NUMBER
DRAWING
NUMBER
DRAWING
INDEX OF DRAWINGS
DRAWING TITLE DRAWING TITLE
BEEN PERSONALLY CHECKED BY THE UNDERSIGNED.
NOT TO BE CONSTRUED TO MEAN THAT ALL ASPECTS OF THE DESIGN HAVE
THE DESIGN APPEARS TO CONFORM TO APPLICABLE CRITERIA. APPROVAL IS
TRANSPORTATION PRINCIPAL ENGINEER
04 - STRUCTURES
PAVEMENT PRESERVATIONJPC
050-219ACC
S-1ON I-95
FAIRFIELD/BRIDGEPORT
INDEX OF DRAWINGS
S-1
S-2
S-6
S-7
S-8
S-3
S-4
S-5
S-9
S-10
INDEX OF DRAWINGS
S-11
ASPHALTIC PLUG JOINT DETAILS 1
ASPHALTIC PLUG JOINT DETAILS 2
MILLING AND PAVING RESTRICTIONS
S-12
GENERAL NOTES AND QUANTITIES
BRIDGE INFORMATION TABLE
S-13
S-14
S-15
S-16
S-17
S-18
ASPHALTIC PLUG JOINT DETAILS 3
ASPHALTIC PLUG JOINT DETAILS 4
PREFORMED JOINT SEAL CROSS SECTIONS
DECK PATCHING DETAILS
S-19
PREFORMED JOINT SEAL DETAILS
APJ MEDIAN/PARAPET DETAILS 1
APJ MEDIAN/PARAPET DETAILS 2
MEDIAN/PARAPET RECONSTRUCTION DETAILS
DECK/APPROACH SLAB EXIST. REBAR SCHEDULE
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-1_15.12.15_Index_of_Drawings.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PREFORMED JOINT SEAL MEDIAN/PARAPET DETAILS 1
PREFORMED JOINT SEAL MEDIAN/PARAPET DETAILS 2
MEDIAN/PARAPET SLIDING PLATE DETAILS
APJ/PREFORMED JOINT CRACK SEAL DETAILS
04.01
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-2_15.12.29_General Notes.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
ASPHALTIC PLUG EXPANSION JOINT SYSTEM NOTES
QUANTITIES
AMOUNTUNITITEM
C.Y.
C.Y.RECONSTRUCT CONCRETE DECK ENDS
C.F.
C.F.
MEMBRANE WATERPROOFING (WOVEN GLASS FABRIC)
470
PAVEMENT PRESERVATION
GENERAL NOTES AND QUANTITIES
FAIRFIELD/BRIDGEPORT 050-219
PREFORMED JOINT SEAL NOTES
JOINT BITUMINOUS CONCRETE PLACEMENT REQUIREMENTS
S.Y.
C.F.
ACC
JPC ON I-95
ELASTOMERIC CONCRETE HEADER
ASPHALTIC PLUG EXPANSION JOINT SYSTEM
PARTIAL DEPTH PATCH
80
5,780
7,260
1,500
S.Y.
S-2
7,110REMOVAL OF EXISTING WEARING SURFACE
GENERAL NOTES
JOINT WORK FOR BRIDGES
CONCRETE REPAIR NOTES
NO ADDITIONAL COST TO THE STATE.
PAID FOR OR SHALL BE REMOVED AND REDONE TO THE REQUIREMENTS ABOVE AT
ANY WORK NOT COMPLETED TO THE REQUIREMENTS DESCRIBED SHALL NOT BE 9.
COMPACTION REQUIREMENTS DESCRIBED ABOVE.
WORK SHALL STOP UNTIL SUCH TIME THAT THE CONTRACTOR CAN PERFORM THE
IF THE WORK IS NOT COMPLETED TO THE REQUIREMENTS DESCRIBED ABOVE, THE 8.
APPROVED BY THE ENGINEER PRIOR TO THEIR USE.
PLACEMENT PROCEDURES. THE EQUIPMENT AND PROCEDURES MUST BE
A REQUEST TO THE ENGINEER DESCRIBING THE CHANGE IN METHODS OR
THE CONTRACTOR MAY REQUEST TO USE ALTERNATE EQUIPMENT BY SUBMITTING 7.
