
Covid-19 serta adanya penataan dan
penambahan kegiatan baru yang belum masuk
dalam DIPA awal atas kebijakan Nasional dan
Kementan.
Melakukan pemantauan secara intensif melalui
koordinasi dengan pihak Tim/Pokja Pengadaan
(UKPBJ/ULP/dan IFAD).
Percepatan pengajuan revisi (DIPA/POK).
KEMENTERIAN PERTANIAN
210
DEVELOPMENT OF INTEGRATED FARMING SYSTEMS IN UPLAND AREAS (UPLANDS)
Meningkatkan produktivitas pertanian dan pendapatan petani di daerah dataran tinggi berupa
pengembangan infrastruktur lahan dan air, pengembangan sistem agribisnis dan penguatan sistem
kelembagaan.
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
IFAD IJ275XUA
30/11/2019
s/d
30/06/2025
USD 50,0 0,0 0,0 50,0 -10,4 0,0 0,0 0,0
Instansi Pelaksana
Kementerian Pertanian – Direktorat
Pengelolaan Air Irigasi
Lokasi Proyek
7 Provinsi, 14 Kabupaten
a. Provinsi Banten (Lebak);
b. Provinsi Jawa Barat (Tasikmalaya,
Subang, Cirebon, Garut);
c. Provinsi Jawa Tengah (Banjarnegara,
Purbalingga, Magelang);
d. Provinsi Jawa Timur (Malang,
Sumenep);
e. Provinsi NTB (Lombok Timur,
Sumbawa);
f. Provinsi Sulawesi Utara (Minahasa
Selatan);
g. Provinsi Gorontalo (Gorontalo).
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pengembangan Infrastruktur untuk Peningkatan Produktivitas dan Pembentukan Ketahanan
Pertanian;
b. Pengembangan Agribisnis dan Fasilitasi Peningkatan Pendapatan Masyarakat;
c. Penguatan Sistem Kelembagaan;
d. Manajemen Proyek.
KEMENTERIAN PERTANIAN
211
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No Paket Kontrak/ Komponen Nilai
Kontrak
Keuangan Fisik (%)
Realisasi
Kumulatif TA 2020 TA 2020
Nilai % Target Realisasi* % Target Realisasi
1 Operational Project
Management Unit (PMU) N/A 0 0 N/A 0.02 0 N/A 0
2 Consulting Services N/A 0 0 N/A 0 0 N/A 0
Kemajuan Pelaksanaan Kegiatan
Blokir Anggaran. Blokir anggaran telah dibuka per 19 Juni 2020.
Revisi DIPA. Proses pengajuan revisi DIPA untuk penambahan anggaran senilai ±3-5 miliar rupiah untuk
uang muka konsultan.
Procurement. (1) Pengadaan Konsultan PMC dan DSC telah selesai tahap prakualifikasi. (2) Pengadaan
konsultan individu dan supporting staff sedang berproses. (3) EA akan berproses untuk pengajuan NOL ke
mitra pembangunan untuk procurement TA 2021.
On-Granting. Kegiatan on-granting akan dilaksanakan pada tahun anggaran 2021. EA telah
berkoordinasi dengan daerah pada tanggal 23 – 30 Juli 2020 perihal rencana penandatanganan Surat
Penetapan Penerima Hibah (SPPH) pada 14 kabupaten lokasi kegiatan UPLAND. Adapun total konfirmasi
anggaran yang akan diterushibahkan ke daerah pada 12 lokasi (kecuali Kabupaten Cirebon dan
Malang) adalah senilai 193 Milyar.
KEMENTERIAN PERTANIAN
212
DEVELOPMENT OF INTEGRATED FARMING SYSTEM IN UPLAND AREAS (UPLANDS)
Meningkatkan produktivitas pertanian dan pendapatan petani di daerah dataran tinggi berupa
pengembangan infrastruktur lahan dan air, pengembangan sistem agribisnis dan penguatan sistem
kelembagaan.
Lender Kode
Loan
Tanggal
Efektif
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum Ditarik
(Juta)
PV
TA 2020 (Juta USD)
(Juta) % Target Realisasi %
IsDB IDN 1024
16/04/2020
s/d
N/A
USD 66,0 0,0 0,0 66,0 - 0,2 0,0 0,0
16/04/2020
s/d
N/A
USD 4,0 0,0 0,0 4,0 - 0,0 0,0 0,0
15/01/2020
s/d
N/A
USD 0,5 0,0 0,0 0,5 - 0,0 0,0 0,0
❖ Instansi Pelaksana
Direktorat Jenderal Prasarana dan Sarana
Pertanian, Kementerian Pertanian
❖ Lokasi Proyek
a. Provinsi Banten
b. Provinsi Jawa Barat
c. Provinsi Jawa Tengah
d. Provinsi Jawa Timur
e. Provinsi Nusa Tenggara Barat
f. Provinsi Sulawesi Utara
g. Provinsi Gorontalo
❖ Ruang Lingkup (Pekerjaan dan Sasaran)
a. Peningkatan produktivitas dan
pembentukan ketahanan pangan
b. Pengembangan agribisnis dan fasilitasi
peningkatan pendapatan masyarakat
c. Penguatan sistem kelembagaan
d. Manajemen Proyek
❖ Kinerja Pelaksanaan Proyek dan Pencapaian Indikator Kinerja
(Ekuivalen juta USD)
No Paket Kontrak/ Komponen Nilai
Kontrak
KEUANGAN FISIK (%)
Realisasi
Kumulatif TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1 Productivity enhancement
and resilience building 39,56 - - - - - - - -
2 Agribusiness development
and livelihood facilitation 10,54 - - - - - - - -
3 Strengthening institutional 1,92 - - - - - - - -
KEMENTERIAN PERTANIAN
213
No Paket Kontrak/ Komponen Nilai
Kontrak
KEUANGAN FISIK (%)
Realisasi
Kumulatif TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
delivery systems
4 Project management 13,31 - - - - - - - -
❖ Kemajuan Pelaksanaan Kegiatan
1. Productivity enhancement and resilience building. Kegiatan belum dilaksanakan.
2. Agribusiness development and livelihood facilitation. Kegiatan belum dilaksanakan
3. Strengthening institutional delivery system. Kegiatan sedang dalam penyiapan sambil menunggu
penyelesaian proses pembukaan blokir akun proyek UPLAND. Pada tahun 2020, kegiatan akan fokus
di PMU pusat untuk penyiapan komponen on granting mulai tahun 2021 dan capacity building.
4. Project management. Sedang dalam pemrosesan anvanced procurement tahap prakualifikasi untuk
Project Management Consultan (PMC) dan Design and Supervision Consultant (DSC). Saat ini juga
sedang dilakukan penyiapan untuk kegiatan start up workshop melalui virtual meeting.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Anggaran untuk T.A. 2020 senilai Rp 3
Milyar masih diblokir. Menurut
perhitungan PMU, anggaran tersebut
tidak cukup membiayai seluruh kegiatan
di 2020.
b. Adanya pandemi Covid-19 membuat
target pekerjaan berjalan lebih lambat.
c. Batas waktu first disbursement untuk porsi
pinjaman IsDB adalah pada 16 Oktober
2020, namun hingga saat ini EA belum
melakukan penarikan pertama. Jika
hingga waktu yang ditentukan EA tetap
belum melakukan penarikan, maka
pinjaman akan dibatalkan secara
otomatis.
a. PMU telah mengusulkan pembukaan
blokir dan penambahan anggaran T.A.
2020 sebesar Rp 23 Milyar kepada
Kementerian Keuangan.
b. PMU akan melakukan penyesuaian
waktu pelaksanaan kegiatan yang
sesuai dengan prosedur pelaksanaan
selama Covid-19.
c. EA akan mengajukan permintaan
pengisian rekening khusus untuk porsi
pinjaman IsDB pada triwulan III untuk
pelaksanaan start up workshop.
KEMENTERIAN PPN/BAPPENAS
217
PROFESSIONAL HUMAN RESOURCES DEVELOPMENT IV
Program Pengembangan Sumber Daya Manusia
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
568
23/06/2014
s/d
23/06/2023
JPY 7.075,0 5.239,0
74,0
1.836,0
7,1
774,5 322,3
41,6
USD 65,7 48,6 17,0 7,2 3,0
Leaflet PHRDP IV
Instansi Pelaksana
a. Program Pengelolaan Sumber Daya
Manusia Aparatur (PPSDMA)
b. Pusat Pembinaan, Pendidikan, dan
Pelatihan Perencana, Kementerian
PPN/Bappenas
Lokasi Proyek
Provinsi DKI Jakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Program Luar Negeri: Program S3 dan
S2 reguler, Program S2 linkage,
Program non-gelar reguler, Program
non-gelar linkage, staff enhancement,
conference, academic staff
exchange
b. Program Dalam negeri: Program S3
dan S2 reguler
c. Consulting Services: Planning and
Management, Fellowship Support
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan IP-568 ini bertujuan untuk memperkuat kapasitas Instansi Pemerintah Pusat maupun Pemerintah
Daerah dalam rangka memfasilitasi proses desentralisasi melalui pengembangan sumber daya aparatur
perencana seluruh Indonesia dengan melaksanakan program Gelar dan non-Gelar baik di Indonesia
maupun di Jepang. Berikut alokasi dana pinjaman IP-568 per kategori.
