Navitus Bay Wind Park Recreational Sailing Consultation

Embed Size (px)

Citation preview

Page 1: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

Navitus Bay Wind ParkRecreational Sailing Consultation April/May 2012

Page 2: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................2

• Owned by 60 Dutch Municipalities. The largest shareholders being: Rotterdam (31%), The Hague (16%), Dordecht (9%)

• Approximately 2 million business and retail customers

• 24,500 GWh electricity / 6,700 million m3 Gas sold in 2010

• €4,922m annual turnover (2010)

• 6545 employees

• Head Office in Rotterdam - the main energy port of Western Europe

EnecoGroup Profile

2

Page 3: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................33

Present ActivityThe Netherlands, UK, France, Belgium, Germany

Legend

On- and Offshore

Wind energy

Bio energy

Solar energy

Heat

Heat pump

Hydro power

Own and operate 29 wind farms in Europe, including 120MW Prinses Amalia offshore project

Page 4: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................4

The Crown Estate – Round 3

• 32 GW target by 2020

• Meet 25% of UK demand

Page 5: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Project Development Area Overview

• Site chosen after a zone appraisal and planning (ZAP) process in accordance with guidance from The Crown Estate – constraints mapping

• 76 square miles• At least 900MW, up to 1200MW• Average water depths 30-50m• 7.1 nm from Swanage at its closest point, 8.9 nm from Bournemouth and

7.1 nm from the Needles

5

Page 6: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................66

Zone Appraisal Studies

• Environmental Data Gap Analysis• Seascape and visual impact study• Commercial Fisheries• Shipping and Navigation• Benthic Habitat Study• Archaeological Study• Aviation and Mod Study• Ornithology• Metocean Study• Geological Modelling• UXO Studies• Wind Resource Assessment• Trenching Assessment• Foundation and turbine concept study

Page 7: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................77

ZAP – Consultations

• Navigation – MCA, Trinity House, Harbour Authorities (5), RYA, Chamber of Shipping, Ferry Companies (3)

• Borough/District/City Councils (11)• Environment – CEFAS, JNCC, MMO, Natural England, English

Heritage, IoW AONB Board, New Forest National Park Authority, National Trust, Dorset Coast Forum, Solent Protection

• RDAs – SEEDA, SWRDA• Government – MoD, DoT, OFCOM• Aviation – MoD, Bournemouth Airport, Southampton Airport, NATS• MCZs – Balanced Seas, Finding Sanctuary• Fishing – NFFO, MMO, Southern Sea Fisheries• Aggregates – Cemex, Hanson, Tarmac• Tourism – South East / South West Tourism Boards• Others – National Grid, Portsmouth University• The Public – 14 public information days held

Page 8: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................8

Distances from shore

Page 9: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Onshore Works – cable route & substation

• Grid Connection at Mannington (north of Bournemouth)

• Cable corridor ~1km wide– Identified using

environmental, engineering and landowner constraints

• Two landfall options under consideration

• Two substation options consulted on near to Mannington

9

Page 10: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................10

High Level Project Schedule

• Environmental Impact Assessment (EIA)

Scoping Report completed September 2011

• Offshore Works

2012: Geophysical survey, Borehole for Met Mast, Met Mast installation (subject to license)

• The Development Consent Order (DCO)

Application to IPC end of 2013. Consent decision expected end of 2014 / Q1 2015

• Financial Close / Construction Contracts to be awarded in 2016

• Construction

Proposed to commence 2016

• Operational Wind Park

2019 / 2020

Page 11: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Navigational Safety Risk Assessment

• Part of EIA consent process.

• Navigation Statutory Consultees - MCA & THLS

• Other consultees include: COS; Ferry & Shipping Companies; Fishing Organisations; Recreational bodies (RYA, BSAC); individual organisations e.g. Yacht clubs.

• All classes of vessel (including recreational) have to be assessed. AIS/Radar surveys inform risk analysis as does consultation with representative bodies and local organisations.

11

Page 12: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Navigational Safety Risk Assessment

• MCA advises MMO on acceptability of proposal with regards to navigational safety.

– Has to demonstrate that those affected have been identified and consultation taken place.

– Methodology has to be acceptable.

– Demonstration that claims of tolerability of risk are supported by evidence.

