81
Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2012-13 (Rs in lakhs) Model-I (13) Agra Phy Fin Unit Cost Phy Fin Unit Cost Phy Fin Phy Fin 24 KGBV Financial Provision perschool Non Recurring (One time grant) 24.01 Construction of Building New 0 28.20000 65.860 0 0.00000 0 0.00000 0 28.20000 24.02 Construction of Building (Variation on account of change of unit cost) (old) 0 6.05000 0 0.00000 0 0.00000 0 6.05000 Sub Total 0.00 34.25000 65.86 0.00000 0.00000 0 34.25000 24.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000 24.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 4.50000 0 0.00000 0 0.00000 0 4.50000 Sub Total 0.00 4.50000 3.00 0.00000 0.00000 0 4.50000 24.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000 24.06 Boring/Handpump (minimum rates prescribed by State Drinking Water Department subject to a ceiling of Rs. 1.00 lakhs). 0 2.00000 0 0.00000 0 0.00000 0 2.00000 Sub Total 0.00 2.00000 1.00 0.00000 0.00000 0 2.00000 24.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000 24.08 Electricity/Water Charges (Variation on account of change of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000 Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000 24.09 Furniture/Equipment(including Kitchen equipment) New 0 21.76000 3.000 0 0.00000 0 0.00000 0 21.76000 24.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.04900 1.500 0 0.00000 1.50 0 0.00000 0 0.04900 Sub Total 0.00 21.80900 4.50 0.00000 0.00000 0 21.80900 24.11 Teaching learning material and equipment including library books(New) 8 20.59000 3.500 0 0.00000 0 0.00000 0 20.59000 24.12 Teaching learning material and equipment including library books 0 8.68700 0 0.00000 1.75 0 0.00000 0 8.68700 Sub Total 8.00 29.27700 3.50 0.00000 0.00000 0 29.27700 24.13 Bedding 0 6.00000 0.750 0 0.00000 0.38 0 0.00000 0 6.00000 24.14 Replacement of Bedding (once in 3 Year) 3 2.27900 0.750 0 0.00000 0 0.00000 0 2.27900 Sub Total 3.00 8.27900 1.50 0.00000 0.00000 0 8.27900 TOTAL 100.11500 80.36 0.00000 0.00000 100.11500 Recurring Costs per annum 24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40000 0 0.00000 13 140.40000 24.18 Stipend for girl student per month @ Rs. 50 0.600 13 7.80000 0 0.00000 13 7.80000 24.19 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 13 7.80000 0 0.00000 13 7.80000 24.2 Examination fee 0.020 0 0.00000 0 0.00000 0 0.00000 24.21 Salaries: 12.000 13 156.00000 0 0.00000 13 156.00000 24.22 Vocational training/specific skill training 0.500 13 6.50000 0 0.00000 13 6.50000 24.23 Electricity/water charges 0.600 13 7.80000 0 0.00000 13 7.80000 24.24 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75000 0 0.00000 13 9.75000 24.25 Maintenance 0.400 13 5.20000 0 0.00000 13 5.20000 24.26 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 13 5.20000 0 0.00000 13 5.20000 24.27 Preparatory camps 0.150 13 1.95000 0 0.00000 13 1.95000 24.28 PTAs/school functions 0.150 13 1.95000 0 0.00000 13 1.95000 24.29 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000 Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000 Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000 Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10) 0 0.00000 0 0.00000 24.3 Capacity building 0.300 13 3.90000 0 0.00000 13 3.90000 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000 TOTAL 0 0.00000 37.470 13 354.25000 0 0.00000 13 354.25000 Grant Total 0 100.11500 117.830 13 354.25000 0 0.00000 13 454.36500 Sl. No. Activity Total Outlay Total of Year 2012-13 Model-I & II Upgradation Fresh Recommended 2012-13 Spill over Fresh Recommended 2012-13 D:\KGBVAWP_B_2012-13_-_UPAgra

Model-I (13) Agra - Upefa.com

Embed Size (px)

Citation preview

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (13) Agra

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

24 KGBV Financial Provision perschoolNon Recurring (One time grant)

24.01 Construction of Building New 0 28.20000 65.860 0 0.00000 0 0.00000 0 28.20000

24.02 Construction of Building (Variation on account of change of unit cost) (old) 0 6.05000 0 0.00000 0 0.00000 0 6.05000

Sub Total 0.00 34.25000 65.86 0.00000 0.00000 0 34.2500024.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

24.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 4.50000 0 0.00000 0 0.00000 0 4.50000

Sub Total 0.00 4.50000 3.00 0.00000 0.00000 0 4.5000024.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

24.06

Boring/Handpump (minimum ratesprescribed by State Drinking WaterDepartment subject to a ceiling of Rs. 1.00lakhs).

0 2.00000 0 0.00000 0 0.00000 0 2.00000

Sub Total 0.00 2.00000 1.00 0.00000 0.00000 0 2.0000024.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

24.08 Electricity/Water Charges (Variation onaccount of change of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

24.09 Furniture/Equipment(including Kitchenequipment) New 0 21.76000 3.000 0 0.00000 0 0.00000 0 21.76000

24.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.04900 1.500 0 0.00000 1.50 0 0.00000 0 0.04900

Sub Total 0.00 21.80900 4.50 0.00000 0.00000 0 21.80900

24.11 Teaching learning material and equipmentincluding library books(New)

8 20.59000 3.500 0 0.00000 0 0.00000 0 20.59000

24.12 Teaching learning material and equipment including library books 0 8.68700 0 0.00000 1.75 0 0.00000 0 8.68700

Sub Total 8.00 29.27700 3.50 0.00000 0.00000 0 29.2770024.13 Bedding 0 6.00000 0.750 0 0.00000 0.38 0 0.00000 0 6.0000024.14 Replacement of Bedding (once in 3 Year) 3 2.27900 0.750 0 0.00000 0 0.00000 0 2.27900

Sub Total 3.00 8.27900 1.50 0.00000 0.00000 0 8.27900TOTAL 100.11500 80.36 0.00000 0.00000 100.11500Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40000 0 0.00000 13 140.40000

24.18 Stipend for girl student per month @ Rs. 50 0.600 13 7.80000 0 0.00000 13 7.80000

24.19 Supplementary TLM, stationery and other educational material @RS 50per month

0.600 13 7.80000 0 0.00000 13 7.80000

24.2 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000024.21 Salaries: 12.000 13 156.00000 0 0.00000 13 156.0000024.22 Vocational training/specific skill training 0.500 13 6.50000 0 0.00000 13 6.5000024.23 Electricity/water charges 0.600 13 7.80000 0 0.00000 13 7.80000

24.24 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75000 0 0.00000 13 9.75000

24.25 Maintenance 0.400 13 5.20000 0 0.00000 13 5.20000

24.26 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 13 5.20000 0 0.00000 13 5.20000

24.27 Preparatory camps 0.150 13 1.95000 0 0.00000 13 1.9500024.28 PTAs/school functions 0.150 13 1.95000 0 0.00000 13 1.9500024.29 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

24.3 Capacity building 0.300 13 3.90000 0 0.00000 13 3.90000Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000TOTAL 0 0.00000 37.470 13 354.25000 0 0.00000 13 354.25000Grant Total 0 100.11500 117.830 13 354.25000 0 0.00000 13 454.36500

Sl. No. Activity Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPAgra

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (13) Aligarh

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 116.10000 65.860 0 0.00000 0 0.00000 0 116.10000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 116.10000 65.86 0.00000 0.00000 0 116.1000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 3.00 0.00000 0.00000 0 3.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.90000 0 0.00000 0 0.00000 0 0.90000

Sub Total 0.00 0.90000 1.00 0.00000 0.00000 0 0.9000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 20.63000 3.000 0 0.00000 0 0.00000 0 20.63000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.34900 1.500 0 0.00000 1.50 0 0.00000 0 0.34900

Sub Total 0.00 20.97900 4.50 0.00000 0.00000 0 20.97900

27.11 Teaching learning material and equipment includinglibrary books(New)

9 20.44000 3.500 0 0.00000 0 0.00000 0 20.44000

27.12 Teaching learning material and equipment includinglibrary books 0 1.90000 0 0.00000 1.75 0 0.00000 0 1.90000

Sub Total 9.00 22.34000 3.50 0.00000 0.00000 0 22.3400027.13 Bedding 0 3.42000 0.750 0 0.00000 0.38 0 0.00000 0 3.4200027.14 Replacement of Bedding (once in 3 Year) 3 2.25000 0.750 0 0.00000 0 0.00000 0 2.25000

Sub Total 3.00 5.67000 1.50 0.00000 0.00000 0 5.67000TOTAL 168.98900 80.36 0.00000 0.00000 168.98900Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40000 0 0.00000 13 140.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 13 7.80000 0 0.00000 13 7.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 13 7.80000 0 0.00000 13 7.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 13 156.00000 0 0.00000 13 156.0000027.2 Vocational training/specific skill training 0.500 13 6.50000 0 0.00000 13 6.5000027.21 Electricity/water charges 0.600 13 7.80000 0 0.00000 13 7.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75000 0 0.00000 13 9.7500027.23 Maintenance 0.400 13 5.20000 0 0.00000 13 5.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 13 5.20000 0 0.00000 13 5.20000

27.25 Preparatory camps 0.150 13 1.95000 0 0.00000 13 1.9500027.26 PTAs/school functions 0.150 13 1.95000 0 0.00000 13 1.9500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 9 32.40000 0 0.00000 9 32.40000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 13 3.90000 0 0.00000 13 3.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 13 386.65000 0 0.00000 13 386.65000Grant Total 0 168.98900 118.330 13 386.65000 0 0.00000 13 555.63900

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPAligarh

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (20) Allahabad

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 193.47000 65.860 0 0.00000 0 0.00000 0 193.47000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 193.47000 65.86 0.00000 0.00000 0 193.4700027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 3.00 0.00000 0.00000 0 3.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.00000 0 0.00000 0 0.00000 0 2.00000

Sub Total 0.00 2.00000 1.00 0.00000 0.00000 0 2.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.22000 3.000 0 0.00000 0 0.00000 0 0.22000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.08300 1.500 0 0.00000 1.50 0 0.00000 0 0.08300

Sub Total 0.00 0.30300 4.50 0.00000 0.00000 0 0.30300

27.11 Teaching learning material and equipment includinglibrary books(New)

15 46.24000 3.500 0 0.00000 0 0.00000 0 46.24000

27.12 Teaching learning material and equipment includinglibrary books 0 5.38700 0 0.00000 1.75 0 0.00000 0 5.38700

Sub Total 15.00 51.62700 3.50 0.00000 0.00000 0 51.6270027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 4 1.21900 0.750 0 0.00000 0 0.00000 0 1.21900

Sub Total 4.00 1.21900 1.50 0.00000 0.00000 0 1.21900TOTAL 251.61900 80.36 0.00000 0.00000 251.61900Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 20 216.00000 0 0.00000 20 216.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 20 12.00000 0 0.00000 20 12.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 20 12.00000 0 0.00000 20 12.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 20 240.00000 0 0.00000 20 240.0000027.2 Vocational training/specific skill training 0.500 20 10.00000 0 0.00000 20 10.0000027.21 Electricity/water charges 0.600 20 12.00000 0 0.00000 20 12.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 20 15.00000 0 0.00000 20 15.0000027.23 Maintenance 0.400 20 8.00000 0 0.00000 20 8.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 20 8.00000 0 0.00000 20 8.00000

27.25 Preparatory camps 0.150 20 3.00000 0 0.00000 20 3.0000027.26 PTAs/school functions 0.150 20 3.00000 0 0.00000 20 3.0000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 15 54.00000 0 0.00000 15 54.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 20 6.00000 0 0.00000 20 6.0000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 20 599.00000 0 0.00000 20 599.00000Grant Total 0 251.61900 118.330 20 599.00000 0 0.00000 20 850.61900

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPAllahabad

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (8) AmbedkarNagar

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 48.92000 65.860 0 0.00000 0 0.00000 0 48.92000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.18000 0 0.00000 0 0.00000 0 0.18000

Sub Total 0.00 49.10000 65.86 0.00000 0.00000 0 49.1000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 1.50000 0 0.00000 0 0.00000 0 1.50000

Sub Total 0.00 1.50000 3.00 0.00000 0.00000 0 1.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 3.75000 3.000 0 0.00000 0 0.00000 0 3.75000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.05000 1.500 0 0.00000 1.50 0 0.00000 0 0.05000

Sub Total 0.00 3.80000 4.50 0.00000 0.00000 0 3.80000

27.11 Teaching learning material and equipment includinglibrary books(New)

5 16.43000 3.500 0 0.00000 0 0.00000 0 16.43000

27.12 Teaching learning material and equipment includinglibrary books 0 0.27700 0 0.00000 1.75 0 0.00000 0 0.27700

Sub Total 5.00 16.70700 3.50 0.00000 0.00000 0 16.7070027.13 Bedding 0 0.04000 0.750 0 0.00000 0.38 0 0.00000 0 0.0400027.14 Replacement of Bedding (once in 3 Year) 1 0.08300 0.750 0 0.00000 0 0.00000 0 0.08300

Sub Total 1.00 0.12300 1.50 0.00000 0.00000 0 0.12300TOTAL 71.23000 80.36 0.00000 0.00000 71.23000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40000 0 0.00000 8 86.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 8 4.80000 0 0.00000 8 4.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 8 4.80000 0 0.00000 8 4.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 8 96.00000 0 0.00000 8 96.0000027.2 Vocational training/specific skill training 0.500 8 4.00000 0 0.00000 8 4.0000027.21 Electricity/water charges 0.600 8 4.80000 0 0.00000 8 4.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00000 0 0.00000 8 6.0000027.23 Maintenance 0.400 8 3.20000 0 0.00000 8 3.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 8 3.20000 0 0.00000 8 3.20000

27.25 Preparatory camps 0.150 8 1.20000 0 0.00000 8 1.2000027.26 PTAs/school functions 0.150 8 1.20000 0 0.00000 8 1.2000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 8 2.40000 0 0.00000 8 2.4000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 8 218.00000 0 0.00000 8 218.00000Grant Total 0 71.23000 118.330 8 218.00000 0 0.00000 8 289.23000

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPAmbedkarNagar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (21) Azamgarh

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 99.75000 65.860 0 0.00000 0 0.00000 0 99.75000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.03000 0 0.00000 0 0.00000 0 0.03000

Sub Total 0.00 99.78000 65.86 0.00000 0.00000 0 99.7800027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.31000 0 0.00000 0 0.00000 0 0.31000

Sub Total 0.00 0.31000 3.00 0.00000 0.00000 0 0.3100027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.24000 0 0.00000 0 0.00000 0 2.24000

Sub Total 0.00 2.24000 1.00 0.00000 0.00000 0 2.2400027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 28.52000 3.000 0 0.00000 0 0.00000 0 28.52000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.23600 1.500 0 0.00000 1.50 0 0.00000 0 0.23600

Sub Total 0.00 28.75600 4.50 0.00000 0.00000 0 28.75600

27.11 Teaching learning material and equipment includinglibrary books(New)

15 42.87000 3.500 0 0.00000 0 0.00000 0 42.87000

27.12 Teaching learning material and equipment includinglibrary books 0 0.06400 0 0.00000 1.75 0 0.00000 0 0.06400

Sub Total 15.00 42.93400 3.50 0.00000 0.00000 0 42.9340027.13 Bedding 0 1.16000 0.750 0 0.00000 0.38 0 0.00000 0 1.1600027.14 Replacement of Bedding (once in 3 Year) 2 0.19100 0.750 0 0.00000 0 0.00000 0 0.19100

Sub Total 2.00 1.35100 1.50 0.00000 0.00000 0 1.35100TOTAL 175.37100 80.36 0.00000 0.00000 175.37100Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 21 226.80000 0 0.00000 21 226.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 21 12.60000 0 0.00000 21 12.60000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 21 12.60000 0 0.00000 21 12.60000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 21 252.00000 0 0.00000 21 252.0000027.2 Vocational training/specific skill training 0.500 21 10.50000 0 0.00000 21 10.5000027.21 Electricity/water charges 0.600 21 12.60000 0 0.00000 21 12.6000027.22 Medical care/contingencies @ Rs. 750 child 0.750 21 15.75000 0 0.00000 21 15.7500027.23 Maintenance 0.400 21 8.40000 0 0.00000 21 8.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 21 8.40000 0 0.00000 21 8.40000

27.25 Preparatory camps 0.150 21 3.15000 0 0.00000 21 3.1500027.26 PTAs/school functions 0.150 21 3.15000 0 0.00000 21 3.1500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 21 6.30000 0 0.00000 21 6.3000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 21 572.25000 0 0.00000 21 572.25000Grant Total 0 175.37100 118.330 21 572.25000 0 0.00000 21 747.62100

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill over

D:\KGBVAWP_B_2012-13_-_UPAzamgarh

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (18) Badaun

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 65.86 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 10.46000 0 0.00000 0 0.00000 0 10.46000

Sub Total 0.00 10.46000 1.00 0.00000 0.00000 0 10.4600027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 3.40000 0 0.00000 0 0.00000 0 3.40000

Sub Total 0.00 3.40000 1.00 0.00000 0.00000 0 3.40000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 6.45000 1.500 0 0.00000 1.50 0 0.00000 0 6.45000

Sub Total 0.00 6.45000 4.50 0.00000 0.00000 0 6.45000

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 18.10000 0 0.00000 1.75 0 0.00000 0 18.10000

Sub Total 0.00 18.10000 3.50 0.00000 0.00000 0 18.1000027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 21 7.69000 0.750 0 0.00000 0 0.00000 0 7.69000

Sub Total 21.00 7.69000 1.50 0.00000 0.00000 0 7.69000TOTAL 46.10000 80.36 0.00000 0.00000 46.10000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 18 194.40000 0 0.00000 18 194.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 18 10.80000 0 0.00000 18 10.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 18 10.80000 0 0.00000 18 10.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 18 216.00000 0 0.00000 18 216.0000027.2 Vocational training/specific skill training 0.500 18 9.00000 0 0.00000 18 9.0000027.21 Electricity/water charges 0.600 18 10.80000 0 0.00000 18 10.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 18 13.50000 0 0.00000 18 13.5000027.23 Maintenance 0.400 18 7.20000 0 0.00000 18 7.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 18 7.20000 0 0.00000 18 7.20000

27.25 Preparatory camps 0.150 18 2.70000 0 0.00000 18 2.7000027.26 PTAs/school functions 0.150 18 2.70000 0 0.00000 18 2.7000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 18 5.40000 0 0.00000 18 5.4000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 18 490.50000 0 0.00000 18 490.50000Grant Total 0 46.10000 118.330 18 490.50000 0 0.00000 18 536.60000

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPBadaun

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (2) Baghpat

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 24.04100 0 0.00000 0 0.00000 0 24.04100

Sub Total 0.00 24.04100 65.86 0.00000 0.00000 0 24.0410027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 3.00 0.00000 0.00000 0 3.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.00000 0 0.00000 0 0.00000 0 2.00000

Sub Total 0.00 2.00000 1.00 0.00000 0.00000 0 2.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 -0.00100 1.500 0 0.00000 1.50 0 0.00000 0 -0.00100

Sub Total 0.00 -0.00100 4.50 0.00000 0.00000 0 -0.00100

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 1.25500 0 0.00000 1.75 0 0.00000 0 1.25500

Sub Total 0.00 1.25500 3.50 0.00000 0.00000 0 1.2550027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 1 0.07200 0.750 0 0.00000 0 0.00000 0 0.07200

Sub Total 1.00 0.07200 1.50 0.00000 0.00000 0 0.07200TOTAL 30.56700 80.36 0.00000 0.00000 30.56700Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 2 21.60000 0 0.00000 2 21.60000

27.16 Stipend for girl student per month @ Rs. 50 0.600 2 1.20000 0 0.00000 2 1.20000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 2 1.20000 0 0.00000 2 1.20000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 2 24.00000 0 0.00000 2 24.0000027.2 Vocational training/specific skill training 0.500 2 1.00000 0 0.00000 2 1.0000027.21 Electricity/water charges 0.600 2 1.20000 0 0.00000 2 1.2000027.22 Medical care/contingencies @ Rs. 750 child 0.750 2 1.50000 0 0.00000 2 1.5000027.23 Maintenance 0.400 2 0.80000 0 0.00000 2 0.80000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 2 0.80000 0 0.00000 2 0.80000

27.25 Preparatory camps 0.150 2 0.30000 0 0.00000 2 0.3000027.26 PTAs/school functions 0.150 2 0.30000 0 0.00000 2 0.3000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 2 0.60000 0 0.00000 2 0.6000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 2 54.50000 0 0.00000 2 54.50000Grant Total 0 30.56700 118.330 2 54.50000 0 0.00000 2 85.06700

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPBaghpat

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (15) Bahraich

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 36.59500 0 0.00000 0 0.00000 0 36.59500

Sub Total 0.00 36.59500 65.86 0.00000 0.00000 0 36.5950027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 10.76000 0 0.00000 0 0.00000 0 10.76000

Sub Total 0.00 10.76000 3.00 0.00000 0.00000 0 10.7600027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 11.63000 0 0.00000 0 0.00000 0 11.63000

Sub Total 0.00 11.63000 1.00 0.00000 0.00000 0 11.6300027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.80000 0 0.00000 0 0.00000 0 0.80000

Sub Total 0.00 0.80000 1.00 0.00000 0.00000 0 0.80000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 3.97600 1.500 0 0.00000 1.50 0 0.00000 0 3.97600

Sub Total 0.00 3.97600 4.50 0.00000 0.00000 0 3.97600

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 13.20200 0 0.00000 1.75 0 0.00000 0 13.20200

Sub Total 0.00 13.20200 3.50 0.00000 0.00000 0 13.2020027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 14 10.43400 0.750 0 0.00000 0 0.00000 0 10.43400

Sub Total 14.00 10.43400 1.50 0.00000 0.00000 0 10.43400TOTAL 87.39700 80.36 0.00000 0.00000 87.39700Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 15 162.00000 0 0.00000 15 162.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 15 9.00000 0 0.00000 15 9.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 15 9.00000 0 0.00000 15 9.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 15 180.00000 0 0.00000 15 180.0000027.2 Vocational training/specific skill training 0.500 15 7.50000 0 0.00000 15 7.5000027.21 Electricity/water charges 0.600 15 9.00000 0 0.00000 15 9.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 15 11.25000 0 0.00000 15 11.2500027.23 Maintenance 0.400 15 6.00000 0 0.00000 15 6.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 15 6.00000 0 0.00000 15 6.00000

27.25 Preparatory camps 0.150 15 2.25000 0 0.00000 15 2.2500027.26 PTAs/school functions 0.150 15 2.25000 0 0.00000 15 2.2500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 15 4.50000 0 0.00000 15 4.5000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 15 408.75000 0 0.00000 15 408.75000Grant Total 0 87.39700 118.330 15 408.75000 0 0.00000 15 496.14700

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPBahraich

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old05+New11) Balia

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 449.50000 65.860 0 0.00000 0 0.00000 0 449.50000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 8.05000 0 0.00000 0 0.00000 0 8.05000

Sub Total 0.00 457.55000 65.86 0.00000 0.00000 0 457.5500027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 7.50000 0 0.00000 0 0.00000 0 7.50000

Sub Total 0.00 7.50000 3.00 0.00000 0.00000 0 7.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 5.00000 0 0.00000 0 0.00000 0 5.00000

Sub Total 0.00 5.00000 1.00 0.00000 0.00000 0 5.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 27.03000 3.000 0 0.00000 0 0.00000 0 27.03000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 4.95900 1.500 0 0.00000 1.50 0 0.00000 0 4.95900

Sub Total 0.00 31.98900 4.50 0.00000 0.00000 0 31.98900

27.11 Teaching learning material and equipment includinglibrary books(New)

11 37.60000 3.500 0 0.00000 0 0.00000 0 37.60000

27.12 Teaching learning material and equipment includinglibrary books 0 6.55100 0 0.00000 1.75 0 0.00000 0 6.55100

Sub Total 11.00 44.15100 3.50 0.00000 0.00000 0 44.1510027.13 Bedding 0 4.61000 0.750 0 0.00000 0.38 0 0.00000 0 4.6100027.14 Replacement of Bedding (once in 3 Year) 2 1.35800 0.750 0 0.00000 0 0.00000 0 1.35800