IT SHALL WEIGH 3• TO 4• TONSII.
IT SHALL BE DESIGNED TO COMPACT HOT MIX ASPHALT.I.
THE DOUBLE DRUM ROLLER SHALL MEET THE FOLLOWING REQUIREMENTS:A.
THE FINAL (SURFACE) LIFT SHALL BE COMPACTED WITH A DOUBLE DRUM ROLLER.6.
(FOR ANY GIVEN AREA) BEFORE THE MATERIAL TEMPERATURE DROPS TO 180°F.
TAMPER (APPROVED FOR USE BY THE ENGINEER) A MINIMUM OF 20 TIMES
VIBRATORY PLATE COMPACTOR SHALL BE COMPACTED WITH A HAND
ANY CORNERS OR OTHER AREAS THAT CANNOT BE REACHED BY THE VI.
IT SHALL GENERATE A MINIMUM OF 4400 VIBRATIONS PER MINUTE.V.
160 POUNDS.
IT SHALL HAVE AN OPERATING WEIGHT (WITHOUT WATER) OF AT LEAST IV.
BUT NO GREATER THAN 6000 POUNDS.
IT SHALL GENERATE A CENTRIFUGAL FORCE OF AT LEAST 3200 POUNDS III.
IT SHALL BE EQUIPPED WITH A WATER TANK.II.
IT SHALL BE DESIGNED TO COMPACT BITUMINOUS CONCRETE.I.
THE VIBRATORY PLATE COMPACTOR SHALL MEET THE FOLLOWING REQUIREMENTS:A.
VIBRATORY PLATE COMPACTOR DESIGNED TO COMPACT HOT MIX ASPHALT.
ALL INTERMEDIATE (NON-SURFACE) LIFTS SHALL BE COMPACTED WITH A 5.
BELOW TO COMPLETE THE REQUIRED NUMBER OF PASSES.
OF 180°F. THE CONTRACTOR SHALL USE THE COMPACTION EQUIPMENT DESCRIBED
BE COMPLETED BEFORE THE BITUMINOUS CONCRETE COOLS TO A TEMPERATURE
COMPACTION (COMPLETING THE MINIMUM NUMBER OF SPECIFIED PASSES) SHALL
RECEIVING THE MINIMUM NUMBER OF PASSES REQUIRED IN TABLE A. ALL
THE BITUMINOUS CONCRETE MATERIAL SHALL BE COMPACTED IN ALL AREAS, 4.
DISCARDED BY THE CONTRACTOR AT NO COST TO THE STATE.
ABLE TO BE PLACED AT 240 DEGREES OR ABOVE IT SHALL BE PROPERLY
TEMPERATURE OF 240°F. WHEN ANY BITUMINOUS CONCRETE MATERIAL IS NOT
AREA WITH COMPACTION COMMENCING PRIOR TO THE MATERIAL COOLING TO A
BETWEEN 265 AND 325°F. IT SHALL BE PLACED AND SPREAD IN THE PREPARED
THE HMA S0.375 INCH SHALL BE DELIVERED TO THE JOBSITE AT TEMPERATURES 3.
BE FOLLOWED TO ASSURE PROPER COMPACTION.
INCHES. IN LIEU OF DENSITY TESTING, THE METHODS DESCRIBED BELOW SHALL
INCH SHALL BE PLACED AT A COMPACTED THICKNESS BETWEEN 1‚ AND 2•
AT A COMPACTED THICKNESS OF 1‚ INCHES. A SECOND LIFT OF HMA S0.375
THE FIRST LIFT OF HMA S0.375 INCH BITUMINOUS CONCRETE SHALL BE PLACED 2.
SHALL BE MET EXCEPT AS DESCRIBED BELOW.
ALL THE REQUIREMENTS OF SPECIAL PROVISION SECTION 4.06 IN THE CONTRACT 1.
L.F. 18,190JOINT CRACK SEALING OF BIT. CONCRETE PAVEMENT
L.F.PREFORMED JOINT SEAL 5,650
FULL DEPTH PATCH (HIGH EARLY STRENGTH CONCRETE) 190
TON 770HMA S0.375
DETERMINED TO BE LESS THAN 2" OR GREATER THAN 6" WITHIN THE BRIDGE LIMITS.
