Upload
rashida-amahtullah
View
18
Download
2
Tags:
Embed Size (px)
Citation preview
MEMORANDUMMEMORANDUM( 100 YEARS HTC/HTK : 1913 - 2013 )( 100 YEARS HTC/HTK : 1913 - 2013 )
BIOMIEBIOMIEBIOPOWER, BIOFUELS, CHEMICALS, MATERIALS 3BIOPOWER, BIOFUELS, CHEMICALS, MATERIALS 3rdrd GENERATION GENERATION
THE INVENTORSTHE INVENTORS FRIEDRICH BERGIUSFRIEDRICH BERGIUS FISCHER- TROPSCH
DAMIR AGIC
DAMIR AGICDAMIR AGIC&&
PARTNERPARTNER
„YES WE CAN SAVE THE WORLD !“„YES WE CAN SAVE THE WORLD !“
--- VERSION 1.0 ------ VERSION 1.0 ---02 / 201302 / 2013
PUBLIC DOCUMENT
MEMORANDUM
THE STORY OF BIOMIETHE STORY OF BIOMIE&&
DAMIR AGICDAMIR AGIC--- THE INVENTOR ------ THE INVENTOR ---
•• 1980 -19831980 -1983 CHILDHOOD PAGE 3
•• 01.12.9701.12.97 ORDER FROM OUTSIDE PAGE 4
•• 12/2007 – 01/201012/2007 – 01/2010 START UP HTC/HTK- REACTOR DEVELOPMENT PAGE 5 - 11
•• 01/2010 - 01/201201/2010 - 01/2012 STUDY GERMAN HISTORY OF TECHNOLOGY PAGE 12 - 13
•• 20122012 THE SOLUTION PAGE 14 - 15
•• After 2012After 2012 VISIONS, THOUGHTS, IDEAS, CONCEPTS PAGE 16 - 24
•• 04.02.1304.02.13 PROJECT BIOMIE PAGE 16
TO BRING BACK MEMORIESTO BRING BACK MEMORIES
•• 2009/112009/11 MEETING WITH THE GERMAN GREENS PAGE 17
•• 2011/52011/5 MEETING WITH THE RUSSIANS PAGE 18
+ GO_POINT 2024+ GO_POINT 2024+ RÉSUMÉ+ RÉSUMÉ
DAMIR AGICDAMIR AGIC
OWNER / CEO AGICENRGYCEO TECHNOLOGY A&A CHEMISTRY
PROJECTMANAGER AGDA (e.V.)DEVELOPMENT CAD ENGINEER AGIC POWER SYSTEMS
--- DIPLOMATIC STATUS ---GERMANY04.02.201304.02.2013
| PAGE 1 OF 23 |
MEMORANDUM
CHILDHOOD FROM DAMIR AGICCHILDHOOD FROM DAMIR AGIC
(BOSNIA / 1980 - 1983) / Natural Playground / childhoodIn the beautiful wilderness played and learned a child without constraints. There was no TV, no computer games, no mass media, it was not what could hurt a child's soul. There was only his grandmother, who could explain everything to him and his kingdom where he could observe and discover. His soul was the mirror image of his kingdom. His ego was the king of this realm. His tenure was his kingdom.
(GERMANY / 1996 - 1997)After childhood Agic Damir moved to the city and got to know the modern society. The manmade reality ached. The reality of its own reward placed on paper, because the people were well motivated and always creating something new. Therefore decided Damir Agic to improve his craft. He learned after school now in the Design Institute. After this architecture and than mechanical engineering and plant and equipment. He felt like an artist who understood the math.
| PAGE 2 OF 23 |
MEMORANDUM
THE ORDER FROM OUTSIDETHE ORDER FROM OUTSIDE
(GERMANY / 1997 / around Christmas)(GERMANY / 1997 / around Christmas)
"You must save the world! ""You must save the world! "
Damir Agic : "How can I save the world?"Damir Agic : "How can I save the world?"
"Draw a picture and you'll see it!""Draw a picture and you'll see it!"