KEMENTERIAN PPN/BAPPENAS
218
CATEGORY LOAN AMOUNT
OVERSEAS STUDY PROGRAM JPY 3.908.000.000
DOMESTIC STUDY PROGRAM JPY 1.969.000.000
CONSULTING SERVICES JPY 905.000.000
CONTINGENCIES JPY 293.000.000
TOTAL JPY 7.075.000.000
Kemajuan pelaksanaan karyasiswa sampai dengan Triwulan II Tahun Anggaran 2020 adalah sebagai berikut,
Rekapitulasi Karyasiswa Gelar PHRD IV (Target vs Realisasi)
PROGRAM
Target
MOD
/Rev.
Realisasi Per Tahun Estimate
Realization 2014 2015 2016 2017 2018 2019 2020
S2 Linkage (Overseas) 540 95 114 113 113 118 79 0 632
S2 Regular (Overseas) 30 4 13 6 3 6 2 0 34
S3 Regular (Overseas) 12 0 3 6 3 3 0 0 15
S2 Regular (Domestic) 1.476 391 324 318 281 275 282 0 1.871
S3 Regular (Domestic) 16 0 3 6 6 0 13 0 28
TOTAL 2.074 490 457 449 406 402 376 0 2.580
Rekapitulasi Karyasiswa Non Gelar PHRD IV (Target vs Realisasi)
PROGRAM
Target
MOD
/Rev.
Realisasi Per Tahun Estimate
Realization
2014 2015 2016 2017 2018 2019 2020
Short term Training Regular 150 - - - 23 74 75 - 172
Short Term Training Linkage 245 - 69 75 72 25 - - 241
Staf Enhancement 60 - 17 20 22 15 15 - 89
Conference Participation
Program 30 - - - 1 11 10 - 22
Academic Exchange From
Japan 15 - - - 3 7 8 - 18
Academic Exchange From
Indonesia 30 - 4 6 4 4 9 - 27
TOTAL 530 - 90 101 125 136 117 - 569
Catatan : Kemajuan pelaksanaan karyasiswa masih sama dengan periode laporan sebelumnya, karena karyasiswa
direncanakan baru akan berangkat di triwulan selanjutnya atau triwulan III 2020
KEMENTERIAN RISTEK/BRIN
221
RESEARCH AND INNOVATION IN SCIENCE AND TECHNOLOGY PROJECT (RISET-PRO)
Menciptakan lingkungan yang kondusif bagi kegiatan penelitian dan pengembangan di bidang ilmu
pengetahuan dan teknologi, memperkuat kinerja lembaga penelitian dan pengembangan publik, dan
memperkuat kapasitas sumber daya manusia di bidang ilmu pengetahuan, teknologi, dan inovasi
Lender Kode
Loan Masa Laku
Nilai
Pinjaman
(Juta
USD)
Penarikan Kumulatif Pinjaman
Belum
Ditarik
(Juta USD)
PV
TA 2020 (Juta USD)
(Juta USD) % Target Realisasi %
Bank
Dunia
8245-
ID
12/06/2013
s/d
31/12/2020
80,0 68,6 85,8 11,4 -7,6 4,0 1,1 28,0
Tes akademik pendidikan gelar RISET-Pro
Sumber :www.ristek.go.id
Instansi Pelaksana
Sekretariat Kementerian Riset, Teknologi
dan Pendidikan Tinggi
Lokasi Proyek
Provinsi DKI Jakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Improving Innovation Policy
Framework and Performance of Public
Research Centers
b. Strengthening Public Research
Funding
c. Developing S&T Human Resources
Capacity
d. Project Management
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1
Strengthening the
Innovation System and
Technology Transfer at
Public Research Agencies
2,5 1,91 76,4 0,29 - 0
Konsultan Sub-Componen
1.b.3.1 Strengthening 100% 0%
Konsultan Sub-Componen
1.b.3.2 Advocacy 100% 0%
Konsultan Sub-Componen
1.b.3.3 Piloting 100% 0%
KEMENTERIAN RISTEK /BRIN
222
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
2 Strengthening Public
Research Funding 2,5 1,68 67,2 0,23 - 0
Konsultan Sub-Component
2 .b pengembangan 100% 0%
3 Developing S&T Human
Resources Capacity 68 47,54 70 2,80 1,07 38,2
Degree 100% 65%
Non Degree 100% 0%
4 Project Management 7 3,74 53,4 0,66 0,35 53
Konsultan FMS 100% 0%
Asisten Konsultan FMS 100% 50%
Konsultan Advisor Kompnen
1 100% 50%
Konsultan Afvisor
Komponen 2 100% 50%
Konsultan Harmonisasi
antar Komponen 100% 0%
Editor Web Content 100% 0%
Web Content 100% 0%
Asisten Konsultan FMS
Komponen 4 100% 0%
Asisten Konsultan FMS
Komponen 1 100% 50%
Asisten Konsultan FMS untuk
pendukung program gelar
dan non gelar
100% 50%
Sewa Kantor 100% 50%
Sewa Kendaraan 100% 100%
Sewa Meubeler Kantor 100% 50%
Sewa Komputer 100% 0%
Kemajuan Pelaksanaan Kegiatan
Pengadaan Paket dan Implementasi. Sedang diusulkan perpanjangan masa laku untuk memanfaatkan
sisa dana pinjaman untuk membiayai program non gelar untuk kurang lebih 985 orang peserta dalam
rangka mendukung peningkatan produktivitas iptek dan inovasi sesuai agenda pembangunan iptek 2020
– 2024.
Perencanaan dan Penganggaran. Sampai dengan Februari 2020, disbursement untuk kegiatan ini sebesar
USD 66,45 juta (83,06%), dengan sisa dana yang belum terserap sebesar USD 13,55 juta. Dari dana yang
belum terserap tersebut, rencananya besaran yang akan diserap pada bulan Juli s.d. Desember 2020
adalah sebesar USD 2,65 juta, sehingga sampai dengan akhir tahun 2020 terdapat sisa dana kegiatan
RISET-Pro sebesar USD 10,90 juta.
Capaian Kegiatan.
a. Program Gelar RISET-Pro telah berkontribusi menghasilkan 292 publikasi internasional dan
nasional dari 104 karyasiswa yang disurvey, dimana sebanyak 70,2% merupakan publikasi
terindeks global (Thomson Reuters dan Scopus Indeks).
b. Meningkatnya jumlah publikasi nasional dan internasional telah mendukung Indeks Kinerja
Utama (IKU) instansi.
KEMENTERIAN RISTEK/BRIN
223
c. Sebanyak 254 publikasi dihasilkan oleh karyasiswa S3, sedangkan 38 publikasi dihasilkan oleh
karyasiswa S2.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Administrasi
a. Pemindahan DIPA dari Ditjen SDID ke
Pusdiklat.
b. Belum ada penetapan SOTK Kementerian
Riset dan Teknologi/BRIN.
Lain-lain
a. Keadaan darurat Kesehatan Masyarakat
Pandemi Covid-19.
b. Terdapat potensi unspent loan sebanyak
USD 10,9 juta.
a. Pemindahan DIPA baru selesai dilakukan
pada pertengahan bulan Maret 2020.
b. Menunggu penetapan SOTK
Kemenristek/BRIN.
a. WFH dengan memanfaatkan teknologi
berbasis online dan menjadwalkan
kembali beberapa kegiatan.
b. Perpanjangan masa laku pinjaman
sedang diusulkan. Potensi sisa dana akan
diserap pada tahun 2021 diusulkan sekitar
USD 5,6 juta, sehingga akan ada sisa
dana yang tidak terserap danakan
dilakukan partial cancellation.
KEPOLISIAN REPUBLIK INDONESIA
227
INTEGRATED TRUNKING RADIO SYSTEM FOR INDONESIAN NATIONAL POLICE
Pengadaan dan konstruksi radio komunikasi
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Korea INA-
18
14/02/2012
s/d
30/09/2021
KRW 42.731,6 959,4
2,2
41.772,2
-84,8
8.733,0 0,0
0,0
USD 35,7 0,8 34,9 7,3 0,0
Instansi Pelaksana
Kepolisian Negara Republik Indonesia
Lokasi Proyek
Kalimantan, Indonesia
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pengadaan dan Konstruksi (Peralatan
dan pekerjaan, Training, Operation and
Management)
b. Jasa Konsultasi (Survei lapangan, Basic
Design, Persiapan dokumen
pelelangan, Supervisi untuk
pengadaan dan pekerjaan konstruksi)
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Paket jasa konsultan
Saat ini masih proses seleksi atau pemilihan Penyedia B/J (main kontraktor). Nilai KJB untuk Main
kontraktor belum didapat, karena saat ini masih tahapan persiapan lelang (Pemasukan dokumen
penawaran). Pendaftaran lelang mulai tanggal 28 Oktober 2019 s/d 28 November 2019, diperpanjang s.d.
7 Desember 2020, namun hanya satu yg memasukan dokumen penawaran, sehingga dilaksanakan
lelang/prakualifinasi ulang. Lelang/Prakualifikasi ulang prakualifikasi 27 Feb 2020 s/d 30 Maret 2020
(terdapat 10 perusahaan Korea yg mendaftar) dengan batas akhir pemasukan dokumen penawaran 3
Juli 2020, dengan 2 (dua) peserta yg memasukan penawaran, saat ini masih tahap evaluasi penawaran
dua peserta (Nuri Taihan & Hyundai Autoever).
Paket pengadaan radio
Akan dilaksanakan setelah selesai lelang konsultan.
KEPOLISIAN REPUBLIK INDONESIA
228
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
Kementerian Keungan mempertimbangkan untuk
menutup loan ini dan membuka loan baru dengan
pertimbangan waktu yang tersisa untuk
pelaksanaan kegiatan hanya 1 tahun dan
spesifikasi radio yang direncanakan pada tahun
2011 mungkin berbeda dengan kebutuhan di masa
sekarang.