Sub Total 2.00 5.96800 1.50 0.00000 0.00000 0 5.96800TOTAL 552.15800 80.36 0.00000 0.00000 552.15800Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 16 172.80000 0 0.00000 16 172.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 16 9.60000 0 0.00000 16 9.60000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 16 9.60000 0 0.00000 16 9.60000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 16 192.00000 0 0.00000 16 192.0000027.2 Vocational training/specific skill training 0.500 16 8.00000 0 0.00000 16 8.0000027.21 Electricity/water charges 0.600 16 9.60000 0 0.00000 16 9.6000027.22 Medical care/contingencies @ Rs. 750 child 0.750 16 12.00000 0 0.00000 16 12.0000027.23 Maintenance 0.400 16 6.40000 0 0.00000 16 6.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 16 6.40000 0 0.00000 16 6.40000

27.25 Preparatory camps 0.150 16 2.40000 0 0.00000 16 2.4000027.26 PTAs/school functions 0.150 16 2.40000 0 0.00000 16 2.4000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 16 4.80000 0 0.00000 16 4.8000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 16 436.00000 0 0.00000 16 436.00000Grant Total 0 552.15800 118.330 16 436.00000 0 0.00000 16 988.15800

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPBallia

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old11) Balrampur

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 17.09600 0 0.00000 0 0.00000 0 17.09600

Sub Total 0.00 17.09600 65.86 0.00000 0.00000 0 17.0960027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 16.50000 0 0.00000 0 0.00000 0 16.50000

Sub Total 0.00 16.50000 3.00 0.00000 0.00000 0 16.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 11.00000 0 0.00000 0 0.00000 0 11.00000

Sub Total 0.00 11.00000 1.00 0.00000 0.00000 0 11.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.80000 0 0.00000 0 0.00000 0 0.80000

Sub Total 0.00 0.80000 1.00 0.00000 0.00000 0 0.80000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.36600 1.500 0 0.00000 1.50 0 0.00000 0 0.36600

Sub Total 0.00 0.36600 4.50 0.00000 0.00000 0 0.36600

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 7.13600 0 0.00000 1.75 0 0.00000 0 7.13600

Sub Total 0.00 7.13600 3.50 0.00000 0.00000 0 7.1360027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 10 3.57500 0.750 0 0.00000 0 0.00000 0 3.57500

Sub Total 10.00 3.57500 1.50 0.00000 0.00000 0 3.57500TOTAL 56.47300 80.36 0.00000 0.00000 56.47300Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 11 118.80000 0 0.00000 11 118.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 11 6.60000 0 0.00000 11 6.60000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 11 6.60000 0 0.00000 11 6.60000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 11 132.00000 0 0.00000 11 132.0000027.2 Vocational training/specific skill training 0.500 11 5.50000 0 0.00000 11 5.5000027.21 Electricity/water charges 0.600 11 6.60000 0 0.00000 11 6.6000027.22 Medical care/contingencies @ Rs. 750 child 0.750 11 8.25000 0 0.00000 11 8.2500027.23 Maintenance 0.400 11 4.40000 0 0.00000 11 4.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 11 4.40000 0 0.00000 11 4.40000

27.25 Preparatory camps 0.150 11 1.65000 0 0.00000 11 1.6500027.26 PTAs/school functions 0.150 11 1.65000 0 0.00000 11 1.6500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months)3.600 3 10.80000 0 0.00000 3 10.80000

Provision of Rent (3 months)1.800 0.00000 0 0.00000 0 0.00000

Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 11 3.30000 0 0.00000 11 3.3000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 11 310.55000 0 0.00000 11 310.55000Grant Total 0 56.47300 118.330 11 310.55000 0 0.00000 11 367.02300

Sl. No. Activity Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over

D:\KGBVAWP_B_2012-13_-_UPBalrampur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old4+New4) Banda

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 51.57000 65.860 0 0.00000 0 0.00000 0 51.57000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.36000 0 0.00000 0 0.00000 0 0.36000

Sub Total 0.00 51.93000 65.86 0.00000 0.00000 0 51.9300027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.73000 0 0.00000 0 0.00000 0 3.73000

Sub Total 0.00 3.73000 3.00 0.00000 0.00000 0 3.7300027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.35000 0 0.00000 0 0.00000 0 2.35000

Sub Total 0.00 2.35000 1.00 0.00000 0.00000 0 2.3500027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 7.47000 3.000 0 0.00000 0 0.00000 0 7.47000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 1.03100 1.500 0 0.00000 1.50 0 0.00000 0 1.03100

Sub Total 0.00 8.50100 4.50 0.00000 0.00000 0 8.50100

27.11 Teaching learning material and equipment includinglibrary books(New)

4 12.94000 3.500 0 0.00000 0 0.00000 0 12.94000

27.12 Teaching learning material and equipment includinglibrary books 0 1.24100 0 0.00000 1.75 0 0.00000 0 1.24100

Sub Total 4.00 14.18100 3.50 0.00000 0.00000 0 14.1810027.13 Bedding 0 0.05000 0.750 0 0.00000 0.38 0 0.00000 0 0.0500027.14 Replacement of Bedding (once in 3 Year) 1 0.00400 0.750 0 0.00000 0 0.00000 0 0.00400

Sub Total 1.00 0.05400 1.50 0.00000 0.00000 0 0.05400TOTAL 80.74600 80.36 0.00000 0.00000 80.74600Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40000 0 0.00000 8 86.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 8 4.80000 0 0.00000 8 4.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 8 4.80000 0 0.00000 8 4.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 8 96.00000 0 0.00000 8 96.0000027.2 Vocational training/specific skill training 0.500 8 4.00000 0 0.00000 8 4.0000027.21 Electricity/water charges 0.600 8 4.80000 0 0.00000 8 4.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00000 0 0.00000 8 6.0000027.23 Maintenance 0.400 8 3.20000 0 0.00000 8 3.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 8 3.20000 0 0.00000 8 3.20000

27.25 Preparatory camps 0.150 8 1.20000 0 0.00000 8 1.2000027.26 PTAs/school functions 0.150 8 1.20000 0 0.00000 8 1.2000027.27 Provision of Rent (8 months) 4.800 4 19.20000 0 0.00000 4 19.20000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 8 2.40000 0 0.00000 8 2.4000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 8 237.20000 0 0.00000 8 237.20000Grant Total 0 80.74600 118.330 8 237.20000 0 0.00000 8 317.94600

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPBanda

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old9+New6) Barabanki

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 77.34000 65.860 0 0.00000 0 0.00000 0 77.34000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.27000 0 0.00000 0 0.00000 0 0.27000

Sub Total 0.00 77.61000 65.86 0.00000 0.00000 0 77.6100027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 1.50000 0 0.00000 0 0.00000 0 1.50000

Sub Total 0.00 1.50000 3.00 0.00000 0.00000 0 1.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 1.00000 0 0.00000 0 0.00000 0 1.00000

Sub Total 0.00 1.00000 1.00 0.00000 0.00000 0 1.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.40000 0 0.00000 0 0.00000 0 0.40000

Sub Total 0.00 0.40000 1.00 0.00000 0.00000 0 0.40000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 4.67000 3.000 0 0.00000 0 0.00000 0 4.67000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.09200 1.500 0 0.00000 1.50 0 0.00000 0 0.09200

Sub Total 0.00 4.76200 4.50 0.00000 0.00000 0 4.76200

27.11 Teaching learning material and equipment includinglibrary books(New)

6 13.26000 3.500 0 0.00000 0 0.00000 0 13.26000

27.12 Teaching learning material and equipment includinglibrary books 0 1.73500 0 0.00000 1.75 0 0.00000 0 1.73500

Sub Total 6.00 14.99500 3.50 0.00000 0.00000 0 14.9950027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 8 0.10900 0.750 0 0.00000 0 0.00000 0 0.10900

Sub Total 8.00 0.10900 1.50 0.00000 0.00000 0 0.10900TOTAL 100.37600 80.36 0.00000 0.00000 100.37600Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 15 162.00000 0 0.00000 15 162.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 15 9.00000 0 0.00000 15 9.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 15 9.00000 0 0.00000 15 9.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 15 180.00000 0 0.00000 15 180.0000027.2 Vocational training/specific skill training 0.500 15 7.50000 0 0.00000 15 7.5000027.21 Electricity/water charges 0.600 15 9.00000 0 0.00000 15 9.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 15 11.25000 0 0.00000 15 11.2500027.23 Maintenance 0.400 15 6.00000 0 0.00000 15 6.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 15 6.00000 0 0.00000 15 6.00000

27.25 Preparatory camps 0.150 15 2.25000 0 0.00000 15 2.2500027.26 PTAs/school functions 0.150 15 2.25000 0 0.00000 15 2.2500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 6 21.60000 0 0.00000 6 21.60000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 15 4.50000 0 0.00000 15 4.5000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 15 430.35000 0 0.00000 15 430.35000Grant Total 0 100.37600 118.330 15 430.35000 0 0.00000 15 530.72600

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPBarabanki

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old18) Bareilly

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 25.000 14 350.00000 14 350.00000

Sub Total 0.00 0.00000 65.86 0.00000 25.00 350.00000 14 350.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 3.00 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00500 1.500 0 0.00000 1.500 14 21.00000 14 21.00500

Sub Total 0.00 0.00500 4.50 0.00000 4.50 21.00000 14 21.00500

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00300 0 0.00000 1.750 14 24.50000 14 24.50300

Sub Total 0.00 0.00300 3.50 0.00000 1.75 24.50000 14 24.5030027.13 Bedding 0 0.00000 0.750 0 0.00000 0.375 14 5.25000 14 5.2500027.14 Replacement of Bedding (once in 3 Year) 17 12.75400 0.750 0 0.00000 0.750 0.00000 0 12.75400

Sub Total 17.00 12.75400 1.50 0.00000 1.13 5.25000 14 18.00400TOTAL 12.76200 80.36 0.00000 37.38 400.75000 413.51200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 18 194.40000 5.400 14 75.60000 18 270.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 18 10.80000 0.300 14 4.20000 18 15.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 18 10.80000 0.300 14 4.20000 18 15.00000

27.18 Examination fee 0.020 0 0.00000 0.010 0 0.00000 0 0.0000027.19 Salaries: 12.000 18 216.00000 4.740 14 66.36000 18 282.3600027.2 Vocational training/specific skill training 0.500 18 9.00000 0.250 14 3.50000 18 12.5000027.21 Electricity/water charges 0.600 18 10.80000 0.300 14 4.20000 18 15.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 18 13.50000 0.375 14 5.25000 18 18.7500027.23 Maintenance 0.400 18 7.20000 0.200 14 2.80000 18 10.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 18 7.20000 0.200 14 2.80000 18 10.00000

27.25 Preparatory camps 0.150 18 2.70000 0.075 14 1.05000 18 3.7500027.26 PTAs/school functions 0.150 18 2.70000 0.075 14 1.05000 18 3.7500027.27 Provision of Rent (8 months) 4.800 0.00000 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 18 5.40000 0.150 14 2.10000 18 7.5000027.28 Maintenance of building 0.500 0 0.00000 0.500 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 18 490.50000 12.875 14 173.11000 18 663.61000Grant Total 0 12.76200 118.330 18 490.50000 50.250 14 573.86000 18 1077.12200

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPBarelliy

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old5+NEW8) Basti

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 126.95000 65.860 0 0.00000 0 0.00000 0 126.95000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 126.95000 65.86 0.00000 0.00000 0 126.9500027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06 Boring/Handpump (minimum rates prescribedby State Drinking Water Department subjectto a ceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation onaccount of change of unit cost (old) 0 0.60000 0 0.00000 0 0.00000 0 0.60000

Sub Total 0.00 0.60000 1.00 0.00000 0.00000 0 0.60000

27.09 Furniture/Equipment(including Kitchenequipment) New 0 24.00000 3.000 0 0.00000 0 0.00000 0 24.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.01400 1.500 0 0.00000 1.50 0 0.00000 0 0.01400

Sub Total 0.00 24.01400 4.50 0.00000 0.00000 0 24.01400

27.11 Teaching learning material and equipmentincluding library books(New)

8 28.00000 3.500 0 0.00000 0 0.00000 0 28.00000

27.12 Teaching learning material and equipment including library books 0 0.01100 0 0.00000 1.75 0 0.00000 0 0.01100

Sub Total 8.00 28.01100 3.50 0.00000 0.00000 0 28.0110027.13 Bedding 0 6.00000 0.750 0 0.00000 0.38 0 0.00000 0 6.00000

27.14 Replacement of Bedding (once in 3 Year) 3 0.02000 0.750 0 0.00000 0 0.00000 0 0.02000

Sub Total 3.00 6.02000 1.50 0.00000 0.00000 0 6.02000TOTAL 185.59500 80.36 0.00000 0.00000 185.59500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs.900/- 10.800 13 140.40000 0 0.00000 13 140.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 13 7.80000 0 0.00000 13 7.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 13 7.80000 0 0.00000 13 7.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 13 156.00000 0 0.00000 13 156.0000027.2 Vocational training/specific skill training 0.500 13 6.50000 0 0.00000 13 6.5000027.21 Electricity/water charges 0.600 13 7.80000 0 0.00000 13 7.80000

27.22 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75000 0 0.00000 13 9.75000

27.23 Maintenance 0.400 13 5.20000 0 0.00000 13 5.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 13 5.20000 0 0.00000 13 5.20000

27.25 Preparatory camps 0.150 13 1.95000 0 0.00000 13 1.9500027.26 PTAs/school functions 0.150 13 1.95000 0 0.00000 13 1.9500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (200708, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 13 3.90000 0 0.00000 13 3.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 13 354.25000 0 0.00000 13 354.25000Grant Total 0 185.59500 118.330 13 354.25000 0 0.00000 13 539.84500

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPBasti

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old2+NEW3) Bhadohi

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 103.84000 65.860 0 0.00000 0 0.00000 0 103.84000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 103.84000 65.86 0.00000 0.00000 0 103.8400027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.04000 3.000 0 0.00000 0 0.00000 0 0.04000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.50 0 0.00000 0 0.00000

Sub Total 0.00 0.04000 4.50 0.00000 0.00000 0 0.04000

27.11 Teaching learning material and equipment includinglibrary books(New)

3 1.94000 3.500 0 0.00000 0 0.00000 0 1.94000

27.12 Teaching learning material and equipment includinglibrary books 0 0.01000 0 0.00000 1.75 0 0.00000 0 0.01000

Sub Total 3.00 1.95000 3.50 0.00000 0.00000 0 1.9500027.13 Bedding 0 0.01000 0.750 0 0.00000 0.38 0 0.00000 0 0.0100027.14 Replacement of Bedding (once in 3 Year) 2 0.00000 0.750 0 0.00000 0 0.00000 0 0.00000

Sub Total 2.00 0.01000 1.50 0.00000 0.00000 0 0.01000TOTAL 105.84000 80.36 0.00000 0.00000 105.84000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00000 0 0.00000 5 54.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 5 3.00000 0 0.00000 5 3.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 5 3.00000 0 0.00000 5 3.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 5 60.00000 0 0.00000 5 60.0000027.2 Vocational training/specific skill training 0.500 5 2.50000 0 0.00000 5 2.5000027.21 Electricity/water charges 0.600 5 3.00000 0 0.00000 5 3.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75000 0 0.00000 5 3.7500027.23 Maintenance 0.400 5 2.00000 0 0.00000 5 2.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 5 2.00000 0 0.00000 5 2.00000

27.25 Preparatory camps 0.150 5 0.75000 0 0.00000 5 0.7500027.26 PTAs/school functions 0.150 5 0.75000 0 0.00000 5 0.7500027.27 Provision of Rent (8 months) 4.800 3 14.40000 0 0.00000 3 14.40000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 5 1.50000 0 0.00000 5 1.5000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 5 150.65000 0 0.00000 5 150.65000Grant Total 0 105.84000 118.330 5 150.65000 0 0.00000 5 256.49000

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPBhadohi

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I Bheem Nagar(10)

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 25.000 2 50.00000 2 50.00000

Sub Total 0.00 0.00000 65.86 0.00000 25.00 50.00000 2 50.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 3.00 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.500 2 3.00000 2 3.00000

Sub Total 0.00 0.00000 4.50 0.00000 4.50 3.00000 2 3.00000

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00000 0 0.00000 1.750 2 3.50000 2 3.50000

Sub Total 0.00 0.00000 3.50 0.00000 1.75 3.50000 2 3.5000027.13 Bedding 0 0.00000 0.750 0 0.00000 0.375 2 0.75000 2 0.7500027.14 Replacement of Bedding (once in 3 Year) 0 0.00000 0.750 0 0.00000 0.750 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.50 0.00000 1.13 0.75000 2 0.75000TOTAL 0.00000 80.36 0.00000 37.38 57.25000 57.25000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 10 108.00000 5.400 2 10.80000 10 118.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 10 6.00000 0.300 2 0.60000 10 6.60000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 10 6.00000 0.300 2 0.60000 10 6.60000

27.18 Examination fee 0.020 0 0.00000 0.010 0 0.00000 0 0.0000027.19 Salaries: 12.000 10 120.00000 4.740 2 9.48000 10 129.4800027.2 Vocational training/specific skill training 0.500 10 5.00000 0.250 2 0.50000 10 5.5000027.21 Electricity/water charges 0.600 10 6.00000 0.300 2 0.60000 10 6.6000027.22 Medical care/contingencies @ Rs. 750 child 0.750 10 7.50000 0.375 2 0.75000 10 8.2500027.23 Maintenance 0.400 10 4.00000 0.200 2 0.40000 10 4.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 10 4.00000 0.200 2 0.40000 10 4.40000

27.25 Preparatory camps 0.150 10 1.50000 0.075 2 0.15000 10 1.6500027.26 PTAs/school functions 0.150 10 1.50000 0.075 2 0.15000 10 1.6500027.27 Provision of Rent (8 months) 4.800 1 4.80000 0.00000 1 4.80000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 10 3.00000 0.150 2 0.30000 10 3.3000027.28 Maintenance of building 0.500 0 0.00000 0.500 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 10 277.30000 12.875 2 24.73000 10 302.03000Grant Total 0 0.00000 118.330 10 277.30000 50.250 2 81.98000 10 359.28000

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPBheem Nagar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old14) Bijnor

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 64.20700 0 0.00000 0 0.00000 0 64.20700

Sub Total 0.00 64.20700 65.86 0.00000 0.00000 0 64.2070027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 21.00000 0 0.00000 0 0.00000 0 21.00000

Sub Total 0.00 21.00000 3.00 0.00000 0.00000 0 21.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 14.00000 0 0.00000 0 0.00000 0 14.00000

Sub Total 0.00 14.00000 1.00 0.00000 0.00000 0 14.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 1.20000 0 0.00000 0 0.00000 0 1.20000

Sub Total 0.00 1.20000 1.00 0.00000 0.00000 0 1.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 8.81800 1.500 0 0.00000 1.50 0 0.00000 0 8.81800

Sub Total 0.00 8.81800 4.50 0.00000 0.00000 0 8.81800

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 14.33500 0 0.00000 1.75 0 0.00000 0 14.33500

Sub Total 0.00 14.33500 3.50 0.00000 0.00000 0 14.3350027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 12 3.36700 0.750 0 0.00000 0 0.00000 0 3.36700

Sub Total 12.00 3.36700 1.50 0.00000 0.00000 0 3.36700TOTAL 126.92700 80.36 0.00000 0.00000 126.92700Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 14 151.20000 0 0.00000 14 151.20000

27.16 Stipend for girl student per month @ Rs. 50 0.600 14 8.40000 0 0.00000 14 8.40000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 14 8.40000 0 0.00000 14 8.40000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 14 168.00000 0 0.00000 14 168.0000027.2 Vocational training/specific skill training 0.500 14 7.00000 0 0.00000 14 7.0000027.21 Electricity/water charges 0.600 14 8.40000 0 0.00000 14 8.4000027.22 Medical care/contingencies @ Rs. 750 child 0.750 14 10.50000 0 0.00000 14 10.5000027.23 Maintenance 0.400 14 5.60000 0 0.00000 14 5.60000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 14 5.60000 0 0.00000 14 5.60000

27.25 Preparatory camps 0.150 14 2.10000 0 0.00000 14 2.1000027.26 PTAs/school functions 0.150 14 2.10000 0 0.00000 14 2.1000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 14 4.20000 0 0.00000 14 4.2000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 14 381.50000 0 0.00000 14 381.50000Grant Total 0 126.92700 118.330 14 381.50000 0 0.00000 14 508.42700

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPBijnor

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old10+NEW6) Bulandshar

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 21.15000 65.860 0 0.00000 0 0.00000 0 21.15000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 21.15000 65.86 0.00000 0.00000 0 21.1500027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 1.43000 0 0.00000 0 0.00000 0 1.43000

Sub Total 0.00 1.43000 3.00 0.00000 0.00000 0 1.4300027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 3.67000 0 0.00000 0 0.00000 0 3.67000

Sub Total 0.00 3.67000 1.00 0.00000 0.00000 0 3.6700027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.80000 0 0.00000 0 0.00000 0 0.80000

Sub Total 0.00 0.80000 1.00 0.00000 0.00000 0 0.80000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 2.12000 3.000 0 0.00000 0 0.00000 0 2.12000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 -0.06400 1.500 0 0.00000 1.50 0 0.00000 0 -0.06400

Sub Total 0.00 2.05600 4.50 0.00000 0.00000 0 2.05600

27.11 Teaching learning material and equipment includinglibrary books(New)

6 14.59000 3.500 0 0.00000 0 0.00000 0 14.59000

27.12 Teaching learning material and equipment includinglibrary books 0 3.70800 0 0.00000 1.75 0 0.00000 0 3.70800

Sub Total 6.00 18.29800 3.50 0.00000 0.00000 0 18.2980027.13 Bedding 0 0.02000 0.750 0 0.00000 0.38 0 0.00000 0 0.0200027.14 Replacement of Bedding (once in 3 Year) 8 3.41800 0.750 0 0.00000 0 0.00000 0 3.41800

Sub Total 8.00 3.43800 1.50 0.00000 0.00000 0 3.43800TOTAL 50.84200 80.36 0.00000 0.00000 50.84200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 16 172.80000 0 0.00000 16 172.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 16 9.60000 0 0.00000 16 9.60000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 16 9.60000 0 0.00000 16 9.60000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 16 192.00000 0 0.00000 16 192.0000027.2 Vocational training/specific skill training 0.500 16 8.00000 0 0.00000 16 8.0000027.21 Electricity/water charges 0.600 16 9.60000 0 0.00000 16 9.6000027.22 Medical care/contingencies @ Rs. 750 child 0.750 16 12.00000 0 0.00000 16 12.0000027.23 Maintenance 0.400 16 6.40000 0 0.00000 16 6.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 16 6.40000 0 0.00000 16 6.40000

27.25 Preparatory camps 0.150 16 2.40000 0 0.00000 16 2.4000027.26 PTAs/school functions 0.150 16 2.40000 0 0.00000 16 2.4000027.27 Provision of Rent (8 months) 4.800 6 28.80000 0 0.00000 6 28.80000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 16 4.80000 0 0.00000 16 4.8000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 16 464.80000 0 0.00000 16 464.80000Grant Total 0 50.84200 118.330 16 464.80000 0 0.00000 16 515.64200

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPBulandshar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old5+New4) Chandauli

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 26.60000 65.860 0 0.00000 0 0.00000 0 26.60000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.15000 0 0.00000 0 0.00000 0 0.15000

Sub Total 0.00 26.75000 65.86 0.00000 0.00000 0 26.7500027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 3.00 0.00000 0.00000 0 3.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.00000 0 0.00000 0 0.00000 0 2.00000

Sub Total 0.00 2.00000 1.00 0.00000 0.00000 0 2.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 2.77900 1.500 0 0.00000 1.50 0 0.00000 0 2.77900

Sub Total 0.00 2.77900 4.50 0.00000 0.00000 0 2.77900

27.11 Teaching learning material and equipment includinglibrary books(New)

4 6.60000 3.500 0 0.00000 0 0.00000 0 6.60000

27.12 Teaching learning material and equipment includinglibrary books 0 2.13600 0 0.00000 1.75 0 0.00000 0 2.13600

Sub Total 4.00 8.73600 3.50 0.00000 0.00000 0 8.7360027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 4 1.53300 0.750 0 0.00000 0 0.00000 0 1.53300

Sub Total 4.00 1.53300 1.50 0.00000 0.00000 0 1.53300TOTAL 44.99800 80.36 0.00000 0.00000 44.99800Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 9 97.20000 0 0.00000 9 97.20000

27.16 Stipend for girl student per month @ Rs. 50 0.600 9 5.40000 0 0.00000 9 5.40000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 9 5.40000 0 0.00000 9 5.40000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 9 108.00000 0 0.00000 9 108.0000027.2 Vocational training/specific skill training 0.500 9 4.50000 0 0.00000 9 4.5000027.21 Electricity/water charges 0.600 9 5.40000 0 0.00000 9 5.4000027.22 Medical care/contingencies @ Rs. 750 child 0.750 9 6.75000 0 0.00000 9 6.7500027.23 Maintenance 0.400 9 3.60000 0 0.00000 9 3.60000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 9 3.60000 0 0.00000 9 3.60000