From a picture, two images ...→ From a picture, two images ...→
| PAGE 3 OF 23 |
MEMORANDUM
START UP HTC/HTK- REACTOR DEVELOPMENTSTART UP HTC/HTK- REACTOR DEVELOPMENT
(GERMANY / after 2007)(GERMANY / after 2007)
Our exclusive little world ...
... with our Mother Nature ...
... HAS A VERY LARGE AND SERIOUS PROBLEM ...... HAS A VERY LARGE AND SERIOUS PROBLEM ...
| PAGE 4 OF 23 |
MEMORANDUM
Overpopulation ...
Pollution ...
Hunger for power ...
| PAGE 5 OF 23 |
MEMORANDUM
BUT THERE WAS LIGHT IN THE DARK!BUT THERE WAS LIGHT IN THE DARK!
100 years tucked away in a drawer German by good people who were able to appreciate this invention, it chemist Antonietti took from the drawer and gave it to the world at the right time!
(After the 2nd World War all German patents were seized and brought to America)
Knowing (1913) on HTC / HTK!--- HYDROTHERMAL carbonization ------ HYDROTHERMAL carbonization ---
The solution to the biggest problem of mankind ! But few were trying to do with it what.
The most of them were hoping just to yourself to get a profit. They tried to get the IDEA of HTC/HTK- reactor.
- No-Teamwork ---
The very evil sought to block even this invention !
| PAGE 6 OF 23 |
MEMORANDUM
BUT THEN CAME THE NEWCOMER ...
- - - DAMIR AGIC - - -
Was tested by NASA (USA) and then cleared ...
He built a Team-Works system for better development !
| PAGE 7 OF 23 |
MEMORANDUM
DAMIR AGIC INVENTED THE HTC/HTK- BIO-COAL POWER PLANTDAMIR AGIC INVENTED THE HTC/HTK- BIO-COAL POWER PLANT( 3 months before the NASA (USA) has reported )( 3 months before the NASA (USA) has reported )
15.12.200715.12.2007
• This saw the envious and indebted. They hoped to satisfy your ego by analog Damir Agic and tried to steal his ideas.
• Damir Agic believed in the physics of God and decided to move back home in order to crack the HTC/HTK- problem alone!
| PAGE 8 OF 23 |
MEMORANDUM
2 YEARS (12/2007-01/2010) ... ALONE IN THE BASEMENT, ONLY WITH CAPTAIN
ENERGY, HE DEVELOPED A HTC/HTK- PLANT AFTER ANOTHER :
... But all worked on the 0th law of thermodynamics is not well ...
HE SAW THE END ....( PEAK OIL, WE LIVE ON PUMP! )
Until he got the HPTC by Michie ! The HPTC was the starter from HTC. Which he saw in the letter, and founded Project H(P)TC. This resulted in: ENERGY AUTARK IDEA. This Bioenergy system do not need fossil energy from outside. He also transformed the system from mechanical engineering in the plant, resulting from the CARBONATOR_MODUL the CARBONATOR_SYSTEM grew.
HE CRECK THE HTC/HTK- PROBLEM !
| PAGE 9 OF 23 |
MEMORANDUM
ONE WONDERS OF CHEMISTRY IS CALLED HTC / HTK
HTC / HTKHTC / HTK
• HYDROTHERMAL CARBONIZATION / CARBONISATION
• GREEN BIOMASS ( no food ) are mixed with some water. In addition, is added a catalyst.
It need a pressure of 20 bar, a temperature of 200 degrees Celsius and 10 hours time to
reacts the complete green- plant to BIOCOAL, water and a little sulfur.
TABLE : HTC / HTK CHEMISTRY PROCESS FROM BIOMASS TO BIOCOAL
This method was first described by Friedrich Bergius in 1913, and at the Max Planck Society 9th October
2006 under the title "Magic Coal from the cooking steam pot" as a press information released.
Markus Antonietti, Director at Potsdam Max Planck Institute of Colloids and Interfaces has investigated
this reaction chemically. He even found that the chemical reaction releases a lot of heat.