Rapat monev TW II 2020 menyepakati bahwa loan
ini akan tetap dilanjutkan dengan
mempertimbangkan bahwa kegiatan masih dapat
diselesaikan pada bulan September 2021 dan
spesifikasi radio akan menyesuaikan dengan
kebutuhan di masa sekarang.
LEMBAGA ILMU PENGETAHUAN INDONESIA
231
CORAL REEF REHABILITATION AND MANAGEMENT PROGRAM-CORAL TRIANGLE INITIATIVE
(COREMAP-CTI)
Program Pengelolaan Sumberdaya Terumbu Karang yang Berkelanjutan untuk Meningkatkan Kesejahteraan
Masyarakat Pesisir pada Lokasi Terpilih
Lender Kode Loan Masa Laku Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia 8336-ID
05/06/2014
s/d
30/6/2022
USD 47,4 34,2 72,2 13,2 -3,0 0,0 3,6 0,0
PetaTutupanKarangHidup di Kabupaten/Kota Porsi Bank Dunia
Instansi Pelaksana
Pusat Penelitian Oseanografi, Lembaga
Ilmu Pengetahuan Indonesia
Lokasi Proyek
a. Provinsi DKI Jakarta
b. 14 PIU (6 UPT dan 14 Kabupaten/Kota)
c. Provinsi Nusa Tenggara Barat (Gili
matra National MPA di Kabupaten
Lombok)
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Penguatan Kelembagaan untuk
Pemantauan Ekosistem Pesisir
b. Dukungan untuk Penelitian Ekosistem
Pesisir
c. Memperkuat Sistem Kelembagaan
untuk Pemantauan Ekosistem Pesisir
LEMBAGA ILMU PENGETAHUAN INDONESIA
232
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Penguatan Kelembagaan untuk Pemantauan Ekosistem Pesisir
b. Dukungan untuk Penelitian Ekosistem Pesisir
c. Memperkuat Sistem Kelembagaan untuk Pemantauan Ekosistem Pesisir
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi
Kumulatif s/d
Desember 2019
(USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1
Pekerjaan Jasa
Konsultansi Perencanaan
Pembangunan
Infrastruktur Gedung dan
Laboratorium Tahun 2020
0,24 0,24 0,16 65
2
Pengadaan Akomodasi
dan Konsumsi Sinkronisasi
Kegiatan dan Anggaran
pada Deputi Bidang Ilmu
Pengetahuan Kebumian
LIPI
0,004 0,004 0,004 100
3
Pengadaan Jasa
Pengurusan Proses
Pengeluaran Barang
Impor Container ukuran
1x20f feet dan 1x40 feet
dalam rangka kegiatan
Circulation and
Ecocyctem Study In The
Indonesia Seas 2020
0,05 - - 0,05 0,05 100 - 100% 85%
4
CW-8 / Building Ancol
National Data Repository
Campus
4.8 0,97 19,9 3,15 1,62 51,3 - 100% 100%
5 CS-15 / Construction
Management for Ancol 0,11 0,015 35,8 0,10 0,,04 22,6 - 100% 100%
6 CW-3 / Renovation of
UPTs. Lombok 2,49 0,5 19,9 2,5 1,62 64,9 - 100% 0%
7
CS-12 / Supervision
Consultant for Renovation
Lombok
0,028 - - 0,026 0,004 14,8 - 100% 0%
8
e-Purchasing Pengadaan
Belanja Modal Peralatan
dan Mesin
berupa Peralatan
Laboratorium Pendukung
Riset Ekosistem
Pesisir Pada Pusat
Penelitian Oseanografi
LIPI
0,004 - - - 0,004 - - 100% 0%
9
Pengadaan Bahan Kimia
dan Perlengkapan
Lainnya dalam
rangka Pemindahan
Refcoll dari Pusat
Penelitian Oseanografi
ke Pusat Penelitian Biologi
di Cibinong
0,013 - - - 0,013 - - 100% 0%
10
Pengadaan Peralatan
Laboratorium Pendukung
Riset
Ekosistem Pesisir pada
Pusat Penelitian
Oseanografi LIPI
Pembiayaan COREMAP-
CTI Tahun 2020
0,01 - - - 0,01 - - 100% 100%
LEMBAGA ILMU PENGETAHUAN INDONESIA
233
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi
Kumulatif s/d
Desember 2019
(USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
11
Pekerjaan Pemindahan
Spesimen Koleksi Rujukan
dari Pusat
Penelitian Oseanografi ke
Pusat Penelitian Biologi di
Cibinong
0,007 - - - 0,007 - - 100% 100%
12
Pengadaan Peralatan
Laboratorium Pendukung
Kegiatan
Penelitian Coremap CTI
Pusat Penelitian
Oseanografi
0,009 - - - 0,009 - - 100% 100%
13
E-Purchasing pengadaan
belanja modal peralatan
dan mesin
berupa peralatan
laboratorium pendukung
riset ekosistem
pesisir pada Puslit
Oseanografi LIPI
pembiayaan
COREMAPCTI
0,007 - - - 0,007 - - 100% 100%
Status Kontrak.
Komponen 1: Secara umum pelaksanaan kegiatan dapat berjalan sesuai target. Meskipun
demikian, pelaksanaan monitoring ekosistem pesisir terkendala Covid-19 sehingga dilakukan
pembatalan 5 lokasi monitoring. Selain itu, pekerjaan fisik yang direncanakan di 6 lokasi/bangunan,
dikurangi menjadi 5 lokasi/bangunan karena pembatalan pekerjaan fisik di UPT Bitung.
Komponen 2: Kegiatan berupa pelatihan peneliti dan demand-driven research sudah berjalan. Untuk
kegiatan research disesuaikan agar tidak membutuhkan kunjungan lapangan.
Komponen 3: Pedoman umum sudah dilegalisasi sehingga 6 kegiatan sub-grant sudah dapat
dilaksanakan. Perjanjian sudah ditandatangani.
Proses revisi AWP untuk mengakomodasi penambahan kegiatan upgrade infrastruktur dan
pembatalan pekerjaan fisik UPT Bitung. LIPI telah bersurat ke Bappenas untuk meminta agar
diadakan SC Meeting dalam rangka pembahasan dan permintaan persetujuan revisi AWP.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
a. Pelaksanaan monitoring ekosistem pesisir
direncanakan pada bulan Agustus 2020,
namun apabila situasi belum
memungkinkan akibat Covid-19 maka
waktu pelaksanaan perlu diundur dan
kemungkinan beberapa lokasi akan
dibatalkan kembali.
b. Jadwal pelaksanaan kegiatan
terkendala dengan terjadinya Pandemi
Covid-19.
a. Penjadwalan ulang agenda kegiatan.
b. Beberapa kegiatan dilakukan secara
daring, namun tidak semua kegiatan
dapat dilakukan secara daring, sehingga
ada beberapa kegiatan yang harus
dilakukan secara langsung ke lapangan
dengan mematuhi Protokol Kesehatan
yang telah ditentukan.
PT. PERTAMINA
237
LUMUT BALAI GEOTHERMAL POWER PLANT PROJECT
Kegiatan Mengembangkan Potensi Panas Bumi di Daerah Sumatera Bagian Selatan Kapasitas 2x55 MW
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
557
25/10/2011
s/d
25/10/2023
JPY 26.966,0 11.169,8
41,4
15.796,2
-30,9
7.774,8 0,0
0,0
USD 250,4 103,7 146,7 72,2 0,0
Pekerjaan Penyambungan Pipa di Lumut Balai
Sumber : Kunjungan Lapangan Bappenas
Instansi Pelaksana
PT. Pertamina Geothermal Energy
Lokasi Proyek
Provinsi Sumatera Selatan
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Jasa Konsutansi untuk Persiapan
Pekerjaan
b. Pelaksanaan FEED dan Persiapan
Dokumen Teknis Tender EPC
c. Pemboran Sumur
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Loan JICA IP-557 dengan instansi pelaksana PT Pertamina adalah pinjaman yang mendanai kegiatan LMB
unit 1 dan LMB Unit 2. Berikut status pelaksanaan masing-masing Kegiatan LMB Unit 1 dan LMB Unit 2;
Kegiatan Proyek LMB Unit 1. Konstruksi LMB Unit 1 telah mencapai 100%. Amandemen pinjaman SLA antara
Pemerintah Indonesia dan PT Pertamina (Persero) masih dalam proses. Surat Menteri Keuangan RI No. S-
468/MK.05/2020 tanggal 5 Juni 2020 perihal penyelesaian amandemen SLA-1242/DSMI/2011, PT Pertamina
(Persero) diminta untuk segera menyepakati harga Perjanjian Jual Beli Listrik (PJBL) PLTP Lumut Balai 1 dan
2 antara PT Pertamina (Persero) dengan PT PLN. Difasilitasi Dit.SMI, Ditjen Perbendaharaan, pada tanggal
23 Juni 2020 diadakan rapat Tindak Lanjut Penyelesaian Amandemen SLA 1242/DSMI/2011. Dalam rapat
tersebut PT PGE dan PT Pertamina (Persero) menyampaikan bahwa PLTP Lumut Balai 1 telah berproduksi,
namun Tanggal Operasi Komersial (TOK) dan Harga Jual sesuai HOA masih belum disepakati antara PT
PGE dan PT PLN. Atas hasil rapat ini Dit. SMI akan memfasilitasi rapat antara PT PGE, PT Pertamina (Persero),
dan PT PLN yang akan direncanakan dilaksanakan pada bulan Juli 2020.
