1
incl. angle is to big 10 11 12 13 14 15 16 17 18 files BANKING HALL Dispatch Desk cleaners' room xerox BACK OFFICE F RG 20ÿ 20ÿ 20ÿ 20ÿ 25ÿ 25ÿ 20ÿ 20ÿ 20ÿ ks. undersink heater FB whb ur wc wc wc wc whb 32ÿ 32ÿ 25ÿ 20ÿ wc whb whb 20ÿ 20ÿ 32ÿ F/A 25ÿ F/A Indoor unit (18) PROPOSED SERVICES ENGINEERS GEDOX ASSOCIATES, P.O. BOX 64441-00620, NAIROBI - KENYA A TEL/FAX : 254-02-2636000 E N G I N E E R S X G CLIENT PROJECT TITLE Date: 1:100 FILE: Scale: Issued to/Date Sheet Scale: FILE: 1:100 Date: Drawing No.: Checked/Date Checked/Date Drawing No.: ARCHITECT Designed by: MJ Approved by: GWJ Checked by: GWJ GWJ Checked by: GWJ Approved by: Designed by: Description Drawn by: Rev. Rev. Drawn by: Description MJ Date: 1:100 FILE: Scale: Issued to/Date 1 OF 2 Sheet Scale: FILE: 1:100 Date: JULY 2011 Drawing No.: Checked/Date Checked/Date Drawing No.: USE IT FOR CONSTRUCTION WITHOUT THE EXPRESS AUTHORITY OF GEDOX ASSOCIATES THIS DRAWING IS THE COPYRIGHT OF THE ENGINEERS. IT IS ILLEGAL TO REPRODUCE IT OR THIS DRAWING IS THE COPYRIGHT OF THE ENGINEERS. IT IS ILLEGAL TO REPRODUCE IT OR USE IT FOR CONSTRUCTION WITHOUT THE EXPRESS AUTHORITY OF GEDOX ASSOCIATES THIS DRAWING IS THE COPYRIGHT OF THE ENGINEERS. IT IS ILLEGAL TO REPRODUCE IT OR USE IT FOR CONSTRUCTION WITHOUT THE EXPRESS AUTHORITY OF GEDOX ASSOCIATES Designed by: MJ Approved by: GWJ Checked by: GWJ GWJ Checked by: GWJ Approved by: Designed by: Description Drawn by: Rev. A Rev. Drawn by: Description MJ A B KENYA WOMEN FINANCE TRUST M11/44 PROPOSED KWFT BANK BRANCH AT KMA Cold water pipe Hot water pipe Wash hand basin From above Kitchen sink To below Pipe rise Water closet Overflow pipe Pipe drop O/F PR F/A T/B WHB KS WC PD Shower SH. LEGEND one grade higher than the indicated size will be used 8. Pipe sizes given are for GI incase of PPR 3. All valves to be bronze to BS 1952 PLUMBING NOTES. mild steel to BS 1387 class 4. All wet area to have gate valves for isolation 5. Sanitary appliances to be served by 6. Overflow pipe to discharge 150mm below 2. Water pipes to be medium gauge galvanized 1. All dimensions to be in millimetres unless 7. The installation to conform to British Authority states otherwise. Standard CP 137 except where the local 15mm pipes otherwise stated 9. The system is fully pressurised d c w 4.5 Carbon Dioxide 5Kg. Dry chemical powder 9Litres Water/CO Fire. extinguisher Fire.extinguisher Fire.extinguisher ARPLAD ARCHITECTS, P.O BOX 54777, Tel 2712514, Fax 2713871 Nairobi w c w c c d FIRST FLOOR PLUMBING AND FIRE FIGHTING LAYOUT FIRST FLOOR PLUMBING AND FIRE FIGHTING LAYOUT P.o Box 4179 -00506, Nairobi-Kenya

01 Plumbing & fire fighting.PDF

Embed Size (px)