HTC/HTK DISCOVERER FRIEDRICH BERGIUS
German chemist
Come 11 October 1884 in Wroclaw
Gone 31 March 1949 in Argentina
1931 Nobel Prize in Chemistry with Carl Bosch
Coal liquefaction (Bergius-Pier process)
PHOTO : FRIEDRICH BERGIUS
STANDARD BIOCOAL
• Damir Agic have given his BIOCOAL the name STANDARD BIOCOAL. STANDARD because there is
a minimum requirement on the quality of this product to process them as other products.
ANALYSIS
STANDARD BIOCOAL
The quality of the produce biocoal can be clearly seen. Now there is an optimal basic for producing clean energy and chemistry. This basic product does not burn with a flame but it glow without smoke.This is only possible how knows the secreats of the HTC/HTK- process and chemistry.
BUT WHAT TO DO WITH THIS BIOCARBON ? WHAT ARE THE NEXT STEP ?BUT WHAT TO DO WITH THIS BIOCARBON ? WHAT ARE THE NEXT STEP ?
| PAGE 10 OF 23 |
SUDAN GRASS >SUDAN GRASS >
MEMORANDUM
STUDY THE HISTORY ABOUT THE GERMAN SYNTHETIC GASOLINE !!!
AFTER 2010
GERMAN SYNTHETIC GASOLINE was a fuel in Germany as of the end of the 1920s years which was
produced in hydrogenating plants with COAL. I.G. FARBEN has development the hydrogenating plants (
LEUNAWERKE ) in Germany. I.G. FARBEN was to the end of 1945 the biggest chemistry company in the
world with the location in Germany. The STANDARD OIL COMPANY with the location in the USA was the
competition. The coal deposits would hold more longer than the earth mineral oil deposits and her
products was innovatively and qualitativ better, so was only a question of time to I.G. FARBEN since
would the the worldwide one dominate the energy and chemicals market. I.G. FARBEN was crushed end
of the second world ware by the American government.
YEAR MINERAL OIL GERMAN SYN. GASOLINE
1939 8.200.000 t/a 2.200.000 t/a 27%
1940 7.600.000 t/a 3.348.000 t/a 44%
1941 10.000.000 t/a 4.116.000 t/a 41%
1942 9.500.000 t/a 4.920.000 t/a 52%
1943 11.300.000 t/a 5.748.000 t/a 51%
1944 6.830.000 t/a 3.830.000 t/a 56%
EMERGE MINERAL OIL AND PRODUCTION GERMAN SYN. GASOLINE
LEUNAWERK / HYDROGENATING PLANTPRODUCING GERMAN SYNTHETIC GASOLINE FROM COAL
+ OLD PATENT KNOW HOW ( 1938 – 1970 )
+ OLD LITERATUR KNOW HOW ( 1938 – 1970 )
OLD GERMAN BOOK / TITLE COAL, AIR AND WATER
| PAGE 11 OF 23 |
MEMORANDUM
WHAT ARE THE COMPETITION DOING ?
A total of € 1300 million in biofuels (Germany) is investing 1ten
and 2nd generation fails (research and development). The
investments were made which dealt with the problem of shortage
of oil companies, universities, institutes and FH. Their task was a
replacement for fossil fuel, diesel and heating oil to find. Biofuels
were hot. Upon further examination was made of the biofuels of
agricultural fuel.
The funding would be reduced and the biomass was due to the
enormous demand for increasingly expensive. A bioenergy plant
after another from the 1ten and 2nd generation had to file for
bankruptcy.
Finally I had left was the 10 - biofuel-ethanol (alcohol) through
which fuel is mixed with the fossil. The alcohol is ethanol (E10 fuel
blend) has a net revenue per hectare land area of approximately
300 liters.
FAILURE HTC/HTK REACTOR CONSTRUCTION /
COMPETITION :
The HTC/HTK reactor technolgy from our competition is not
serious to took. With this construction you can only produce peat,
something like soil. It used electrical energy for the thermal
process. How to get good quality and economic biocarbon that is
only Damir Agic business secreat.