CONTRACTOR SHALL NOTIFY THE DEPARTMENT IF THE EXISTING PAVEMENT IS 14.
GENERAL COST OF THE ITEM "REMOVAL OF EXISTING WEARING SURFACE".
EXPLORATION OF PAVEMENT THICKNESS AND JOINT LOCATION TO BE INCLUDED IN THE 13.
SPECIAL PROVISION.
SELECTED JOINT PRODUCT IN THE TABLE FOR "INSTALLATION RESTRICTIONS" IN THE
EXPANSION JOINT SYSTEM". REFERENCE THE RANGE OF THERMAL MOVEMENT FOR THE
TEMPERATURE RANGE SPECIFIED IN THE SPECIAL PROVISION "ASPHALTIC PLUG
ASPHALTIC PLUG EXPANSION JOINT SYSTEMS MAY BE INSTALLED ONLY WITHIN THE12.
INSTALLATION OF EMSEAL TO BE PAID UNDER THE ITEM "PREFORMED JOINT SEAL".11.
FOR PAYMENT UNDER THE ITEM "ASPHALTIC PLUG EXPANSION JOINT SYSTEM".
SAW-CUTTING AND REMOVAL OF PAVEMENT FOR JOINT INSTALLATION TO BE INCLUDED 10.
UNDER THE ITEM "PMA S0.5".
THE FURNISHING AND PLACING OF PMA S0.5 TO BE INCLUDED FOR PAYMENT 9.
UNDER THE ITEM "PMA S0.25".
THE FURNISHING AND PLACING OF PMA S0.25 TO BE INCLUDED FOR PAYMENT 8.
"MEMBRANE WATERPROOFING (WOVEN GLASS FABRIC)".
INSTALLATION OF MEMBRANE WITHIN THE LIMITS SHOWN TO BE PAID UNDER THE ITEM, 7.
OPENING.
MEASURING THE JOINT OPENING, THE ROD SHALL BE 25% LARGER THAN THE JOINT
TEMPORARY CLOSED CELL BACKER ROD DIAMETER SHALL BE DETERMINED AFTER 6.
WEARING SURFACE".
SHOWN TO BE INCLUDED FOR PAYMENT UNDER THE ITEM "REMOVAL OF EXISTING
CONCRETE, MEMBRANE WATERPROOFING AND BOND BREAKER WITHIN THE LIMITS
THE REMOVAL OF ALL EXISTING JOINT SYSTEMS, HMA WEARING SURFACE, BITUMINOUS5.
WHERE A BRIDGE DECK END MEETS A BITUMINOUS APPROACH PAVEMENTB.
JOINT BETWEEN A DECK END AND A CONCRETE APPROACH PAVEMENTA.
NO BRIDGING PLATE SHALL BE USED AT THE FOLLOWING LOCATIONS:4.
WILL BE REQUIRED
FOR JOINT OPENINGS WHICH EXCEED 3", A …" THICK BY 12" WIDE PLATE
‚" THICK BY 8" WIDE.NEW STEEL BRIDGING PLATES SHALL BE A MINIMUM OF 3.
"ASPHALTIC PLUG EXPANSION JOINT SYSTEM" SPECIAL PROVISION.
SLAB IS DISCONTINUED (TYPICALLY IN THE ROADWAY SHOULDERS). SEE
DISCONTINUE THE INSTALLATION OF THE BRIDGING PLATE WHERE THE APPROACH2.
OR THE JOINT BETWEEN A DECK END AND A CONCRETE APPROACH SLAB.
A BRIDGING PLATE SHALL BE USED TO SPAN THE GAP BETWEEN TWO DECK ENDS1.
"MAINTENANCE AND PROTECTION OF TRAFFIC" AND "PROSECUTION AND PROGRESS."
TRAFFIC: ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE SPECIAL PROVISIONS
FOR REFERENCE BY THE REVIEWER.