Kegiatan Proyek LMB Unit 2. Bid. Launch tender EPCC PLTP Lumut Balai Unit 2 belum terlaksana karena
masih menunggu persetujuan Amandemen SLA 1242/DSMI/2011, terkait kesepakatan harga perjajian jual
beli listrik (PJBL) PLTP Lumut Balai 1 dan 2 antara PT Pertamina (Persero) dengan PT PLN. Dit. SMI akan
memfasilitasi rapat antara PT PGE, PT Pertamina (Persero), dan PT PLN yang akan direncanakan
dilaksanakan pada bulan Juli 2020.
PT. PERTAMINA
238
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Proyek LMB Unit 2
Proses tender diundur karena adanya No. S-
468/MK.05/2020 tanggal 5 Juni 2020 perihal
penyelesaian amandemen SLA -1242/DSMI/2011, PT
Pertamina (Persero) diminta untuk segera
menyepakati harga Perjanjian Jual Beli Listrik (PJBL)
PLTP Lumut Balai 1 dan 2 antara PT Pertamina
(Persero) dengan PT PLN.
Penyelesaian amandemen SLA 1242/DSMI/2011 ini
masih berproses. Sampai dengan Juni 2020 belum
ada kesepakatan. Dit. SMI akan memfasilitasi rapat
antara PT PGE, PT Pertamina (Persero), dan PT PLN
yang akan direncanakan dilaksanakan pada
bulan Juli 2020.
PT. PLN
241
ASAHAN HYDROELECTRIC POWER PLANT CONSTRUCTION III
Pembangunan PLTA Asahan 3
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
532
26/06/2008
s/d
31/12/2022
JPY 27.642,0 6.744,9
24,4
20.897,1
-58,4
4.866,3 1.381,6
28,4
USD 256,7 62,6 194,0 45,2 12,8
Sumber : PT PLN
Instansi Pelaksana
PT. PLN (Persero) Unit Pembangunan I
Lokasi Proyek
a. Kabupaten Asahan, Provinsi Sumatera
Utara
b. Kabupaten Toba Samosir, Provinsi
Sumatera Utara
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pembangunan PLTA Asahan 3
b. Consulting Services
c. Contingecies
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No. Paket
Kontrak
Keterangan No. Efektif Expired
Progres
Fisik
1 Engineering Service 162.PJ/61/DIR/2009
9 Juni 2010 4 Mei 2015 14 Sep 2020 46%
Supervisi Pekerjaan konstruksi ICB
dan lokal kontrak
2 LOT I Main Civil Work 0013.PJ/DAN.02.01/DIR/2019
15 Jan 2019 28 Mar 2019 27 Mar 2023
15%
Konstuksi sipil
3 LOT II Metal Works 0347.PJ/DAN.02.01/DIR/2019
4 September 2019 10 Okt 2019 13 Feb 2023 16%
Konstruksi/Instalasi Pintu air,
Penstock dll.
4 LOT III Electrical-
Mechanical Work
Open Bid. Doc
5 LOT IV Transmission
Line
Penyusunan Bid. Doc
Loan Eksisting JICA IP-532 diperkirakan akan habis pada kuartal IV 2021, sehingga dibutuhkan tambahan
pendanaan untuk penyelesaian proyek yang diperkirakan akan selesai pada Juni tahun 2023. Kekurangan
pendanaan ini disebabkan oleh tidak relevannya harga yang direncanakan pada tahun 2006 dengan
PT. PLN
242
kondisi saat ini. Untuk penyelesaian proyek diperlukan tambahan pendananaan. Usulan tambahan
pendanaan sedang dibahas di internal PLN dan dikoordinasikan dengan instansi terkait.
PT. PLN
243
GDAP (HULULAIS GEOTHERMAL POWER PLANT PROJECT (E/S))
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
572
14/10/2016
s/d
14/10/2025
JPY 657,0 232,6
35,4
424,4
-5,8
53,7 7,5
14,0
USD 6,1 2,2 3,9 0,5 0,1
Sumber : PT. PLN
Instansi Pelaksana
PT. PLN (Persero)
Lokasi Proyek
Provinsi Bengkulu
Ruang Lingkup (Pekerjaan dan Sasaran)
Pekerjaan Engineering Consulting Services
for Hululais Geothermal Power Plant Project
(E/S)
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan IP-572 (Engineering Consulting Services for Hululais Geothermal Power Plant Project (E/S)) tanda
tangan kontrak tanggal 11 November 2016. Nama kontraktor terpilih adalah ELC Electroconsult S.p.A joint
venture with NEWJEC Inc. Capaian fisik pekerjaan pada Triwulan I tahun 2020 ini sekitar 34%.
Salah satu syarat persetujuan dari Official Development Assistance (ODA) Loan Konstruksi dari Lender
proyek adalah approval AMDAL, AMDAL pembangkit dan AMDAL transmisi masih dalam proses. AMDAL
for Power Plant and T/L (September 2018). SKKLH (Surat Keputusan Kelayakan Lingkungan Hidup) telah
terbit, sampai dengan periode laporan ini masih menunggu izin lingkungan Transmisi dari OSS.
Terdapat 131 tapak tower yang akan dibebaskan dalam kegiatan ini. Pelaksanaan kegiatan telah
melaksanakan sosialisasi pengadaan tanah tapak tower tanggal 24 September 2019 sampai dengan 23
Oktober 2019. Musyawarah penetapan ganti rugi lahan tapak tower : 88/131 dan yang Sepakat : 42/131.
PT. PLN
244
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Administrasi
a. Amandemen Kontrak Konsultan untuk
Lingkup Pekerjaan Transmisi dan
Penambahan Man-month untuk
penyiapan dokumen persyaratan loan
terkait aspek lingkungan dan sosial.
b. Saat ini sedang dilakukan penyusunan Bid
Doc EPC Kontraktor untuk Pembangkit dan
Transmisi.
a. Pelaksana kegiatan berkoordinasi dengan
Konsultan, Bappenas dan JICA.
b. Berkoordinasi dengan pihak yang terkait.
PT. PLN
245
INDRAMAYU COAL FIRED POWER PLANT PROJECT (E/S)
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
561
23/10/2013
s/d
23/10/2022
JPY 1.727,0 711,4
41,2
1.015,6
-33,1
25,1 11,4
45,5
USD 16,0 6,6 9,4 0,2 0,1
Sumber : PT. PLN
Instansi Pelaksana
PT. PLN (Persero)
Lokasi Proyek
Indramayu, Provinsi Jawa Barat
Ruang Lingkup (Pekerjaan dan Sasaran)
Pekerjaan Engineering Services
pembangunan PLTU Indramayu 2x1000 MW
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Kegiatan IP-561 (Indramayu Coal Fired Power Plant PROJECT (E/S)) telah tanda tangan kontrak tanggal
28 Januari 2016. Kick of meeting dilaksanakan pada tanggal 24 Maret 2016. PT. PLN telah mengajukan
permohonan Penetapan Lokasi kepada BPPT (Badan Pelayanan Perizinan Terpadu) pada tanggal 23
Maret 2016. Berita Acara Konsultasi Publik telah dilaksanakan pada tanggal 24 Februari 2016. Total
bidang lahan yang akan digunakan dalam proyek ini adalah 602 bidang. Kegiatan IP- 561 ini adalah
kegiatan E/S, progres fisiknya pada periode laporan Triwulan I 2020 mencapai 29%.
Gugatan dari masyarakat Desa Mekarsari terhadap Izin Lingkungan PLTU Indramayu yang diterbitkan
Bupati Indramayu di PTUN Bandung, pada tanggal 02 Mei 2018 Penggugat mengajukan kasasi ke
Mahkamah Agung. Namun pada tanggal 19 September 2018 telah terbit putusan kasasi, putusannya
adalah menolak permohonan kasasi dari Pemohon Kasasi. Salinan putusan telah disampaikan kepada
PTUN Bandung tanggal 21 November 2018 yang berisi :
a. Menolak permohonan kasasi dari para Pemohon Kasasi.
b. Pemohon kasasi diwajibkan membayar biaya perkara dalam tingkat kasasi.
c. Ijin lingkungan PLTU Indramayu dinilai masih sah berlaku dan legal.
Pada tanggal 9 Mei 2019, pihak penggugat mengajukan memori Peninjauan Kembali (PK) terhadap
putusan Mahkamah Agung Republik Indonesia Nomor 465K/TUN/LH/2018. Pada tanggal 29 Mei 2019,
Advokat dan Konsultan Hukum PT PLN mengajukan Kontra Memori Peninjauan Kembali melalui
Kepaniteraan PTUN Bandung. Putusan terkait PK (PeninjauanKembali) Izin Lingkungan PLTU Indramayu
PT. PLN
246
telah terbit pada tanggal 03 Oktober 2019, yang hasilnya adalah menolak PK. Hasil keputusan MA RI No.
465K/TUN/LH/2018 terkait hasil kasasi gugatan Izin Lingkungan PLTU Indramayu menyatakan Izin
Lingkungan telah memenuhi ketentuan perundangan-undangan dan berlaku efektif. Salinan resmi PK Izin
Lingkungan telah disampaikan secara resmi oleh Mahkamah Agung pada 18 November 2019.
Jadwal COD PLTU Indramayu dimundurkan ke tahun 2026 sesuai RUPTL 2018-2027. PT PLN melakukan
penangguhan kontrak konsultan selama 2 tahun terhitung sejak 1 Maret 2020 (memorandum 4).
