- Hearing Session - Marion Picard - July 28th, 2011
STATUS OF HIRADMAT SAFETY FILE
Outline Safety file
Descriptive part Hazard inventory Demonstrative part Operational part Feedbacks
Other recommendations from safety review
2
STATUS OF HIRADMAT SAFETY FILE
I - Descriptive part
II – Hazards Inventory
1.Methodology 2.List of Hazards
- Hearing Session - Marion Picard - July 28th, 2011
3
HIRADMAT SAFETY FILEI - DESCRIPTIVE PART
- Hearing Session - Marion Picard - July 28th, 2011
TABLE OF CONTENTS:
1. MOTIVATIONS AND GOALS2. LOCATION AND VICINITY3. TECHNICAL DESCRIPTION3.1 Beam line3.2 Experimental area3.3 Infrastructure4. OPERATION LIFE CYCLE4.1 Assembly in BA7 lab4.2 Lab to test zone4.3 Test zone to cool-down zone4.4 Cool-down zone removal4.5 Irradiated experimental equipments5. DISMANTLING PHASE & DISPOSAL6. HAZARD INVENTORY
4
35-page content Safety oriented description 7 weekly meetings with DSO from BE and EN
HiRadMat_descriptive_part_v2.0 in EDMS: 1145711
- Hearing Session - Marion Picard - July 28th, 2011
HIRADMAT SAFETY FILEI - DESCRIPTIVE PART
5
1. Methodology:a. Scope of analysis: processes identification in HiRadMat
- Hearing Session - Marion Picard - July 28th, 2011
HIRADMAT SAFETY FILEII – HAZARDS INVENTORY
6
- Hearing Session - Marion Picard - July 28th, 2011
II – HAZARDS INVENTORY1.A. PROCESSES IDENTIFICATION
7
- Hearing Session - Marion Picard - July 28th, 2011
…
Basic Activity 7:Preparation crane for
remote use
…
Basic Activity 8:Remote use of crane
…
…
…
Subprocess: Test table transport to cool down
zone2.2.3
Basic Activity 1:Access in controlled area
2.2.3.1
2.2.3.2
2.2.3.4
2.2.3.5
2.2.3.3
…2.2.3.6
…
II – HAZARDS INVENTORY1.A. PROCESSES IDENTIFICATION
Defined with operators
8
- Hearing Session - Marion Picard - July 28th, 2011
Processes linked to the operation Processes linked to the maintenance
Tested equipment installation in lab TNC relighting
Table installation AUG tests
Activated table handling to cooling area PR532 maintenance in TJ7
Cooled table removal from TNC PR532 annual load test
Containment + experiment separation from table PR532 repair in TNC
Gas and or vacuum connection Drain network maintenance
Gas and or vacuum disconnection Elevator & lifts maintenance
Survey check of the 3 base tables Air Handling Unit maintenance
New cable pulling Radiation monitoring maintenance
Plug-in system exchange Fire detection tests
Patrol TNC Dump and upstream collimator exchange
HiRadMat procedures on processes during operation: EDMS 1154782 HiRadMat procedures on maintenance: EDMS 1154793
● Creation of HiRadMat_Maintenance_Plan: EDMS 1154793
II – HAZARDS INVENTORY1.A. PROCESSES IDENTIFICATION
9
- Hearing Session - Marion Picard - July 28th, 2011
HiRadMat _Maintenance_Plan:● Summarizes on which equipments, how often, who and how
EquipmentsType and frequency
PersonnelProcedure in
EDMS
3.1 Fire detection tests Preventive: annual2 operators from subcontractor1 RP technician
1154831
3.2 Absolute filters exchange in ventilation
Preventive: check filter state
2 operators EN-CV1 RP technician 1154808
3.3 Evacuation of condensate water from dehumidification unit
Preventive: check water level
2 operators1 RP technician
To be added
3.4 Dump and upstream collimator exchange
Corrective1 operator from EN-STI-TCD 1 RP technician
1154835
3.5 Radiation monitors control Preventive: annual
2 operators1 RP technician 985693
Material lift tests Preventive: quarterly To be addedElevator tests Preventive: monthly To be addedEmergency, evacuation and regular lights replacement in TNC
EL-OP, subcontractor Will be defined in VIC before 1st intervention
AUG tests Preventive: annual 110244
II – HAZARDS INVENTORY1.A. PROCESSES IDENTIFICATION
10
- Hearing Session - Marion Picard - July 28th, 2011
1. Methodology:A. Scope of analysis: processes identification in HiRadMat
B. Hazards identification on processes
II – HAZARDS INVENTORY1.B. HAZARDS IDENTIFICATION
…
Basic Activity 7:Preparation crane for
remote use
…
Basic Activity 8:Remote use of crane
Subprocess: Test table transport to cool down
zone2.2.3
Basic Activity 1:Access in controlled area
2.2.3.1
2.2.3.2
2.2.3.4
2.2.3.5
2.2.3.3
…2.2.3.6
…
11
- Hearing Session - Marion Picard - July 28th, 2011
SAFETY FILE: LIST OF HAZARDS
Process: HiRadMat operation Process n° 2.2
Subprocess: Test table transport to cool down zone Subprocess n° 2.2.3
No.Work unit,
tooling, material, substances
Hazard
Hazard Potential
Safety rules known and available
Rules covering the work Need for
specialistsHigh Low Yes No Partly
2.2.3.1
2 crochets de 13 kg du pont roulant sur palette et caméras en BA7
2.2.3.2 Accès en zone contrôlée BA1: Entrance/activity in controlled area
2.2.3.3Descente du matériel sur transpalette par le monte-charge BA7
Lifting and carrying loads (2x13 kg) x Personnel EN/HE from transportLift transport limited in weight and size x
2.2.3.4 Preparation remote PR-532 BA7: preparation remote PR-532
2.2.3.5
Installation manuelle des crochets intermédiaires sur le palonnier du pont roulant avec les blocages
Hooks 13 kg at 1.50 m height x
Crane operational procedure EDMS 1146242See 2.2.3.4 (Manipulation by overhead craneman EN/HE)See 2.2.3.1 (wearing IPE)
x
2.2.3.6 Remote use of PR-532 BA8: Remote use of PR-532
2.2.3.7Prise de la table dans les 2 anses avec les crochets intermédiaires
See 2.2.3.6
II – HAZARDS INVENTORY1.B. HAZARDS IDENTIFICATION
12
HiRadMat_Hazards_Inventory in EDMS: 1145836 Explains the methodology Summarizes the hazards on activities
List of hazards in EDMS (sub-docs of Hazards_Inventory): Associated with operation: 1154929 Associated with maintenance: 1154930 Hazards on basic activities: 1154932
- Hearing Session - Marion Picard - July 28th, 2011
II – HAZARDS INVENTORY2. LIST OF HAZARDS