27.25 Preparatory camps 0.150 9 1.35000 0 0.00000 9 1.3500027.26 PTAs/school functions 0.150 9 1.35000 0 0.00000 9 1.3500027.27 Provision of Rent (8 months) 4.800 2 9.60000 0 0.00000 2 9.60000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 9 2.70000 0 0.00000 9 2.7000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 9 254.85000 0 0.00000 9 254.85000Grant Total 0 44.99800 118.330 9 254.85000 0 0.00000 9 299.84800

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPChandauli

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old11+New5) Chatrapati Sahu Ji Maharaj Nagar

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 2.05000 65.860 0 0.00000 0 0.00000 0 2.05000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 9.66100 0 0.00000 0 0.00000 0 9.66100

Sub Total 0.00 11.71100 65.86 0.00000 0.00000 0 11.7110027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 4.83000 0 0.00000 0 0.00000 0 4.83000

Sub Total 0.00 4.83000 3.00 0.00000 0.00000 0 4.8300027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 6.00000 0 0.00000 0 0.00000 0 6.00000

Sub Total 0.00 6.00000 1.00 0.00000 0.00000 0 6.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.85000 3.000 0 0.00000 0 0.00000 0 0.85000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 -0.14700 1.500 0 0.00000 1.50 0 0.00000 0 -0.14700

Sub Total 0.00 0.70300 4.50 0.00000 0.00000 0 0.70300

27.11 Teaching learning material and equipment includinglibrary books(New)

5 4.21000 3.500 0 0.00000 0 0.00000 0 4.21000

27.12 Teaching learning material and equipment includinglibrary books 0 4.21100 0 0.00000 1.75 0 0.00000 0 4.21100

Sub Total 5.00 8.42100 3.50 0.00000 0.00000 0 8.4210027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 4 0.11000 0.750 0 0.00000 0 0.00000 0 0.11000

Sub Total 4.00 0.11000 1.50 0.00000 0.00000 0 0.11000TOTAL 31.77500 80.36 0.00000 0.00000 31.77500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 16 172.80000 0 0.00000 16 172.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 16 9.60000 0 0.00000 16 9.60000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 16 9.60000 0 0.00000 16 9.60000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 16 192.00000 0 0.00000 16 192.0000027.2 Vocational training/specific skill training 0.500 16 8.00000 0 0.00000 16 8.0000027.21 Electricity/water charges 0.600 16 9.60000 0 0.00000 16 9.6000027.22 Medical care/contingencies @ Rs. 750 child 0.750 16 12.00000 0 0.00000 16 12.0000027.23 Maintenance 0.400 16 6.40000 0 0.00000 16 6.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 16 6.40000 0 0.00000 16 6.40000

27.25 Preparatory camps 0.150 16 2.40000 0 0.00000 16 2.4000027.26 PTAs/school functions 0.150 16 2.40000 0 0.00000 16 2.4000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 16 4.80000 0 0.00000 16 4.8000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 16 436.00000 0 0.00000 16 436.00000Grant Total 0 31.77500 118.330 16 436.00000 0 0.00000 16 467.77500

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPCSM

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old3+New1) Chitrakoot

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.40000 65.860 0 0.00000 0 0.00000 0 0.40000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.40000 65.86 0.00000 0.00000 0 0.4000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.18000 3.000 0 0.00000 0 0.00000 0 0.18000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.50 0 0.00000 0 0.00000

Sub Total 0.00 0.18000 4.50 0.00000 0.00000 0 0.18000

27.11 Teaching learning material and equipment includinglibrary books(New)

1 1.57000 3.500 0 0.00000 0 0.00000 0 1.57000

27.12 Teaching learning material and equipment includinglibrary books 0 1.19800 0 0.00000 1.75 0 0.00000 0 1.19800

Sub Total 1.00 2.76800 3.50 0.00000 0.00000 0 2.7680027.13 Bedding 0 0.34000 0.750 0 0.00000 0.38 0 0.00000 0 0.3400027.14 Replacement of Bedding (once in 3 Year) 2 0.68600 0.750 0 0.00000 0 0.00000 0 0.68600

Sub Total 2.00 1.02600 1.50 0.00000 0.00000 0 1.02600TOTAL 4.37400 80.36 0.00000 0.00000 4.37400Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 4 43.20000 0 0.00000 4 43.20000

27.16 Stipend for girl student per month @ Rs. 50 0.600 4 2.40000 0 0.00000 4 2.40000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 4 2.40000 0 0.00000 4 2.40000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 4 48.00000 0 0.00000 4 48.0000027.2 Vocational training/specific skill training 0.500 4 2.00000 0 0.00000 4 2.0000027.21 Electricity/water charges 0.600 4 2.40000 0 0.00000 4 2.4000027.22 Medical care/contingencies @ Rs. 750 child 0.750 4 3.00000 0 0.00000 4 3.0000027.23 Maintenance 0.400 4 1.60000 0 0.00000 4 1.60000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 4 1.60000 0 0.00000 4 1.60000

27.25 Preparatory camps 0.150 4 0.60000 0 0.00000 4 0.6000027.26 PTAs/school functions 0.150 4 0.60000 0 0.00000 4 0.6000027.27 Provision of Rent (8 months) 4.800 1 4.80000 0 0.00000 1 4.80000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 4 1.20000 0 0.00000 4 1.2000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 4 113.80000 0 0.00000 4 113.80000Grant Total 0 4.37400 118.330 4 113.80000 0 0.00000 4 118.17400

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPChitrakoot

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old4+New9) Deoria

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 298.17000 65.860 0 0.00000 0 0.00000 0 298.17000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 8.00000 0 0.00000 0 0.00000 0 8.00000

Sub Total 0.00 306.17000 65.86 0.00000 0.00000 0 306.1700027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 2.06000 3.000 0 0.00000 0 0.00000 0 2.06000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00200 1.500 0 0.00000 1.50 0 0.00000 0 0.00200

Sub Total 0.00 2.06200 4.50 0.00000 0.00000 0 2.06200

27.11 Teaching learning material and equipment includinglibrary books(New)

9 12.44000 3.500 0 0.00000 0 0.00000 0 12.44000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00300 0 0.00000 1.75 0 0.00000 0 0.00300

Sub Total 9.00 12.44300 3.50 0.00000 0.00000 0 12.4430027.13 Bedding 0 0.50000 0.750 0 0.00000 0.38 0 0.00000 0 0.5000027.14 Replacement of Bedding (once in 3 Year) 2 -0.00300 0.750 0 0.00000 0 0.00000 0 -0.00300

Sub Total 2.00 0.49700 1.50 0.00000 0.00000 0 0.49700TOTAL 321.17200 80.36 0.00000 0.00000 321.17200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40000 0 0.00000 13 140.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 13 7.80000 0 0.00000 13 7.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 13 7.80000 0 0.00000 13 7.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 13 156.00000 0 0.00000 13 156.0000027.2 Vocational training/specific skill training 0.500 13 6.50000 0 0.00000 13 6.5000027.21 Electricity/water charges 0.600 13 7.80000 0 0.00000 13 7.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75000 0 0.00000 13 9.7500027.23 Maintenance 0.400 13 5.20000 0 0.00000 13 5.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 13 5.20000 0 0.00000 13 5.20000

27.25 Preparatory camps 0.150 13 1.95000 0 0.00000 13 1.9500027.26 PTAs/school functions 0.150 13 1.95000 0 0.00000 13 1.9500027.27 Provision of Rent (8 months) 4.800 8 38.40000 0 0.00000 8 38.40000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 13 3.90000 0 0.00000 13 3.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 13 392.65000 0 0.00000 13 392.65000Grant Total 0 321.17200 118.330 13 392.65000 0 0.00000 13 713.82200

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPDeoria

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old1+New7) Etah

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 46.55000 65.860 0 0.00000 0 0.00000 0 46.55000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 46.55000 65.86 0.00000 0.00000 0 46.5500027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 20.49000 3.000 0 0.00000 0 0.00000 0 20.49000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.50 0 0.00000 0 0.00000

Sub Total 0.000 20.49000 4.500 0.00000 0.00000 0 20.49000

27.11 Teaching learning material and equipment includinglibrary books(New)

7 24.50000 3.500 0 0.00000 0 0.00000 0 24.50000

27.12 Teaching learning material and equipment includinglibrary books 0 0.54000 0 0.00000 1.75 0 0.00000 0 0.54000

Sub Total 7.000 25.04000 3.500 0.00000 0.00000 0 25.0400027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 0 0.00000 0.750 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.000 0.00000 1.500 0.00000 0.00000 0 0.00000TOTAL 92.08000 80.360 0.00000 0.00000 92.08000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40000 0 0.00000 8 86.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 8 4.80000 0 0.00000 8 4.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 8 4.80000 0 0.00000 8 4.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 8 96.00000 0 0.00000 8 96.0000027.2 Vocational training/specific skill training 0.500 8 4.00000 0 0.00000 8 4.0000027.21 Electricity/water charges 0.600 8 4.80000 0 0.00000 8 4.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00000 0 0.00000 8 6.0000027.23 Maintenance 0.400 8 3.20000 0 0.00000 8 3.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 8 3.20000 0 0.00000 8 3.20000

27.25 Preparatory camps 0.150 8 1.20000 0 0.00000 8 1.2000027.26 PTAs/school functions 0.150 8 1.20000 0 0.00000 8 1.2000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 8 2.40000 0 0.00000 8 2.4000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 8 218.00000 0 0.00000 8 218.00000Grant Total 0 92.08000 118.330 8 218.00000 0 0.00000 8 310.08000

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPEtah

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old2) Etawah

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 5.39000 0 0.00000 0 0.00000 0 5.39000

Sub Total 0.00 5.39000 65.86 0.00000 0.00000 0 5.3900027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 3.00 0.00000 0.00000 0 3.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.00000 0 0.00000 0 0.00000 0 2.00000

Sub Total 0.00 2.00000 1.00 0.00000 0.00000 0 2.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.50 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 4.50 0.00000 0.00000 0 0.00000

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00300 0 0.00000 1.75 0 0.00000 0 0.00300

Sub Total 0.00 0.00300 3.50 0.00000 0.00000 0 0.0030027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 1 0.00000 0.750 0 0.00000 0 0.00000 0 0.00000

Sub Total 1.00 0.00000 1.50 0.00000 0.00000 0 0.00000TOTAL 10.59300 80.36 0.00000 0.00000 10.59300Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 2 21.60000 0 0.00000 2 21.60000

27.16 Stipend for girl student per month @ Rs. 50 0.600 2 1.20000 0 0.00000 2 1.20000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 2 1.20000 0 0.00000 2 1.20000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 2 24.00000 0 0.00000 2 24.0000027.2 Vocational training/specific skill training 0.500 2 1.00000 0 0.00000 2 1.0000027.21 Electricity/water charges 0.600 2 1.20000 0 0.00000 2 1.2000027.22 Medical care/contingencies @ Rs. 750 child 0.750 2 1.50000 0 0.00000 2 1.5000027.23 Maintenance 0.400 2 0.80000 0 0.00000 2 0.80000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 2 0.80000 0 0.00000 2 0.80000

27.25 Preparatory camps 0.150 2 0.30000 0 0.00000 2 0.3000027.26 PTAs/school functions 0.150 2 0.30000 0 0.00000 2 0.3000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 2 0.60000 0 0.00000 2 0.6000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 2 54.50000 0 0.00000 2 54.50000Grant Total 0 10.59300 118.330 2 54.50000 0 0.00000 2 65.09300

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPEtawah

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old5+New5) Faizabad

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 48.87000 65.860 0 0.00000 0 0.00000 0 48.87000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.51000 0 0.00000 0 0.00000 0 0.51000

Sub Total 0.00 49.38000 65.86 0.00000 0.00000 0 49.3800027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 9.06000 3.000 0 0.00000 0 0.00000 0 9.06000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.50 0 0.00000 0 0.00000

Sub Total 0.00 9.06000 4.50 0.00000 0.00000 0 9.06000

27.11 Teaching learning material and equipment includinglibrary books(New)

5 14.08000 3.500 0 0.00000 0 0.00000 0 14.08000

27.12 Teaching learning material and equipment includinglibrary books 0 5.85300 0 0.00000 1.75 0 0.00000 0 5.85300

Sub Total 5.00 19.93300 3.50 0.00000 0.00000 0 19.9330027.13 Bedding 0 0.74000 0.750 0 0.00000 0.38 0 0.00000 0 0.7400027.14 Replacement of Bedding (once in 3 Year) 5 3.80500 0.750 0 0.00000 0 0.00000 0 3.80500

Sub Total 5.00 4.54500 1.50 0.00000 0.00000 0 4.54500TOTAL 83.11800 80.36 0.00000 0.00000 83.11800Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 10 108.00000 0 0.00000 10 108.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 10 6.00000 0 0.00000 10 6.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 10 6.00000 0 0.00000 10 6.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 10 120.00000 0 0.00000 10 120.0000027.2 Vocational training/specific skill training 0.500 10 5.00000 0 0.00000 10 5.0000027.21 Electricity/water charges 0.600 10 6.00000 0 0.00000 10 6.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 10 7.50000 0 0.00000 10 7.5000027.23 Maintenance 0.400 10 4.00000 0 0.00000 10 4.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 10 4.00000 0 0.00000 10 4.00000

27.25 Preparatory camps 0.150 10 1.50000 0 0.00000 10 1.5000027.26 PTAs/school functions 0.150 10 1.50000 0 0.00000 10 1.5000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 10 3.00000 0 0.00000 10 3.0000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 10 272.50000 0 0.00000 10 272.50000Grant Total 0 83.11800 118.330 10 272.50000 0 0.00000 10 355.61800

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPFaizabad

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old3+New2) Farukhabad

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 13.30000 65.860 0 0.00000 0 0.00000 0 13.30000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 13.30000 65.86 0.00000 0.00000 0 13.3000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 1.50000 0 0.00000 0 0.00000 0 1.50000

Sub Total 0.00 1.50000 3.00 0.00000 0.00000 0 1.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 3.41000 3.000 0 0.00000 0 0.00000 0 3.41000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 -0.00100 1.500 0 0.00000 1.50 0 0.00000 0 -0.00100

Sub Total 0.00 3.40900 4.50 0.00000 0.00000 0 3.40900

27.11 Teaching learning material and equipment includinglibrary books(New)

2 5.61000 3.500 0 0.00000 0 0.00000 0 5.61000

27.12 Teaching learning material and equipment includinglibrary books 0 0.01100 0 0.00000 1.75 0 0.00000 0 0.01100

Sub Total 2.00 5.62100 3.50 0.00000 0.00000 0 5.6210027.13 Bedding 0 0.78000 0.750 0 0.00000 0.38 0 0.00000 0 0.7800027.14 Replacement of Bedding (once in 3 Year) 2 0.00200 0.750 0 0.00000 0 0.00000 0 0.00200

Sub Total 2.00 0.78200 1.50 0.00000 0.00000 0 0.78200TOTAL 24.61200 80.36 0.00000 0.00000 24.61200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00000 0 0.00000 5 54.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 5 3.00000 0 0.00000 5 3.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 5 3.00000 0 0.00000 5 3.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 5 60.00000 0 0.00000 5 60.0000027.2 Vocational training/specific skill training 0.500 5 2.50000 0 0.00000 5 2.5000027.21 Electricity/water charges 0.600 5 3.00000 0 0.00000 5 3.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75000 0 0.00000 5 3.7500027.23 Maintenance 0.400 5 2.00000 0 0.00000 5 2.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 5 2.00000 0 0.00000 5 2.00000

27.25 Preparatory camps 0.150 5 0.75000 0 0.00000 5 0.7500027.26 PTAs/school functions 0.150 5 0.75000 0 0.00000 5 0.7500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 5 1.50000 0 0.00000 5 1.5000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 5 136.25000 0 0.00000 5 136.25000Grant Total 0 24.61200 118.330 5 136.25000 0 0.00000 5 160.86200

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPFarrukhabad

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old3+New7) Fatehpur

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 34.75000 65.860 0 0.00000 0 0.00000 0 34.75000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 9.09000 0 0.00000 0 0.00000 0 9.09000

Sub Total 0.00 43.84000 65.86 0.00000 0.00000 0 43.8400027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 19.60000 3.000 0 0.00000 0 0.00000 0 19.60000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 1.25300 1.500 0 0.00000 1.50 0 0.00000 0 1.25300

Sub Total 0.00 20.85300 4.50 0.00000 0.00000 0 20.85300

27.11 Teaching learning material and equipment includinglibrary books(New)

7 23.65000 3.500 0 0.00000 0 0.00000 0 23.65000

27.12 Teaching learning material and equipment includinglibrary books 0 2.33500 0 0.00000 1.75 0 0.00000 0 2.33500

Sub Total 7.00 25.98500 3.50 0.00000 0.00000 0 25.9850027.13 Bedding 0 0.13000 0.750 0 0.00000 0.38 0 0.00000 0 0.1300027.14 Replacement of Bedding (once in 3 Year) 1 2.28600 0.750 0 0.00000 0 0.00000 0 2.28600

Sub Total 1.00 2.41600 1.50 0.00000 0.00000 0 2.41600TOTAL 93.09400 80.36 0.00000 0.00000 93.09400Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 10 108.00000 0 0.00000 10 108.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 10 6.00000 0 0.00000 10 6.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 10 6.00000 0 0.00000 10 6.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 10 120.00000 0 0.00000 10 120.0000027.2 Vocational training/specific skill training 0.500 10 5.00000 0 0.00000 10 5.0000027.21 Electricity/water charges 0.600 10 6.00000 0 0.00000 10 6.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 10 7.50000 0 0.00000 10 7.5000027.23 Maintenance 0.400 10 4.00000 0 0.00000 10 4.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 10 4.00000 0 0.00000 10 4.00000

27.25 Preparatory camps 0.150 10 1.50000 0 0.00000 10 1.5000027.26 PTAs/school functions 0.150 10 1.50000 0 0.00000 10 1.5000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 10 3.00000 0 0.00000 10 3.0000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 10 272.50000 0 0.00000 10 272.50000Grant Total 0 93.09400 118.330 10 272.50000 0 0.00000 10 365.59400

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPFatehpur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old3) Firozabad

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 3.73600 0 0.00000 0 0.00000 0 3.73600

Sub Total 0.00 3.73600 65.86 0.00000 0.00000 0 3.7360027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 4.50000 0 0.00000 0 0.00000 0 4.50000

Sub Total 0.00 4.50000 3.00 0.00000 0.00000 0 4.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 1.00 0.00000 0.00000 0 3.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 -0.00300 1.500 0 0.00000 1.50 0 0.00000 0 -0.00300

Sub Total 0.00 -0.00300 4.50 0.00000 0.00000 0 -0.00300

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 2.01200 0 0.00000 1.75 0 0.00000 0 2.01200

Sub Total 0.00 2.01200 3.50 0.00000 0.00000 0 2.0120027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 1 -0.00400 0.750 0 0.00000 0 0.00000 0 -0.00400

Sub Total 1.00 -0.00400 1.50 0.00000 0.00000 0 -0.00400TOTAL 13.44100 80.36 0.00000 0.00000 13.44100Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 3 32.40000 0 0.00000 3 32.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 3 1.80000 0 0.00000 3 1.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 3 1.80000 0 0.00000 3 1.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 3 36.00000 0 0.00000 3 36.0000027.2 Vocational training/specific skill training 0.500 3 1.50000 0 0.00000 3 1.5000027.21 Electricity/water charges 0.600 3 1.80000 0 0.00000 3 1.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 3 2.25000 0 0.00000 3 2.2500027.23 Maintenance 0.400 3 1.20000 0 0.00000 3 1.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 3 1.20000 0 0.00000 3 1.20000

27.25 Preparatory camps 0.150 3 0.45000 0 0.00000 3 0.4500027.26 PTAs/school functions 0.150 3 0.45000 0 0.00000 3 0.4500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 3 0.90000 0 0.00000 3 0.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 3 81.75000 0 0.00000 3 81.75000Grant Total 0 13.44100 118.330 3 81.75000 0 0.00000 3 95.19100

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPFirozabad

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old1+NEW1) G.B.Nagar

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 25.000 1 25.00000 1 25.00000

Sub Total 0.00 0.00000 65.86 0.00000 25.00 25.00000 1 25.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 3.00 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 2.86000 3.000 0 0.00000 3.000 0.00000 0 2.86000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00100 1.500 0 0.00000 1.000 1 1.00000 1 1.00100

Sub Total 0.00 2.86100 4.50 0.00000 4.00 1.00000 1 3.86100

27.11 Teaching learning material and equipment includinglibrary books(New)

1 3.50000 3.500 0 0.00000 0 3.50000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00700 0 0.00000 1.500 1 1.50000 1 1.50700

Sub Total 1.00 3.50700 3.50 0.00000 1.50 1.50000 1 5.0070027.13 Bedding 0 0.00000 0.750 0 0.00000 0.375 1 0.37500 1 0.3750027.14 Replacement of Bedding (once in 3 Year) 1 0.00300 0.750 0 0.00000 0.750 0.00000 0 0.00300

Sub Total 1.00 0.00300 1.50 0.00000 1.13 0.37500 1 0.37800TOTAL 6.37100 80.36 0.00000 36.63 27.87500 34.24600Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 2 21.60000 5.400 1 5.40000 2 27.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 2 1.20000 0.300 1 0.30000 2 1.50000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 2 1.20000 0.300 1 0.30000 2 1.50000

27.18 Examination fee 0.020 0 0.00000 0.000 0 0.00000 0 0.0000027.19 Salaries: 12.000 2 24.00000 0.000 1 0.00000 2 24.0000027.2 Vocational training/specific skill training 0.500 2 1.00000 0.300 1 0.30000 2 1.3000027.21 Electricity/water charges 0.600 2 1.20000 0.360 1 0.36000 2 1.5600027.22 Medical care/contingencies @ Rs. 750 child 0.750 2 1.50000 0.375 1 0.37500 2 1.8750027.23 Maintenance 0.400 2 0.80000 0.200 1 0.20000 2 1.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 2 0.80000 0.200 1 0.20000 2 1.00000

27.25 Preparatory camps 0.150 2 0.30000 0.100 1 0.10000 2 0.4000027.26 PTAs/school functions 0.150 2 0.30000 0.100 1 0.10000 2 0.4000027.27 Provision of Rent (8 months) 4.800 0.00000 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 2 0.60000 0.150 1 0.15000 2 0.7500027.28 Maintenance of building 0.500 0 0.00000 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 2 54.50000 7.785 1 7.78500 2 62.28500Grant Total 0 6.37100 118.330 2 54.50000 44.410 1 35.66000 2 96.53100

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPG.B.Nagar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (3) Ghaziabad

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 10.04600 0 0.00000 0 0.00000 0 10.04600

Sub Total 0.00 10.04600 65.86 0.00000 0.00000 0 10.0460027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.12000 0 0.00000 0 0.00000 0 0.12000

Sub Total 0.00 0.12000 3.00 0.00000 0.00000 0 0.1200027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 1.87000 0 0.00000 0 0.00000 0 1.87000

Sub Total 0.00 1.87000 1.00 0.00000 0.00000 0 1.8700027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.22300 1.500 0 0.00000 1.50 0 0.00000 0 0.22300

Sub Total 0.00 0.22300 4.50 0.00000 0.00000 0 0.22300

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 4.65400 0 0.00000 1.75 0 0.00000 0 4.65400

Sub Total 0.00 4.65400 3.50 0.00000 0.00000 0 4.6540027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 7 2.50600 0.750 0 0.00000 0 0.00000 0 2.50600

Sub Total 7.00 2.50600 1.50 0.00000 0.00000 0 2.50600TOTAL 19.41900 80.36 0.00000 0.00000 19.41900Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 3 32.40000 0 0.00000 3 32.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 3 1.80000 0 0.00000 3 1.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 3 1.80000 0 0.00000 3 1.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 3 36.00000 0 0.00000 3 36.0000027.2 Vocational training/specific skill training 0.500 3 1.50000 0 0.00000 3 1.5000027.21 Electricity/water charges 0.600 3 1.80000 0 0.00000 3 1.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 3 2.25000 0 0.00000 3 2.2500027.23 Maintenance 0.400 3 1.20000 0 0.00000 3 1.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 3 1.20000 0 0.00000 3 1.20000

27.25 Preparatory camps 0.150 3 0.45000 0 0.00000 3 0.4500027.26 PTAs/school functions 0.150 3 0.45000 0 0.00000 3 0.4500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 3 0.90000 0 0.00000 3 0.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 3 81.75000 0 0.00000 3 81.75000Grant Total 0 19.41900 118.330 3 81.75000 0 0.00000 3 101.16900