PT. PLN
247
JAVA-SUMATERA INTERCONECTION TRANSMISSION LINE PROJECT
Pembangunan Transmisi Interkoneksi Sumatera-Jawa
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
556
26/03/2013
s/d
30/04/2022
JPY 36.994,0 1.706,6
4,6
35.287,4
-75,2
0,0 0,0
0,0
USD 343,5 15,8 327,7 0,0 0,0
Sumber : PT PLN
Instansi Pelaksana
PT. PLN (Persero) Induk Pembangkit dan
Jaringan Jawa Bali dan Nusa Tenggara
Lokasi Proyek
a. Provinsi Sumatera Selatan
b. Provinsi Lampung
c. Provinsi Banten
d. Pulau Jawa
Ruang Lingkup (Pekerjaan dan Sasaran)
Pekerjaan Konstruksi Pembangunan
Jaringan HVDC Sumatera – Jawa dengan
kapasitas 500kV
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Surat Plt Direktur Utama PT PLN pada tanggal 18 september 2019 Nomor 4521/KEU.05.02/010000/2019
menyampaikan bahwa PLN memutuskan untuk tidak melanjutkan kegiatan IP-556. Keputusan ini diambil
setelah menerima hasil kajian yang dilakukan oleh ITB. PLN juga menyampaikan untuk melakukan
pengakhiran kontrak, pengakhiran loan, dan menghentikan semua proses pengadaan yang sedang
berjalan terkait proyek HVDC. Dalam surat tersebut PT PLN juga mengusulkan:
a. Tidak memperpanjang closing date atas loan agreement JICA IP-555 Engineering/Services for
Java Sumatera Interconnection Transmission Line Project (E/S HVDC).
b. Melakukan percepatan penutupan Loan Agreement JICA IP-556 Java Sumatera
Interconnection Transmission Line I.
c. Mengakhiri Loan Agreement JICA No. IP-570 Java Sumatera Interconnection Transmission Line
Project II.
PT. PLN
248
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
Surat Plt Direktur Utama PT PLN pada tanggal 18
september 2019 Nomor 4521/KEU.05.02/010000/2019
menyampaikan bahwa PLN memutuskan untuk
tidak melanjutkan kegiatan IP-555, penutupan LA IP-
556 dan mengakhiri Loan IP-570.
Berkoordinasi dengan pihak terkait penutupan
masa berlaku Loan IP-555, IP-556 dan IP-570.
PT. PLN
249
PANGKALAN SUSU COAL FIRED STEAM POWER PLANT
Proyek Pembangkit Listrik Tenaga Uap di Pangkalan Susu
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
RR
Tiongkok
EXIM PBC
330
03/06/2015
s/d
03/06/2020
USD 373,0 316,2 84,8 56,9 -16,7 55,5 55,5 100,0
Sumber : PT. PLN
Instansi Pelaksana
PT. PLN (Persero)
Lokasi Proyek
Kabupaten Langkat, Provinsi Sumatera
Utara
Ruang Lingkup (Pekerjaan dan Sasaran)
Konstruksi Pembangunan Pembangkit Listrik
Tenaga Uap Unit 3 dan 4 dengan
kapasitas 2 x 200 MW
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Pada TW II 2020, progres fisik proyek mencapai 100 % dengan progres keuangan hanya mencapai 85 %.
Permanent Jetty telah selesai dan telah beroperasi sejak Desember 2019. Setelah penarikan terakhir akan
terdapat sisa loan yang tidak terpakai sebesar USD 56 juta. Terdapat opsi reimbursement untuk
mengurangi commitment fee.
PT. PLN
250
PEUSANGAN HYDROELECTRIC POWER PLANT CONSTRUCTION PROJECT
Pembangunan PLTA Peusangan
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
538
29/01/2009
s/d
29/01/2021
JPY 26.016,0 24.123,0
92,7
1.893,1
-2,4
2.500,9 1.042,6
41,7
USD 241,6 224,0 17,6 23,2 9,7
Power Station
Sumber : Kunjungan Lapangan Bappenas
Instansi Pelaksana
PT. PLN (Persero) Unit Induk Pembangunan I
Lokasi Proyek
Provinsi Aceh
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pembangunan PLTA Peusangan 1
Peusangan 1 HEPP (2 x 22.5 MW) dan
Peusangan 2 HEPP (2 x 21.5 MW)
b. Pekerjaan Konsultan
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Proyek IP-538 ini tediri dari delapan paket kegiatan. Seluruh paket kegiatan sudah terkontrak. Sampai
dengan periode laporan Triwulan II 2020, pelaksana kegiatan telah menyelesaikan 3 paket kontrak yaitu
Paket Lot 2 Distribution Line South Takengon, Paket Lot 3 Distribution Line North Takengon dan Paket Lot-4
Control Equipment. Lima paket kontrak lainnya sedang dalam pelaksanaan.
Berikut capaian fisik pekerjaan kegiatan IP-538 per Triwulan II 2020:
No Paket Kontrak Keterangan
No. Efektif Expired Progres
1 Engineering
Services
012.PJ/61/DIR/2009
23 Februari 2009 24 Nov 2008
19 Feb
2021 99%
2 Lot I – Main Civil
Works
131.PJ/041/DIR/2011
18 Maret 2011 3 Mei 2011 30 Jun 2022 84%
Amandemen EoT
ditandatangani
pada 19 September
2018
3 Lot II – Metal
Works
016.PJ/041/DIR/2012
13 Februari 2012 8 Mar 2012 7 Mar 2018 76%
Proses
penandatanganan
amandemen EoT S/d
29 September 2022
4
Lot III –
Electromechanic
al Works
0130.PJ/041/DIR/2013
28 Agustus 2013 21 Okt 2013 30 Okt 2022 59%
Amandemen No.4
EoT ditandatangani
pada 16 April 2019
5 Lot IV –
Transmission Line
020.PJ/041/DIR/2013
13 Februari 2013 31 Mar 2013
30 Nov
2018 100%
6 Lot 2 – Distribution 320.PJ/613/PKITSUM 28 Nov 2012 16 Sep 100%
PT. PLN
251
Line South
Takengon
I/2012
28 November 2012
2013
7
Lot 3 – Distribution
Line North
Takengon
321.PJ/613/PKITSUM
I/2012
28 November 2012
28 Nov 2012 15 Mar
2014 100%
8 Lot 4 – Control
Equipment
322.PJ/613/PKITSUM
I/2012
28 November 2012
3 Mar 2013 28 Des 2018 100%
Area Proyek PLTA Peusangan 1&2 terletak di zona batuan yang sangat rapuh dalam Zona Great
Sumatera Fault (hasil studi setelah gempa bumi pada 2 Juli 2013). Dari hasil studi tersebut dan
berdasarkan hasil penggalian tunnel (sekitar No. 1 Powerhouse) diketahui bahwa No. 1 P/H Cavern
terletak diantara 2 fault. Oleh karena itu dilakukan perubahan desain untuk Underground Power Station
No.1 dengan mengubah dimensi Power Station dan menambah penguatan pada dinding setebal 1
meter. Perubahan desain ini mengakibatkan perubahan project completion schedule No.1 P/S menjadi
30 Oktober 2022 dan terdapat juga penambahan biaya.
Penambahan biaya. Loan IP 538 diperkirakan habis pada pertengahan tahun 2020, dan loan expired
pada Januari 2021. Terkait penambahan biaya PT PLN telah menyampaikan perhitungan kebutuhan
tambahan dana penyelesaian proyek dan telah mendapatkan rekomendasi dari BPKP dengan nilai
tambahan sebesar 14.026 juta JPY (eq. 1,65 Triliun IDR). Bappenas telah menyampaikan Pre-Request
kepada Japan Embassy untuk Usulan Additional Loan PLTA Peusangan (surat nomor 01054/D.8/01/2020,
tanggal 24 Januari 2020). Kemudian Bappenas meminta PLN untuk menyampaikan revisi Explanatory Note
Additional Loan, dan PLN telah menyampaikan revisi melalui surat nomor 3641/KEU.01.08/010100/2020
tanggal 30 Maret 2020. Bappenas telah mengirimkan pre-request additional loan kepada pemerintah
Jepang senilai USD 131.045.000 melalu surat Deputi Pendanaan Pembangunan Nomor 04930/D.8.05/2020
tanggal 4 Mei 2020.
Efek dari pandemi Covid-19 terhadap pelaksanaan konstruksi PLTA Peusangan 1&2 dapat disampaikan
sebagai berikut :
a. Adanya penurunan capaian progres pada pekerjaan akibat pemberlakuan pembatasan jam
malam oleh Forkopimda melalui edarannya tanggal 29 Maret 2020. Atas instruksi ini dampak
signifikan terjadi pada pekerjaan pada jalur kritis No.1 Power House yang semula dapat bekerja
shift malam, hanya menjadi shift siang;
b. Penarikan personel konsultan berdasarkan instruksi Pemerintah Jepang untuk personel yang
berusia 70 tahun ke atas dan personel dengan riwayat penyakit, terdapat sekitar 5 orang
personel ekspatriat yang sudah pulang ke negaranya. Dengan demikian, kegiatan supervisi
konstruksi dan desain dilaksanakan dengan penyesuaian man power di lapangan.
