23
7th COSMO meeting Zuric h ALADIN co-operation A cluster of NWP projects Dijana Klaric , Dominique Giard, Andras Horanyi, Per Unden LACE ALADIN HIRLAM

ALADIN consortium ALADIN structure ALADIN networking ALADIN 2 Project

  • Upload
    heman

  • View
    77

  • Download
    2

Embed Size (px)

DESCRIPTION

ALADIN co-operation A cluster of NWP projects Dijana Klaric , Dominique Giard, Andras Horanyi, Per Unden LACE ALADIN HIRLAM. ALADIN co-operation A cluster of NWP projects.  ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project - PowerPoint PPT Presentation

Citation preview

Page 1: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN co-operationA cluster of NWP projects

Dijana Klaric, Dominique Giard, Andras Horanyi, Per Unden

LACE ALADIN HIRLAM

Page 2: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN consortium

ALADIN structure

ALADIN networking

ALADIN 2 Project

ALADIN-HIRLAM co-operation

ALADIN co-operationA cluster of NWP projects

Page 3: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

F,RO,BG,CZ,HU,SK, PL,A,MC,SI,CR,B,PT,Mo,Tu (Al,Ma)

I-----I-----I-----I-----I-----I-----I-----I-----I-----I-----I-----I----I1990 1995 2002

ALADIN Consortium

Page 4: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN Project

Structure:

• Assembly of ALADIN Partners

• ALADIN MoU (II)

• Coordinators for Scientific and Strategic Issues (CSSI)

• National coordinators

Page 5: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN tasks

ARPEGE/ALADIN code development:– ALADIN mid-term scientific plans

3rd (2002-2004), transition plan for 2005– local and centralized code development– common phasing for reference version (IFS/AR/AL)

ALADIN Workshops (15th at Bratislava June 2005)

ALADIN Newsletter (no 27 => no28)(www.cnrm.meteo.fr/aladin/newsletters/newsletters.html)

Page 6: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN networking

• 15 NWP groups• Meteo-France leadership

(co-ordination,R&D, operations, ref. version, funds) • Regional projects with different goals:

LACE - Central Europe (A,CR,CZ,HU,SI,SK)

(operations ALADIN/LACE , R&D, funds)

SELAM- SE Europe (Ro,Bg,Mo)

Morocco -ALADIN/NORAF for ACMAD countries

Page 7: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN R&D funds NMC – MF – LACE – EU

Page 8: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN 1991-2004

Page 9: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN 2 ALADIN-2

ALADIN (2002-2008):convergence between

international ALADIN and AROME projects

ALADIN (1)

Aire Limitée Adaptation dynamique Développement InterNational

“good for today but not for tomorrow”

ALADIN -2

AROME Limited Area Decentralised International Network

Page 10: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN-2 tasks

• To implement NWP systems at the meso- scale• To maintain the meso- operational capability at the

state of the art level

ALARO interface

Page 11: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN 2 models (AAAA)

• ARPEGE global model (20km mesh size)

• ALADIN operational applications (8 km mesh size)

• Decision about interfacing on the equation and code levels – (TCWSDPI, Nov 2004)

• ALARO-interface (8-10km) prototype -Feb 2006• AROME prototype (2.5 km mesh size) -April 2004

daily runs at:

-Midi-Pyrénées, June 2005

- South-East domain, September 2005

1st AROME WS 21-25 November 2005, Romania

Page 12: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN HIRLAMmesoscale co-operation

2003=>• HIRLAM for co-operation with AROME Project • ALADIN interest on HIRLAM DA achievements• Common interest in EPS on different scales “Future developments requires more resources that

could be achieved by collaboration”

2004=> Contacts at management levels - ALADIN coordinator at HAC - LACE Steering Committee open for HIRLAM Co-operation on Council levels

Page 13: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN HIRLAMconsortium

Page 14: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN HIRLAMscientific and code cooperation

• AAA training for HIRLAM MG on March 2004• 14th ALADIN WS, June 2004 Innsbruck• Decision about interfacing on the equation and code

levels – (TCWSDPI, Nov 2004, Prague)• ALADIN-HIRLAM reference code a ECMWF (2005)• HMG-CSSI coordination meeting, June 2005 Bratislava

– code collaboration and maintenance, phasing– Scientific strategy and working plans:

dynamics and coupling, physics, surface, DA, predictability, verification

• ALADIN-HIRLAM Sc. plan expected (October 2005)

Page 15: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

• HIRLAM physics as switch in AAA

• Meso-scale contribution on AROME physics

• DA code merge (ODB)• Jo and Jb common work• Observations: radar

reflectivities, MSG• Surface ISBA scheme• Externalize surface• Treatment of LBC

SHARED CODE

COMMON CODE

Page 16: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN & HIRLAMworkshops

HIRLAM-ALADIN mini-workshop

on convection and cloud processes

24-26 January, 2005 Tartu, Estonia

ALADIN-HIRLAM workshop

on code maintenance and data assimilation

14-18 November, 2005 Budapest, Hungary

Page 17: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN co-operationsfuture

• ALADIN (internal) solidarity• Next ALADIN MoU (III) and HIRLAM 7 MoU s

define the scope of the interest define the membership 5 years agreements• ALADIN-HIRLAM co-operation agreement

Advanced EU co-operations and coordination SRNWP co-ordinations (WS, MG meetings) EU visibility and fresh funds (STORMNET)

Page 18: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

Acronyms

• ALADIN- Air Limitée Adaptation Dynamique dévéloppement International

• LACE -Limited Area modelling in Central Europe• ACMAD- African Center of Meteorological

Applications of Development• AROME- Application of Research to Operations at

MesoscalE• ALADIN2 Arome Limited Area Decentralised

International Network 

Page 19: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

Page 20: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

Page 21: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

AAA roadmaps 2008 • ARPEGE (TLS):

– 15 km resolution over Europe, 4/day, 60-96h• ALARO :

– 7-10 km, domain as ALADIN(2004), 4/day, 48-60h• AROME forecast:

V1:3 km, reduced domain, 4/day 24h 10 times ALAD1 CPU V2 : 3 km, full domain, 4/day 48h 100 times ALAD1 CPU

• AROME nowcasting: – 3 km, reduced domain, 24/day, 3h 7 times ALAD1 CPU

• AROME substitute dynamical adaptation: – 3 km, reduced domain, 1/2h integration around lead times 3h,

6h, 9h, 12h, 15h, 18h, 21h, 24h, 30h, 36h, 42h, 48h (equivalent to a 6h forecast) 1/2 ALAD1 CPU

Page 22: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich

ALADIN HIRLAMConsortium

Page 23: ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

7th COSMO meeting Zurich