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPGhaziabad

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old4+New10) Ghazipur

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 316.45000 65.860 0 0.00000 0 0.00000 0 316.45000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 16.15100 0 0.00000 0 0.00000 0 16.15100

Sub Total 0.00 332.60100 65.86 0.00000 0.00000 0 332.6010027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 3.00 0.00000 0.00000 0 3.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 4.00000 0 0.00000 0 0.00000 0 4.00000

Sub Total 0.00 4.00000 1.00 0.00000 0.00000 0 4.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 26.14000 3.000 0 0.00000 0 0.00000 0 26.14000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.53000 1.500 0 0.00000 1.50 0 0.00000 0 0.53000

Sub Total 0.00 26.67000 4.50 0.00000 0.00000 0 26.67000

27.11 Teaching learning material and equipment includinglibrary books(New)

10 34.95000 3.500 0 0.00000 0 0.00000 0 34.95000

27.12 Teaching learning material and equipment includinglibrary books 0 0.83800 0 0.00000 1.75 0 0.00000 0 0.83800

Sub Total 10.00 35.78800 3.50 0.00000 0.00000 0 35.7880027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 1 0.72200 0.750 0 0.00000 0 0.00000 0 0.72200

Sub Total 1.00 0.72200 1.50 0.00000 0.00000 0 0.72200TOTAL 402.78100 80.36 0.00000 0.00000 402.78100Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 14 151.20000 0 0.00000 14 151.20000

27.16 Stipend for girl student per month @ Rs. 50 0.600 14 8.40000 0 0.00000 14 8.40000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 14 8.40000 0 0.00000 14 8.40000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 14 168.00000 0 0.00000 14 168.0000027.2 Vocational training/specific skill training 0.500 14 7.00000 0 0.00000 14 7.0000027.21 Electricity/water charges 0.600 14 8.40000 0 0.00000 14 8.4000027.22 Medical care/contingencies @ Rs. 750 child 0.750 14 10.50000 0 0.00000 14 10.5000027.23 Maintenance 0.400 14 5.60000 0 0.00000 14 5.60000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 14 5.60000 0 0.00000 14 5.60000

27.25 Preparatory camps 0.150 14 2.10000 0 0.00000 14 2.1000027.26 PTAs/school functions 0.150 14 2.10000 0 0.00000 14 2.1000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 14 4.20000 0 0.00000 14 4.2000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 14 381.50000 0 0.00000 14 381.50000Grant Total 0 402.78100 118.330 14 381.50000 0 0.00000 14 784.28100

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPGhazipur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old16+New1) Gonda

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 4.95000 65.860 0 0.00000 0.00000 0 4.95000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 14.85000 0 0.00000 25.000 7 175.00000 7 189.85000

Sub Total 0.00 19.80000 65.86 0.00000 25.00 175.00000 7 194.8000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 3.00 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.01000 3.000 0 0.00000 3.000 0.00000 0 0.01000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.17100 1.500 0 0.00000 1.500 7 10.50000 7 10.67100

Sub Total 0.00 0.18100 4.50 0.00000 4.50 10.50000 7 10.68100

27.11 Teaching learning material and equipment includinglibrary books(New)

1 1.26000 3.500 0 0.00000 0 1.26000

27.12 Teaching learning material and equipment includinglibrary books 0 0.13400 0 0.00000 1.750 7 12.25000 7 12.38400

Sub Total 1.00 1.39400 3.50 0.00000 1.75 12.25000 7 13.6440027.13 Bedding 0 0.00000 0.750 0 0.00000 0.375 7 2.62500 7 2.6250027.14 Replacement of Bedding (once in 3 Year) 13 0.04000 0.750 0 0.00000 0.750 0.00000 0 0.04000

Sub Total 13.00 0.04000 1.50 0.00000 1.13 2.62500 7 2.66500TOTAL 21.41500 80.36 0.00000 37.38 200.37500 221.79000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 17 183.60000 5.400 7 37.80000 17 221.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 17 10.20000 0.300 7 2.10000 17 12.30000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 17 10.20000 0.300 7 2.10000 17 12.30000

27.18 Examination fee 0.020 0 0.00000 0.010 0 0.00000 0 0.0000027.19 Salaries: 12.000 17 204.00000 4.740 7 33.18000 17 237.1800027.2 Vocational training/specific skill training 0.500 17 8.50000 0.250 7 1.75000 17 10.2500027.21 Electricity/water charges 0.600 17 10.20000 0.300 7 2.10000 17 12.3000027.22 Medical care/contingencies @ Rs. 750 child 0.750 17 12.75000 0.375 7 2.62500 17 15.3750027.23 Maintenance 0.400 17 6.80000 0.200 7 1.40000 17 8.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 17 6.80000 0.200 7 1.40000 17 8.20000

27.25 Preparatory camps 0.150 17 2.55000 0.075 7 0.52500 17 3.0750027.26 PTAs/school functions 0.150 17 2.55000 0.075 7 0.52500 17 3.0750027.27 Provision of Rent (8 months) 4.800 0.00000 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 17 5.10000 0.150 7 1.05000 17 6.1500027.28 Maintenance of building 0.500 0 0.00000 0.500 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 17 463.25000 12.875 7 86.55500 17 549.80500Grant Total 0 21.41500 118.330 17 463.25000 50.250 7 286.93000 17 771.59500

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPGonda

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old7+New13) Gorakhpur

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 217.50000 65.860 0 0.00000 0 0.00000 0 217.50000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 12.21000 0 0.00000 0 0.00000 0 12.21000

Sub Total 0.00 229.71000 65.86 0.00000 0.00000 0 229.7100027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 3.00 0.00000 0.00000 0 3.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.50000 0 0.00000 0 0.00000 0 2.50000

Sub Total 0.00 2.50000 1.00 0.00000 0.00000 0 2.5000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 2.20000 3.000 0 0.00000 0 0.00000 0 2.20000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 -0.00100 1.500 0 0.00000 1.50 0 0.00000 0 -0.00100

Sub Total 0.00 2.19900 4.50 0.00000 0.00000 0 2.19900

27.11 Teaching learning material and equipment includinglibrary books(New)

13 19.15000 3.500 0 0.00000 0 0.00000 0 19.15000

27.12 Teaching learning material and equipment includinglibrary books 0 3.44600 0 0.00000 1.75 0 0.00000 0 3.44600

Sub Total 13.00 22.59600 3.50 0.00000 0.00000 0 22.5960027.13 Bedding 0 0.54000 0.750 0 0.00000 0.38 0 0.00000 0 0.5400027.14 Replacement of Bedding (once in 3 Year) 3 0.59200 0.750 0 0.00000 0 0.00000 0 0.59200

Sub Total 3.00 1.13200 1.50 0.00000 0.00000 0 1.13200TOTAL 261.33700 80.36 0.00000 0.00000 261.33700Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 20 216.00000 0 0.00000 20 216.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 20 12.00000 0 0.00000 20 12.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 20 12.00000 0 0.00000 20 12.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 20 240.00000 0 0.00000 20 240.0000027.2 Vocational training/specific skill training 0.500 20 10.00000 0 0.00000 20 10.0000027.21 Electricity/water charges 0.600 20 12.00000 0 0.00000 20 12.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 20 15.00000 0 0.00000 20 15.0000027.23 Maintenance 0.400 20 8.00000 0 0.00000 20 8.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 20 8.00000 0 0.00000 20 8.00000

27.25 Preparatory camps 0.150 20 3.00000 0 0.00000 20 3.0000027.26 PTAs/school functions 0.150 20 3.00000 0 0.00000 20 3.0000027.27 Provision of Rent (8 months) 4.800 4 19.20000 0 0.00000 4 19.20000

Provision of Rent (6 months) 3.600 9 32.40000 0 0.00000 9 32.40000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 20 6.00000 0 0.00000 20 6.0000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 20 596.60000 0 0.00000 20 596.60000Grant Total 0 261.33700 118.330 20 596.60000 0 0.00000 20 857.93700

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPGorakhpur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old2+New4) Hamirpur

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 26.60000 65.860 0 0.00000 0 0.00000 0 26.60000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 27.30000 0 0.00000 0 0.00000 0 27.30000

Sub Total 0.00 53.90000 65.86 0.00000 0.00000 0 53.9000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 10.93000 3.000 0 0.00000 0 0.00000 0 10.93000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 1.17200 1.500 0 0.00000 1.50 0 0.00000 0 1.17200

Sub Total 0.00 12.10200 4.50 0.00000 0.00000 0 12.10200

27.11 Teaching learning material and equipment includinglibrary books(New)

4 11.92000 3.500 0 0.00000 0 0.00000 0 11.92000

27.12 Teaching learning material and equipment includinglibrary books 0 1.28400 0 0.00000 1.75 0 0.00000 0 1.28400

Sub Total 4.00 13.20400 3.50 0.00000 0.00000 0 13.2040027.13 Bedding 0 2.86000 0.750 0 0.00000 0.38 0 0.00000 0 2.8600027.14 Replacement of Bedding (once in 3 Year) 1 1.19600 0.750 0 0.00000 0 0.00000 0 1.19600

Sub Total 1.00 4.05600 1.50 0.00000 0.00000 0 4.05600TOTAL 83.26200 80.36 0.00000 0.00000 83.26200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 6 64.80000 0 0.00000 6 64.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 6 3.60000 0 0.00000 6 3.60000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 6 3.60000 0 0.00000 6 3.60000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 6 72.00000 0 0.00000 6 72.0000027.2 Vocational training/specific skill training 0.500 6 3.00000 0 0.00000 6 3.0000027.21 Electricity/water charges 0.600 6 3.60000 0 0.00000 6 3.6000027.22 Medical care/contingencies @ Rs. 750 child 0.750 6 4.50000 0 0.00000 6 4.5000027.23 Maintenance 0.400 6 2.40000 0 0.00000 6 2.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 6 2.40000 0 0.00000 6 2.40000

27.25 Preparatory camps 0.150 6 0.90000 0 0.00000 6 0.9000027.26 PTAs/school functions 0.150 6 0.90000 0 0.00000 6 0.9000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 6 1.80000 0 0.00000 6 1.8000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 6 163.50000 0 0.00000 6 163.50000Grant Total 0 83.26200 118.330 6 163.50000 0 0.00000 6 246.76200

ActivitySl. No. Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPHamirpur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (20) Hardoi

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 167.57000 65.860 0 0.00000 0.00000 0 167.57000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 25.000 1 25.00000 1 25.00000

Sub Total 0.00 167.57000 65.86 0.00000 25.00 25.00000 1 192.5700027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 1.19000 0 0.00000 0.00000 0 1.19000

Sub Total 0.00 1.19000 3.00 0.00000 3.00 0.00000 0 1.1900027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 4.00000 0 0.00000 0.00000 0 4.00000

Sub Total 0.00 4.00000 1.00 0.00000 1.00 0.00000 0 4.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 3.48000 3.000 0 0.00000 3.000 0.00000 0 3.48000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.500 1 1.50000 1 1.50000

Sub Total 0.00 3.48000 4.50 0.00000 4.50 1.50000 1 4.98000

27.11 Teaching learning material and equipment includinglibrary books(New)

13 43.27000 3.500 0 0.00000 0 43.27000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00000 0 0.00000 1.750 1 1.75000 1 1.75000

Sub Total 13.00 43.27000 3.50 0.00000 1.75 1.75000 1 45.0200027.13 Bedding 0 2.47000 0.750 0 0.00000 0.375 1 0.37500 1 2.8450027.14 Replacement of Bedding (once in 3 Year) 3 0.90000 0.750 0 0.00000 0.750 0.00000 0 0.90000

Sub Total 3.00 3.37000 1.50 0.00000 1.13 0.37500 1 3.74500TOTAL 222.88000 80.36 0.00000 37.38 28.62500 251.50500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 20 216.00000 5.400 1 5.40000 20 221.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 20 12.00000 0.300 1 0.30000 20 12.30000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 20 12.00000 0.300 1 0.30000 20 12.30000

27.18 Examination fee 0.020 0 0.00000 0.010 0 0.00000 0 0.0000027.19 Salaries: 12.000 20 240.00000 4.740 1 4.74000 20 244.7400027.2 Vocational training/specific skill training 0.500 20 10.00000 0.250 1 0.25000 20 10.2500027.21 Electricity/water charges 0.600 20 12.00000 0.300 1 0.30000 20 12.3000027.22 Medical care/contingencies @ Rs. 750 child 0.750 20 15.00000 0.375 1 0.37500 20 15.3750027.23 Maintenance 0.400 20 8.00000 0.200 1 0.20000 20 8.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 20 8.00000 0.200 1 0.20000 20 8.20000

27.25 Preparatory camps 0.150 20 3.00000 0.075 1 0.07500 20 3.0750027.26 PTAs/school functions 0.150 20 3.00000 0.075 1 0.07500 20 3.0750027.27 Provision of Rent (8 months) 4.800 9 43.20000 0.00000 9 43.20000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 20 6.00000 0.150 1 0.15000 20 6.1500027.28 Maintenance of building 0.500 0 0.00000 0.500 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 20 588.20000 12.875 1 12.36500 20 600.56500Grant Total 0 222.88000 118.330 20 588.20000 50.250 1 40.99000 20 852.07000

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPHardoi

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old3+New2) Hathras

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 31.72000 65.860 0 0.00000 0 0.00000 0 31.72000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 3.76000 0 0.00000 0 0.00000 0 3.76000

Sub Total 0.00 35.48000 65.86 0.00000 0.00000 0 35.4800027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.00000 0 0.00000 0 0.00000 0 2.00000

Sub Total 0.00 2.00000 1.00 0.00000 0.00000 0 2.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.67000 3.000 0 0.00000 0 0.00000 0 0.67000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 1.01300 1.500 0 0.00000 1.50 0 0.00000 0 1.01300

Sub Total 0.00 1.68300 4.50 0.00000 0.00000 0 1.68300

27.11 Teaching learning material and equipment includinglibrary books(New)

2 3.36000 3.500 0 0.00000 0 0.00000 0 3.36000

27.12 Teaching learning material and equipment includinglibrary books 0 1.32800 0 0.00000 1.75 0 0.00000 0 1.32800

Sub Total 2.00 4.68800 3.50 0.00000 0.00000 0 4.6880027.13 Bedding 0 0.05000 0.750 0 0.00000 0.38 0 0.00000 0 0.0500027.14 Replacement of Bedding (once in 3 Year) 1 0.15500 0.750 0 0.00000 0 0.00000 0 0.15500

Sub Total 1.00 0.20500 1.50 0.00000 0.00000 0 0.20500TOTAL 44.05600 80.36 0.00000 0.00000 44.05600Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00000 0 0.00000 5 54.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 5 3.00000 0 0.00000 5 3.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 5 3.00000 0 0.00000 5 3.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 5 60.00000 0 0.00000 5 60.0000027.2 Vocational training/specific skill training 0.500 5 2.50000 0 0.00000 5 2.5000027.21 Electricity/water charges 0.600 5 3.00000 0 0.00000 5 3.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75000 0 0.00000 5 3.7500027.23 Maintenance 0.400 5 2.00000 0 0.00000 5 2.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 5 2.00000 0 0.00000 5 2.00000

27.25 Preparatory camps 0.150 5 0.75000 0 0.00000 5 0.7500027.26 PTAs/school functions 0.150 5 0.75000 0 0.00000 5 0.7500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 5 1.50000 0 0.00000 5 1.5000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 5 136.25000 0 0.00000 5 136.25000Grant Total 0 44.05600 118.330 5 136.25000 0 0.00000 5 180.30600

ActivitySl. No. Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPHathras

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old4+New3) Jalaun

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 24.39000 65.860 0 0.00000 0.00000 0 24.39000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00200 0 0.00000 25.000 1 25.00000 1 25.00200

Sub Total 0.00 24.39200 65.86 0.00000 25.00 25.00000 1 49.3920027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 3.00 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.40000 0 0.00000 0.00000 0 0.40000

Sub Total 0.00 0.40000 1.00 0.00000 1.00 0.00000 0 0.40000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 6.75000 3.000 0 0.00000 3.000 0.00000 0 6.75000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 3.25300 1.500 0 0.00000 1.000 1 1.00000 1 4.25300

Sub Total 0.00 10.00300 4.50 0.00000 4.00 1.00000 1 11.00300

27.11 Teaching learning material and equipment includinglibrary books(New)

3 10.13000 3.500 0 0.00000 0 10.13000

27.12 Teaching learning material and equipment includinglibrary books 0 3.27000 0 0.00000 1.500 1 1.50000 1 4.77000

Sub Total 3.00 13.40000 3.50 0.00000 1.50 1.50000 1 14.9000027.13 Bedding 0 0.35000 0.750 0 0.00000 0.375 1 0.37500 1 0.7250027.14 Replacement of Bedding (once in 3 Year) 3 0.57400 0.750 0 0.00000 0.750 0.00000 0 0.57400

Sub Total 3.00 0.92400 1.50 0.00000 1.13 0.37500 1 1.29900TOTAL 49.11900 80.36 0.00000 36.63 27.87500 76.99400Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 7 75.60000 5.400 1 5.40000 7 81.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 7 4.20000 0.300 1 0.30000 7 4.50000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 7 4.20000 0.300 1 0.30000 7 4.50000

27.18 Examination fee 0.020 0 0.00000 0.000 0 0.00000 0 0.0000027.19 Salaries: 12.000 7 84.00000 0.000 1 0.00000 7 84.0000027.2 Vocational training/specific skill training 0.500 7 3.50000 0.300 1 0.30000 7 3.8000027.21 Electricity/water charges 0.600 7 4.20000 0.360 1 0.36000 7 4.5600027.22 Medical care/contingencies @ Rs. 750 child 0.750 7 5.25000 0.375 1 0.37500 7 5.6250027.23 Maintenance 0.400 7 2.80000 0.200 1 0.20000 7 3.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 7 2.80000 0.200 1 0.20000 7 3.00000

27.25 Preparatory camps 0.150 7 1.05000 0.100 1 0.10000 7 1.1500027.26 PTAs/school functions 0.150 7 1.05000 0.100 1 0.10000 7 1.1500027.27 Provision of Rent (8 months) 4.800 3 14.40000 0.00000 3 14.40000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 7 2.10000 0.150 1 0.15000 7 2.2500027.28 Maintenance of building 0.500 0 0.00000 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 7 205.15000 7.785 1 7.78500 7 212.93500Grant Total 0 49.11900 118.330 7 205.15000 44.410 1 35.66000 7 289.92900

Sl. No. Activity Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPJalaun

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old6+New13) Jaunpur

Phy Fin Unit Cost Phy Fin Unit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 112.57000 65.860 0 0.00000 0 0.00000 0 112.57000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.01000 0 0.00000 0 0.00000 0 0.01000

Sub Total 0.00 112.58000 65.86 0.00000 0.00000 0 112.5800027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 4.50000 0 0.00000 0 0.00000 0 4.50000

Sub Total 0.00 4.50000 3.00 0.00000 0.00000 0 4.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 5.76000 0 0.00000 0 0.00000 0 5.76000

Sub Total 0.00 5.76000 1.00 0.00000 0.00000 0 5.7600027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 34.49000 3.000 0 0.00000 0 0.00000 0 34.49000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.77300 1.500 0 0.00000 1.50 0 0.00000 0 0.77300

Sub Total 0.00 35.26300 4.50 0.00000 0.00000 0 35.26300

27.11 Teaching learning material and equipment includinglibrary books(New)

13 45.37000 3.500 0 0.00000 0 0.00000 0 45.37000

27.12 Teaching learning material and equipment including library books 0 3.16900 0 0.00000 1.75 0 0.00000 0 3.16900

Sub Total 13.00 48.53900 3.50 0.00000 0.00000 0 48.5390027.13 Bedding 0 4.73000 0.750 0 0.00000 0.38 0 0.00000 0 4.7300027.14 Replacement of Bedding (once in 3 Year) 2 2.00300 0.750 0 0.00000 0 0.00000 0 2.00300

Sub Total 2.00 6.73300 1.50 0.00000 0.00000 0 6.73300TOTAL 213.37500 80.36 0.00000 0.00000 213.37500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 19 205.20000 0 0.00000 19 205.20000

27.16 Stipend for girl student per month @ Rs. 50 0.600 19 11.40000 0 0.00000 19 11.40000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 19 11.40000 0 0.00000 19 11.40000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 19 228.00000 0 0.00000 19 228.0000027.2 Vocational training/specific skill training 0.500 19 9.50000 0 0.00000 19 9.5000027.21 Electricity/water charges 0.600 19 11.40000 0 0.00000 19 11.4000027.22 Medical care/contingencies @ Rs. 750 child 0.750 19 14.25000 0 0.00000 19 14.2500027.23 Maintenance 0.400 19 7.60000 0 0.00000 19 7.60000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 19 7.60000 0 0.00000 19 7.60000

27.25 Preparatory camps 0.150 19 2.85000 0 0.00000 19 2.8500027.26 PTAs/school functions 0.150 19 2.85000 0 0.00000 19 2.8500027.27 Provision of Rent (8 months) 4.800 14 67.20000 0 0.00000 14 67.20000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 19 5.70000 0 0.00000 19 5.7000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 19 584.95000 0 0.00000 19 584.95000Grant Total 0 213.37500 118.330 19 584.95000 0 0.00000 19 798.32500

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPJaunpur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old5+New4) Jhansi

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 138.46000 65.860 0 0.00000 0 0.00000 0 138.46000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 138.46000 65.86 0.00000 0.00000 0 138.4600027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.86000 0 0.00000 0 0.00000 0 0.86000

Sub Total 0.00 0.86000 3.00 0.00000 0.00000 0 0.8600027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.47000 0 0.00000 0 0.00000 0 0.47000

Sub Total 0.00 0.47000 1.00 0.00000 0.00000 0 0.4700027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.18000 0 0.00000 0 0.00000 0 0.18000

Sub Total 0.00 0.18000 1.00 0.00000 0.00000 0 0.18000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.06000 3.000 0 0.00000 0 0.00000 0 0.06000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.27400 1.500 0 0.00000 1.50 0 0.00000 0 0.27400

Sub Total 0.00 0.33400 4.50 0.00000 0.00000 0 0.33400

27.11 Teaching learning material and equipment includinglibrary books(New)

4 7.85000 3.500 0 0.00000 0 0.00000 0 7.85000

27.12 Teaching learning material and equipment includinglibrary books 0 2.84200 0 0.00000 1.75 0 0.00000 0 2.84200

Sub Total 4.00 10.69200 3.50 0.00000 0.00000 0 10.6920027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 3 0.02700 0.750 0 0.00000 0 0.00000 0 0.02700

Sub Total 3.00 0.02700 1.50 0.00000 0.00000 0 0.02700TOTAL 151.02300 80.36 0.00000 0.00000 151.02300Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 9 97.20000 0 0.00000 9 97.20000

27.16 Stipend for girl student per month @ Rs. 50 0.600 9 5.40000 0 0.00000 9 5.40000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 9 5.40000 0 0.00000 9 5.40000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 9 108.00000 0 0.00000 9 108.0000027.2 Vocational training/specific skill training 0.500 9 4.50000 0 0.00000 9 4.5000027.21 Electricity/water charges 0.600 9 5.40000 0 0.00000 9 5.4000027.22 Medical care/contingencies @ Rs. 750 child 0.750 9 6.75000 0 0.00000 9 6.7500027.23 Maintenance 0.400 9 3.60000 0 0.00000 9 3.60000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 9 3.60000 0 0.00000 9 3.60000

27.25 Preparatory camps 0.150 9 1.35000 0 0.00000 9 1.3500027.26 PTAs/school functions 0.150 9 1.35000 0 0.00000 9 1.3500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 9 2.70000 0 0.00000 9 2.7000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 9 245.25000 0 0.00000 9 245.25000Grant Total 0 151.02300 118.330 9 245.25000 0 0.00000 9 396.27300

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPJhansi

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old8) J.P.Nagar

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 65.86 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 2.31000 0 0.00000 0 0.00000 0 2.31000

Sub Total 0.00 2.31000 3.00 0.00000 0.00000 0 2.3100027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.00000 0 0.00000 0 0.00000 0 2.00000

Sub Total 0.00 2.00000 1.00 0.00000 0.00000 0 2.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.40000 0 0.00000 0 0.00000 0 0.40000

Sub Total 0.00 0.40000 1.00 0.00000 0.00000 0 0.40000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.04900 1.500 0 0.00000 1.50 0 0.00000 0 0.04900

Sub Total 0.00 0.04900 4.50 0.00000 0.00000 0 0.04900

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.27400 0 0.00000 1.75 0 0.00000 0 0.27400