PT. PLN
252
TAKALAR COAL FIRED STEAM POWER PLANT
Proyek Pembangkit Listrik Tenaga Uap di Takalar
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
RR
Tiongkok
EXIM PBC
329
29/04/2015
s/d
29/04/2020
USD 241,0 229,9 95,4 11,1 -8,0 0,0 0,0 0,0
Koordinasi antara Bappenas, PT PLN dan Pelaksana Proyek di
PLTU TAKALAR
Sumber : Kunjungan Lapangan Bappenas
Instansi Pelaksana
PT. PLN (Persero)
Lokasi Proyek
Kabupaten Takalar, Provinsi Sulawesi
Selatan
Ruang Lingkup (Pekerjaan dan Sasaran)
Konstruksi Pembangunan Pembangkit Listrik
Tenaga Uap dengan kapasitas 2 x 100 MW
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Pelaksanaan pekerjaan proyek ini sudah selesai dengan rincian sebagai berikut :
Unit #1
Unit #2
1. COD : 19 Desember 2017
2. FAC : 19 Desember 2018
1. COD : 14 Februari 2018
2. FAC : 29 Agustus 2019
PT. PLN
253
TULEHU GEOTHERMAL POWER PLANT PROJECT (E/S)
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA)
IP-
560
23/10/2013
s/d
23/10/2022
JPY 5.104,0 3.663,2
71,8
1.440,9
-2,5
48,8 45,9
94,1
USD 47,4 34,0 13,4 0,5 0,4
Pelaksanaan pekerjaan waterline system (Sumber : PT. PLN)
Instansi Pelaksana
PT. PLN (Persero)
Lokasi Proyek
Tulehu, Provinsi Maluku
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Pekerjaan Engineering Services untuk
pembangunan PLTP TULEHU dengan
kapasitas 2x10 MW
b. Pekerjaan Driling
c. Pekerjaan Konsultansi
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Pekerjaan Tulehu Geothermal Power Plant Project (E/S) Loan JICA IP-560 terdiri dari 2 kontrak paket
pekerjaan yaitu Paket Engineering Services dan Paket Kontrak IPM Drilling. Hingga periode akhir Maret
2020 capaian fisik masing-masing paket adalah Paket Engineering Services sebesar 41% dan paket IPM
Drilling sebesar 100%.
Pekerjaan Selesai :
1. Pengeboran:
a. Pengeboran sumur TLU-D-01 dilakukan pada 27 Juni 2017-17 Agustus 2017 (52 hari) dengan
kedalaman 1.712 m, maksimum T 140°C, dan permeabilitas tinggi.
b. Pengeboran sumur TLU-B-01 dilakukan pada 1 September 2017-28 September 2017 (27 hari)
dengan kedalaman 1.800 m, maksimum T 205°C, dan permeabilitas rendah.
c. Pengeboran sumur TLU-C-01 dilakukan pada 12 Oktober 2017-15 November 2017 (35 hari)
dengan kedalaman 1.900 m, maksimum T 184°C, dan permeabilitas rendah.
d. Pengeboran sumur TLU-B-02 dilakukan pada 28 Desember 2017-30 Januari 2018 (34 hari) dengan
kedalaman 1.800 m, maksimum T 213°C dan permeabilitas rendah.
2. Uji Produksi :
a. Uji Produksi TLU-D-01 dilakukan pada 5-24 Februari 2018. Hasil uji tersebut adalah sumur dapat
melakukan discharge fluida dengan steam flow rate 1 t/h dan brine flow rate 60 t/h pada
tekanan wellhead 3 bara, namun terdapat scaling kalsit pada flow lines.
PT. PLN
254
b. Uji Produksi TLU-B-02 dilakukan pada 5 Maret - 3 April 2018. Hasil uji tersebut adalah sumur dapat
melakukan discharge fluida dengan total mass flow rate 93,6 t/h pada tekanan wellhead 3 bara,
steam flow rate 11,7 t/h dan brine flow rate 81,9 t/h.
c. Eksplorasi yang dihasilkan diperkirakan sekitar 5-6 Megawatt (MW) jauh dari rencana yang
dituangkan dalam RUPTL 2x10 MW. Kepastian kelanjutan proyek Tulehu masih dilakukan
pembahasan di BOD berdasarkan hasil Review Preliminary Feasibility Study oleh Konsultan LAPI
ITB, pelaksanaan review studi tambahan geosains untuk memastikan titik target pengeboran
selanjutnya.
Preliminary Feasibility Study Report telah disubmit oleh Konsultan dan dipresentasi kepada Management
PLN. Terhadap hal tersebut, Management PLN memutuskan untuk dilakukan Peer Review. Keputusan
pada saat Rapat Direksi terkait pengembangan PLTP Tulehu adalah melanjutkan proyek PLTP Tulehu
dengan pola kemitraan dan menghentikan sisa kontrak konsultan West Jec dan sisa undisbursed loan JICA.
PT. PLN
255
UPPER CISOKAN PUMPED STORAGE HYDRO ELECTRICAL POWER (1.040 MW)
Peningkatan kapasitas puncak yang signifikan dari sistem pembangkit listrik di Jawa dan Bali melalui cara yang
berkelanjutan secara lingkungan dan sosial serta memperkuat kapasitas Unit Pelaksana Kegiatan dalam
perencanaan, pengembangan, dan operasi pembangkit listrik tenaga air
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8057-
ID
01/05/2012
s/d
30/11/2020
USD 44,0 35,8 81,3 8,2 -13,8 0,0 0,0 0,0
Pembangunan PLTA Cisokan
Sumber : www.pln.co.id
Instansi Pelaksana
PT. PLN (Persero)
Lokasi Proyek
Provinsi Jawa Barat/Kabupaten Bandung
Barat dan Kabupaten Cianjur
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Bagian 1: Pembangunan Pembangkit
Listrik Tenaga Air Upper Cisokan
b. Bagian 2: Pengelolaan Dampak Sosial
dan Lingkungan
c. Bagian 3: Studi Kelayakan dan
Persiapan dari Dokumen Desain dan
Lelang untuk Proyek Pembangkit Listrik
Tenaga Air Matenggeng dan
Pengembangan Kapasitas terkait
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD juta)
Keuangan Fisik (%)
Realisasi
Kumulatif
(USD juta)
TA 2020 (USD Juta) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1
E/S for Pre
Construction &
Construction
Supervision
Phase of Upper
Cisokan Pumped
Storage Power
Plant
20,09 6,91 - - 0,00 - loan cancel loan cancel
2 Package 1 - Lot
1A Upper & 98,25 9,80 - - 0,00 - loan cancel - loan cancel
PT. PLN
256
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD juta)
Keuangan Fisik (%)
Realisasi
Kumulatif
(USD juta)
TA 2020 (USD Juta) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
Lower DAM
3 Package 1 - Lot
1B Upper &
Lower DAM
130,82 13,04 - - 0,00 - loan cancel loan cancel
4
Package 2 -
Pump-Turbine,
Generator-Motor
and Auxiliary
Equipment
- - - - 0,00 - loan cancel loan cancel
5 Package 3 - 500
kV Transmission
Line
- - - - 0,00 - loan cancel loan cancel
6 Package 4 -
Hydraulic Metal
Works
35,10 - - - 0,00 - loan cancel loan cancel
7
Project Review
Panel (PRP) dan
ESP
Environmental &
Social Panel
(ESP)
1,76 1,06 - - 0,00 - - -
8
Pre-Feasibilty
Study Update
And Feasibility
Level Design
Matenggeng
Pumped Storage
Power Project
3,17 4,92 - - 0,00 - 100.00% 100.00%
9 Consulting for
ESIA for
Matenggeng
3,17 0,048 - - 0,00 - 30.00% 30.00%
Progres pekerjaan.
1. PLTA Matenggeng telah selesai melakukan update Feasibility Study (100%).
2. Paket Consulting for ESIA for Matenggeng mengalami kendala konsultan tidak perform sehingga
baru mencapai 30% penyelesaian pekerjaan.
3. Akan dilakukan pengadaan ulang Konsultan ESIA dengan durasi pengerjaan selama 12 bulan
(target selesai November 2021).
4. Konsultan Environmental and Social Panel (ESP) juga akan dikontrak setelah Konsultan ESIA
terkontrak, dengan masa pengerjaan mengikuti periode kontrak Konsultan ESIA.
5. DED dan Dokumen Tender saat ini sedang menunggu penerbitan NoL dari Bank Dunia.
6. Consultant of Design and Tender Document Preparation Stage I direncanakan terkontrak pada
Februari 2021 dengan durasi pekerjaan selama 8 bulan sehingga ditargetkan selesai pada
Oktober 2021.
PT. PLN
257
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Pengadaaan barang dan jasa
Paket kontrak ESIA mengalami kendala yaitu
konsultan tidak perform sehingga diakukan
pengadaan ulang.
Lain-lain
a. Pengerjaan ESIA membutuhkan waktu
tambahan sehingga PT PLN mengajukan
perpanjangan hingga Desember 2022.
b. Berdasarkan arahan dari Direksi, Paket
Pekerjaan Capacity Building tidak
dilaksanakan menggunakan anggaran
Loan IBRD 8057-ID.
c. Konsultan ESIA dan AMDAL ditender ulang
sehingga ESP tidak bisa bekerja karena
data tidak bisa diberikan.
Pelaksanaan tender ulang untuk ESIA telah
dilakukan evaluasi teknis dan saat ini sedang
dimintakan NoL dari WB, setelah itu evaluasi harga
dst.
a. Rekomendasi perpanjangan loan telah
dikirimkan dari Bappenas kepada
Kementerian Keuangan, saat ini sedang
menunggu feedback dari Kementerian
Keuangan.
b. Paket Pekerjaan Capacity Building
dicancel.