8000 Biogas plants in Germany are
producing 10% of the electrical energy
for Germany. More don´t match.
The limit was reached.
FOR WHAT WE NEED FOSSIL MINERAL OIL ?
The fossil mineral oil is the basis for the industrial society
development of the 20th and 21st century. It is a universal raw
material for millions of materials. The fossil mineral oil is a
resource not only for the energy production. It is raw material for
plastics, textile, colorings, drugs, fertilizers or detergents.
OTHER ENVIRONMENT- AND NEW ENERGY SYSTEMS ?
• WIND POWER: E. ON FINDS SITUATION DISASTROUS IN GERMAN COUNTRY!
• BE ELECTRIC CARS KNOWLEDGE CLIMATE DEMAGING!
• THERMAL POWER STATION COLD PROVIDED IN GERMAN COUNTRY!
• PHOTOVOLTAIK: POISON ON THE ROOF!
• HUNDREDS OF BIOGAS PLANTS BEFORE THE END IN GERMAN COUNTRY !
• WIND POWER LIES!
--> EUROPA HAS TOO FEW AREA TO PRODUCE ENOUGH NEW ENERGY ON THIS.--> EUROPA HAS TOO FEW AREA TO PRODUCE ENOUGH NEW ENERGY ON THIS.
THE MOST AREA ARE NEEDED FOR FOOD PRODUCTION !THE MOST AREA ARE NEEDED FOR FOOD PRODUCTION !
| PAGE 12 OF 23 |
MEMORANDUM
“NOW EVERYTHING WAS CLEAR ...”“NOW EVERYTHING WAS CLEAR ...”
--- THE SOLUTION ------ THE SOLUTION ---
( GERMANY / 01/2012 )( GERMANY / 01/2012 )
•• THIS SOLUTION MUST GET A SPECIAL DEFINITION ...THIS SOLUTION MUST GET A SPECIAL DEFINITION ...
| PAGE 13 OF 23 |
MEMORANDUM
( GERMANY / 01/2012 )( GERMANY / 01/2012 )
NOW IT IS TIME TO GIVE THE BABY A NAME : BIOMIENOW IT IS TIME TO GIVE THE BABY A NAME : BIOMIE
| PAGE 14 OF 23 |
MEMORANDUM
THE LAST POSSIBILITY TO REPLEACE THE MINERAL OILTHE LAST POSSIBILITY TO REPLEACE THE MINERAL OIL
• PROJECT BIOMIEPROJECT BIOMIE IS THE LAST POSSIBILITY TO REPLEACE THE MINERAL OIL
• THE NEW GREEN ENERGY NEED A NEW GREEN CHEMISTRY
• THE BEGINNING OF THE NEW GREEN CHEMISTRY IS THE PROJECT BIOMIE
04.02.2013
| PAGE 15 OF 23 |
MEMORANDUM
THE MEETING WITH THE GERMAN GREENS
THE GREENS GIVE DAMIR AGIC THE GREENS GIVE DAMIR AGIC A ORDERA ORDER : :
"SO WITH AN INVENTION blackmailed MAN THE PEOPLE IN ORDER TO MAKE POLICY!"
11 / 2009
THE GREENS GIVE DAMIR AGIC THE GREENS GIVE DAMIR AGIC SPECIAL SPECIAL RIGHTS :RIGHTS :
DAMIR AGICDAMIR AGIC
--- DIPLOMATIC STATUS ------ DIPLOMATIC STATUS ---
--- IMMUNITY ------ IMMUNITY ---GERMANYGERMANY
„THANK YOU PROJECT LIEBELT !!!“„THANK YOU PROJECT LIEBELT !!!“
< 1% TO YOUR FAMILIES >
| PAGE 16 OF 23 |
MEMORANDUM
THE MEETING WITH THE RUSSIANS
20.05.2011
ONE AMBASSADOR FROM RUSSIA COMES TO DAMIR AGIC AND ASK HIM :
“What is Civil War ?”