Sub Total 0.00 0.27400 3.50 0.00000 0.00000 0 0.2740027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 7 0.75900 0.750 0 0.00000 0 0.00000 0 0.75900

Sub Total 7.00 0.75900 1.50 0.00000 0.00000 0 0.75900TOTAL 5.79200 80.36 0.00000 0.00000 5.79200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40000 0 0.00000 8 86.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 8 4.80000 0 0.00000 8 4.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 8 4.80000 0 0.00000 8 4.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 8 96.00000 0 0.00000 8 96.0000027.2 Vocational training/specific skill training 0.500 8 4.00000 0 0.00000 8 4.0000027.21 Electricity/water charges 0.600 8 4.80000 0 0.00000 8 4.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00000 0 0.00000 8 6.0000027.23 Maintenance 0.400 8 3.20000 0 0.00000 8 3.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 8 3.20000 0 0.00000 8 3.20000

27.25 Preparatory camps 0.150 8 1.20000 0 0.00000 8 1.2000027.26 PTAs/school functions 0.150 8 1.20000 0 0.00000 8 1.2000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 1 3.60000 0 0.00000 1 3.60000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 8 2.40000 0 0.00000 8 2.4000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 8 221.60000 0 0.00000 8 221.60000Grant Total 0 5.79200 118.330 8 221.60000 0 0.00000 8 227.39200

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPJPNagar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old5) Kannauj

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.45000 0 0.00000 0 0.00000 0 0.45000

Sub Total 0.00 0.45000 65.86 0.00000 0.00000 0 0.4500027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.30000 0 0.00000 0 0.00000 0 0.30000

Sub Total 0.00 0.30000 1.00 0.00000 0.00000 0 0.30000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00400 1.500 0 0.00000 1.50 0 0.00000 0 0.00400

Sub Total 0.00 0.00400 4.50 0.00000 0.00000 0 0.00400

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.75700 0 0.00000 1.75 0 0.00000 0 0.75700

Sub Total 0.00 0.75700 3.50 0.00000 0.00000 0 0.7570027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 4 0.77400 0.750 0 0.00000 0 0.00000 0 0.77400

Sub Total 4.00 0.77400 1.50 0.00000 0.00000 0 0.77400TOTAL 2.28500 80.36 0.00000 0.00000 2.28500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00000 0 0.00000 5 54.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 5 3.00000 0 0.00000 5 3.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 5 3.00000 0 0.00000 5 3.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 5 60.00000 0 0.00000 5 60.0000027.2 Vocational training/specific skill training 0.500 5 2.50000 0 0.00000 5 2.5000027.21 Electricity/water charges 0.600 5 3.00000 0 0.00000 5 3.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75000 0 0.00000 5 3.7500027.23 Maintenance 0.400 5 2.00000 0 0.00000 5 2.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 5 2.00000 0 0.00000 5 2.00000

27.25 Preparatory camps 0.150 5 0.75000 0 0.00000 5 0.7500027.26 PTAs/school functions 0.150 5 0.75000 0 0.00000 5 0.7500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 5 1.50000 0 0.00000 5 1.5000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 5 136.25000 0 0.00000 5 136.25000Grant Total 0 2.28500 118.330 5 136.25000 0 0.00000 5 138.53500

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPKannauj

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old) Kanpur Dehat

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 65.86 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.50 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 4.50 0.00000 0.00000 0 0.00000

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00000 0 0.00000 1.75 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.50 0.00000 0.00000 0 0.0000027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 0 0.00000 0.750 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.50 0.00000 0.00000 0 0.00000TOTAL 0.00000 80.36 0.00000 0.00000 0.00000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 1 10.80000 0 0.00000 1 10.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 1 0.60000 0 0.00000 1 0.60000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 1 0.60000 0 0.00000 1 0.60000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 1 12.00000 0 0.00000 1 12.0000027.2 Vocational training/specific skill training 0.500 1 0.50000 0 0.00000 1 0.5000027.21 Electricity/water charges 0.600 1 0.60000 0 0.00000 1 0.6000027.22 Medical care/contingencies @ Rs. 750 child 0.750 1 0.75000 0 0.00000 1 0.7500027.23 Maintenance 0.400 1 0.40000 0 0.00000 1 0.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 1 0.40000 0 0.00000 1 0.40000

27.25 Preparatory camps 0.150 1 0.15000 0 0.00000 1 0.1500027.26 PTAs/school functions 0.150 1 0.15000 0 0.00000 1 0.1500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 1 0.30000 0 0.00000 1 0.3000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 1 27.25000 0 0.00000 1 27.25000Grant Total 0 0.00000 118.330 1 27.25000 0 0.00000 1 27.25000

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPKanpurDehat

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old6+New2) Kashiram Nagar

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 25.78000 65.860 0 0.00000 0 0.00000 0 25.78000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 13.71100 0 0.00000 0 0.00000 0 13.71100

Sub Total 0.00 39.49100 65.86 0.00000 0.00000 0 39.4910027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 2.22000 0 0.00000 0 0.00000 0 2.22000

Sub Total 0.00 2.22000 3.00 0.00000 0.00000 0 2.2200027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 4.04000 0 0.00000 0 0.00000 0 4.04000

Sub Total 0.00 4.04000 1.00 0.00000 0.00000 0 4.0400027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 6.00000 3.000 0 0.00000 0 0.00000 0 6.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.06000 1.500 0 0.00000 1.50 0 0.00000 0 0.06000

Sub Total 0.00 6.06000 4.50 0.00000 0.00000 0 6.06000

27.11 Teaching learning material and equipment includinglibrary books(New)

2 7.00000 3.500 0 0.00000 0 0.00000 0 7.00000

27.12 Teaching learning material and equipment includinglibrary books 0 8.01800 0 0.00000 1.75 0 0.00000 0 8.01800

Sub Total 2.00 15.01800 3.50 0.00000 0.00000 0 15.0180027.13 Bedding 0 0.02000 0.750 0 0.00000 0.38 0 0.00000 0 0.0200027.14 Replacement of Bedding (once in 3 Year) 4 0.20700 0.750 0 0.00000 0 0.00000 0 0.20700

Sub Total 4.000 0.22700 1.500 0.00000 0.00000 0 0.22700TOTAL 67.25600 80.36 0.00000 0.00000 67.25600Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40000 0 0.00000 8 86.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 8 4.80000 0 0.00000 8 4.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 8 4.80000 0 0.00000 8 4.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 8 96.00000 0 0.00000 8 96.0000027.2 Vocational training/specific skill training 0.500 8 4.00000 0 0.00000 8 4.0000027.21 Electricity/water charges 0.600 8 4.80000 0 0.00000 8 4.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00000 0 0.00000 8 6.0000027.23 Maintenance 0.400 8 3.20000 0 0.00000 8 3.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 8 3.20000 0 0.00000 8 3.20000

27.25 Preparatory camps 0.150 8 1.20000 0 0.00000 8 1.2000027.26 PTAs/school functions 0.150 8 1.20000 0 0.00000 8 1.2000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 8 2.40000 0 0.00000 8 2.4000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 8 218.00000 0 0.00000 8 218.00000Grant Total 0 67.25600 118.330 8 218.00000 0 0.00000 8 285.25600

Sl. No. Activity Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13Spill over

D:\KGBVAWP_B_2012-13_-_UPKashiramNagar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old5+New3) Kaushambi

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 98.67000 65.860 0 0.00000 0 0.00000 0 98.67000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 98.67000 65.86 0.00000 0.00000 0 98.6700027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.53000 3.000 0 0.00000 0 0.00000 0 0.53000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.50 0 0.00000 0 0.00000

Sub Total 0.00 0.53000 4.50 0.00000 0.00000 0 0.53000

27.11 Teaching learning material and equipment includinglibrary books(New)

3 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 -1.00600 0 0.00000 1.75 0 0.00000 0 -1.00600

Sub Total 3.00 -1.00600 3.50 0.00000 0.00000 0 -1.0060027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 3 0.00000 0.750 0 0.00000 0 0.00000 0 0.00000

Sub Total 3.00 0.00000 1.50 0.00000 0.00000 0 0.00000TOTAL 98.19400 80.36 0.00000 0.00000 98.19400Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40000 0 0.00000 8 86.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 8 4.80000 0 0.00000 8 4.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 8 4.80000 0 0.00000 8 4.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 8 96.00000 0 0.00000 8 96.0000027.2 Vocational training/specific skill training 0.500 8 4.00000 0 0.00000 8 4.0000027.21 Electricity/water charges 0.600 8 4.80000 0 0.00000 8 4.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00000 0 0.00000 8 6.0000027.23 Maintenance 0.400 8 3.20000 0 0.00000 8 3.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 8 3.20000 0 0.00000 8 3.20000

27.25 Preparatory camps 0.150 8 1.20000 0 0.00000 8 1.2000027.26 PTAs/school functions 0.150 8 1.20000 0 0.00000 8 1.2000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 8 2.40000 0 0.00000 8 2.4000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 8 218.00000 0 0.00000 8 218.00000Grant Total 0 98.19400 118.330 8 218.00000 0 0.00000 8 316.19400

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPKaushambi

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old7+New7) Kushinagar

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 93.16000 65.860 0 0.00000 0 0.00000 0 93.16000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 4.89000 0 0.00000 0 0.00000 0 4.89000

Sub Total 0.00 98.05000 65.86 0.00000 0.00000 0 98.0500027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 3.00 0.00000 0.00000 0 3.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 7.00000 0 0.00000 0 0.00000 0 7.00000

Sub Total 0.00 7.00000 1.00 0.00000 0.00000 0 7.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 9.72000 3.000 0 0.00000 0 0.00000 0 9.72000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 3.80100 1.500 0 0.00000 1.50 0 0.00000 0 3.80100

Sub Total 0.00 13.52100 4.50 0.00000 0.00000 0 13.52100

27.11 Teaching learning material and equipment includinglibrary books(New)

7 22.19000 3.500 0 0.00000 0 0.00000 0 22.19000

27.12 Teaching learning material and equipment includinglibrary books 0 7.89800 0 0.00000 1.75 0 0.00000 0 7.89800

Sub Total 7.00 30.08800 3.50 0.00000 0.00000 0 30.0880027.13 Bedding 0 2.00000 0.750 0 0.00000 0.38 0 0.00000 0 2.0000027.14 Replacement of Bedding (once in 3 Year) 4 0.37100 0.750 0 0.00000 0 0.00000 0 0.37100

Sub Total 4.00 2.37100 1.50 0.00000 0.00000 0 2.37100TOTAL 154.23000 80.36 0.00000 0.00000 154.23000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 14 151.20000 0 0.00000 14 151.20000

27.16 Stipend for girl student per month @ Rs. 50 0.600 14 8.40000 0 0.00000 14 8.40000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 14 8.40000 0 0.00000 14 8.40000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 14 168.00000 0 0.00000 14 168.0000027.2 Vocational training/specific skill training 0.500 14 7.00000 0 0.00000 14 7.0000027.21 Electricity/water charges 0.600 14 8.40000 0 0.00000 14 8.4000027.22 Medical care/contingencies @ Rs. 750 child 0.750 14 10.50000 0 0.00000 14 10.5000027.23 Maintenance 0.400 14 5.60000 0 0.00000 14 5.60000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 14 5.60000 0 0.00000 14 5.60000

27.25 Preparatory camps 0.150 14 2.10000 0 0.00000 14 2.1000027.26 PTAs/school functions 0.150 14 2.10000 0 0.00000 14 2.1000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 14 4.20000 0 0.00000 14 4.2000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 14 381.50000 0 0.00000 14 381.50000Grant Total 0 154.23000 118.330 14 381.50000 0 0.00000 14 535.73000

Sl. No. Activity Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPKushinagar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old11+New5) Lakhimpur Kheri

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 198.08000 65.860 0 0.00000 0.00000 0 198.08000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 26.06000 0 0.00000 25.000 5 125.00000 5 151.06000

Sub Total 0.00 224.14000 65.86 0.00000 25.00 125.00000 5 349.1400027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 8.62500 0 0.00000 0 8.62500

Sub Total 0.00 8.62500 3.00 0.00000 3.00 0.00000 0 8.6250027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 5.75000 0 0.00000 0 5.75000

Sub Total 0.00 5.75000 1.00 0.00000 1.00 0.00000 0 5.7500027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.80000 0 0.00000 0 0.80000

Sub Total 0.00 0.80000 1.00 0.00000 1.00 0.00000 0 0.80000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 5.40000 3.000 0 0.00000 3.000 0.00000 0 5.40000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 1.24000 1.500 0 0.00000 1.500 5 7.50000 5 8.74000

Sub Total 0.00 6.64000 4.50 0.00000 4.50 7.50000 5 14.14000

27.11 Teaching learning material and equipment includinglibrary books(New)

5 10.73000 3.500 0 0.00000 0.00000 0 10.73000

27.12 Teaching learning material and equipment includinglibrary books 0 13.39200 0 0.00000 1.750 5 8.75000 5 22.14200

Sub Total 5.00 24.12200 3.50 0.00000 1.75 8.75000 5 32.8720027.13 Bedding 0 0.09000 0.750 0 0.00000 0.375 5 1.87500 5 1.9650027.14 Replacement of Bedding (once in 3 Year) 10 8.56800 0.750 0 0.00000 0.750 0.00000 0 8.56800

Sub Total 10.00 8.65800 1.50 0.00000 1.13 1.87500 5 10.53300TOTAL 278.73500 80.36 0.00000 37.38 143.12500 421.86000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 16 172.80000 5.400 5 27.00000 16 199.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 16 9.60000 0.300 5 1.50000 16 11.10000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 16 9.60000 0.300 5 1.50000 16 11.10000

27.18 Examination fee 0.020 0 0.00000 0.010 0 0.00000 0 0.0000027.19 Salaries: 12.000 16 192.00000 4.740 5 23.70000 16 215.7000027.2 Vocational training/specific skill training 0.500 16 8.00000 0.250 5 1.25000 16 9.2500027.21 Electricity/water charges 0.600 16 9.60000 0.300 5 1.50000 16 11.1000027.22 Medical care/contingencies @ Rs. 750 child 0.750 16 12.00000 0.375 5 1.87500 16 13.8750027.23 Maintenance 0.400 16 6.40000 0.200 5 1.00000 16 7.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 16 6.40000 0.200 5 1.00000 16 7.40000

27.25 Preparatory camps 0.150 16 2.40000 0.075 5 0.37500 16 2.7750027.26 PTAs/school functions 0.150 16 2.40000 0.075 5 0.37500 16 2.7750027.27 Provision of Rent (8 months) 4.800 5 24.00000 0.00000 5 24.00000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 16 4.80000 0.150 5 0.75000 16 5.5500027.28 Maintenance of building 0.500 0 0.00000 0.500 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 16 460.00000 12.875 5 61.82500 16 521.82500Grant Total 0 278.73500 118.330 16 460.00000 50.250 5 204.95000 16 943.68500

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPLakhimpur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old5+New1) Lalitpur

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 65.86 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.25000 0 0.00000 0 0.00000 0 0.25000

Sub Total 0.00 0.25000 1.00 0.00000 0.00000 0 0.2500027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.45000 3.000 0 0.00000 0 0.00000 0 0.45000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.01400 1.500 0 0.00000 1.50 0 0.00000 0 0.01400

Sub Total 0.00 0.46400 4.50 0.00000 0.00000 0 0.46400

27.11 Teaching learning material and equipment includinglibrary books(New)

1 1.44000 3.500 0 0.00000 0 0.00000 0 1.44000

27.12 Teaching learning material and equipment includinglibrary books 0 1.23500 0 0.00000 1.75 0 0.00000 0 1.23500

Sub Total 1.00 2.67500 3.50 0.00000 0.00000 0 2.6750027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 4 0.01100 0.750 0 0.00000 0 0.00000 0 0.01100

Sub Total 4.00 0.01100 1.50 0.00000 0.00000 0 0.01100TOTAL 3.60000 80.36 0.00000 0.00000 3.60000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 6 64.80000 0 0.00000 6 64.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 6 3.60000 0 0.00000 6 3.60000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 6 3.60000 0 0.00000 6 3.60000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 6 72.00000 0 0.00000 6 72.0000027.2 Vocational training/specific skill training 0.500 6 3.00000 0 0.00000 6 3.0000027.21 Electricity/water charges 0.600 6 3.60000 0 0.00000 6 3.6000027.22 Medical care/contingencies @ Rs. 750 child 0.750 6 4.50000 0 0.00000 6 4.5000027.23 Maintenance 0.400 6 2.40000 0 0.00000 6 2.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 6 2.40000 0 0.00000 6 2.40000

27.25 Preparatory camps 0.150 6 0.90000 0 0.00000 6 0.9000027.26 PTAs/school functions 0.150 6 0.90000 0 0.00000 6 0.9000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 6 1.80000 0 0.00000 6 1.8000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 6 163.50000 0 0.00000 6 163.50000Grant Total 0 3.60000 118.330 6 163.50000 0 0.00000 6 167.10000

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPLalitpur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old3+NEW5) Lucknow

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 25.000 1 25.00000 1 25.00000

Sub Total 0.00 0.00000 65.86 0.00000 25.00 25.00000 1 25.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 3.00 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 6.50000 3.000 0 0.00000 3.000 0.00000 0 6.50000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.500 1 1.50000 1 1.50000

Sub Total 0.00 6.50000 4.50 0.00000 4.50 1.50000 1 8.00000

27.11 Teaching learning material and equipment includinglibrary books(New)

5 13.06000 3.500 0 0.00000 0 13.06000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00000 0 0.00000 1.750 1 1.75000 1 1.75000

Sub Total 5.00 13.06000 3.50 0.00000 1.75 1.75000 1 14.8100027.13 Bedding 0 1.41000 0.750 0 0.00000 0.375 1 0.37500 1 1.7850027.14 Replacement of Bedding (once in 3 Year) 2 1.50000 0.750 0 0.00000 0.750 0.00000 0 1.50000

Sub Total 2.00 2.91000 1.50 0.00000 1.13 0.37500 1 3.28500TOTAL 22.47000 80.36 0.00000 37.38 28.62500 51.09500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40000 5.400 1 5.40000 8 91.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 8 4.80000 0.300 1 0.30000 8 5.10000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 8 4.80000 0.300 1 0.30000 8 5.10000

27.18 Examination fee 0.020 0 0.00000 0.010 0 0.00000 0 0.0000027.19 Salaries: 12.000 8 96.00000 4.740 1 4.74000 8 100.7400027.2 Vocational training/specific skill training 0.500 8 4.00000 0.250 1 0.25000 8 4.2500027.21 Electricity/water charges 0.600 8 4.80000 0.300 1 0.30000 8 5.1000027.22 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00000 0.375 1 0.37500 8 6.3750027.23 Maintenance 0.400 8 3.20000 0.200 1 0.20000 8 3.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 8 3.20000 0.200 1 0.20000 8 3.40000

27.25 Preparatory camps 0.150 8 1.20000 0.075 1 0.07500 8 1.2750027.26 PTAs/school functions 0.150 8 1.20000 0.075 1 0.07500 8 1.2750027.27 Provision of Rent (8 months) 4.800 5 24.00000 0.00000 5 24.00000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 8 2.40000 0.150 1 0.15000 8 2.5500027.28 Maintenance of building 0.500 0 0.00000 0.500 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 8 242.00000 12.875 1 12.36500 8 254.36500Grant Total 0 22.47000 118.330 8 242.00000 50.250 1 40.99000 8 305.46000

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPLucknow

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old13) Maharajganj

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00300 0 0.00000 0 0.00000 0 0.00300

Sub Total 0.00 0.00300 65.86 0.00000 0.00000 0 0.0030027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.20000 0 0.00000 0 0.00000 0 2.20000

Sub Total 0.00 2.20000 1.00 0.00000 0.00000 0 2.2000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 1.40000 0 0.00000 0 0.00000 0 1.40000

Sub Total 0.00 1.40000 1.00 0.00000 0.00000 0 1.40000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 -0.00200 1.500 0 0.00000 1.50 0 0.00000 0 -0.00200

Sub Total 0.00 -0.00200 4.50 0.00000 0.00000 0 -0.00200

27.11 Teaching learning material and equipmentincluding library books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment including library books 0 1.30600 0 0.00000 1.75 0 0.00000 0 1.30600

Sub Total 0.00 1.30600 3.50 0.00000 0.00000 0 1.3060027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 11 0.12400 0.750 0 0.00000 0 0.00000 0 0.12400

Sub Total 11.00 0.12400 1.50 0.00000 0.00000 0 0.12400TOTAL 5.03100 80.36 0.00000 0.00000 5.03100Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40000 0 0.00000 13 140.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 13 7.80000 0 0.00000 13 7.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 13 7.80000 0 0.00000 13 7.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 13 156.00000 0 0.00000 13 156.0000027.2 Vocational training/specific skill training 0.500 13 6.50000 0 0.00000 13 6.5000027.21 Electricity/water charges 0.600 13 7.80000 0 0.00000 13 7.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75000 0 0.00000 13 9.7500027.23 Maintenance 0.400 13 5.20000 0 0.00000 13 5.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 13 5.20000 0 0.00000 13 5.20000

27.25 Preparatory camps 0.150 13 1.95000 0 0.00000 13 1.9500027.26 PTAs/school functions 0.150 13 1.95000 0 0.00000 13 1.9500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 13 3.90000 0 0.00000 13 3.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 13 354.25000 0 0.00000 13 354.25000Grant Total 0 5.03100 118.330 13 354.25000 0 0.00000 13 359.28100

Sl. No. Activity Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over

D:\KGBVAWP_B_2012-13_-_UPMaharajganj

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old3) Mahoba

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.03000 0 0.00000 0 0.00000 0 0.03000

Sub Total 0.00 0.03000 65.86 0.00000 0.00000 0 0.0300027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.21000 0 0.00000 0 0.00000 0 0.21000

Sub Total 0.00 0.21000 1.00 0.00000 0.00000 0 0.2100027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00400 1.500 0 0.00000 1.50 0 0.00000 0 0.00400

Sub Total 0.00 0.00400 4.50 0.00000 0.00000 0 0.00400

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 -0.00100 0 0.00000 1.75 0 0.00000 0 -0.00100

Sub Total 0.00 -0.00100 3.50 0.00000 0.00000 0 -0.0010027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 2 -0.00500 0.750 0 0.00000 0 0.00000 0 -0.00500

Sub Total 2.00 -0.00500 1.50 0.00000 0.00000 0 -0.00500TOTAL 0.23800 80.36 0.00000 0.00000 0.23800Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 3 32.40000 0 0.00000 3 32.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 3 1.80000 0 0.00000 3 1.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 3 1.80000 0 0.00000 3 1.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 3 36.00000 0 0.00000 3 36.0000027.2 Vocational training/specific skill training 0.500 3 1.50000 0 0.00000 3 1.5000027.21 Electricity/water charges 0.600 3 1.80000 0 0.00000 3 1.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 3 2.25000 0 0.00000 3 2.2500027.23 Maintenance 0.400 3 1.20000 0 0.00000 3 1.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 3 1.20000 0 0.00000 3 1.20000

27.25 Preparatory camps 0.150 3 0.45000 0 0.00000 3 0.4500027.26 PTAs/school functions 0.150 3 0.45000 0 0.00000 3 0.4500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 3 0.90000 0 0.00000 3 0.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 3 81.75000 0 0.00000 3 81.75000Grant Total 0 0.23800 118.330 3 81.75000 0 0.00000 3 81.98800

ActivitySl. No.