PT. SARANA MULTI INFRASTRUKTUR
261
ADDITIONAL FINANCING FOR INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT
Penguatan dan pengembangan lanjutan dari kerangka kerja kelembagaan sektor keuangan untuk
memfasilitasi pembiayaan dari proyek infrasruktur komersil, sehingga meningkatkan penyediaan infrastruktur
swasta di Indonesia
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8715-
ID
26/09/2017
s/d
28/02/2022
USD 200,0 74,8 37,4 125,3 -
25,0 61,7 33,2 53,7
Instansi Pelaksana
PT. Sarana Multi Infrastruktur
Lokasi Proyek
Provinsi DKI Jakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
Establishment of Non-bank Financial
Institution
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Progres pekerjaan.
1. Dari alokasi dana sebesar Rp 600 Milyar, sebesar Rp 583 Milyar sudah terserap yang digunakan untuk
pengerjaan jalan Tol Pemalang dengan Batang.
2. Penetapan suku bunga berakibat pada operating cost yang mengakibatkan PT.SMI mengajukan
penurunan suku bunga ke Kementerian Keuangan. Saat ini IIF masih menunggu hasil kajian dari
konsultan PWC yang baru memberikan 1st draft.
PT. SARANA MULTI INFRASTRUKTUR
262
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1
Establishment of
Indonesia Infrastructure
Finance
- 41,66 20,8 61,71 33,15 53,7 - - -
Progres pekerjaan.
a. Dari alokasi dana sebesar Rp 600 Milyar, sebesar Rp 583 Milyar sudah terserap yang digunakan untuk
pengerjaan jalan Tol Pemalang dengan Batang.
b. Penetapan suku bunga berakibat pada operating cost yang mengakibatkan PT.SMI mengajukan
penurunan suku bunga ke Kementerian Keuangan. Saat ini IIF masih menunggu hasil kajian dari
konsultan PWC yang baru memberikan 1st draft.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
Penetapan tingkat suku bunga SUN seri benchmark
20 tahun dan berubah setiap tahun dirasakan relatif
mahal serta menyulitkan IIF dalam menentukan
margin yang dapat diterima oleh IIF saat digunakan
untuk pembayaran ke pihak peminjam IIFF. Hal ini
karena IIF tidak dapat menerapkan mekanisme
penentuan suku bunga yang sama kepada pihak
debitur, sehingga terdapat kemungkinan suku
bunga yang dibebankan IIF di masa depan dapat
lebih tinggi daripada suku bunga yang dibebankan
oleh IIF kepada pihak debitur.
Menunjuk konsultan untuk melakukan kajian
dampak tingkat suku bunga yang selanjutnya akan
dijadikan sebagai acuan untuk mengusulkan
penyesuaian tingkat bunga.
PT. SARANA MULTI INFRASTRUKTUR
263
REGIONAL INFRASTRUCTURE DEVELOPMENT FUND (RIDF)
Bantuan modal untuk pembiayaan infrastruktur dan pengembangan kapasitas serta pendampingan kepada
Pemerintah Daerah yang layak memenuhi kriteria
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Bank
Dunia
8714-
ID
25/09/2017
s/d
31/12/2020
USD 100,0 33,1 33,1 66,9 -51,5 4,2 0,0 0,0
AIIB 012-
1-IDN
25/09/2017
s/d
31/12/2020
USD 100,0 33,0 33,0 67,0 -51,6 4,2 0,0 0,0
Instansi Pelaksana
PT. Sarana Multi Infrastruktur
Lokasi Proyek
Provinsi DKI Jakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Capital Support for RIDF
b. RIDF Project Development Facility
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
No
Paket Kontrak/
Komponen
Nilai
Kontrak
(USD Juta)
Keuangan Fisik (%)
Realisasi Kumulatif
s/d Desember
2019 (USD Juta)
TA 2020 (Juta USD) Realisasi
Kumulatif
TA 2020
Nilai % Target Realisasi % Target Realisasi
1
Regional Infrastructure
Development Fund
Bank DUnia
- 33,11 33,11 4,22 0 0 - - -
Progress Kegiatan.
PT. SARANA MULTI INFRASTRUKTUR
264
Komponen 1
RIDF telah menyalurkan fasilitasnya untuk 6 proyek di 4 Pemda untuk membiayai pembangunan 3 pasar, 2
rumah sakit, dan 1 proyek jalan. Sementara itu, telah disiapkan 5 pipeline dan 3 prospek pipeline di 8
Pemda untuk membiayai pembangunan 5 rumah sakit, 1 pasar, 1 proyek jalan, dan 1 proyek di sektor
pariwisata.
8 pipeline (14 fasilitas) tersebut akan diproses pada tahun 2020 dan diproyeksikan akan selesai
konstruksinya pada bulan September 2022.
Komponen 2
Sampai dengan Maret 2020, nilai TA untuk 21 proyek yang telah mendapatkan persetujuan adalah sebesar
Rp 32,5 Milyar dari total alokasi untuk seluruh pipeline sebesar Rp 39,9 Miliar.
Dari 21 proyek tersebut, 8 proyek telah menyelesaikan output yang diharapkan, 7 proyek dalam tahap
implementasi TA, dan 6 proyek lainnya dalam tahap persiapan.
Desain Kegiatan
Direncanakan akan dilakukan penambahan Komponen ERRC yang merupakan arahan dari Menteri
Keuangan kepada PT.SMI sebagai upaya menyediakan alternatif sumber pembiayaan kepada Pemda
untuk mengatasi pandemi Covid-19 dan pemulihan setelah pandemi Covid-19 berakhir.
Status Terakhir Proyek
Terdapat rencana perpanjangan loan hingga tahun 2022 dikarenakan persiapan proyek yang melebihi
waktu yang telah ditentukan.
Direktur Utama PT. Sarana Multi Infrastruktur (Persero) melalui suratnya Nomor: S-614/SMI/DU/0520 tanggal
14 Mei 2020 menyampaikan usulan amandemen Pinjaman Regional Infrastructure Development Fund
(RIDF) sebagai berikut:
a. Perpanjangan Closing Date Pinjaman RIDF selama 24 bulan, dari semula 31 Desember 2020
menjadi 31 Desember 2022 dalam rangka mengakomodasi penyelesaian konstruksi proyek yang
sedang berjalan dan pemanfaatan secara maksimal pendanaan melalui proyek-proyek dalam
pipeline;
b. Penghapusan klausul terkait pengenaan tingkat suku bunga SLA dalam Loan Agreement RIDF
IBRD dan AIIB dalam rangka mengakomodasi penyesuaian suku bunga SLA yang masih dalam
proses di internal Kementerian Keuangan;
c. Penambahan Komponen Early Response and Recovery Component (ERRC) dalam rangka
membantu pemerintah daerah dalam penanganan krisis akibat dampak wabah COVID-19.
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Lain-lain
Covid-19 menyebabkan lambannya penyelesaian
konstruksi di beberapa daerah.
Pipeline RIDF terhambat prosesnya untuk memasuki
tahap konstruksi karena Covid-19.
Menunggu Pandemi Covid-19 berakhir.
PEMERINTAH PROVINSI DKI JAKARTA
267
CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT PHASE I (STAGE II)
Tambahan Biaya Pembangunan MRT Daerah Jakarta Tahap I (Jalur Selatan-Utara, Korider Lebak Bulus –
Bundaran Hotel Indonesia)
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA) IP-571
31/03/2016
s/d
31/03/2022
JPY 75.218,0 64.208,8
85,4
11.009,2
14,5
2.594,6 1.258,5
48,5
USD 698,4 596,2 102,2 24,1 11,7
Pekerja mengerjakan proyek pembangunan stasiun layang MRT di
Jalan Sisingamangaraja
Sumber : www.jakartamrt.co.id
Instansi Pelaksana
PT. MRT Jakarta
Lokasi Proyek
Provinsi DKI Jakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
Pengadaan Konsultan dan Kontraktor
untuk Pembangunan Jakarta MRT System
Project
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Pinjaman LA. No. IP-571 merupakan pendanaan lanjutan yang berdampak kepada keberlanjutan
pembangunan konstruksi MRT Tahap I (yang didanai LA No. IP-554). Untuk konstruksi Fase I Lebak Bulus-
Bundaran HI telah selesai. Pinjaman IP-571 saat ini melaksanakan pekerjaan fase II yaitu Bundaran HI -
Kota). Berikut kemajuan pelaksanaan pekerjaan Konstruksi MRT dilapangan.
Engineering Study Fase - 2 (Bundaran HI - Kampung Bandan)
Pembangunan Fase 2 MRTJ dibagi dalam 7 (tujuh) paket pekerjaan atau biasa disebut dengan contract
package (CP). Penjelasan paket tersebut adalah sebagai berikut:
Contract Packages Jakarta MRT Phase II
CP 200 D-wall RSS at Monas Park
CP 201 Bundaran HI – Harmoni (2 Under Ground Stations, C&C tunnel and
Bored tunnel)
CP 202 Harmoni – Glodok (3 UG Stations, Bored tunnel)
CP 203 Glodok – Kota (2 UG stations, Bored tunnel, C&C tunnel)
PEMERINTAH PROVINSI DKI JAKARTA
268
Contract Packages Jakarta MRT Phase II
CP 204
Kota-Kampung Bandan (TransitionUG to AG, AG station & Depot)
Catatan: untuk paket ini masih menunggu keputusan Pemerintah
Provinsi DKI
CP 205 Railway Systems & Trackwork
CP 206 Rolling Stock
Analisis Dampak Lingkungan (AMDAL)
Terkait kegiatan pemutakhiran dokumen AMDAL, dapat disampaikan bahwa saat ini survei AMDAL telah
dilakukan di semua lokasi pengambilan sampel, studi dan dokumen telah siap dan final. Saat ini sedang
menunggu kelengkapan administrasi untuk bisa segera mendaftarkan ke sidang AMDAL. Sidang AMDAL
dijadwalkan akan dilakukan setelah kelengkapan administrasi terkumpul seluruhnya.