SUBMITTED FOR APPROVAL, THE FIELD MEASUREMENTS SHALL ALSO BE SUBMITTED
ACCURACY. WHEN SHOP DRAWINGS BASED ON FIELD MEASUREMENTS ARE
THE FINISHED WORK AND SHALL ASSUME FULL RESPONSIBILITY FOR THEIR
SHALL TAKE ALL FIELD MEASUREMENTS NECESSARY TO ASSURE THE PROPER FIT OF
THE ORIGINAL DESIGN DRAWINGS AND ARE NOT GUARANTEED. THE CONTRACTOR
THESE PLANS ARE FOR GENERAL REFERENCE ONLY. THEY HAVE BEEN TAKEN FROM
EXISTING DIMENSIONS: ALL DIMENSIONS OF THE EXISTING STRUCTURES SHOWN ON
TRAFFIC ON THE PATCHED SURFACES
-SHALL ATTAIN A COMPRESSIVE STRENGTH OF 2,500 PSI PRIOR TO ALLOWING
-SHALL ATTAIN A 24 HOUR MINIMUM COMPRESSIVE STRENGTH OF 3,500 PSI
-SHALL ATTAIN A 1 HOUR MINIMUM COMPRESSIVE STRENGTH OF 2,500 PSI
PATCHING MATERIAL:
REINFORCEMENT: (ASTM A615 GRADE 60) fy = 60,000 PSI
MATERIAL PROPERTIES
BRIDGE DESIGN MANUAL (2003).
2016 AS SUPPLEMENTED BY THE CONNECTICUT DEPARTMENT OF TRANSPORTATION
U.S. UNITS 7TH EDITION - 2014, INCLUDING ALL INTERIM REVISIONS THROUGH
DESIGN SPECIFICATIONS: AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS CUSTOMARY
SUPPLEMENTAL SPECIFICATIONS DATED JULY 2015 AND SPECIAL PROVISIONS.
SPECIFICATIONS: CONNECTICUT DEPARTMENT OF TRANSPORTATION FORM 816 (2004),
AVERAGE.
THE DEPTH OF PROPOSED ASPHALTIC PLUG JOINT IS ESTIMATED TO BE 3" 7.
PLUG EXPANSION JOINT SYSTEM".
LEVELING COMPOUND AND INCLUDED FOR PAYMENT UNDER THE ITEM "ASPHALTIC
ROUGH OR DAMAGED CONCRETE DECK SURFACES SHALL BE REPAIRED WITH A 6.
PAVING OPERATIONS ARE COMPLETED.
NEW JOINT ELEMENTS SHALL NOT BE INSTALLED UNTIL AFTER MILLING AND 5.
JOINTS DURING CONSTRUCTION AS APPROVED BY THE ENGINEER.
OVERLAY. THE CONTRACTOR MAY MASK OFF THE LIMITS OF THE NEW BRIDGE
GLASS FABRIC)" AND SHALL BE PLACED PRIOR TO PLACEMENT OF PAVEMENT
MEMBRANE WATERPROOFING SHALL BE "MEMBRANE WATERPROOFING (WOVEN 4.
AND SHALL BE INCLUDED FOR PAYMENT UNDER THE ITEM "HMA S0.375".
SHALL CONFORM TO "JOINT BITUMINOUS CONCRETE PLACEMENT REQUIREMENTS"
THE FURNISHING AND PLACING OF TEMPORARY PAVEMENT IN THE JOINT CUT-OUT3.
LOCATION AND HAVE THE LIMITS OF SAW-CUTTING APPROVED BY THE ENGINEER.
ASPHALT OVERLAY THE CONTRACTOR SHALL VERIFY THE BRIDGE DECK JOINT
WHERE EXISTING BRIDGE DECK JOINTS ARE CONCEALED BENEATH HOT MIX 2.
THE COST OF "RECONSTRUCT CONCRETE DECK ENDS".
EXISTING JOINT COMPONENTS AND SEALING ELEMENTS, SHALL BE INCLUDED IN
AND DISPOSE OF H.M.A. WEARING SURFACE, MEMBRANE WATERPROOFING,
ALL WORK TO REMOVE HOT MIX ASPHALT (H.M.A.) WEARING SURFACE, REMOVE
FOR BRIDGES 00098, 00099 AND 00100 (WEST ABUTMENT):
THE COST OF "REMOVAL OF EXISTING WEARING SURFACE".