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill over

D:\KGBVAWP_B_2012-13_-_UPMahoba

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old3) Mainpur

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 7.30000 0 0.00000 0 0.00000 0 7.30000

Sub Total 0.00 7.30000 65.86 0.00000 0.00000 0 7.3000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 1.50000 0 0.00000 0 0.00000 0 1.50000

Sub Total 0.00 1.50000 3.00 0.00000 0.00000 0 1.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 1.00 0.00000 0.00000 0 3.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.85000 1.500 0 0.00000 1.50 0 0.00000 0 0.85000

Sub Total 0.00 0.85000 4.50 0.00000 0.00000 0 0.85000

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 2.79800 0 0.00000 1.75 0 0.00000 0 2.79800

Sub Total 0.00 2.79800 3.50 0.00000 0.00000 0 2.7980027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 2 0.20000 0.750 0 0.00000 0 0.00000 0 0.20000

Sub Total 2.00 0.20000 1.50 0.00000 0.00000 0 0.20000TOTAL 15.64800 80.36 0.00000 0.00000 15.64800Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 3 32.40000 0 0.00000 3 32.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 3 1.80000 0 0.00000 3 1.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 3 1.80000 0 0.00000 3 1.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 3 36.00000 0 0.00000 3 36.0000027.2 Vocational training/specific skill training 0.500 3 1.50000 0 0.00000 3 1.5000027.21 Electricity/water charges 0.600 3 1.80000 0 0.00000 3 1.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 3 2.25000 0 0.00000 3 2.2500027.23 Maintenance 0.400 3 1.20000 0 0.00000 3 1.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 3 1.20000 0 0.00000 3 1.20000

27.25 Preparatory camps 0.150 3 0.45000 0 0.00000 3 0.4500027.26 PTAs/school functions 0.150 3 0.45000 0 0.00000 3 0.4500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 3 0.90000 0 0.00000 3 0.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 3 81.75000 0 0.00000 3 81.75000Grant Total 0 15.64800 118.330 3 81.75000 0 0.00000 3 97.39800

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPMainpuri

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old4+New6) Mathura

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 39.89000 65.860 0 0.00000 0 0.00000 0 39.89000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 9.08400 0 0.00000 0 0.00000 0 9.08400

Sub Total 0.00 48.97400 65.86 0.00000 0.00000 0 48.9740027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 6.00000 0 0.00000 0 0.00000 0 6.00000

Sub Total 0.00 6.00000 3.00 0.00000 0.00000 0 6.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 4.00000 0 0.00000 0 0.00000 0 4.00000

Sub Total 0.00 4.00000 1.00 0.00000 0.00000 0 4.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 13.55000 3.000 0 0.00000 0 0.00000 0 13.55000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.06700 1.500 0 0.00000 1.50 0 0.00000 0 0.06700

Sub Total 0.00 13.61700 4.50 0.00000 0.00000 0 13.61700

27.11 Teaching learning material and equipment includinglibrary books(New)

6 15.19000 3.500 0 0.00000 0 0.00000 0 15.19000

27.12 Teaching learning material and equipment includinglibrary books 0 2.43700 0 0.00000 1.75 0 0.00000 0 2.43700

Sub Total 6.00 17.62700 3.50 0.00000 0.00000 0 17.6270027.13 Bedding 0 2.80000 0.750 0 0.00000 0.38 0 0.00000 0 2.8000027.14 Replacement of Bedding (once in 3 Year) 2 1.40400 0.750 0 0.00000 0 0.00000 0 1.40400

Sub Total 2.00 4.20400 1.50 0.00000 0.00000 0 4.20400TOTAL 94.42200 80.36 0.00000 0.00000 94.42200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 10 108.00000 0 0.00000 10 108.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 10 6.00000 0 0.00000 10 6.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 10 6.00000 0 0.00000 10 6.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 10 120.00000 0 0.00000 10 120.0000027.2 Vocational training/specific skill training 0.500 10 5.00000 0 0.00000 10 5.0000027.21 Electricity/water charges 0.600 10 6.00000 0 0.00000 10 6.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 10 7.50000 0 0.00000 10 7.5000027.23 Maintenance 0.400 10 4.00000 0 0.00000 10 4.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 10 4.00000 0 0.00000 10 4.00000

27.25 Preparatory camps 0.150 10 1.50000 0 0.00000 10 1.5000027.26 PTAs/school functions 0.150 10 1.50000 0 0.00000 10 1.5000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 7 25.20000 0 0.00000 7 25.20000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 10 3.00000 0 0.00000 10 3.0000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 10 297.70000 0 0.00000 10 297.70000Grant Total 0 94.42200 118.330 10 297.70000 0 0.00000 10 392.12200

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPMathura

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old3+New2) Mau

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 1.04000 65.860 0 0.00000 0 0.00000 0 1.04000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 1.04000 65.86 0.00000 0.00000 0 1.0400027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 4.50000 0 0.00000 0 0.00000 0 4.50000

Sub Total 0.00 4.50000 3.00 0.00000 0.00000 0 4.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 1.00 0.00000 0.00000 0 3.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 4.66000 3.000 0 0.00000 0 0.00000 0 4.66000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.01500 1.500 0 0.00000 1.50 0 0.00000 0 0.01500

Sub Total 0.00 4.67500 4.50 0.00000 0.00000 0 4.67500

27.11 Teaching learning material and equipment includinglibrary books(New)

2 5.04000 3.500 0 0.00000 0 0.00000 0 5.04000

27.12 Teaching learning material and equipment includinglibrary books 0 1.90000 0 0.00000 1.75 0 0.00000 0 1.90000

Sub Total 2.00 6.94000 3.50 0.00000 0.00000 0 6.9400027.13 Bedding 0 1.24000 0.750 0 0.00000 0.38 0 0.00000 0 1.2400027.14 Replacement of Bedding (once in 3 Year) 1 1.84900 0.750 0 0.00000 0 0.00000 0 1.84900

Sub Total 1.00 3.08900 1.50 0.00000 0.00000 0 3.08900TOTAL 23.24400 80.36 0.00000 0.00000 23.24400Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00000 0 0.00000 5 54.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 5 3.00000 0 0.00000 5 3.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 5 3.00000 0 0.00000 5 3.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 5 60.00000 0 0.00000 5 60.0000027.2 Vocational training/specific skill training 0.500 5 2.50000 0 0.00000 5 2.5000027.21 Electricity/water charges 0.600 5 3.00000 0 0.00000 5 3.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75000 0 0.00000 5 3.7500027.23 Maintenance 0.400 5 2.00000 0 0.00000 5 2.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 5 2.00000 0 0.00000 5 2.00000

27.25 Preparatory camps 0.150 5 0.75000 0 0.00000 5 0.7500027.26 PTAs/school functions 0.150 5 0.75000 0 0.00000 5 0.7500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 5 1.50000 0 0.00000 5 1.5000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 5 136.25000 0 0.00000 5 136.25000Grant Total 0 23.24400 118.330 5 136.25000 0 0.00000 5 159.49400

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPMau

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old4+New1) Meerut

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 33.33000 65.860 0 0.00000 0 0.00000 0 33.33000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 1.84000 0 0.00000 0 0.00000 0 1.84000

Sub Total 0.00 35.17000 65.86 0.00000 0.00000 0 35.1700027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 1.40000 0 0.00000 0 0.00000 0 1.40000

Sub Total 0.00 1.40000 1.00 0.00000 0.00000 0 1.4000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.06000 3.000 0 0.00000 0 0.00000 0 0.06000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00100 1.500 0 0.00000 1.50 0 0.00000 0 0.00100

Sub Total 0.00 0.06100 4.50 0.00000 0.00000 0 0.06100

27.11 Teaching learning material and equipment includinglibrary books(New)

1 0.28000 3.500 0 0.00000 0 0.00000 0 0.28000

27.12 Teaching learning material and equipment includinglibrary books 0 0.08200 0 0.00000 1.75 0 0.00000 0 0.08200

Sub Total 1.00 0.36200 3.50 0.00000 0.00000 0 0.3620027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 2 0.03400 0.750 0 0.00000 0 0.00000 0 0.03400

Sub Total 2.00 0.03400 1.50 0.00000 0.00000 0 0.03400TOTAL 37.22700 80.36 0.00000 0.00000 37.22700Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00000 0 0.00000 5 54.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 5 3.00000 0 0.00000 5 3.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 5 3.00000 0 0.00000 5 3.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 5 60.00000 0 0.00000 5 60.0000027.2 Vocational training/specific skill training 0.500 5 2.50000 0 0.00000 5 2.5000027.21 Electricity/water charges 0.600 5 3.00000 0 0.00000 5 3.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75000 0 0.00000 5 3.7500027.23 Maintenance 0.400 5 2.00000 0 0.00000 5 2.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 5 2.00000 0 0.00000 5 2.00000

27.25 Preparatory camps 0.150 5 0.75000 0 0.00000 5 0.7500027.26 PTAs/school functions 0.150 5 0.75000 0 0.00000 5 0.7500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 5 1.50000 0 0.00000 5 1.5000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 5 136.25000 0 0.00000 5 136.25000Grant Total 0 37.22700 118.330 5 136.25000 0 0.00000 5 173.47700

ActivitySl. No.

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPMeerut

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old5+New5) Mirzapur

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 62.49000 65.860 0 0.00000 0 0.00000 0 62.49000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 4.69000 0 0.00000 0 0.00000 0 4.69000

Sub Total 0.00 67.18000 65.86 0.00000 0.00000 0 67.1800027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 7.50000 0 0.00000 0 0.00000 0 7.50000

Sub Total 0.00 7.50000 3.00 0.00000 0.00000 0 7.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 5.00000 0 0.00000 0 0.00000 0 5.00000

Sub Total 0.00 5.00000 1.00 0.00000 0.00000 0 5.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 15.00000 3.000 0 0.00000 0 0.00000 0 15.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 2.95200 1.500 0 0.00000 1.50 0 0.00000 0 2.95200

Sub Total 0.00 17.95200 4.50 0.00000 0.00000 0 17.95200

27.11 Teaching learning material and equipment includinglibrary books(New)

5 17.50000 3.500 0 0.00000 0 0.00000 0 17.50000

27.12 Teaching learning material and equipment includinglibrary books 0 6.00000 0 0.00000 1.75 0 0.00000 0 6.00000

Sub Total 5.00 23.50000 3.50 0.00000 0.00000 0 23.5000027.13 Bedding 0 3.75000 0.750 0 0.00000 0.38 0 0.00000 0 3.7500027.14 Replacement of Bedding (once in 3 Year) 5 4.72000 0.750 0 0.00000 0 0.00000 0 4.72000

Sub Total 5.00 8.47000 1.50 0.00000 0.00000 0 8.47000TOTAL 129.60200 80.36 0.00000 0.00000 129.60200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 10 108.00000 0 0.00000 10 108.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 10 6.00000 0 0.00000 10 6.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 10 6.00000 0 0.00000 10 6.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 10 120.00000 0 0.00000 10 120.0000027.2 Vocational training/specific skill training 0.500 10 5.00000 0 0.00000 10 5.0000027.21 Electricity/water charges 0.600 10 6.00000 0 0.00000 10 6.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 10 7.50000 0 0.00000 10 7.5000027.23 Maintenance 0.400 10 4.00000 0 0.00000 10 4.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 10 4.00000 0 0.00000 10 4.00000

27.25 Preparatory camps 0.150 10 1.50000 0 0.00000 10 1.5000027.26 PTAs/school functions 0.150 10 1.50000 0 0.00000 10 1.5000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 1 3.60000 0 0.00000 1 3.60000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 10 3.00000 0 0.00000 10 3.0000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 10 276.10000 0 0.00000 10 276.10000Grant Total 0 129.60200 118.330 10 276.10000 0 0.00000 10 405.70200

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPMirzapur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (9) Moradabad

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 25.000 4 100.00000 4 100.00000

Sub Total 0.00 0.00000 65.86 0.00000 25.00 100.00000 4 100.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 3.00 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.500 4 6.00000 4 6.00000

Sub Total 0.00 0.00000 4.50 0.00000 4.50 6.00000 4 6.00000

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00000 0 0.00000 1.750 4 7.00000 4 7.00000

Sub Total 0.00 0.00000 3.50 0.00000 1.75 7.00000 4 7.0000027.13 Bedding 0 0.00000 0.750 0 0.00000 0.375 4 1.50000 4 1.5000027.14 Replacement of Bedding (once in 3 Year) 16 0.00000 0.750 0 0.00000 0.750 0.00000 0 0.00000

Sub Total 16.00 0.00000 1.50 0.00000 1.13 1.50000 4 1.50000TOTAL 0.00000 80.36 0.00000 37.38 114.50000 114.50000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 9 97.20000 5.400 4 21.60000 9 118.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 9 5.40000 0.300 4 1.20000 9 6.60000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 9 5.40000 0.300 4 1.20000 9 6.60000

27.18 Examination fee 0.020 0 0.00000 0.010 0 0.00000 0 0.0000027.19 Salaries: 12.000 9 108.00000 4.740 4 18.96000 9 126.9600027.2 Vocational training/specific skill training 0.500 9 4.50000 0.250 4 1.00000 9 5.5000027.21 Electricity/water charges 0.600 9 5.40000 0.300 4 1.20000 9 6.6000027.22 Medical care/contingencies @ Rs. 750 child 0.750 9 6.75000 0.375 4 1.50000 9 8.2500027.23 Maintenance 0.400 9 3.60000 0.200 4 0.80000 9 4.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 9 3.60000 0.200 4 0.80000 9 4.40000

27.25 Preparatory camps 0.150 9 1.35000 0.075 4 0.30000 9 1.6500027.26 PTAs/school functions 0.150 9 1.35000 0.075 4 0.30000 9 1.6500027.27 Provision of Rent (8 months) 4.800 0.00000 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 9 2.70000 0.150 4 0.60000 9 3.3000027.28 Maintenance of building 0.500 0 0.00000 0.500 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 9 245.25000 12.875 4 49.46000 9 294.71000Grant Total 0 0.00000 118.330 9 245.25000 50.250 4 163.96000 9 409.21000

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPMoradabad

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old4) Muzaffar Nagar

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.80500 0 0.00000 25.000 5 125.00000 5 125.80500

Sub Total 0.00 0.80500 65.86 0.00000 25.00 125.00000 5 125.8050027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 3.00 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.84000 0 0.00000 0 2.84000

Sub Total 0.00 2.84000 1.00 0.00000 1.00 0.00000 0 2.8400027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.80000 0 0.00000 0 0.80000

Sub Total 0.00 0.80000 1.00 0.00000 1.00 0.00000 0 0.80000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 1.62600 1.500 0 0.00000 5 5.50000 5 7.12600

Sub Total 0.00 1.62600 4.50 0.00000 3.00 5.50000 5 7.12600

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 5.10810 0 0.00000 5 7.75000 5 12.85810

Sub Total 0.00 5.10810 3.50 0.00000 0.00 7.75000 5 12.8581027.13 Bedding 0 0.00000 0.750 0 0.00000 0.375 5 1.87500 5 1.8750027.14 Replacement of Bedding (once in 3 Year) 5 1.96000 0.750 0 0.00000 0.750 0.00000 0 1.96000

Sub Total 5.00 1.96000 1.50 0.00000 1.13 1.87500 5 3.83500TOTAL 13.13910 80.36 0.00000 34.13 140.12500 153.26410Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 4 43.20000 5 27.00000 4 70.20000

27.16 Stipend for girl student per month @ Rs. 50 0.600 4 2.40000 5 1.50000 4 3.90000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 4 2.40000 5 1.50000 4 3.90000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 4 48.00000 5 4.74000 4 52.7400027.2 Vocational training/specific skill training 0.500 4 2.00000 5 1.45000 4 3.4500027.21 Electricity/water charges 0.600 4 2.40000 5 1.74000 4 4.1400027.22 Medical care/contingencies @ Rs. 750 child 0.750 4 3.00000 5 1.87500 4 4.8750027.23 Maintenance 0.400 4 1.60000 5 1.00000 4 2.60000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 4 1.60000 5 1.00000 4 2.60000

27.25 Preparatory camps 0.150 4 0.60000 5 0.47500 4 1.0750027.26 PTAs/school functions 0.150 4 0.60000 5 0.47500 4 1.0750027.27 Provision of Rent (8 months) 4.800 0.00000 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 4 1.20000 5 0.75000 4 1.9500027.28 Maintenance of building 0.500 0 0.00000 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 4 109.00000 0.000 5 43.50500 4 152.50500Grant Total 0 13.13910 118.330 4 109.00000 34.125 5 183.63000 4 305.76910

Total of Year 2012-13 Model-I & II

Total OutlaySpill over Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13Sl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPMuzaffarnagar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I Panchsheel Nagar(5)

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 65.86 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.50 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 4.50 0.00000 0.00000 0 0.00000

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00000 0 0.00000 1.75 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.50 0.00000 0.00000 0 0.0000027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 0 0.00000 0.750 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.50 0.00000 0.00000 0 0.00000TOTAL 0.00000 80.36 0.00000 0.00000 0.00000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00000 0 0.00000 5 54.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 5 3.00000 0 0.00000 5 3.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 5 3.00000 0 0.00000 5 3.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 5 60.00000 0 0.00000 5 60.0000027.2 Vocational training/specific skill training 0.500 5 2.50000 0 0.00000 5 2.5000027.21 Electricity/water charges 0.600 5 3.00000 0 0.00000 5 3.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75000 0 0.00000 5 3.7500027.23 Maintenance 0.400 5 2.00000 0 0.00000 5 2.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 5 2.00000 0 0.00000 5 2.00000

27.25 Preparatory camps 0.150 5 0.75000 0 0.00000 5 0.7500027.26 PTAs/school functions 0.150 5 0.75000 0 0.00000 5 0.7500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 5 1.50000 0 0.00000 5 1.5000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 5 136.25000 0 0.00000 5 136.25000Grant Total 0 0.00000 118.330 5 136.25000 0 0.00000 5 136.25000

Spill overSl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPPanchsheelNagar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (9) Pilibhit

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 1.20000 65.860 0 0.00000 0 0.00000 0 1.20000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.79000 0 0.00000 0 0.00000 0 0.79000

Sub Total 0.00 1.99000 65.86 0.00000 0.00000 0 1.9900027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.08200 1.500 0 0.00000 1.50 0 0.00000 0 0.08200

Sub Total 0.00 0.08200 4.50 0.00000 0.00000 0 0.08200

27.11 Teaching learning material and equipment includinglibrary books(New)

3 0.44000 3.500 0 0.00000 0 0.00000 0 0.44000

27.12 Teaching learning material and equipment includinglibrary books 0 0.65400 0 0.00000 1.75 0 0.00000 0 0.65400

Sub Total 3.00 1.09400 3.50 0.00000 0.00000 0 1.0940027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 5 0.04000 0.750 0 0.00000 0 0.00000 0 0.04000

Sub Total 5.00 0.04000 1.50 0.00000 0.00000 0 0.04000TOTAL 3.20600 80.36 0.00000 0.00000 3.20600Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 9 97.20000 0 0.00000 9 97.20000

27.16 Stipend for girl student per month @ Rs. 50 0.600 9 5.40000 0 0.00000 9 5.40000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 9 5.40000 0 0.00000 9 5.40000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 9 108.00000 0 0.00000 9 108.0000027.2 Vocational training/specific skill training 0.500 9 4.50000 0 0.00000 9 4.5000027.21 Electricity/water charges 0.600 9 5.40000 0 0.00000 9 5.4000027.22 Medical care/contingencies @ Rs. 750 child 0.750 9 6.75000 0 0.00000 9 6.7500027.23 Maintenance 0.400 9 3.60000 0 0.00000 9 3.60000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 9 3.60000 0 0.00000 9 3.60000

27.25 Preparatory camps 0.150 9 1.35000 0 0.00000 9 1.3500027.26 PTAs/school functions 0.150 9 1.35000 0 0.00000 9 1.3500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 9 2.70000 0 0.00000 9 2.7000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 9 245.25000 0 0.00000 9 245.25000Grant Total 0 3.20600 118.330 9 245.25000 0 0.00000 9 248.45600

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPPilibhit

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I Prabuddha Nagar

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 65.86 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.50 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 4.50 0.00000 0.00000 0 0.00000

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00000 0 0.00000 1.75 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.50 0.00000 0.00000 0 0.0000027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 0 0.00000 0.750 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.50 0.00000 0.00000 0 0.00000TOTAL 0.00000 80.36 0.00000 0.00000 0.00000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 3 32.40000 0 0.00000 3 32.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 3 1.80000 0 0.00000 3 1.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 3 1.80000 0 0.00000 3 1.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 3 36.00000 0 0.00000 3 36.0000027.2 Vocational training/specific skill training 0.500 3 1.50000 0 0.00000 3 1.5000027.21 Electricity/water charges 0.600 3 1.80000 0 0.00000 3 1.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 3 2.25000 0 0.00000 3 2.2500027.23 Maintenance 0.400 3 1.20000 0 0.00000 3 1.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 3 1.20000 0 0.00000 3 1.20000

27.25 Preparatory camps 0.150 3 0.45000 0 0.00000 3 0.4500027.26 PTAs/school functions 0.150 3 0.45000 0 0.00000 3 0.4500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 3 0.90000 0 0.00000 3 0.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 3 81.75000 0 0.00000 3 81.75000Grant Total 0 0.00000 118.330 3 81.75000 0 0.00000 3 81.75000

Sl. No. Activity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPPrabuddhaNagar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old5+New10) Pratapgarh

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 329.30000 65.860 0 0.00000 0 0.00000 0 329.30000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 10.81000 0 0.00000 0 0.00000 0 10.81000

Sub Total 0.00 340.11000 65.86 0.00000 0.00000 0 340.1100027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 1.50000 0 0.00000 0 0.00000 0 1.50000

Sub Total 0.00 1.50000 3.00 0.00000 0.00000 0 1.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 1.00000 0 0.00000 0 0.00000 0 1.00000

Sub Total 0.00 1.00000 1.00 0.00000 0.00000 0 1.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 10.00000 3.000 0 0.00000 0 0.00000 0 10.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.32700 1.500 0 0.00000 1.50 0 0.00000 0 0.32700

Sub Total 0.00 10.32700 4.50 0.00000 0.00000 0 10.32700

27.11 Teaching learning material and equipment includinglibrary books(New)

10 12.00000 3.500 0 0.00000 0 0.00000 0 12.00000

27.12 Teaching learning material and equipment includinglibrary books 0 4.50600 0 0.00000 1.75 0 0.00000 0 4.50600

Sub Total 10.00 16.50600 3.50 0.00000 0.00000 0 16.5060027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 2 0.65200 0.750 0 0.00000 0 0.00000 0 0.65200

Sub Total 2.00 0.65200 1.50 0.00000 0.00000 0 0.65200TOTAL 370.09500 80.36 0.00000 0.00000 370.09500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 15 162.00000 0 0.00000 15 162.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 15 9.00000 0 0.00000 15 9.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 15 9.00000 0 0.00000 15 9.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 15 180.00000 0 0.00000 15 180.0000027.2 Vocational training/specific skill training 0.500 15 7.50000 0 0.00000 15 7.5000027.21 Electricity/water charges 0.600 15 9.00000 0 0.00000 15 9.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 15 11.25000 0 0.00000 15 11.2500027.23 Maintenance 0.400 15 6.00000 0 0.00000 15 6.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 15 6.00000 0 0.00000 15 6.00000

27.25 Preparatory camps 0.150 15 2.25000 0 0.00000 15 2.2500027.26 PTAs/school functions 0.150 15 2.25000 0 0.00000 15 2.2500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 15 4.50000 0 0.00000 15 4.5000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 15 408.75000 0 0.00000 15 408.75000Grant Total 0 370.09500 118.330 15 408.75000 0 0.00000 15 778.84500

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPPratapgarh

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old1+New12) Rai Bareilly

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 4.80000 65.860 0 0.00000 0 0.00000 0 4.80000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.09000 0 0.00000 0 0.00000 0 0.09000

Sub Total 0.00 4.89000 65.86 0.00000 0.00000 0 4.8900027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 19.53000 3.000 0 0.00000 0 0.00000 0 19.53000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.39000 1.500 0 0.00000 1.50 0 0.00000 0 0.39000

Sub Total 0.00 19.92000 4.50 0.00000 0.00000 0 19.92000

27.11 Teaching learning material and equipment includinglibrary books(New)

12 35.17000 3.500 0 0.00000 0 0.00000 0 35.17000

27.12 Teaching learning material and equipment includinglibrary books 0 2.35000 0 0.00000 1.75 0 0.00000 0 2.35000

Sub Total 12.00 37.52000 3.50 0.00000 0.00000 0 37.5200027.13 Bedding 0 0.08000 0.750 0 0.00000 0.38 0 0.00000 0 0.0800027.14 Replacement of Bedding (once in 3 Year) 1 0.03000 0.750 0 0.00000 0 0.00000 0 0.03000

Sub Total 1.00 0.11000 1.50 0.00000 0.00000 0 0.11000TOTAL 62.64000 80.36 0.00000 0.00000 62.64000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40000 0 0.00000 13 140.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 13 7.80000 0 0.00000 13 7.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 13 7.80000 0 0.00000 13 7.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 13 156.00000 0 0.00000 13 156.0000027.2 Vocational training/specific skill training 0.500 13 6.50000 0 0.00000 13 6.5000027.21 Electricity/water charges 0.600 13 7.80000 0 0.00000 13 7.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75000 0 0.00000 13 9.7500027.23 Maintenance 0.400 13 5.20000 0 0.00000 13 5.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 13 5.20000 0 0.00000 13 5.20000

27.25 Preparatory camps 0.150 13 1.95000 0 0.00000 13 1.9500027.26 PTAs/school functions 0.150 13 1.95000 0 0.00000 13 1.9500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 13 3.90000 0 0.00000 13 3.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 13 354.25000 0 0.00000 13 354.25000Grant Total 0 62.64000 118.330 13 354.25000 0 0.00000 13 416.89000