PEMERINTAH PROVINSI DKI JAKARTA
269
CONSTRUCTION OF JAKARTA MASS RAPID TRANSIT PROJECT (PHASE 2) (I)
Pembangunan MRT Daerah Jakarta
Lender Kode
Loan Masa Laku
Mata
Uang
Nilai
Pinjaman
(Juta)
Penarikan
Kumulatif Pinjaman
Belum
Ditarik
(Juta)
PV
TA 2020 (Juta)
(Juta) % Target Realisasi %
Jepang
(JICA) IP-578
24/04/2019
s/d
23/04/2025
JPY 70.021,0 16.990,9
24,3
53.030,2
4,5
16.990,9 4.601,7
27,1
USD 650,2 157,8 492,4 157,8 42,7
Sumber : PT MRT Jakarta
Instansi Pelaksana
PT. MRT Jakarta
Lokasi Proyek
Provinsi DKI Jakarta
Ruang Lingkup (Pekerjaan dan Sasaran)
a. Construction Works (Phase 1 VO &
PA)
b. Construction Works (Phase 2)
c. Construction Managegement
Consultant Service
d. Consultant (Phase 2 Bund HI- Kp
Bandan)
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Perkembangan konstruksi fase 2
Perkembangan konstruksi CP200 yang telah dilakukan, antara lain:
a. Progres fisik per Juni 2020 adalah sekitar 98%.
b. Pekerjaan yang perlu dilakukan antara lain: cleaning area site, pembersihan saluran drainase dan
demobilization equipment dan container.
c. Pekerjaan fisik yang telah dilakukan:
No Nama pekerjaan status Keterangan
1 Pekerjaan Guide Wall selesai
2 Penanaman Pohon Pengganti Selesai
3 Rebar Fabrication selesai
4 Penggalian D-wall selesai (34/34) Panel
5 Pengecoran D-wall selesai (34/34) Panel
6 Demobilization Dalam proses Dalam proses
PEMERINTAH PROVINSI DKI JAKARTA
270
d. Perizinan yang telah diselesaikan:
No Item Perizinan Related Authority Status
1 Izin melaksanakan pekerjaan UPK Monas Approved
2 Izin loading UPK Monas Approved
3 Izin pemotongan pohon Dinas Kehutanan dan UPK Monas Approved
4 Izin penggunaan tanah
galian
Biro Penataan Kota dan Lingkungan
Hidup
Approved
Selain itu, terkait revisi penetapan lokasi trase MRT Phase 2, PT MRT Jakarta telah bersurat kepada Gubernur
DKI Jakarta per tanggal 23 Juli 2019 No. 1480/DIR-MRT/VII/2019 perihal permohonan penerbitan
pembaruan/revisi penetapan lokasi trase untuk pembangunan jalur MRT Jakarta Fase 2 koridor Bundaran
HI-Kota, serta bersurat kepada Kepala Dinas Perhubungan Provinsi DKI Jakarta per tanggal 23 Juli 2019 No.
1503-1/DIR-MRT/VII/2019 perihal penyampaian pembaruan dokumen kajian teknis pengadaan lahan untuk
MRT Jakarta Fase 2 koridor Bundaran HI-Kota. Dengan kedua surat ini, kami berharap agar perubahan
kebutuhan lahan dapat segera diakomodasi melalui perubahan dokumen penlok.
Depo MRT Jakarta Fase 2
Terdapat permasalahan hukum pada lahan Kampung Bandan antara PT KAI dan Pihak ketiga, adanya
rencana PT KAI untuk memanfaatkan lahan tersebut sebagai stabling yard, maka PT MRTJ membutuhkan
arahan atau instruksi segera dari Pemprov DKI Jakarta terkait keputusan lokasi depo MRT fase II, termasuk
arahan studi alternative lokasi depo selain Kampung Bandan. Sampai dengan Juni 2020, masih
dilaksanakan study terkait alternative lokasi depo selain Kampung Bandan.
KEMENTERIAN PERTAHANAN
275
PENGADAAN ALAT UTAMA SISTEM PERSENJATAAN KEMENTERIAN PERTAHANAN
Unit Organisasi Jumlah Alokasi
(juta USD)
Total Komitmen
Pinjaman
(juta USD)
Penarikan
Kumulatif
(juta USD)
TA 2020
(juta USD)
Target * Realisasi**
Mabes TNI 71,0 60,2 24,3
568,2
24,4
TNI AD 1.223,6 1.048,5 578,4 150,6
TNI AL 1.619,3 1.650,2 1.315,2 155,6
TNI AU 880,2 748,,3 313,5 149,4
Total 3.794,0 3.507,2 2.231,4 568,2 480,2
Catatan :
*) Merupakan target penarikan pinjaman luar negeri untuk kegiatan yang efektif.
**) Data realisasi merupakan data LPKPHLN Kementerian Pertahanan (SP4H)
Instansi Pelaksana
Kementerian Pertahanan
Lokasi Proyek
Seluruh Indonesia
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Pada Triwulan II Tahun 2020 terdapat 36 kegiatan Alat Utama Sistem Persenjataan (Alutsista) di
Kementerian Pertahanan yang menjadi objek pemantauan. Total komitmen pinjaman luar negeri dari
kegiatan-kegiatan tersebut adalah USD 3.507,2 juta. Sampai dengan akhir bulan Juni 2020 jumlah
kumulatif pinjaman yang terserap adalah USD 2.231,4 juta. Sementara jumlah pinjaman yang terserap di
tahun 2020 saja adalah USD 480,2 juta atau sebesar 84,5,2% dari target di tahun 2020.
Selama bulan Januari - Maret 2020, Kementerian Pertahanan berhasil menyelesaikan 5 kegiatan, yakni:
a. MLM KRI Kelas Korvet Tahap II (TNI AL)
b. Short Range Air Defence (TNI AD)
c. Missile MLRS Avibras/Astros II (TNI AD)
d. Upgrade & Retrofit Pesawat Angkut C-130 (TNI AU)
e. AWS & Air Weapon Scoring System (TNI AU)
Pada Triwulan II Tahun 2020 terdapat 21 kegiatan yang belum efektif dengan nilai kegiatan sebesar USD
5.224,2 juta. Dari 21 kegiatan tersebut, 1 kegiatan sedang dalam proses lelang, 1 kegiatan sedang proses
carry over Renstra 2020-2024, 16 kegiatan dalam proses loan agreement, 1 kegiatan dalam proses revisi
DIPA, dan 2 proses buka L/C.
Tahun Alokasi Unit Organisasi Jumlah Kegiatan Nilai Kegiatan
(juta USD)
2015-2019
MABES TNI 2 64.0
TNI AD 5 548.5
TNI AL 8 2.227.7
TNI AU 6 2.384.0
Total 21 5.224.2
KEPOLISIAN REPUBLIK INDONESIA
279
PENGADAAN ALAT UTAMA KHUSUS KEPOLISIAN REPUBLIK INDONESIA
Sumber
Pinjaman
Tahun
Alokasi
Jumlah Alokasi
(Juta USD)
Total Komitmen
Pinjaman
(Juta USD)
Penarikan
Kumulatif
(Juta USD)
TA 2020
(Juta USD)
Target Realisasi
LPKE/KSA 2009 37,0 31,4 28,3
158,9
6,1
LPKE/KSA 2011 44,9 44,1 38,2 1,6
LPKE/KSA 2016 569,5 484,1 247,8 46,3
Total 651,4 559,6 314,3 158,9 54,0
Instansi Pelaksana
Kepolisian Republik Indonesia
Lokasi Proyek
Seluruh Indonesia
Kemajuan Pelaksanaan Kegiatan dan Pencapaian Indikator Kinerja
Pada triwulan II tahun 2020 Kepolisian Republik Indonesia memiliki 20 kegiatan yang menjadi obyek
pemantauan dengan total komitmen pinjaman sebesar USD 559,6 juta. Sepanjang tahun 2020, jumlah
kumulatif pinjaman yang terserap adalah sebesar USD 314,3 juta. Realisasi pinjaman selama tahun 2020
adalah sebesar USD 54,0 juta atau 34,0% dari target penyerapan pinjaman di tahun 2020.
Dari 20 kegiatan yang dipantau sampai akhir triwulan II tahun 2020 terdapat 8 kegiatan yang telah
selesai, 13 kegiatan dalam proses pelaksanaan, dan 4 kegiatan dalam persiapan FAT.
Kegiatan-kegiatan yang berhasil diselesaikan POLRI selama tahun 2020 adalah :
a. Pengadaan Kendaraan Patroli Cepat Sabhara (KSA 2016)
b. Armoured Water Cannon (AWC) Sabhara (KSA 2016)
c. Puslabfor Mabes POLRI (KE 2009)
d. Teknologi Pendidikan (KSA 2011)
e. Peralatan Puslabfor (KSA 2011)
f. Peralatan KHusus Satwa (KSA 2016)
g. Peralatan KBR (KSA 2016)
h. Peralatan Security Barier (KSA 2016)