© UPU 2010 – All rights reserved

Implementation of the postal

development plan for Africa

29th session of the PAPU Council of Administration

2–3 August 2010, Yaounde, Cameroon

Mr Claude Defoundoux, Africa Regional Programme Manager

Page 2: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Mise en œuvre du plan pour le

développement postal en Afrique

29e session de l’UPAP, 2-3 août 2010 YAOUNDE, CAMEROUN

Claude Defoundoux, Chef du Programme régional pour l’Afrique

Page 3: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Results of the PDR 2006–2008 at a glance

– 6.13% increase in the number of post offices

– 17 countries adopted the IPDP reform process

– 28 countries participating in continuous testing

– Significant improvement in exchanges with industrialized countries.

English-speaking countries are measuring their exchanges (58.5% in

J+5): outcome of global quality of service project for SAPOA countries

– 17 countries have IPS and 23 countries have IPS Light (compared with

25 in 2005)

– Increasingly diverse range of postal services provided. 63% of postal

revenue generated by letter post (compared with 67% in 2005)

– 19 countries connected to IFS network. Pilot project bringing together six

West African countries: extension of service in rural areas (agreement

between UPU and IFAD)

– Post consolidated its presence in parcels segment in 2008, enjoying a

15.91% year-on-year increase in domestic volumes

– 64% of operators offer Internet access points, 36% online services, and

21% a domestic hybrid mail service

Page 4: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Les résultats du PDR 2006-2008 en un clic

Augmentation des bureaux de poste de 6.13%.17 pays ont adopté le processus de réforme PIDEP.28 pays participent au contrôle continu;amélioration notable des échanges avec les pays industrialisés. Les pays anglophones mesurent les échanges entre eux (58.2% à j+5): résultat projet Approche globale QS en faveur des pays de la SAPOA.17 pays ont IPS et 23 IPS-Light, contre 25 en 2005. L’offre postale est de plus en plus diversifiée (63% des revenus des postes, contre 67% en 2005, sont générés par les lettres).19 pays sont connectés au réseau IFS. Un projet pilote à regroupe 6 pays de l’Afrique de l’Ouest: extension du service dans les zones rurales (Accord signé entre l’UPU et le FIDA).Le trafic intérieur des colis postaux a évolué de 15.91% en 2008 par rapport à 2007 dénotant d’une vigueur nouvelle de la poste sur ce marché.64% des opérateurs offrent des points d’accès à Internet; 36% offrent des services en ligne et 21% offrent le courrier hybride en interne.

Page 5: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

A strategic vision: The Nairobi Postal Strategy

A framework for UPU development cooperation activities

The postal sector – an essential component of the global economy

Page 6: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

UNE VISION STRATEGIQUE:LA STRATEGIE POSTALE DE NAIROBI

Un cadre pour les activités de la coopération au développement de l’UPU

Le secteur postal – un composant essentiel de l’économie mondiale

Page 7: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Priorities of 2009–2012 RDP for Africa

• Postal sector reform

• Harmonization of postal regulations and legislation for the sustainable development of the sector

• Improvement in quality of service

• Development of electronic and financial networks and diversification of products and services

• Development of human resources

Page 8: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Priorités du PDR 2009-2012 pour l’Afrique

• Réforme du secteur postal• Harmonisation des législations et des

réglementations postales pour le développement durable du secteur

• Amélioration de la qualité de service• Développement du réseau électronique et

financier et diversification des produits et services

• Développement des ressources humaines

Page 9: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

A tool for implementing the NPS

Annex 6

A COMMON PLATFORM FOR ALL A COMMON PLATFORM FOR ALL PLAYERS, ALLOWING THEM TO PLAYERS, ALLOWING THEM TO HAVE THE SAME OBJECTIVES HAVE THE SAME OBJECTIVES AND PRIORITIES AND TO MAKE AND PRIORITIES AND TO MAKE BETTER USE OF RESOURCESBETTER USE OF RESOURCES

Page 10: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Un outil pour la mise oeuvre de la SPN

Annex 6

UNE PLATE-FORME COMMUNE À UNE PLATE-FORME COMMUNE À TOUS LES ACTEURS POUR UNE TOUS LES ACTEURS POUR UNE ADHÉSION AUX MÊMES ADHÉSION AUX MÊMES OBJECTIFS, LE PARTAGE DES OBJECTIFS, LE PARTAGE DES MÊMES PRIORITÉS ET UNE MÊMES PRIORITÉS ET UNE MEILLEURE UTILISATION DES MEILLEURE UTILISATION DES RESSOURCESRESSOURCES

Page 11: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Projects being implemented

• Global approach to quality of service management:o Project for Central Africa (two workshops held)o Project for English-speaking West African countries (two workshops held)o Project for Eastern African countries (one workshop held)

• Intra/inter-regional surface mail transport:o Continuation of SAPOA projecto Extension of ECOWAS projecto Projects for Eastern and Central Africa – feasibility study

• Addressing projects:o Project for English-speaking countries: expertise on addressing and postcodes; monitoring of progresso Joint project with COMESA: awareness-raising, training of experts and exchange of experiences

1 Improving quality of service

Page 12: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Des projets en cours: 1. Améliorer la Qualité de service