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPRaeBarelliy

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old) Rampur

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.63000 0 0.00000 25.000 2 50.00000 2 50.63000

Sub Total 0.00 0.63000 65.86 0.00000 25.00 50.00000 2 50.6300027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 10.50000 0 0.00000 0.00000 0 10.50000

Sub Total 0.00 10.50000 3.00 0.00000 3.00 0.00000 0 10.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.80000 0 0.00000 0.00000 0 0.80000

Sub Total 0.00 0.80000 1.00 0.00000 1.00 0.00000 0 0.80000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00000 1.500 0 0.00000 1.500 2 3.00000 2 3.00000

Sub Total 0.00 0.00000 4.50 0.00000 4.50 3.00000 2 3.00000

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 1.17000 0 0.00000 1.750 2 3.50000 2 4.67000

Sub Total 0.00 1.17000 3.50 0.00000 1.75 3.50000 2 4.6700027.13 Bedding 0 0.00000 0.750 0 0.00000 0.375 2 0.75000 2 0.7500027.14 Replacement of Bedding (once in 3 Year) 7 0.04000 0.750 0 0.00000 0.750 0.00000 0 0.04000

Sub Total 7.00 0.04000 1.50 0.00000 1.13 0.75000 2 0.79000TOTAL 13.14000 80.36 0.00000 37.38 57.25000 70.39000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 7 75.60000 5.400 2 10.80000 7 86.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 7 4.20000 0.300 2 0.60000 7 4.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 7 4.20000 0.300 2 0.60000 7 4.80000

27.18 Examination fee 0.020 0 0.00000 0.010 0 0.00000 0 0.0000027.19 Salaries: 12.000 7 84.00000 4.740 2 9.48000 7 93.4800027.2 Vocational training/specific skill training 0.500 7 3.50000 0.250 2 0.50000 7 4.0000027.21 Electricity/water charges 0.600 7 4.20000 0.300 2 0.60000 7 4.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 7 5.25000 0.375 2 0.75000 7 6.0000027.23 Maintenance 0.400 7 2.80000 0.200 2 0.40000 7 3.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 7 2.80000 0.200 2 0.40000 7 3.20000

27.25 Preparatory camps 0.150 7 1.05000 0.075 2 0.15000 7 1.2000027.26 PTAs/school functions 0.150 7 1.05000 0.075 2 0.15000 7 1.2000027.27 Provision of Rent (8 months) 4.800 0.00000 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 7 2.10000 0.150 2 0.30000 7 2.4000027.28 Maintenance of building 0.500 0 0.00000 0.500 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 7 190.75000 12.875 2 24.73000 7 215.48000Grant Total 0 13.14000 118.330 7 190.75000 50.250 2 81.98000 7 285.87000

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPRampur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old) Saharnpur

Phy Fin Unit Cost Phy Fin Unit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 65.86 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.80000 0 0.00000 0 0.00000 0 0.80000

Sub Total 0.00 0.80000 1.00 0.00000 0.00000 0 0.80000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 2.45800 1.500 0 0.00000 1.50 0 0.00000 0 2.45800

Sub Total 0.00 2.45800 4.50 0.00000 0.00000 0 2.45800

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 11.61600 0 0.00000 1.75 0 0.00000 0 11.61600

Sub Total 0.00 11.61600 3.50 0.00000 0.00000 0 11.6160027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 7 5.49100 0.750 0 0.00000 0 0.00000 0 5.49100

Sub Total 7.00 5.49100 1.50 0.00000 0.00000 0 5.49100TOTAL 20.36500 80.36 0.00000 0.00000 20.36500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 9 97.20000 0 0.00000 9 97.20000

27.16 Stipend for girl student per month @ Rs. 50 0.600 9 5.40000 0 0.00000 9 5.40000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 9 5.40000 0 0.00000 9 5.40000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 9 108.00000 0 0.00000 9 108.0000027.2 Vocational training/specific skill training 0.500 9 4.50000 0 0.00000 9 4.5000027.21 Electricity/water charges 0.600 9 5.40000 0 0.00000 9 5.4000027.22 Medical care/contingencies @ Rs. 750 child 0.750 9 6.75000 0 0.00000 9 6.7500027.23 Maintenance 0.400 9 3.60000 0 0.00000 9 3.60000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 9 3.60000 0 0.00000 9 3.60000

27.25 Preparatory camps 0.150 9 1.35000 0 0.00000 9 1.3500027.26 PTAs/school functions 0.150 9 1.35000 0 0.00000 9 1.3500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 9 2.70000 0 0.00000 9 2.7000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 9 245.25000 0 0.00000 9 245.25000Grant Total 0 20.36500 118.330 9 245.25000 0 0.00000 9 265.61500

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPSaharanpur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

6+NEW1) Sant Kabir Nagar

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 31.64000 65.860 0 0.00000 0.00000 0 31.64000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 6.63000 0 0.00000 25.000 1 25.00000 1 31.63000

Sub Total 0.00 38.27000 65.86 0.00000 25.00 25.00000 1 63.2700027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 3.00 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 1.00 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00080 1.500 0 0.00000 1.500 1 1.50000 1 1.50080

Sub Total 0.00 0.00080 4.50 0.00000 4.50 1.50000 1 1.50080

27.11 Teaching learning material and equipment includinglibrary books(New)

1 0.00000 3.500 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.03100 0 0.00000 1.750 1 1.75000 1 1.78100

Sub Total 1.00 0.03100 3.50 0.00000 1.75 1.75000 1 1.7810027.13 Bedding 0 0.03000 0.750 0 0.00000 0.375 1 0.37500 1 0.4050027.14 Replacement of Bedding (once in 3 Year) 4 0.68060 0.750 0 0.00000 0.750 0.00000 0 0.68060

Sub Total 4.00 0.71060 1.50 0.00000 1.13 0.37500 1 1.08560TOTAL 39.01240 80.36 0.00000 37.38 28.62500 67.63740Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 7 75.60000 5.400 1 5.40000 7 81.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 7 4.20000 0.300 1 0.30000 7 4.50000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 7 4.20000 0.300 1 0.30000 7 4.50000

27.18 Examination fee 0.020 0 0.00000 0.010 0 0.00000 0 0.0000027.19 Salaries: 12.000 7 84.00000 4.740 1 4.74000 7 88.7400027.2 Vocational training/specific skill training 0.500 7 3.50000 0.250 1 0.25000 7 3.7500027.21 Electricity/water charges 0.600 7 4.20000 0.300 1 0.30000 7 4.5000027.22 Medical care/contingencies @ Rs. 750 child 0.750 7 5.25000 0.375 1 0.37500 7 5.6250027.23 Maintenance 0.400 7 2.80000 0.200 1 0.20000 7 3.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 7 2.80000 0.200 1 0.20000 7 3.00000

27.25 Preparatory camps 0.150 7 1.05000 0.075 1 0.07500 7 1.1250027.26 PTAs/school functions 0.150 7 1.05000 0.075 1 0.07500 7 1.1250027.27 Provision of Rent (8 months) 4.800 0.00000 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 7 2.10000 0.150 1 0.15000 7 2.2500027.28 Maintenance of building 0.500 0 0.00000 0.500 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 7 190.75000 12.875 1 12.36500 7 203.11500Grant Total 0 39.01240 118.330 7 190.75000 50.250 1 40.99000 7 270.75240

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPSKNagar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (16 ) Shajahanpur

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 2.40000 65.860 0 0.00000 0.00000 0 2.40000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 9.08000 0 0.00000 25.000 3 75.00000 3 84.08000

Sub Total 0.00 11.48000 65.86 0.00000 25.00 75.00000 3 86.4800027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 3.000 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 1.50000 0 0.00000 0.00000 0 1.50000

Sub Total 0.00 1.50000 3.00 0.00000 3.00 0.00000 0 1.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 5.00000 0 0.00000 0.00000 0 5.00000

Sub Total 0.00 5.00000 1.00 0.00000 1.00 0.00000 0 5.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 1.000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 1.00 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 18.00000 3.000 0 0.00000 3.000 0.00000 0 18.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 2.25000 1.500 0 0.00000 1.500 3 4.50000 3 6.75000

Sub Total 0.00 20.25000 4.50 0.00000 4.50 4.50000 3 24.75000

27.11 Teaching learning material and equipment includinglibrary books(New)

6 21.00000 3.500 0 0.00000 0 21.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.53000 0 0.00000 1.750 3 5.25000 3 5.78000

Sub Total 6.00 21.53000 3.50 0.00000 1.75 5.25000 3 26.7800027.13 Bedding 0 4.50000 0.750 0 0.00000 0.375 3 1.12500 3 5.6250027.14 Replacement of Bedding (once in 3 Year) 9 6.75000 0.750 0 0.00000 0.750 0.00000 0 6.75000

Sub Total 9.00 11.25000 1.50 0.00000 1.13 1.12500 3 12.37500TOTAL 71.21000 80.36 0.00000 37.38 85.87500 157.08500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 16 172.80000 5.400 3 16.20000 16 189.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 16 9.60000 0.300 3 0.90000 16 10.50000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 16 9.60000 0.300 3 0.90000 16 10.50000

27.18 Examination fee 0.020 0 0.00000 0.010 0 0.00000 0 0.0000027.19 Salaries: 12.000 16 192.00000 4.740 3 14.22000 16 206.2200027.2 Vocational training/specific skill training 0.500 16 8.00000 0.250 3 0.75000 16 8.7500027.21 Electricity/water charges 0.600 16 9.60000 0.300 3 0.90000 16 10.5000027.22 Medical care/contingencies @ Rs. 750 child 0.750 16 12.00000 0.375 3 1.12500 16 13.1250027.23 Maintenance 0.400 16 6.40000 0.200 3 0.60000 16 7.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 16 6.40000 0.200 3 0.60000 16 7.00000

27.25 Preparatory camps 0.150 16 2.40000 0.075 3 0.22500 16 2.6250027.26 PTAs/school functions 0.150 16 2.40000 0.075 3 0.22500 16 2.6250027.27 Provision of Rent (8 months) 4.800 1 4.80000 0.00000 1 4.80000

Provision of Rent (6 months) 3.600 0.00000 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000

27.27 Capacity building 0.300 16 4.80000 0.150 3 0.45000 16 5.2500027.28 Maintenance of building 0.500 0 0.00000 0.500 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 16 440.80000 12.875 3 37.09500 16 477.89500Grant Total 0 71.21000 118.330 16 440.80000 50.250 3 122.97000 16 634.98000

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPShajahanpur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old13) Sidarth Nagar

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 7.01500 0 0.00000 0 0.00000 0 7.01500

Sub Total 0.00 7.01500 65.86 0.00000 0.00000 0 7.0150027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 3.00 0.00000 0.00000 0 3.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.00000 0 0.00000 0 0.00000 0 2.00000

Sub Total 0.00 2.00000 1.00 0.00000 0.00000 0 2.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.40000 0 0.00000 0 0.00000 0 0.40000

Sub Total 0.00 0.40000 1.00 0.00000 0.00000 0 0.40000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00500 1.500 0 0.00000 1.50 0 0.00000 0 0.00500

Sub Total 0.00 0.00500 4.50 0.00000 0.00000 0 0.00500

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 0.17000 0 0.00000 1.75 0 0.00000 0 0.17000

Sub Total 0.00 0.17000 3.50 0.00000 0.00000 0 0.1700027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 12 0.13400 0.750 0 0.00000 0 0.00000 0 0.13400

Sub Total 12.00 0.13400 1.50 0.00000 0.00000 0 0.13400TOTAL 12.72400 80.36 0.00000 0.00000 12.72400Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40000 0 0.00000 13 140.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 13 7.80000 0 0.00000 13 7.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 13 7.80000 0 0.00000 13 7.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 13 156.00000 0 0.00000 13 156.0000027.2 Vocational training/specific skill training 0.500 13 6.50000 0 0.00000 13 6.5000027.21 Electricity/water charges 0.600 13 7.80000 0 0.00000 13 7.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75000 0 0.00000 13 9.7500027.23 Maintenance 0.400 13 5.20000 0 0.00000 13 5.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 13 5.20000 0 0.00000 13 5.20000

27.25 Preparatory camps 0.150 13 1.95000 0 0.00000 13 1.9500027.26 PTAs/school functions 0.150 13 1.95000 0 0.00000 13 1.9500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 13 3.90000 0 0.00000 13 3.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 13 354.25000 0 0.00000 13 354.25000Grant Total 0 12.72400 118.330 13 354.25000 0 0.00000 13 366.97400

Sl. No. Activity Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPSidarthNagar

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old11+New9) Sitapur

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 60.12000 65.860 0 0.00000 0 0.00000 0 60.12000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 1.68400 0 0.00000 0 0.00000 0 1.68400

Sub Total 0.00 61.80400 65.86 0.00000 0.00000 0 61.8040027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.30000 0 0.00000 0 0.00000 0 0.30000

Sub Total 0.00 0.30000 3.00 0.00000 0.00000 0 0.3000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.60000 0 0.00000 0 0.00000 0 0.60000

Sub Total 0.00 0.60000 1.00 0.00000 0.00000 0 0.60000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 21.17000 3.000 0 0.00000 0 0.00000 0 21.17000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.06900 1.500 0 0.00000 1.50 0 0.00000 0 0.06900

Sub Total 0.00 21.23900 4.50 0.00000 0.00000 0 21.23900

27.11 Teaching learning material and equipment includinglibrary books(New)

9 15.29000 3.500 0 0.00000 0 0.00000 0 15.29000

27.12 Teaching learning material and equipment includinglibrary books 0 12.30600 0 0.00000 1.75 0 0.00000 0 12.30600

Sub Total 9.00 27.59600 3.50 0.00000 0.00000 0 27.5960027.13 Bedding 0 0.97000 0.750 0 0.00000 0.38 0 0.00000 0 0.9700027.14 Replacement of Bedding (once in 3 Year) 10 5.62900 0.750 0 0.00000 0 0.00000 0 5.62900

Sub Total 10.00 6.59900 1.50 0.00000 0.00000 0 6.59900TOTAL 118.13800 80.36 0.00000 0.00000 118.13800Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 20 216.00000 0 0.00000 20 216.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 20 12.00000 0 0.00000 20 12.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 20 12.00000 0 0.00000 20 12.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 20 240.00000 0 0.00000 20 240.0000027.2 Vocational training/specific skill training 0.500 20 10.00000 0 0.00000 20 10.0000027.21 Electricity/water charges 0.600 20 12.00000 0 0.00000 20 12.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 20 15.00000 0 0.00000 20 15.0000027.23 Maintenance 0.400 20 8.00000 0 0.00000 20 8.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 20 8.00000 0 0.00000 20 8.00000

27.25 Preparatory camps 0.150 20 3.00000 0 0.00000 20 3.0000027.26 PTAs/school functions 0.150 20 3.00000 0 0.00000 20 3.0000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 20 6.00000 0 0.00000 20 6.0000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 20 545.00000 0 0.00000 20 545.00000Grant Total 0 118.13800 118.330 20 545.00000 0 0.00000 20 663.13800

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPSitapur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old9) Sonebhadra

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 1.22600 0 0.00000 0 0.00000 0 1.22600

Sub Total 0.00 1.22600 65.86 0.00000 0.00000 0 1.2260027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.24000 0 0.00000 0 0.00000 0 0.24000

Sub Total 0.00 0.24000 1.00 0.00000 0.00000 0 0.2400027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 1.00000 0 0.00000 0 0.00000 0 1.00000

Sub Total 0.00 1.00000 1.00 0.00000 0.00000 0 1.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.26700 1.500 0 0.00000 1.50 0 0.00000 0 0.26700

Sub Total 0.00 0.26700 4.50 0.00000 0.00000 0 0.26700

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 4.72200 0 0.00000 1.75 0 0.00000 0 4.72200

Sub Total 0.00 4.72200 3.50 0.00000 0.00000 0 4.7220027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 8 2.49000 0.750 0 0.00000 0 0.00000 0 2.49000

Sub Total 8.00 2.49000 1.50 0.00000 0.00000 0 2.49000TOTAL 9.94500 80.36 0.00000 0.00000 9.94500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 9 97.20000 0 0.00000 9 97.20000

27.16 Stipend for girl student per month @ Rs. 50 0.600 9 5.40000 0 0.00000 9 5.40000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 9 5.40000 0 0.00000 9 5.40000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 9 108.00000 0 0.00000 9 108.0000027.2 Vocational training/specific skill training 0.500 9 4.50000 0 0.00000 9 4.5000027.21 Electricity/water charges 0.600 9 5.40000 0 0.00000 9 5.4000027.22 Medical care/contingencies @ Rs. 750 child 0.750 9 6.75000 0 0.00000 9 6.7500027.23 Maintenance 0.400 9 3.60000 0 0.00000 9 3.60000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 9 3.60000 0 0.00000 9 3.60000

27.25 Preparatory camps 0.150 9 1.35000 0 0.00000 9 1.3500027.26 PTAs/school functions 0.150 9 1.35000 0 0.00000 9 1.3500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 1 3.60000 0 0.00000 1 3.60000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 9 2.70000 0 0.00000 9 2.7000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 9 248.85000 0 0.00000 9 248.85000Grant Total 0 9.94500 118.330 9 248.85000 0 0.00000 9 258.79500

Sl. No. Activity Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPSonebhadra

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old5) Srawasti

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 65.860 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 2.30500 0 0.00000 0 0.00000 0 2.30500

Sub Total 0.00 2.30500 65.86 0.00000 0.00000 0 2.3050027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.40000 0 0.00000 0 0.00000 0 0.40000

Sub Total 0.00 0.40000 1.00 0.00000 0.00000 0 0.40000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.11300 1.500 0 0.00000 1.50 0 0.00000 0 0.11300

Sub Total 0.00 0.11300 4.50 0.00000 0.00000 0 0.11300

27.11 Teaching learning material and equipment includinglibrary books(New)

0 0.00000 3.500 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment includinglibrary books 0 2.04200 0 0.00000 1.75 0 0.00000 0 2.04200

Sub Total 0.00 2.04200 3.50 0.00000 0.00000 0 2.0420027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 5 0.88200 0.750 0 0.00000 0 0.00000 0 0.88200

Sub Total 5.00 0.88200 1.50 0.00000 0.00000 0 0.88200TOTAL 5.74200 80.36 0.00000 0.00000 5.74200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00000 0 0.00000 5 54.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 5 3.00000 0 0.00000 5 3.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 5 3.00000 0 0.00000 5 3.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 5 60.00000 0 0.00000 5 60.0000027.2 Vocational training/specific skill training 0.500 5 2.50000 0 0.00000 5 2.5000027.21 Electricity/water charges 0.600 5 3.00000 0 0.00000 5 3.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75000 0 0.00000 5 3.7500027.23 Maintenance 0.400 5 2.00000 0 0.00000 5 2.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 5 2.00000 0 0.00000 5 2.00000

27.25 Preparatory camps 0.150 5 0.75000 0 0.00000 5 0.7500027.26 PTAs/school functions 0.150 5 0.75000 0 0.00000 5 0.7500027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 5 1.50000 0 0.00000 5 1.5000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 5 136.25000 0 0.00000 5 136.25000Grant Total 0 5.74200 118.330 5 136.25000 0 0.00000 5 141.99200

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPSrawasti

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old 2+New 8) Sultanpur

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 53.19000 65.860 0 0.00000 0 0.00000 0 53.19000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 3.32500 0 0.00000 0 0.00000 0 3.32500

Sub Total 0.00 56.51500 65.86 0.00000 0.00000 0 56.5150027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 3.00 0.00000 0.00000 0 3.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.00000 0 0.00000 0 0.00000 0 2.00000

Sub Total 0.00 2.00000 1.00 0.00000 0.00000 0 2.0000027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 3.94000 3.000 0 0.00000 0 0.00000 0 3.94000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.08700 1.500 0 0.00000 1.50 0 0.00000 0 0.08700

Sub Total 0.00 4.02700 4.50 0.00000 0.00000 0 4.02700

27.11 Teaching learning material and equipment includinglibrary books(New)

8 0.95000 3.500 0 0.00000 0 0.00000 0 0.95000

27.12 Teaching learning material and equipment includinglibrary books 0 0.00000 0 0.00000 1.75 0 0.00000 0 0.00000

Sub Total 8.00 0.95000 3.50 0.00000 0.00000 0 0.9500027.13 Bedding 0 0.00000 0.750 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 2 0.04000 0.750 0 0.00000 0 0.00000 0 0.04000

Sub Total 2.00 0.04000 1.50 0.00000 0.00000 0 0.04000TOTAL 66.53200 80.36 0.00000 0.00000 66.53200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 10 108.00000 0 0.00000 10 108.00000

27.16 Stipend for girl student per month @ Rs. 50 0.600 10 6.00000 0 0.00000 10 6.00000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 10 6.00000 0 0.00000 10 6.00000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 10 120.00000 0 0.00000 10 120.0000027.2 Vocational training/specific skill training 0.500 10 5.00000 0 0.00000 10 5.0000027.21 Electricity/water charges 0.600 10 6.00000 0 0.00000 10 6.0000027.22 Medical care/contingencies @ Rs. 750 child 0.750 10 7.50000 0 0.00000 10 7.5000027.23 Maintenance 0.400 10 4.00000 0 0.00000 10 4.00000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 10 4.00000 0 0.00000 10 4.00000

27.25 Preparatory camps 0.150 10 1.50000 0 0.00000 10 1.5000027.26 PTAs/school functions 0.150 10 1.50000 0 0.00000 10 1.5000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 10 3.00000 0 0.00000 10 3.0000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 10 272.50000 0 0.00000 10 272.50000Grant Total 0 66.53200 118.330 10 272.50000 0 0.00000 10 339.03200

ActivitySl. No.

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPSultanpur

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old3+New10) Unnao

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 203.97000 65.860 0 0.00000 0 0.00000 0 203.97000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 203.97000 65.86 0.00000 0.00000 0 203.9700027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 3.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 1.08000 0 0.00000 0 0.00000 0 1.08000

Sub Total 0.00 1.08000 1.00 0.00000 0.00000 0 1.0800027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.20000 0 0.00000 0 0.00000 0 0.20000

Sub Total 0.00 0.20000 1.00 0.00000 0.00000 0 0.20000

27.09 Furniture/Equipment(including Kitchen equipment)New 0 29.43000 3.000 0 0.00000 0 0.00000 0 29.43000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 2.18000 1.500 0 0.00000 1.50 0 0.00000 0 2.18000

Sub Total 0.00 31.61000 4.50 0.00000 0.00000 0 31.61000

27.11 Teaching learning material and equipment includinglibrary books(New)

10 35.00000 3.500 0 0.00000 0 0.00000 0 35.00000

27.12 Teaching learning material and equipment includinglibrary books 0 3.78500 0 0.00000 1.75 0 0.00000 0 3.78500

Sub Total 10.00 38.78500 3.50 0.00000 0.00000 0 38.7850027.13 Bedding 0 0.39000 0.750 0 0.00000 0.38 0 0.00000 0 0.3900027.14 Replacement of Bedding (once in 3 Year) 2 1.28800 0.750 0 0.00000 0 0.00000 0 1.28800

Sub Total 2.00 1.67800 1.50 0.00000 0.00000 0 1.67800TOTAL 277.32300 80.36 0.00000 0.00000 277.32300Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40000 0 0.00000 13 140.40000

27.16 Stipend for girl student per month @ Rs. 50 0.600 13 7.80000 0 0.00000 13 7.80000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.600 13 7.80000 0 0.00000 13 7.80000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 13 156.00000 0 0.00000 13 156.0000027.2 Vocational training/specific skill training 0.500 13 6.50000 0 0.00000 13 6.5000027.21 Electricity/water charges 0.600 13 7.80000 0 0.00000 13 7.8000027.22 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75000 0 0.00000 13 9.7500027.23 Maintenance 0.400 13 5.20000 0 0.00000 13 5.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 13 5.20000 0 0.00000 13 5.20000

27.25 Preparatory camps 0.150 13 1.95000 0 0.00000 13 1.9500027.26 PTAs/school functions 0.150 13 1.95000 0 0.00000 13 1.9500027.27 Provision of Rent (8 months) 4.800 9 43.20000 0 0.00000 9 43.20000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 13 3.90000 0 0.00000 13 3.9000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 13 397.45000 0 0.00000 13 397.45000Grant Total 0 277.32300 118.330 13 397.45000 0 0.00000 13 674.77300

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total OutlaySpill overSl. No. Activity

D:\KGBVAWP_B_2012-13_-_UPUnnao

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Model-I (Old4+NEW2) Varanasi

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 7.05000 65.860 0 0.00000 0 0.00000 0 7.05000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 8.21300 0 0.00000 0 0.00000 0 8.21300

Sub Total 0.00 15.26300 65.86 0.00000 0.00000 0 15.2630027.03 Boudary Wall New 0 0.00000 3.000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 1.50000 0 0.00000 0 0.00000 0 1.50000

Sub Total 0.00 1.50000 3.00 0.00000 0.00000 0 1.5000027.05 Boring/Handpump (New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.06

Boring/Handpump (minimum ratesprescribed by State Drinking WaterDepartment subject to a ceiling of Rs.1.00 lakhs).