Damir Agic : ” left against right politican a society fallen into ruin !”
“or, or ?”
Damir Agic : “War, nation against nation !”
“or, or ?”
Damir Agic : “Work for every, work for every !”
“What is fatherland?”
Damir Agic : “The people, the children, the love !”
• Than thay make a agreement about a green, new energy / technology deal between
Russia and Germany in the future, up the time when the Russia natural gas go empty.
• In the plan from 2050 is CHINA with energy and basic products of chemistry to deliver in the
future, so that after the end of the mineral oil age in CHINAs country will be well taken care of so
much inner peace, and hence the global to secure.
| PAGE 17 OF 23 |
MEMORANDUM
THE MAIN- AIMS OF AGICs ORGANISATION & PARTNER
11.11.2012 / DAMIR AGIC
•• The aim is the people, societies, cultures, religions and countriesThe aim is the people, societies, cultures, religions and countries to lead in international peace and harmonious living with theto lead in international peace and harmonious living with the nature.nature.
•• The work is to get the knowledge about the BIOMIE and herThe work is to get the knowledge about the BIOMIE and her transformation in an environmental technology for a lastingtransformation in an environmental technology for a lasting industry.industry.
•• From the mineral oil ( crude oil ) era to come in the green, socialFrom the mineral oil ( crude oil ) era to come in the green, social epoche is the solution for a peaceful world.epoche is the solution for a peaceful world.
| PAGE 18 OF 23 |
MEMORANDUM
THE PROJECTMANAGER OF THE GREEN REVOLUTION !THE PROJECTMANAGER OF THE GREEN REVOLUTION !
•• TO BE THE PROJECTMANAGER OF THE 4. INDUSTRIAL REVOLUTION ( GREEN REVOLUTION ),TO BE THE PROJECTMANAGER OF THE 4. INDUSTRIAL REVOLUTION ( GREEN REVOLUTION ),
THAT WAS A DREAM OF DAMIR AGIC. HE START TO CREAT GLOBAL MASTER PLANS TO SAFE THETHAT WAS A DREAM OF DAMIR AGIC. HE START TO CREAT GLOBAL MASTER PLANS TO SAFE THE
NATURE WORLD AND CONCEPTS THAT THE PEOPLE CAN BE PEOPLE IN THE FUTURE WITHOUTNATURE WORLD AND CONCEPTS THAT THE PEOPLE CAN BE PEOPLE IN THE FUTURE WITHOUT
MINERAL OIL, NATURAL GAS AND FOSSIL COAL.MINERAL OIL, NATURAL GAS AND FOSSIL COAL.
| PAGE 19 OF 23 |
MEMORANDUM
PROJECT VISION and the 2012 PROPHECY/ VERSION 3.0
The 1st new energy biocoal producing plants works 3 x
2.500 h without any problems. This is released PROJECT
PEACE IN PALESTINE. TEAM AIOP with workware make
the journey to Jerusalem. In the case, agreements,
contracts, drawings, information, photo and video
equipment. The schedules are tight and fast. In Palestine
will be military upgraded and Iran is building a nuclear
bomb.
TEAM AGDA have arrived in Jerusalem and settle down in
hotel rooms. The Palestine Projectmanager of the AIOP
creat the first strategic plans. The presidents and
generals of the old world has create there plans too, and
wait for the worst coming. It is a good idea to start 3rd
world war in the future because the hungry and
unemployed people will do many problems in own land.
To send the hungry and unemployed in other land that
ther kills each other and so reducing the people
populated on earth will be the plan too of secrat
societies. It is only a question of time. The risen is the mineral oil ( crude oil ) what goes more empty, and Iran has many of them. The mineral oil is the
machine with framework of our society because it gives energy and materials. PROJECT PEACE IN PALESTINE is for
THE AGDA MEMBERS not only work that has to be done or a command that you must perform it is a hallover mission
for a international peace. It will come the time if will the word people development back to the stone age or
development high in a social, green epoche.
