3
0211012015 Pa•p I 0/025US. Nuclear Rem rv Commission Onerations Center Event Renort piom, I Part 21 (PAR) Event# 50799 Rep Org: VALCOR ENGINEERING CORPORATION Notification Date / Time: 02/09/2015 17:17 (EST) Supplier: VALCOR ENGINEERING CORPORATION Event Date I Time: 02/09/2015 (EST) Last Modification: 02/09/2015 Region: 1 Docket #: City: SPRINGFIELD Agreement State: Yes County: License #: State: NJ NRC Notified by: FRAN LUCANO Notifications: RAY POWELL R1DO HQ Ops Officer: CHARLES TEAL ROBERT HAAG R2DO Emergency Class: NON EMERGENCY PATTY PELKE R3DO 10 CFR Section: DON ALLEN R4DO 21.21 (a)(2) INTERIM EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL PART 21 REPORT - POSSIBLE ASSEMBLY ERROR IN SOLENOID VALVE "[The licensee] has discovered a possible assembly error that may result in compromising the capability to isolate the solenoid housing internals from a LOCA environment on some of our solenoid valve models that use grafoil packing for sealing the NEMA 4 enclosure. We are in the process of identifying the valve models affected and will notify all customers affected." Description of Defect/Non-Compliance: "As noted on MRR997W the packing ring which seals the solenoid on valve model V526-5631-36 used in Qualification and Production were not matched to the procedure invoked on valve drawing."

0/025US. Nuclear Rem rv Commission Onerations …VALCOR ENGINEERING CORPORATION Vice President, Quality Systems 02/09/2015 MON 18:17 FAX IZ002/002 I S21IO, Rev. J VALCOR ENGINEERING

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 0/025US. Nuclear Rem rv Commission Onerations …VALCOR ENGINEERING CORPORATION Vice President, Quality Systems 02/09/2015 MON 18:17 FAX IZ002/002 I S21IO, Rev. J VALCOR ENGINEERING

0211012015 Pa•p I0/025US. Nuclear Rem rv Commission Onerations Center Event Renort piom, I

Part 21 (PAR) Event# 50799

Rep Org: VALCOR ENGINEERING CORPORATION Notification Date / Time: 02/09/2015 17:17 (EST)Supplier: VALCOR ENGINEERING CORPORATION Event Date I Time: 02/09/2015 (EST)

Last Modification: 02/09/2015

Region: 1 Docket #:

City: SPRINGFIELD Agreement State: Yes

County: License #:

State: NJ

NRC Notified by: FRAN LUCANO Notifications: RAY POWELL R1DOHQ Ops Officer: CHARLES TEAL ROBERT HAAG R2DO

Emergency Class: NON EMERGENCY PATTY PELKE R3DO

10 CFR Section: DON ALLEN R4DO

21.21 (a)(2) INTERIM EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL

PART 21 REPORT - POSSIBLE ASSEMBLY ERROR IN SOLENOID VALVE

"[The licensee] has discovered a possible assembly error that may result in compromising the capability to isolatethe solenoid housing internals from a LOCA environment on some of our solenoid valve models that use grafoilpacking for sealing the NEMA 4 enclosure. We are in the process of identifying the valve models affected and willnotify all customers affected."

Description of Defect/Non-Compliance:

"As noted on MRR997W the packing ring which seals the solenoid on valve model V526-5631-36 used inQualification and Production were not matched to the procedure invoked on valve drawing."

Page 2: 0/025US. Nuclear Rem rv Commission Onerations …VALCOR ENGINEERING CORPORATION Vice President, Quality Systems 02/09/2015 MON 18:17 FAX IZ002/002 I S21IO, Rev. J VALCOR ENGINEERING

r

02/09/2015 MON 18:17 FAX 1a001/002

Croý 4ýý111VALCOR

fikýý ýAVALCOR ENGINEERING CORPORATION*

2 Lawrence Road e Springfield, New Jersey 07081 USAPhone: 973-467-8400, Fax: 973-467-9391

Feb. 9, 2015

NRC Operations CenterFax: 301-816-5151

SUBJECT: Interim of a potential defect

We have discovered a possible assembly error that may result in compromisingthe capability to isolate the solenoid housing internals from a LOCA environmenton some our solenoid valve models that use grafoil packing for sealing the NEMA4 enclosure. We are in the process of identifying the valve models affected andwill notify all customers affected.

VALCOR ENGINEERING CORPORATION

Vice President, Quality Systems

Page 3: 0/025US. Nuclear Rem rv Commission Onerations …VALCOR ENGINEERING CORPORATION Vice President, Quality Systems 02/09/2015 MON 18:17 FAX IZ002/002 I S21IO, Rev. J VALCOR ENGINEERING

02/09/2015 MON 18:17 FAX IZ002/002

I

S21IO, Rev. J

VALCOR ENGINEERING CORPORATION®10 CFR 21 Reporting Evaluation Form

Form C

Initiator: , . ,

Ref: NFR#

Date: ";_-, _-1

0~ cription of Defect/Non-Compliance:X5 V1 _k; %~R~J . t &~M LL- 0kIj# L~A~L- U& W týAi Q ý t' 6CMvt

L, A ___%A 1"A0 2C211A IAL10T41 VOC"L

-6-., -kb QQAUVIV 4\VQ,"1% MIA 1%,'k-A? WV W%)Kk

How was DefectINon-Compliance discovered?O,.-i.. . oA. .r•\ A •.. • V*~ii~ ft

Engineering and QA evaluation: Substantial Safety Hazard - Yes, No, X Unable to determine

V d s4,t..

av, a / r4 C- ~~> I6 ~'llNuclear Engineering Manager Date Q.A)DlrWctor Date

Nuclear Sales & Marketing Director

10CFR21 Reportability Evaluation:

Date

___ 10CFR21 Reportable

SCustomer Notification required. (Forward copy to Contracts for customer notification)

Not reportable per 10CFR21. (Retain In QA file)

Justification, if applicable:

NRC Notification (if applicable).Date notified By

I Sheet 11