0 0.02000 0 0.00000 0 0.00000 0 0.02000

Sub Total 0.00 0.02000 1.00 0.00000 0.00000 0 0.0200027.07 Electricity /Water charges(New) 0 0.00000 1.000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation onaccount of change of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 1.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchenequipment) New 0 5.93000 3.000 0 0.00000 0 0.00000 0 5.93000

27.1Furniture/Equipment For table &chair (Variation on account of change of unit cost

0 0.99600 1.500 0 0.00000 1.50 0 0.00000 0 0.99600

Sub Total 0.00 6.92600 4.50 0.00000 0.00000 0 6.92600

27.11Teaching learning material andequipment including library books(New) 2 7.00000 3.500 0 0.00000 0 0.00000 0 7.00000

27.12 Teaching learning material and equipment including library books 0 2.15000 0 0.00000 1.75 0 0.00000 0 2.15000

Sub Total 2.00 9.15000 3.50 0.00000 0.00000 0 9.1500027.13 Bedding 0 1.50000 0.750 0 0.00000 0.38 0 0.00000 0 1.5000027.14 Replacement of Bedding (once in 3 Year) 3 2.29600 0.750 0 0.00000 0 0.00000 0 2.29600

Sub Total 3.00 3.79600 1.50 0.00000 0.00000 0 3.79600TOTAL 36.65500 80.36 0.00000 0.00000 36.65500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 10.800 6 64.80000 0 0.00000 6 64.80000

27.16 Stipend for girl student per month @ Rs. 50 0.600 6 3.60000 0 0.00000 6 3.60000

27.17 Supplementary TLM, stationery and othereducational material @RS 50per month

0.600 6 3.60000 0 0.00000 6 3.60000

27.18 Examination fee 0.020 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 6 72.00000 0 0.00000 6 72.00000

27.2 Vocational training/specific skill training 0.500 6 3.00000 0 0.00000 6 3.00000

27.21 Electricity/water charges 0.600 6 3.60000 0 0.00000 6 3.60000

27.22 Medical care/contingencies @ Rs. 750 child 0.750 6 4.50000 0 0.00000 6 4.50000

27.23 Maintenance 0.400 6 2.40000 0 0.00000 6 2.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.400 6 2.40000 0 0.00000 6 2.40000

27.25 Preparatory camps 0.150 6 0.90000 0 0.00000 6 0.9000027.26 PTAs/school functions 0.150 6 0.90000 0 0.00000 6 0.9000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 6 1.80000 0 0.00000 6 1.8000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 37.970 6 163.50000 0 0.00000 6 163.50000Grant Total 0 36.65500 118.330 6 163.50000 0 0.00000 6 200.15500

Sl. No. Activity Spill over Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPVaranasi

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Phy Fin Unit Cost Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschool

Non Recurring (One time grant)27.01 Construction of Building New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.0 0.00000 0.0 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.06

Boring/Handpump (minimum ratesprescribed by State Drinking WaterDepartment subject to a ceiling of Rs.1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.08Electricity/Water Charges (Variationon account of change of unit cost(old)

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(includingKitchenequipment) New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.1Furniture/Equipment For table &chair (Variation on account of change of unit cost

0 0.04600 0.750 0 0.00000 1.50 0 0.00000 0 0.04600

Sub Total 0.00 0.04600 0.75 0.00000 0.00000 0 0.04600

27.11Teaching learning material andequipment including librarybooks(New)

0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment including library books 0 0.00200 0 0.00000 1.75 0 0.00000 0 0.00200

Sub Total 0.00 0.00200 0.00 0.00000 0.00000 0 0.0020027.13 Bedding 0 0.00000 0 0.00000 0.38 0 0.00000 0 0.00000

27.14 Replacement of Bedding (once in 3 Year) 1 0.00700 0.375 0 0.00000 0 0.00000 0 0.00700

Sub Total 1.00 0.00700 0.38 0.00000 0.00000 0 0.00700TOTAL 0.05500 1.13 0.00000 0.00000 0.05500Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 5.400 1 5.40000 0 0.00000 1 5.40000

27.16 Stipend for girl student per month @ Rs. 50 0.300 1 0.30000 0 0.00000 1 0.30000

27.17Supplementary TLM, stationery and other educational material @RS 50per month

0.300 1 0.30000 0 0.00000 1 0.30000

27.18 Examination fee 0.010 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 1 12.00000 0 0.00000 1 12.0000027.2 Vocational training/specific skill

training 0.300 1 0.30000 0 0.00000 1 0.3000027.21 Electricity/water charges 0.360 1 0.36000 0 0.00000 1 0.36000

27.22 Medical care/contingencies @ Rs. 750 child 0.380 1 0.38000 0 0.00000 1 0.38000

27.23 Maintenance 0.200 1 0.20000 0 0.00000 1 0.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.200 1 0.20000 0 0.00000 1 0.20000

27.25 Preparatory camps 0.100 1 0.10000 0 0.00000 1 0.1000027.26 PTAs/school functions 0.100 1 0.10000 0 0.00000 1 0.1000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10) 0 0.00000 0 0.00000

27.27 Capacity building 0.300 1 0.30000 0 0.00000 1 0.3000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 30.65 1 19.94000 0 0.00000 1 19.94000Grant Total 0 0.05500 31.775 1 19.94000 0 0.00000 1 19.99500

Model-II G.B. Nagar

Activity Spill over

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPG.B.Nagar (3)

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.0 0.00000 0.0 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on accountof change of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchenequipment) New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.77500 0.750 0 0.00000 1.50 0 0.00000 0 0.77500

Sub Total 0.00 0.77500 0.75 0.00000 0.00000 0 0.77500

27.11 Teaching learning material and equipmentincluding library books(New)

0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment including library books 0 0.98800 0 0.00000 1.75 0 0.00000 0 0.98800

Sub Total 0.00 0.98800 0.00 0.00000 0.00000 0 0.9880027.13 Bedding 0 0.00000 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 1 0.42100 0.375 0 0.00000 0 0.00000 0 0.42100

Sub Total 1.00 0.42100 0.38 0.00000 0.00000 0 0.42100TOTAL 2.18400 1.13 0.00000 0.00000 2.18400Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 5.400 1 5.40000 0 0.00000 1 5.40000

27.16 Stipend for girl student per month @ Rs. 50 0.300 1 0.30000 0 0.00000 1 0.30000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.300 1 0.30000 0 0.00000 1 0.30000

27.18 Examination fee 0.010 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 1 ####### 0 0.00000 1 12.0000027.2 Vocational training/specific skill training 0.300 1 0.30000 0 0.00000 1 0.3000027.21 Electricity/water charges 0.360 1 0.36000 0 0.00000 1 0.3600027.22 Medical care/contingencies @ Rs. 750 child 0.380 1 0.38000 0 0.00000 1 0.3800027.23 Maintenance 0.200 1 0.20000 0 0.00000 1 0.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.200 1 0.20000 0 0.00000 1 0.20000

27.25 Preparatory camps 0.100 1 0.10000 0 0.00000 1 0.1000027.26 PTAs/school functions 0.100 1 0.10000 0 0.00000 1 0.1000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 1 0.30000 0 0.00000 1 0.3000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 30.65 1 ####### 0 0.00000 1 19.94000Grant Total 0 2.18400 31.775 1 ####### 0 0.00000 1 22.12400

Spill over Fresh Recommended 2012-13 Total OutlayUpgradation Fresh

Recommended 2012-13

Total of Year 2012-13 Model-I & II

Sl. No.

Model-II (1)Hamirpur

Activity

D:\KGBVAWP_B_2012-13_-_UPHamirpur (3)

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 5.70000 0 0.00000 0 0.00000 0 5.70000

Sub Total 0.0 5.70000 0.0 0.00000 0.00000 0 5.7000027.03 Boudary Wall New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.06

Boring/Handpump (minimum ratesprescribed by State Drinking WaterDepartment subject to a ceiling of Rs.1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation onaccount of change of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchenequipment) New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.1Furniture/Equipment For table &chair (Variation on account of change of unit cost

0 0.40500 0.750 0 0.00000 1.50 0 0.00000 0 0.40500

Sub Total 0.00 0.40500 0.75 0.00000 0.00000 0 0.40500

27.11 Teaching learning material and equipmentincluding library books(New)

0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipmentincluding library books 0 0.56600 0 0.00000 1.75 0 0.00000 0 0.56600

Sub Total 0.00 0.56600 0.00 0.00000 0.00000 0 0.5660027.13 Bedding 0 0.00000 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 1 0.00100 0.375 0 0.00000 0 0.00000 0 0.00100

Sub Total 1.00 0.00100 0.38 0.00000 0.00000 0 0.00100TOTAL 6.67200 1.13 0.00000 0.00000 6.67200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 5.400 1 5.40000 0 0.00000 1 5.40000

27.16 Stipend for girl student per month @ Rs. 50 0.300 1 0.30000 0 0.00000 1 0.30000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month

0.300 1 0.30000 0 0.00000 1 0.30000

27.18 Examination fee 0.010 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 1 12.00000 0 0.00000 1 12.00000

27.2 Vocational training/specific skill training 0.300 1 0.30000 0 0.00000 1 0.30000

27.21 Electricity/water charges 0.360 1 0.36000 0 0.00000 1 0.36000

27.22 Medical care/contingencies @ Rs. 750 child 0.380 1 0.38000 0 0.00000 1 0.38000

27.23 Maintenance 0.200 1 0.20000 0 0.00000 1 0.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.200 1 0.20000 0 0.00000 1 0.20000

27.25 Preparatory camps 0.100 1 0.10000 0 0.00000 1 0.1000027.26 PTAs/school functions 0.100 1 0.10000 0 0.00000 1 0.1000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 1 0.30000 0 0.00000 1 0.3000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 30.65 1 19.94000 0 0.00000 1 19.94000Grant Total 0 6.67200 31.775 1 19.94000 0 0.00000 1 26.61200

Spill over Fresh Recommended 2012-13 Total OutlayUpgradation Fresh

Recommended 2012-13

Total of Year 2012-13 Model-I & II

Sl. No.

Model-II Hathras

Activity

D:\KGBVAWP_B_2012-13_-_UPHathras (3)

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on accountof change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.0 0.00000 0.0 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.06 Boring/Handpump (minimum rates prescribedby State Drinking Water Department subjectto a ceiling of Rs. 1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation onaccount of change of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchenequipment) New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00200 0.750 0 0.00000 1.50 0 0.00000 0 0.00200

Sub Total 0.00 0.00200 0.75 0.00000 0.00000 0 0.00200

27.11 Teaching learning material and equipmentincluding library books(New)

0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment including library books 0 0.61400 0 0.00000 1.75 0 0.00000 0 0.61400

Sub Total 0.00 0.61400 0.00 0.00000 0.00000 0 0.6140027.13 Bedding 0 0.00000 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 1 0.30800 0.375 0 0.00000 0 0.00000 0 0.30800

Sub Total 1.00 0.30800 0.38 0.00000 0.00000 0 0.30800TOTAL 0.92400 1.13 0.00000 0.00000 0.92400Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 5.400 1 5.40000 0 0.00000 1 5.40000

27.16 Stipend for girl student per month @ Rs. 50 0.300 1 0.30000 0 0.00000 1 0.30000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.300 1 0.30000 0 0.00000 1 0.30000

27.18 Examination fee 0.010 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 1 12.00000 0 0.00000 1 12.0000027.2 Vocational training/specific skill training 0.300 1 0.30000 0 0.00000 1 0.3000027.21 Electricity/water charges 0.360 1 0.36000 0 0.00000 1 0.36000

27.22 Medical care/contingencies @ Rs. 750 child 0.380 1 0.38000 0 0.00000 1 0.38000

27.23 Maintenance 0.200 1 0.20000 0 0.00000 1 0.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.200 1 0.20000 0 0.00000 1 0.20000

27.25 Preparatory camps 0.100 1 0.10000 0 0.00000 1 0.1000027.26 PTAs/school functions 0.100 1 0.10000 0 0.00000 1 0.1000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (200708, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 1 0.30000 0 0.00000 1 0.3000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 30.65 1 19.94000 0 0.00000 1 19.94000Grant Total 0 0.92400 31.775 1 19.94000 0 0.00000 1 20.86400

Fresh Recommended 2012-13

Model-II Jalaun

ActivitySl. No. Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over

D:\KGBVAWP_B_2012-13_-_UPJalaun (3)

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.0 0.00000 0.0 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.06

Boring/Handpump (minimum ratesprescribed by State Drinking WaterDepartment subject to a ceiling of Rs. 1.00lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation onaccount of change of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchenequipment) New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.08300 0.750 0 0.00000 1.50 0 0.00000 0 0.08300

Sub Total 0.00 0.08300 0.75 0.00000 0.00000 0 0.08300

27.11 Teaching learning material and equipmentincluding library books(New)

0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment including library books 0 0.00000 0 0.00000 1.75 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.13 Bedding 0 0.00000 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 1 0.00300 0.375 0 0.00000 0 0.00000 0 0.00300

Sub Total 1.00 0.00300 0.38 0.00000 0.00000 0 0.00300TOTAL 0.08600 1.13 0.00000 0.00000 0.08600Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 5.400 1 5.40000 0 0.00000 1 5.40000

27.16 Stipend for girl student per month @ Rs. 50 0.300 1 0.30000 0 0.00000 1 0.30000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month

0.300 1 0.30000 0 0.00000 1 0.30000

27.18 Examination fee 0.010 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 1 12.00000 0 0.00000 1 12.0000027.2 Vocational training/specific skill training 0.300 1 0.30000 0 0.00000 1 0.3000027.21 Electricity/water charges 0.360 1 0.36000 0 0.00000 1 0.36000

27.22 Medical care/contingencies @ Rs. 750 child 0.380 1 0.38000 0 0.00000 1 0.38000

27.23 Maintenance 0.200 1 0.20000 0 0.00000 1 0.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.200 1 0.20000 0 0.00000 1 0.20000

27.25 Preparatory camps 0.100 1 0.10000 0 0.00000 1 0.1000027.26 PTAs/school functions 0.100 1 0.10000 0 0.00000 1 0.1000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 1 0.30000 0 0.00000 1 0.3000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 30.65 1 19.94000 0 0.00000 1 19.94000Grant Total 0 0.08600 31.775 1 19.94000 0 0.00000 1 20.02600

Model-II(1) Mahoba

Sl. No. Activity Fresh Recommended 2012-13 Total Outlay

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13Spill over

D:\KGBVAWP_B_2012-13_-_UPMahoba (3)

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 2.00000 0 0.00000 0 0.00000 0 2.00000

Sub Total 0.0 2.00000 0.0 0.00000 0.00000 0 2.0000027.03 Boudary Wall New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.19000 0 0.00000 0 0.00000 0 0.19000

Sub Total 0.00 0.19000 0.00 0.00000 0.00000 0 0.1900027.05 Boring/Handpump (New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.06

Boring/Handpump (minimum ratesprescribed by State Drinking WaterDepartment subject to a ceiling of Rs.1.00 lakhs).

0 2.90000 0 0.00000 0 0.00000 0 2.90000

Sub Total 0.00 2.90000 0.00 0.00000 0.00000 0 2.9000027.07 Electricity /Water charges(New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation onaccount of change of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchenequipment) New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.1Furniture/Equipment For table &chair (Variation on account of change of unit cost

0 0.00000 0.750 0 0.00000 1.50 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.75 0.00000 0.00000 0 0.00000

27.11 Teaching learning material andequipment including library books(New)

0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment including library books 0 1.66100 0 0.00000 1.75 0 0.00000 0 1.66100

Sub Total 0.00 1.66100 0.00 0.00000 0.00000 0 1.6610027.13 Bedding 0 0.00000 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 0 1.83500 0.375 0 0.00000 0 0.00000 0 1.83500

Sub Total 0.00 1.83500 0.38 0.00000 0.00000 0 1.83500TOTAL 8.58600 1.13 0.00000 0.00000 8.58600Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 5.400 4 21.60000 0 0.00000 4 21.60000

27.16 Stipend for girl student per month @ Rs. 50 0.300 4 1.20000 0 0.00000 4 1.20000

27.17 Supplementary TLM, stationery and othereducational material @RS 50per month

0.300 4 1.20000 0 0.00000 4 1.20000

27.18 Examination fee 0.010 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 4 48.00000 0 0.00000 4 48.00000

27.2 Vocational training/specific skill training 0.300 4 1.20000 0 0.00000 4 1.20000

27.21 Electricity/water charges 0.360 4 1.44000 0 0.00000 4 1.44000

27.22 Medical care/contingencies @ Rs. 750 child 0.380 4 1.52000 0 0.00000 4 1.52000

27.23 Maintenance 0.200 4 0.80000 0 0.00000 4 0.80000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.200 4 0.80000 0 0.00000 4 0.80000

27.25 Preparatory camps 0.100 4 0.40000 0 0.00000 4 0.4000027.26 PTAs/school functions 0.100 4 0.40000 0 0.00000 4 0.4000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 4 1.20000 0 0.00000 4 1.2000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 30.65 4 79.76000 0 0.00000 4 79.76000Grant Total 0 8.58600 31.775 4 79.76000 0 0.00000 4 88.34600

Spill overSl. No.

Model-II Muzaffarnagar

Activity Fresh Recommended 2012-13

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13 Total Outlay

D:\KGBVAWP_B_2012-13_-_UPMuzaffarnagar (3)

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.0 0.00000 0.0 0.00000 0.00000 0 0.0000027.03 Boudary Wall New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.05 Boring/Handpump (New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.06

Boring/Handpump (minimum ratesprescribed by State Drinking WaterDepartment subject to a ceiling of Rs.1.00 lakhs).

0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.07 Electricity /Water charges(New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation onaccount of change of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(including Kitchenequipment) New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.1Furniture/Equipment For table &chair (Variation on account of change of unit cost

0 0.00000 0.750 0 0.00000 1.50 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.75 0.00000 0.00000 0 0.00000

27.11 Teaching learning material andequipment including library books(New)

0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment including library books 0 0.00000 0 0.00000 1.75 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.0000027.13 Bedding 0 0.00000 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 0 0.00000 0.375 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.38 0.00000 0.00000 0 0.00000TOTAL 0.00000 1.13 0.00000 0.00000 0.00000Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 5.400 1 5.40000 0 0.00000 1 5.40000

27.16 Stipend for girl student per month @ Rs. 50 0.300 1 0.30000 0 0.00000 1 0.30000

27.17 Supplementary TLM, stationery and othereducational material @RS 50per month

0.300 1 0.30000 0 0.00000 1 0.30000

27.18 Examination fee 0.010 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 1 12.00000 0 0.00000 1 12.00000

27.2 Vocational training/specific skill training 0.300 1 0.30000 0 0.00000 1 0.30000

27.21 Electricity/water charges 0.360 1 0.36000 0 0.00000 1 0.36000

27.22 Medical care/contingencies @ Rs. 750 child 0.380 1 0.38000 0 0.00000 1 0.38000

27.23 Maintenance 0.200 1 0.20000 0 0.00000 1 0.20000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.200 1 0.20000 0 0.00000 1 0.20000

27.25 Preparatory camps 0.100 1 0.10000 0 0.00000 1 0.1000027.26 PTAs/school functions 0.100 1 0.10000 0 0.00000 1 0.1000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 1 0.30000 0 0.00000 1 0.3000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 30.65 1 19.94000 0 0.00000 1 19.94000Grant Total 0 0.00000 31.775 1 19.94000 0 0.00000 1 19.94000

Model-II Prabuddha Nagar

Sl. No. Spill over Fresh Recommended 2012-13 Total OutlayActivity

Total of Year 2012-13 Model-I & II

Upgradation Fresh Recommended 2012-13

D:\KGBVAWP_B_2012-13_-_UPPrabuddhaNagar (3)

Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2012-13(Rs in lakhs)

Phy Fin Unit Cost

Phy FinUnit Cost

Phy Fin Phy Fin

27 KGBV Financial Provision perschoolNon Recurring (One time grant)

27.01 Construction of Building New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.02 Construction of Building (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.0 3.00000 0.0 0.00000 0.00000 0 3.0000027.03 Boudary Wall New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 3.00000 0 0.00000 0 0.00000 0 3.00000

Sub Total 0.00 3.00000 0.00 0.00000 0.00000 0 3.0000027.05 Boring/Handpump (New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.06Boring/Handpump (minimum rates prescribed byState Drinking Water Department subject to aceiling of Rs. 1.00 lakhs).

0 2.00000 0 0.00000 0 0.00000 0 2.00000

Sub Total 0.00 2.00000 0.00 0.00000 0.00000 0 2.0000027.07 Electricity /Water charges(New) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.08 Electricity/Water Charges (Variation on account ofchange of unit cost (old) 0 0.00000 0 0.00000 0 0.00000 0 0.00000

Sub Total 0.00 0.00000 0.00 0.00000 0.00000 0 0.00000

27.09 Furniture/Equipment(includingKitchen equipment)New 0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 -0.00200 0.750 0 0.00000 1.50 0 0.00000 0 -0.00200

Sub Total 0.00 -0.00200 0.75 0.00000 0.00000 0 -0.00200

27.11 Teaching learning material and equipmentincluding library books(New)

0 0.00000 0 0.00000 0 0.00000 0 0.00000

27.12 Teaching learning material and equipment including library books 0 0.00400 0 0.00000 1.75 0 0.00000 0 0.00400

Sub Total 0.00 0.00400 0.00 0.00000 0.00000 0 0.0040027.13 Bedding 0 0.00000 0 0.00000 0.38 0 0.00000 0 0.0000027.14 Replacement of Bedding (once in 3 Year) 2 0.01000 0.375 0 0.00000 0 0.00000 0 0.01000

Sub Total 2.00 0.01000 0.38 0.00000 0.00000 0 0.01000TOTAL 8.01200 1.13 0.00000 0.00000 8.01200Recurring Costs per annum

27.15 Maintenance per girl student per month @ Rs. 900/- 5.400 2 10.80000 0 0.00000 2 10.80000

27.16 Stipend for girl student per month @ Rs. 50 0.300 2 0.60000 0 0.00000 2 0.60000

27.17 Supplementary TLM, stationery and other educational material @RS 50per month 0.300 2 0.60000 0 0.00000 2 0.60000

27.18 Examination fee 0.010 0 0.00000 0 0.00000 0 0.0000027.19 Salaries: 12.000 2 24.00000 0 0.00000 2 24.0000027.2 Vocational training/specific skill training 0.300 2 0.60000 0 0.00000 2 0.6000027.21 Electricity/water charges 0.360 2 0.72000 0 0.00000 2 0.7200027.22 Medical care/contingencies @ Rs. 750 child 0.380 2 0.76000 0 0.00000 2 0.7600027.23 Maintenance 0.200 2 0.40000 0 0.00000 2 0.40000

27.24 Miscellaneous (educational tour/ exposure visit/sports material etc) 0.200 2 0.40000 0 0.00000 2 0.40000

27.25 Preparatory camps 0.100 2 0.20000 0 0.00000 2 0.2000027.26 PTAs/school functions 0.100 2 0.20000 0 0.00000 2 0.2000027.27 Provision of Rent (8 months) 4.800 0.00000 0 0.00000 0 0.00000

Provision of Rent (6 months) 3.600 0.00000 0 0.00000 0 0.00000Provision of Rent (3 months) 1.800 0.00000 0 0.00000 0 0.00000Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10)

0 0.00000 0 0.00000

27.27 Capacity building 0.300 2 0.60000 0 0.00000 2 0.6000027.28 Maintenance of building 0.500 0 0.00000 0 0.00000 0 0.00000

TOTAL 0 0.00000 30.65 2 39.88000 0 0.00000 2 39.88000Grant Total 0 8.01200 31.775 2 39.88000 0 0.00000 2 47.89200

Spill over Fresh Recommended 2012-13 Total OutlayUpgradation Fresh Recommended 2012-13

Total of Year 2012-13 Model-I & II

Sl. No.

Model-II Sultanpur

Activity

D:\KGBVAWP_B_2012-13_-_UPSultanpur (3)