In the main command center in north Germany exist a quick and intelligent haven. There is no talk because
everyone knows his job which will best do. The new President of the AGDA is waiting to release the project start. To
get the approval, the Palestinians behind the wall and in proplem areas has to decide whether they want to have a
secure job, a new apartment and a new life in peace, or want to stay in his old houses and areas and so be the
center of the 3rd world war, wher nuclear bombs can exploded and tanks will used uran munition. To use uran
munition means leaving radioactiv areas where childrean coming ill in a world without help and future.
The aim of THE PROJECT PEACE IN ISRAEL is to create a peaceful, social and green Palestine so the people send
news to the world, let us together peaceful life in the hallow land of the biggest world religions.
An undercover informant of the AGDA have to give the information to the Pope with the 144.000 hectares new
agricultural area in Palestine. In the Bible has the 144.000 a symbolic meaning. It means when the 144.000 comes
than will start a new age with a peaceful society for the next long time periode. PROJECT PEACE IN PALESTINE is still
"MISSION SECRET" at the first years. That means that the press should not report on the overall project, because
thay are powerful companies how are planning to make a big business with war in the future. Despite this news
blockade the people of our planet are waiting for the 2012 prophecy. For some it is the end of the world for others a
new beginning for the world and for the rest a new revolution. Some even say, if not 2012 2012 comes it will 2015
comes.
06.09.2012
| PAGE 20 OF 23 |
MEMORANDUM
NOTICE• After a study in the USA and a global master calculation from AGICENERGY ( it was generated the
some result ) only 500,000,000 people can live on the world in harmony with the natural world
without mineral oil / natural gas / coal and biofuels and chemicals 2nd generation. This calculation
need only standard green agricultural areas and biomass what is regular get a definition as food.
• Bioenergy, biofuels and chemicals 3rd generation ( BIOMIE ) need green biomass ( sudangrass
and algae ) what grow in dry and desert areas. That means that is very important to research
and development a new study how many people can live on the world in harmony with the
natural world without mineral oil / natural gas / coal. From the first linear interpolation view
( very rough calculation ) there can 10 bill. People survive. The question is what will that costs,
how many investment is need to save bill. and bill. human life on the earth moreover the natural
world. This is very important question for leader and presidents of the world, because this can be
a reason to stop planning war in the future because there is a better solution.
| PAGE 21 OF 23 |
MEMORANDUM
THE AGDA PLANTHE AGDA PLAN
To work and life in dry and desert areas independent in the future without crude oil, natural
gas and coal is possibel after the first rough study with bioenergy, biofuels and chemicals 3rd
generation ( BIOMIE ). Moreover we have a good food solution with our new green hous
concept. Everywhere will millitary upgraded because it is going for the last energy resources.
Energy resources can not be recycled. The people of our world are insecure and worry about
the future of our childrean. It's not only going about a global human being problem. It´s going
about a climate, nature and animal problem what are depend on the human being problem.
Are we at the best way to destroy the life what god has given us ? In the long run yes how has
study the situation today and than loooking in the history to extracting what will out of the
future comes.
21.01.201321.01.2013
| PAGE 22 OF 23 |
MEMORANDUM
ART_LYRICSART_LYRICS
“God has fallen on me and allowed me to work with strategy with the devil together to save the people to
be people and to save mother earth in the future , his creation. He gave me the master of the genie after
a disabled IQ of 70, because I was non- saleable for the devil. The devil has robbed me the mind because
I say no to him with his goods, money, gold and diamonds but I say yes to a friendship . Actually, I must
for all good in my live thanks the devil, because I show God to be not for sale. My inner voice comes from
outside, I hear the truth and not lie. My truth are the numbers and the image that I need therefore to to
see and calculate and than to understand the future. My images in my head that I receive can only be
from a universum of ideas, because thay are concrete and not fantastic. I am the visionary of the new
social, green epoche. That is not promulgate from me such from people how can examine in detail.