•Transport du courrier intra/inter régional par voie terrestre:o Continuation du projet SAPOA;o Extension du projet des pays de la CEDEAOo Etude de faisabilité des projets pour l’Afrique de l’Est et du Centre

• Approche globale pour la gestion de la qualité de service:o Projet pour l’Afrique centrale (2 ateliers organisés)o Projet pour l’Afrique anglophone de l’ouest (2 ateliers organisés)

o Projet pour l’Afrique de l’Est (1 atelier organisé) • Des projet pour l’adressage:

o Projet pour les pays anglophones: expertise pour adressage et codes postaux; suivi des progrès réaliséso Projet commun avec COMESA: sensibilisation, formation d’experts, échange d’expériences

Page 13: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Projects being implemented

• E-connectivity

o Technopost Africa: exchange of best practices on the use of ICTs and development of e-commerce by African Posts, particularly in rural areas

o E-Post project – currently being implemented by AUC, PAPU, ITU & RASCOM

• Development of financial services

o Project for the development of postal payment services in Central Africa (first workshop held at Libreville, Gabon)

o Project currently being formulated for countries of Eastern and Southern Africa

2 Developing the electronic and financial network

Page 14: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Des projets en cours: 2. Développer le réseau électronique et financier

• E-connectivité: oTechnopost Africa: échange de bonnes prati- ques sur l’utilisation des TIC et le dévelop- pement du commerce électronique dans les postes africaines, notamment dans les zones rurales.o Projet E-Post: un projet en cours de formulation d’un commun accord avec l’UPAP

• Développement des services financierso Un projet pour le développement des SPP en Afrique centrale (1er atelier organisé à Libreville, Gabon)o Un projet en cours de formulation pour les pays de l’Afrique de l’Est et des pays d’Afrique australe

Page 15: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Nombre de pays à ce jour : 166 Nombre d’apprenants TRAINPOST à ce jour : 4100 Nombre d’heures d'accès : 41000 heures Nombre de cours : 36 cours en 4 langues (Arabe, Français, Anglais, Espagnol) et 7 cours en trois langues (Arabe, Français, Anglais) pour un total de 43 cours actuellement sur le site Trainpost.

• Developing human resources

o Training: UPU Trainpost system adopted by several countries

o Training accompanying implementation of each project

Projects being implemented

3 Developing HR

4 Harmonizing legislation

• Harmonization of postal regulations and legislation for the sustainable development

of the sector

o Implementation of 2008 Cairo Declaration and Action Plan (issued by Ministers responsible for ICTs): coordination meeting for the functioning of the regional steering groups

(Addis Ababa, June 2010)

Page 16: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Nombre de pays à ce jour : 166 Nombre d’apprenants TRAINPOST à ce jour : 4100 Nombre d’heures d'accès : 41000 heures Nombre de cours : 36 cours en 4 langues (Arabe, Français, Anglais, Espagnol) et 7 cours en trois langues (Arabe, Français, Anglais) pour un total de 43 cours actuellement sur le site Trainpost.

• Développement des Resources humaines

o Formation: Le système Trainspost de l’UPU partagé par plusieurs payso Formation accompagnant la conduite de chaque projetprojet

• Harmonisation des législations et réglementations postales pour le développement durable du secteur

oImplementation de la Déclaration et le Plan d’action des Ministres des TIC du Caire 2008: réunion de concertation pour le fonctionnement des Groupes régionaux de pilotage à Addis Ababa (juin 2010)

Des projets en cours: 3. Développer les RH4. Harmoniser les législations

Page 17: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Performance indicators

LEVELTHREE

LEVEL TWO

LEVEL ONE

LEVELTHREE

LEVEL TWO

LEVEL ONE

Overview of results

Global indicators for measuring the impact of the RDP on the region

Performance indicators Expertise: RPCsTraining: 40 countries connectedEquipment: trucks for transport

Indicators relating to the formulation and launch of the RDPNumber of projects formulated by area of activity: two (on average)Number of co-financed projects: threeNumber of projects receiving external funding: threeNumber of projects launched: Ten

Page 18: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Indicateurs de performance

LEVELTHREE

LEVEL TWO

LEVEL ONE

LEVELTHREE

LEVEL TWO

LEVEL ONE

Résultats en bref!

INDICATEURS GLOBAUX DE MESURE DE L’IMPACT DU PDR SUR LA RÉGION

INDICATEURS DE RÉALISATION INDICATEURS DE RÉALISATION Expertise: CPRExpertise: CPRFormation: 40 pays connectés/1387 hFormation: 40 pays connectés/1387 hÉquipementÉquipement: Trucks pour transport

INDICATEURS RELATIFS À LA FORMULATION ET AU LANCEMENT DU PDRNombre de projets formulés par domaine d’activité: 2 en moyenneNombre de projets cofinancés: 3Nombre de projets ayant obtenu des financements externes: 3Nombre de projets initiés: 10

Page 19: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August

© UPU 2010 – All rights reserved

Thank you!

Page 20: © UPU 2010 – All rights reserved Implementation of the postal development plan for Africa 29th session of the PAPU Council of Administration 2–3 August