Citation preview

Page 1: 01 Plumbing & fire fighting.PDF

incl. angle is to big

10

11

12

13

14

15

16

17

18

files

BANKING HALL

DispatchDesk

cleaners'room

xeroxBACK OFFICE

FRG

20ÿ

20ÿ

20ÿ

20ÿ

25ÿ

25ÿ

20ÿ 20ÿ 20ÿ

ks.

undersinkheater

FB

whb

ur

wc wc wc wc

whb

32ÿ

32ÿ 25ÿ

20ÿwc

whb

whb

20ÿ

20ÿ

32ÿF/A

25ÿF/A

Indoor unit (18)

PROPOSED

SERVICES ENGINEERS

GEDOX ASSOCIATES,P.O. BOX 64441-00620, NAIROBI - KENYA

A

TEL/FAX : 254-02-2636000E N

G I

N E

E R

SX

G

CLIENT PROJECT TITLE

Date:

1:100

FILE:

Scale:

Issued to/Date

Sheet

Scale:

FILE:

1:100

Date:

Drawing No.:

Checked/DateChecked/Date

Drawing No.:ARCHITECT

Designed by: MJ

Approved by: GWJ

Checked by: GWJGWJChecked by:

GWJApproved by:

Designed by:

Description

Drawn by:

Rev.Rev.

Drawn by:

Description

MJ

Date:

1:100

FILE:

Scale:

Issued to/Date

1 OF 2Sheet

Scale:

FILE:

1:100

Date: JULY 2011

Drawing No.:

Checked/DateChecked/Date

Drawing No.:

USE IT FOR CONSTRUCTION WITHOUT THE EXPRESS AUTHORITY OF GEDOX ASSOCIATESTHIS DRAWING IS THE COPYRIGHT OF THE ENGINEERS. IT IS ILLEGAL TO REPRODUCE IT ORTHIS DRAWING IS THE COPYRIGHT OF THE ENGINEERS. IT IS ILLEGAL TO REPRODUCE IT ORUSE IT FOR CONSTRUCTION WITHOUT THE EXPRESS AUTHORITY OF GEDOX ASSOCIATESTHIS DRAWING IS THE COPYRIGHT OF THE ENGINEERS. IT IS ILLEGAL TO REPRODUCE IT ORUSE IT FOR CONSTRUCTION WITHOUT THE EXPRESS AUTHORITY OF GEDOX ASSOCIATES

Designed by: MJ

Approved by: GWJ

Checked by: GWJGWJChecked by:

GWJApproved by:

Designed by:

Description

Drawn by:

Rev.

AA

Rev.

Drawn by:

Description

MJ

A

BBB

KENYA WOMEN FINANCE TRUSTM11/44

PROPOSED KWFT BANK BRANCH AT KMA

Cold water pipeHot water pipe

Wash hand basin

From above

Kitchen sink

To below

Pipe rise

Water closet

Overflow pipe

Pipe drop

O/F

PR

F/AT/B

WHB

KS

WC

PD

ShowerSH.

LEGEND

one grade higher than the indicated size will be used8. Pipe sizes given are for GI incase of PPR

3. All valves to be bronze to BS 1952

PLUMBING NOTES.

mild steel to BS 1387 class

4. All wet area to have gate valves for isolation

5. Sanitary appliances to be served by

6. Overflow pipe to discharge 150mm below

2. Water pipes to be medium gauge galvanized

1. All dimensions to be in millimetres unless

7. The installation to conform to British

Authority states otherwise. Standard CP 137 except where the local

15mm pipes

otherwise stated

9. The system is fully pressurised

d

c

w

4.5 Carbon Dioxide

5Kg. Dry chemical powder

9Litres Water/CO Fire. extinguisher

Fire.extinguisher

Fire.extinguisher

ARPLAD ARCHITECTS,

P.O BOX 54777,Tel 2712514, Fax 2713871Nairobi

wc

wc

c

d

FIRST FLOOR PLUMBING AND FIRE FIGHTING LAYOUT

FIRST FLOOR PLUMBING AND FIRE FIGHTING LAYOUT

P.o Box 4179 -00506,Nairobi-Kenya