The devil has hold me peceful in his arms in my dream. I've seen him in Facebook with me together as a
child. I wore a black and a white sock. Therefore I teach the devil to Love, what Christians most believe
in. Love your neighbor as yourself. Thus learns the Devil from me and I not from the devil. I tear up with
my clear mind reactions over long distances and bring people ideas, so thay think it would be their ideas
and what good acting by their thoughts. The real people can understand and give her time for the future
of the new generations and our nature planet, such for the life.”
18.11.2012 / Damir Agic18.11.2012 / Damir Agic
| PAGE 23 OF 23 |
GO_POINT 2024GERMANGERMAN
FUELS & CHEMICALS3rd GENERATION
15.09.2011
GO_POINT 2024GO_POINT 2024 DATE 2024 DATE 2024 bbl. ( U.S. ) 185,00
The market determine the prices. Subsidies, government
subsiddies and renewable energy law will no longer used.
The basis of this calculation is the linear increase in fuel
prices in Germany up for a longer period of time, less of fossil
petroleum, to become more expansive by drilling and handling
and the increasing demand for petroleum products. Another
basis of this calculation is the cost calculation for a 42 MW_HTC
BioPower System. From these facts the GO_POINT 2024a is
been calculated.
The GO_POINT is the time where our new BIOPOWER
ENERGY and CHEMICALS can compete with the old energy and
chemicals in relation to the expectations of our BUSINESS and
the FUEL TAXES.
250 Mrd. € per year 250 Mrd. € per year
250.000 Mio. € per year250.000 Mio. € per year
250.000.000.000 € per year250.000.000.000 € per yearTHE MARKET VOLUME FOR HTC / HTK
ORIGIN : MAX- PLANCK- GESELLSCHAFT
GRAPHICS : THE PEAK OIL THEORY
ENERGY PRICES ( FUELS)
BARREL [PRICE] DATE(18.07.2011) / FUTURE 117 ,75 USD / 185,00 USD / +54%
FUELS PRICES GAS STATION DATE(18.07.2011)/ FUTURE 1,6 €/L / 2,46 €/L / +54%
BUSINESS
RETURNS FOR TAXES 37,5 % / 150 Mrd. € pro Jahr
RETURNS / NET PROFIT 18 % / 72 Mrd. € pro Jahr
COST MANPOWER, MATERIALS AND AGRICULTURAL LAND AREA
PERSONNEL REQUIREMENTS GB.5B 2.600.000_MAX / 192.000_MIN
42 MW_HTC (ca.) / 320.000 MW_HTC 8.000 BIOPOWER SYSTEMS
INVESTMENT 400 Mrd. EURO / Anlagenlaufzeit 25 Jahre / BETRIEB 8.000 h / a
TURNOVER BEFORE TAX 250 Mrd. € pro Jahr
OUTGOINGS 100 Mrd. € pro Jahr
PRODUCTION QUANTITY[BARREL] 7.940 x 12.800.000 Liter 77 Mio. Tonnen 639 Mio. Barrel pro Jahr→ →
OUR SUPPLY / DEMAND WORLD 87 Mio. Barrel pro Tag x 365 Tage | 2 % / Das 1/50- Fache |→
AGRICULTURAL LAND AREA MIN. 400.000 km² – 800.000 km² ( Biomass 60 t – 30 t ( fresh ) / ha )
EQUIVALENCE CALCULATION
STAND 18.07.2011 117,75 USD / 82,2 EURO
EQUIVALENCE TO CRUDE OIL 3 : 1 / AUS MASSENBILANZ STANDARD BIOCOAL : BCtL ( BIO-CRUIDE-OIL)
STANDARD BIOCOAL 3.000 kg TS 750 EURO / 1.125 EURO
STANDARD BIOCOAL | SB TONNE Min/Max 250 EURO / 375 EURO |
BCTL MANUFACTURING 830 EURO / 1.245 EURO á 1.300 Liter
