© 2011 Chevron

Oceanic Time Warner CableSolar Project

Brian Kealoha, Regional ManagerRebuild Hawaii ConsortiumApril 5, 2011

Page 2: © 2011 Chevron Oceanic Time Warner Cable Solar Project Brian Kealoha, Regional Manager Rebuild Hawaii Consortium April 5, 2011 Brian Kealoha, Regional

© 2011 Chevron 2

Achieving Oceanic Time Warner Cable’s Vision

Lower business operating costs

Environmental stewardship

Incorporate innovative energy solutions

Page 3: © 2011 Chevron Oceanic Time Warner Cable Solar Project Brian Kealoha, Regional Manager Rebuild Hawaii Consortium April 5, 2011 Brian Kealoha, Regional

© 2011 Chevron 3

Project Design Considerations

Developing Ideal Design

Project sizing

Parking canopy vs. rooftop

LEED Gold certification

Feed-in tariff

City and County landscaping requirements

Page 4: © 2011 Chevron Oceanic Time Warner Cable Solar Project Brian Kealoha, Regional Manager Rebuild Hawaii Consortium April 5, 2011 Brian Kealoha, Regional

© 2011 Chevron 4

Innovative Solar Design

Solar Photovoltaic Canopies

Largest solar canopy system on O`ahu

Proven, patented design

413 kW of solar parking canopy

Rooftop Solar Installation

443 kW of solar on rooftop

Building heat gain reduction

Page 5: © 2011 Chevron Oceanic Time Warner Cable Solar Project Brian Kealoha, Regional Manager Rebuild Hawaii Consortium April 5, 2011 Brian Kealoha, Regional

© 2011 Chevron 5

Achieving Goals with Zero Capital Outlay

Power Purchase Agreement

No upfront capital required

OTW realizes immediate savings and positive cash flow

Establishes a fixed energy cost for a portion of OTW’s energy usage over the next 20 years

Provides a hedge against rising energy costs

Page 6: © 2011 Chevron Oceanic Time Warner Cable Solar Project Brian Kealoha, Regional Manager Rebuild Hawaii Consortium April 5, 2011 Brian Kealoha, Regional

© 2011 Chevron 6

Accelerating Adoption of Electric Vehicles

Electric Car Charging Stations

• Support Hawaii Clean Energy Initiative and the adoption of electric vehicles

• Encourage electric vehicles within OTW’s workforce

• Mounted under canopies for ideal covered parking spaces

• Included in PPA

Page 7: © 2011 Chevron Oceanic Time Warner Cable Solar Project Brian Kealoha, Regional Manager Rebuild Hawaii Consortium April 5, 2011 Brian Kealoha, Regional

© 2011 Chevron

+Questions

Answers