12

Page 13: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

NSRA programme

• Programme

– Apr to Jul 2012: Formal consultation with organisations – Nov 2011 to Aug 2012: Continuous AIS Survey

– Feb/Mar & Jul 2012: Radar survey

– Jul/Aug 2012: Data analysis and risk assessment

– October 2012: Complete NSRA

Page 14: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

AIS Survey Data PlotAll Vessels 1-7 Jul, 1-7 Aug 2011

14

Page 15: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Recreational Vessels Jul 1- 7, Aug 1 – 7, 2011

15

Page 16: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Radar Survey (Non-AIS Tracks) Feb/Mar 2012

16

Page 17: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Radar Survey Data – 28th Feb – 13th March 2012

Ferries Commercial / Military

Fishing Recreational Undefined

Total 12 203 62 46 48

Average 0.8 13.5 4.1 3.1 3.2

17

Page 18: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Met mast, AIS Survey Data PlotAll Vessels 9 Nov – 7 Dec 2011

18

Page 19: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

RYA wind farm survey

• Conducted in 2011 to gather first hand information of experiences sailing through wind farms

• More than 80% of respondents found no difficulty sailing through a wind farm

• Over 75% of those who had sailed through a wind farm would not alter passage in the future

• The RYA described responses as ‘overwhelmingly positive’ whilst emphasising the need for continual engagement to ensure that access and safe passages were maintained.

Page 20: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

RNLI Casualty Data 2007 – 2012 (1)

20

Page 21: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

RNLI Casualty Data 2007 - 2012(2)

21

Page 22: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

RNLI Casualty Figures – 2007 - 2012

Persons/ animals in distress

Small Recreational Craft (Jetski, sail/kite board, dinghy, canoe)

Powerboats ( inc. launches, dive boats)

Sailing Vessels

Cargo/ Pax

Other

Total 2007 - 2012

367 287 653 448 40 93

22

Page 23: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Meteorological Mast

• Single temporary structure up to 100m in height

• Licence issued by the Marine Management Organisation

• A navigation safety risk assessment report was submitted with the application

• The conclusions of the report have been accepted by the MCA and they have responded with no objection.

• THLS have requested further examination of traffic data and we are in the process of agreeing lighting requirements.

Page 24: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Access to Wind farm

• No intention to extinguish navigational rights for the area as a whole.

• Use of Safety Zones:– Construction Phase – 500m around spread– Operational Phase – 50m around each WTG

• Distances between turbines/rows – dependent on number of turbines and rated capacity/size of rotor.

• Rotor Clearance – recommended 22m above MHWS.

24

Page 25: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Controls and Risk Mitigation

• Recommendations for construction phase:– Working areas - iaw IALA MBS.– Consider guard ships. – NtM, WZs in advance and during activities.– Progressive introduction of safety zones

• Recommendation for operational phase - Individual WTG – Painted yellow all round fm HAT to 15m or AtN.– Consider retro-reflective material.– AtN (light) >6m above HAT and below rotor arc.– Unique identifier (down lit sufficient “that collision may be

avoided”)

25

Page 26: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Controls & Risk Mitigation (cont)

• Recommendation for operational phase (Farm)

– Significant Peripheral Structures (SPS) – Special mark (Fl.Y) light(s) visible all round. Synchronised. 5nm Nominal range.

– Consider synchronisation of ALL SPSs.– Distance between SPS should not exceed 3nm.– If sides >3nm, then Intermediate Peripheral Structures

(IPS) should be lit (Special Mark Fl.Y) BUT character distinctly different from SPS. 2nm Nominal range.

• Consider:– Lighting ALL peripheral structures.– Lighting ALL structures WITHIN windfarm.– RACONS/radar reflectors.– AIS.– Sound signals.

26

Page 27: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Search and Rescue

• ASMS/ERCoP

• Trials of SAR Helo at North Hoyle - MSA 10/6/239, May 2005– Braking rotors and locking yaw (MCA ASMS)– Surface rescue – good/poor viz.

• Training of Surface SAR Units

27

Page 28: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

IALA Requirements – Significant and Intermediate Peripheral Structures

28

Page 29: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

Primary Contacts

• Chris Sherrington (Project Director)[email protected]

• Helen Cassini (Consents Manager)[email protected]

• David Cantello (Marine Safety Consultant) [email protected]

29

Page 30: Navitus Bay Wind Park Recreational Sailing Consultation

.................................................................................................

........................................................................

www.navitusbaywindpark.com