Take Control of your Engineering and Design Process
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Julien de Beer, Head of Portfolio Management, Engineering
November 12, 2019
Panel Session
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
EPC-02
Take Control of your Engineering & Design Process
Panel Discussion
Audience Q&A
01
02
03
Market Challenges
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
MARKET ENVIRONMENT
Commodity Prices, Fluctuating Demand
Competition and Consolidation
Equipment, Quality, Safety Regulations
Geopolitical Uncertainties
Generation Shift
Cloud
Industrial IoT
Mobility
Big Data & Analytics
Cyber Security
TECHNOLOGY TRENDSCUSTOMER IMPERATIVES
Start-up new, revamped and reconfigured plants, on time, on budget
Operational Efficiency to Drive Profitability
Increase Agility and Innovation
Zero accident safety cultureand processes
Workforce Evolution and CapabilityPace of Change
Very Low Adoption of Technology in our Industry
1 Based on data of top 20 E&C companies by market value Globally 2 Top 20 companies by market value
Source: McKinsey Global Institute, Capital IQ, Gartner key metrics data 2012
5
0
1
2
3
4
5
6
7
2006 2007 2008 2009 2010 2011 2012 2013
0 1 2 3 4 5 6 7 8
Education
Softw are/internet
Banking/f inance
Professional services
Insurance
Database
Healthcare providers
Transportation
Pharma/life sciences/medical
Utilities
Industrial electronics
Consumer products
Manufacturing
Food beverage processing
Chemicals
Construction
Energy
Telecommunications
Media/entertainment
Retail/w holesale
Consumer
discretionary
Industrials
Aerospace
Automobile
Chemicals
& Energy
Construction
CONSTRUCTIONHospitalityHealthcareGovernmentPersonal and local servicesEntertainment and recreationRetail tradeEducationTransportation and warehousingReal estateMining
Chemicals and pharmaceuticalsUtilitiesOil and gasAdvanced manufacturingWholesale tradeFinance and insuranceProfessional servicesMediaICT
Basic goods manufacturing
Agriculture and Hunting
IT spending
Percent of revenue spent on IT
Level of digitization
MGI industry digitization index,
2015 or latest available data
R&D investment
Percent of revenue spent on R&D
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Customer Challenges
Predictable Project Outcome – cost, schedule, performance
• Achieving FID – getting a credible estimate
• Known Process – want to get more options and higher accuracy
estimate
• Relationship between Owner Operator and EPC
• Rethink contracting strategies
• Greenfield vs Brownfield
• Communication alignment during Project Execution phases
• Controlled handover of information
Owner Operator and EPC
Customer Challenges: EPC and O/O
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
“75% of major projects are over
budget by 40% or more and late
by 20 Months”
– Independent Project Analysis
Project execution
“Unbudgeted costs of poor
Engineering Information Handover is
4% of Capex”
– National Institute of Standards and
Technology
“25-50% of Plant engineers’ time is spent
searching for Master Data (engineering
information) to support production,
maintenance, reliability, safety and
compliance programs”
– Owner Operators
Approx. $21m on a
$500m projectInefficiency
Handover Operations
Low Digital Maturity in Capital Projects
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Manufacturing
Total Economy
Construction
High cost for errors and delays in plant startup
14.2% of Total Installed Cost
* Love et al
COST OF ENGINEERING ERRORS
COST OF CONSTRUCTION REWORK
5.4%of Total Construction Cost.The leading cause is errors in design
* Hwang et al
Digital transformation priority – Owner OperatorsPlant, Cloud and Intelligent Information Management
TOP PRIORITY
Plant Digitalisation (Digital
Twin) is a top priority in the
process industry
BIGGEST IMPACT
Cloud and Intelligent
Information Management has
the biggest impact
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
EPC 4.0 Performance Opportunities
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.
How to improve Productivity1
1. Reshape regulation
2. Rewire contracts (Create Collaboration)
3. Rethink Design & Engineering
4. Improve procurement & supply chain
5. Improve on site execution
6. Infuse technology & innovation
7. Reskill workers
1. Source: McKinsey Global Institute analysis
30%
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
The Value of Front End Engineering & Design
• CII Best Practice – Front End Planning
• Value of CII Best Practices Report
(PAC-2016-4, Published Nov. 2016)
• Assessing the Maturity and Accuracy of Front
End Engineering and Design (Research
Summary 331-1, Published April 2018)
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.
A high maturity project 2% below budget
• CII reports that “more mature and accurate
FEED in the early stages of industrial projects
improves cost and change performance, while
helping meet financial performance and
customer satisfaction expectations
How you get it depends on your contracting strategy with EPC…
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Digital Asset
Contracting
Strategy /
Technology
Mandate
Data Centric
Project
Execution
Document
Centric Project
Execution
NOYES
Trusted
Engineering
Information
4%
Handover
TIC Savings
10% Project
TIC Savings
Typical EPC/Owner Operator Strategy
HANDOVER
Owner
Document
Centric
EPC
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
A Digital Strategy
EPC
Data
Centric
Operations
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
EPC 4.0 cuts time and cost
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Unified Engineering
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Digital Twin = Digital Asset + Process Behavior
ProcessSimulation
Fluid Flow Rating
Simulation
Dynamic Simulation
Simulation changes made for Rating and Dynamics are automatically included in process simulation
PFD P&ID 3D
Engineering and
3D database
Simulate plantheat and material balance
1
Compare multiple design cases with process stream data
2
Detailed design of equipment, piping, instrumentation, and controls
4
Equipment Data
back to simulation5
Verify that the plant will operate as expected and validate the control strategy
7
Generate
FEED deliverables3
Verify that the equipment and piping are properly sized
6
Panel Session
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
EPC-02
Take Control of your Engineering & Design Process
Panel Discussion
Audience Q&A
01
02
03
Panelists
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.
Alamath Carter
Senior Director of Engineering
TechnipFMC Process Technologies
Henry Acheampong
Site Engineering Supervisor
DuPont
Maxime Guillois
Manager, North America
Orinox
linkedin.com/company/aveva
@avevagroup
ABOUT AVEVA
AVEVA is a global leader in engineering and industrial software driving digital transformation across the entire asset and operational l ife cycle of capital -intensive industries.
The company’s engineering, planning and operations, asset performance, and monitoring and control solutions deliver proven results to over 16,000 customers across the globe. Its customers are supported by the largest industrial software ecosystem, including 4,200 partners and 5,700 certified developers. AVEVA is headquartered in Cambridge, UK, with over 4,400 employees at 80 locations in over 40 countries.
aveva.com
© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.