© ABSL Power Solutions 2007© STM Quality Limited

STM Quality Limited

7 Wastes

TOTAL QUALITY MANAGEMENT

7 Wastes

Page 2: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

How often have you used the expressions:

“That was a waste of time!”or

“That was a waste of money!”or

“That was a waste of effort!”

Waste

Page 3: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

Wasted Time

Just imagine if we could

collect all the time together that we have wasted in the

past -How much time would that be?

Page 4: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

Wasted Money

Just imagine if we could collect all the money together that

we have wasted in the

past -How much

money would that be?

Page 5: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

Wasted Effort

Just imagine if we could

collect all the effort together that we have wasted in the

past -How much effort

would that be?

Page 6: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

The Problem With Waste

The problem with wasted time, money & effort is:

When it’s gone…

- it’s gone!

Page 7: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

Eliminating Waste

So what can we do to eliminate waste?

We first need to identify what is & is not waste, then we can look at ways of eliminating or at least reducing waste.

Page 8: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

Identifying Waste in the Workplace

Operational ActivityValue added OperationsAny process that changes the nature,

shape or characteristic of the product in line with customer requirements

e.g. Pressing, welding, heat treatment.

This is where we make a profit!

Page 9: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

Identifying Waste in the Workplace

Operational ActivityNon-Value added OperationsWork carried out which is necessary

under current conditions, but does not increase product value.

e.g. Inspection, tool change, maintenance.

This is where we make a loss!

Page 10: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

Value Added and Non-Value Added operations

The objective is to raise the ratio of Value added operations to non-value added operations and eliminate waste.

WASTE NON-VALUE ADDEDVALUE ADDED

OPERATOR TIME

VALUE ADDED

NON-VALUE ADDED

MORE TIME FOR OTHER ACTIVITIES

ELIMINATE

Page 11: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

7W – The Elimination of Waste

So, now we understand the difference in value added & non-value added operations, what are the benefits in eliminating all waste?

• Reduced costs• Greater Capacity• Bottlenecks are identified

Page 12: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

7W – 7 Types of Waste

1 Over-production

2 Inventory

3 Transportation

4 Process5 Idle Time6 Operator Motion

7 Bad Quality

Page 13: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

7W – 1. Over-production

Over-production

Producing more than is needed hides a multitude of problems. Excessive set-up times, machine faults, risk of producing obsolete stock.

Page 14: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

7W – 2. Inventory

Inventory

Carrying stock attracts cost & storage problems. Storage leads to stacking, racking, sophisticated computers, bar coding & automation, all for an activity that adds no value to the product.

Page 15: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

7W – 3. Transportation

Transportation

This may appear unnecessary but does add value. Large transport is easily identified but small transport such as manual labour may not be so noticeable. These can be improved by changes to the work environment.

Page 16: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

7W – 4. Process

Process

Adds cost but no value - e.g.trimming & moulding to a level that is beyond the required standard adds extra time that customers do not want to pay for.

Page 17: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

7W – 5. Idle Time

Idle Time

Typically, waiting for products & services from preceding operations, waiting for work from their previous set-up or waiting for cycles to finish, or meetings to start.

Page 18: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

7W – 6. Operator Motion

Operator Motion

Typically, single handed operations where both should be used, stretching unnecessarily or awkwardly and walking between things. All of these take time or use time poorly, none add value.

Page 19: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

7W – 7. Bad Quality

Bad Quality

Rejects are always produced by systems and procedures created by management. If operators fail it is because the process allowed them to fail through inadequate training or because the process was not capable in the first place.

Page 20: © ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes

© STM Quality Limited

STM Quality Limited

7W – The Elimination of Waste

So, now we understand the 7 wastes, we can:

• Produce only what is needed;• Carry only essential stock;• Use transportation more wisely;• Produce work to the standard required;• Plan our production processes;• Put our efforts to the best possible use;• Train to make quality work every time!