EXISTING JOINT COMPONENTS AND SEALING ELEMENTS, SHALL BE INCLUDED IN
AND DISPOSE OF H.M.A. WEARING SURFACE, MEMBRANE WATERPROOFING,
ALL WORK TO REMOVE HOT MIX ASPHALT (H.M.A.) WEARING SURFACE, REMOVE
(SOUTH ABUTMENT):
FOR BRIDGES 00090-00096, 00100 (EAST ABUTMENT), 00101-00104 AND 00105A 1.
"RECONSTRUCT CONCRETE DECK ENDS".
"PREFORMED JOINT SEAL DETAILS", AND THE SPECIAL PROVISIONS FOR
AREAS IN ACCORDANCE WITH DETAILS AND NOTES ON DRAWINGS S-11:
DETERIORATED CONCRETE SHALL BE REMOVED FROM THE DESIGNATED
AT CONCRETE DECK FOR BRIDGES 00098, 00099, AND 00100 WEST ABUTMENT: 3.
PATCH (HIGH EARLY STRENGTH CONCRETE)".
THE SPECIAL PROVISIONS FOR "PARTIAL DEPTH PATCH" AND "FULL DEPTH
DETAILS AND NOTES ON DRAWINGS S-17: "DECK PATCHING DETAILS", AND
SHALL BE REMOVED FROM THE DESIGNATED AREAS IN ACCORDANCE WITH
00101-00104, AND 00105A SOUTH ABUTMENT: DETERIORATED CONCRETE
AT CONCRETE DECK FOR BRIDGES 00090-00096, 00100 EAST ABUTMENT, 2.
DETERMINED BY THE ENGINEER DURING CONSTRUCTION.
LOCATION AND LIMITS OF DETERIORATED CONCRETE TO BE REPAIRED SHALL BE
NECESSARILY REFLECT THE CURRENT CONDITION OF THE STRUCTURE. THE EXACT
INFORMATION IS INTENDED TO BE USED AS A GUIDE AND DOES NOT
LIMITED FIELD OBSERVATIONS AND BRIDGE SAFETY INSPECTION REPORTS. THE
THE DETERIORATION AND REPAIR DIMENSIONS SHOWN HEREIN ARE BASED ON 1.
"QUALITY CONTROL PLAN" AT LEAST 30 DAYS PRIOR TO START OF WORK.
THE DESIGN ENGINEER SHALL RECEIVE THE JOINT GAP WIDTH MEASUREMENT AND THE
THE REVIEW AND COMMENT FOR THE INSTALLATION OF THE SELECTED JOINT SYSTEM.
CONTRACTOR SHALL SEND "QUALITY CONTROL PLAN" TO THE DESIGN ENGINEER FOR
ON THE MEASUREMEMTS RECEIVED FROM THE CONTRACTOR. IN ADDITION, THE
ENGINEER. THE DESIGN ENGINEER SHALL SELECT THE APPROPRIATE JOINT SIZE BASED
JOINT SEAL. THE CONTRACTOR SHALL SUBMIT ALL MEASUREMENTS TO THE DESIGN
TEMPERATURE WITH THESE MEASUREMENTS TO DETERMINE THE APPROPRIATELY SIZED
MAXIMUM BRIDGE DECK JOINT WIDTH ALONG THE JOINT AS WELL AS THE CORRESPONDING
SEAL" SPECIFICATION. THE MEASUREMENTS SHOULD ALSO INCLUDE THE MINIMUM AND
THE BRIDGE DECKS AND THE PARAPETS, IN ACCORDANCE TO THE "PREFORMED JOINT
THE CONTRACTOR IS RESPONSIBLE FOR MEASURING THE JOINT GAP WIDTHS IN BOTH,4.
OF THE JOINT AND SHALL BE RECESSED „" BELOW THE BITUMINOUS OVERLAY.
THE ELASTOMERIC CONCRETE HEADER SHALL BE BEVELED „" ALONG THE OPENING 3.
HAS BEEN SAW-CUT AND REMOVED.
AFTER THE PAVEMENT HAS BEEN PLACED ON THE BRIDGE AND THE DESIGNATED AREA
THE ELASTOMERIC CONCRETE HEADER AND PREFORMED JOINT SEAL SHALL BE INSTALLED 2.
THIS WORK SHALL BE PAID FOR UNDER THE ITEM "PREFORMED JOINT SEAL".
CLEANING. DUST SHALL BE REMOVED BY THE METHOD APPROVED BY THE ENGINEER.
