*Minimum Life Until Failure: As part of the design and testing process teams should consider ways to prove an expected life as listed. Previous tests on the device or tests conducted on components in a similar application will be acceptable. Methods of superposition or extrapolation of high wear components may also be considered.
Citation preview
Week 11 Review
Mechanical Components have been ordered and should arrive by Week 1 of winter quarter
Outstanding electrical components dependent on varying mechanical parts
Working on methods to attach and store electrical components (due Week 1 winter)
Test plans have been created for each component, will be ready to complete upon arrival
Current State
Updated Specifications*Minimum Life Until Failure: As part of the design and testing process teams
should consider ways to prove an expected life as listed. Previous tests on
the device or tests conducted on components in a similar application will be acceptable. Methods of superposition
or extrapolation of high wear components may also be considered.
Project Plan: Week 3
Project Plan: Current
Project Plan: Current
Project Plan: Current
Electrical component selection will be finalized when verify mechanical component testing
Outstanding purchased parts◦ electrical components for PCB and battery◦ Steel for attachment◦ Need to verify electronic attachment
Testing plan- need to verify power terrain, how to determine speed, full system testing
Project Plan: Unfinished Tasks
Project Plan: MSD II
Risk Assessment: Week 3
https://edge.rit.edu/edge/P13002/public/Project%20Review
Risk Assessment: Current
Added individual owners to all risk items Risk items more specialized, before was a
generalization Added specific tasks once finalized the
system architecture with the locking mechanism
Customer needs have been identified, should be met based on current design
Risk Assessment: Improvements
Notes from Meetings◦ General Meetings https://
edge.rit.edu/edge/P13002/public/Meetings%20by%20Date
◦ Feedback from Reviewshttps://
edge.rit.edu/edge/P13002/public/Meeting%20Notes/2012-10-05%20Systems%20Design%20Review.pdf
https://edge.rit.edu/edge/P13002/public/Meeting%20Notes/2012-11-01%20Detailed%20Design%20Review.pdf
Edge Documentation