© 2011 Chevron
Oceanic Time Warner CableSolar Project
Brian Kealoha, Regional ManagerRebuild Hawaii ConsortiumApril 5, 2011
© 2011 Chevron 2
Achieving Oceanic Time Warner Cable’s Vision
Lower business operating costs
Environmental stewardship
Incorporate innovative energy solutions
© 2011 Chevron 3
Project Design Considerations
Developing Ideal Design
Project sizing
Parking canopy vs. rooftop
LEED Gold certification
Feed-in tariff
City and County landscaping requirements
© 2011 Chevron 4
Innovative Solar Design
Solar Photovoltaic Canopies
Largest solar canopy system on O`ahu
Proven, patented design
413 kW of solar parking canopy
Rooftop Solar Installation
443 kW of solar on rooftop
Building heat gain reduction
© 2011 Chevron 5
Achieving Goals with Zero Capital Outlay
Power Purchase Agreement
No upfront capital required
OTW realizes immediate savings and positive cash flow
Establishes a fixed energy cost for a portion of OTW’s energy usage over the next 20 years
Provides a hedge against rising energy costs
© 2011 Chevron 6
Accelerating Adoption of Electric Vehicles
Electric Car Charging Stations
• Support Hawaii Clean Energy Initiative and the adoption of electric vehicles
• Encourage electric vehicles within OTW’s workforce
• Mounted under canopies for ideal covered parking spaces
• Included in PPA