BCTL BARREL [159Liter] MANUFACTURING 100 EURO / 150 EURO
BCTL BARREL [159Liter] TRADE 100 EURO / 150 EURO
BCTL BARREL [159Liter] SALE 125 EURO
bbl. ( U.S. ) 125,00 EURO / 181,25 USD
TIME CRUIDE OIL PRICE INCREASE |2011-1,6 €/ L|2016-1,99 €/ L| 5 a / 24% | 10 a / 48% / 2,46 €/ L / 2024 - 12 |
AGICENERGY
PERSONAL DATA
name Damir Agic
birth / place of birth 16.07.76 / Lippstadt
marital status unmarried
nationality german / ( bosnien )
ADDRESS : | Ackersmannstraße 53 / 59558 Lippstadt / NRW.Germany |
RÉSUMÉ / DAMIR AGIC
PHOTO RÉSUMÉ : DAMIR AGIC 04/ 2010
12/ 2007 – today
• INDEPENDENTLY / Duisburg, Paderborn, Lippstadt ( Germany )
• CAD DEVELOPMENT ENGINEER : BIOENERGY, CHEMICALS 3rd GENERATION ( INVENTOR )
• OWNER, CEO : AGIC ENERGY UG
PROFESSIONAL EXPERIENCE & TRAINEESHIP DURING MY STUDY TIME
• TRAINEESHIP :
• ULRICH ROTHE ANLAGENBAU GmbH / 2 weeks
• CP- ENGINEERING GmbH / 8 weeks
• FESER ONE / 12 weeks
• GRENOL GmbH / 12 weeks
• NES GmbH / 6 months ( external )
• NASA ( USA ) / Qualification test for development engineer passed with very good
• PORSCHE AG / 2 weeks ( external )
• HITACHIE POWER EUROPA GmbH / 4 weeks ( external )
• ./. AUTOMATION ENGINEERING / 2 weeks
• 05/ 2007 – 08/ 2007
• RIMA SYSTEMS GmbH / Mönchengladbach ( Germany ) / as a student
• CAD Draftsman
• Machinery and equipment design to create custom 3D and technical documentation.
• 04/ 2006 – 07/ 2006
• SWITCHCRAFT EUROPA GmbH / Duisburg ( Germany ) / as a student
• CAD Draftsman
• Switchgear, switchboards, caps and vacuum circuit breakers
Medium voltage class, sheetmetal, plastic body cast and wind turbine
with the SolidWorks CAD design, develop and construct.
• 11/ 2005 – 03/ 2006
• G&S BMX / Herten ( Germany ) / as a student
• CAD Draftsman
• Frame, handlebar, stem and fork for BMX bikes & M and Fun bikes with AutoCad CAD design,
develop and construct.
• 08/ 2002 – 07/ 2004
• INSTITUTE OF MECHATRONICS / University Duisburg ( Germany ) / as a student
• CAD Draftsman
| 8. / PAGE 1 VON 2 |
PERSONAL DATA
name Damir Agic
birth / place of birth 16.07.76 / Lippstadt
marital status unmarried
nationality german / ( bosnien )
ADDRESS : | Ackersmannstraße 53 / 59558 Lippstadt / NRW.Germany |
RÉSUMÉ / DAMIR AGIC
PHOTO RÉSUMÉ : DAMIR AGIC 04/ 2010
• 10/ 2001 – 10/ 2009
• STUDY: MACHINES AND EQUIPMENT / University of Duisburg ( Germany )
• BREAK
• 08/ 1997 – 01/ 2000 • STUDY: ARCHITECTURE / University of Wuppertal ( Germany )
• undergraduate degree
• 07/ 1996 – 08/ 1997
• VOCATIONAL EDUCATION: TECHNICAL ARTIST / DESIGNER (INDUSTRIAL DESIGNER)
• Privat Design Institute in Rheda- Wiedenbrück ( Germany )
• 1993 - 1996
• HIGH SCHOOL
• Gymnasium Schloss Overhagen in Overhagen / Lippstadt ( Germany )
• CERTIFICATE IEU ( 09/2009 )
◦ Corporate Planning
◦ Accounting
◦ Calculation
◦ Profit- / Loss Account
◦ Funding
◦ Law and Contracts
◦ Advertising and Marketing
| 8. / PAGE 2 VON 2 |