PRIOR TO INSTALLING THE SILICONE SEALANT, CLEAN JOINT SIDES BY ABRASIVE BLAST 1.
04.02
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-3_15.12.28_Milling and Paving Restrictions.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PAVEMENT PRESERVATIONFAIRFIELD/BRIDGEPORT 050-219
ON I-95
(TRI-LOAD COMBINATION OF VEHICLES IN PAVING TRAIN)
21.5 21.538.5
PAVERBRIDGE (WEIGHT) RESTRICTIONS
SCALE: 1"=5'
MILLING AND PAVINGRESTRICTIONS
48.1'
14.33'
AXLE LOADS (KIPS)
AXLE SPACING (FEET)
SCALE: 1"=5'
CT-MTV/PAVER LIVE LOAD
(MATERIAL TRANSFER VEHICLE)
CT-TLC LIVE LOAD
21.5 21.538.5
PAVER
6.1'3'
13.5 18.0
22.5 22.5 38.6
18' 14.33'
SCALE: 1"=5'
50.53'
TRUCK
38.6
AXLE LOADS (KIPS)
AXLE SPACING (FEET)
AXLE LOADS (KIPS)
AXLE SPACING (FEET)
6.1'3'
9.6' 4.1' 4.5'
S-3
13.5 18.0
22.5 22.5 49.5
18'
SCALE: 1"=5'
3.18' 3.45'3.18' 3.45'
53.75'
TRUCK
48.0
AXLE LOADS (KIPS)
AXLE SPACING (FEET)9.6' 4.1' 4.5'
TRI-AXLE AND LARGE MILLER LIVE LOAD
-
-
-
-
TLC
MP
TMM
TLM
TRI-AXLE AND MEDIUM MILLER LIVE LOAD
JPC
ACC
NOT TO SCALE
MTV
PAVER
EDGE OF LANE
DENOTES AXLE (TYP.)
14.33' 6.1'AXLE SPACING (FEET)
3'
TRUCK
9.6'
4.1'
4.5'
14.33'AXLE SPACING (FEET)
NOT TO SCALE
EDGE OF LANE
DENOTES AXLE (TYP.)
VIEW OF PAVING EQUIPMENT/MILLING EQUIPMENT.
* VEHICLES SHALL BE IN ADJACENT LANES. SEE (SCHEMATIC) PLAN
24.67'
17.55'
MILLER
18'
63.7 64.9
84.3'
18' 14.33' 24.67'
13.5 18.0
22.5 22.5
TRUCK
9.6' 4.1' 4.5'
63.7 64.9
MTV (MATERIAL TRANSFER VEHICLE)
MILLING MACHINE
MTV (MATERIAL TRANSFER VEHICLE)
MILLING MACHINE
2.72' 2.62' 2.72' 2.62'
24.67'
REQUIREMENTS.
THE CONTRACTOR SHALL PLAN HIS OPERATIONS TO CONFORM TO THE ABOVE
ENGINEER.
WILL NOT BE ALLOWED ON ANY OF THESE BRIDGES WITHOUT PRIOR APPROVAL OF THE
WEIGHTS EXCEED 128.6 KIPS (THE TOTAL WEIGHT OF THE MATERIAL TRANSFER VEHICLE)
FINALLY, ANY OTHER CONSTRUCTION VEHICLE OR MACHINE WHOSE COMBINED AXLE
PRIOR APPROVAL FROM THE ENGINEER.
THE INDICATED AXLE SPACINGS SHALL ALSO NOT BE ALLOWED UNLESS THERE IS
EXCEEDED WITHOUT PRIOR APPROVAL OF THE ENGINEER. IN ADDITION, DECREASING
THE AXLE WEIGHTS INDICATED IN SECTIONS TLC, TLM, MP, AND TMM SHALL NOT BE
00099 AND 00105A, REFER TO SECTIONS "MP" AND "TMM".
CT-TLC PERMIT LIVE LOAD WITHOUT RESTRICTIONS. FOR RESTRICTIONS ON BRIDGE NO.
ALL BRIDGES EXCEPT FOR BRIDGE NO. 00099 AND 00105A CAN CARRY THE INDICATED
(SCHEMATIC) PLAN VIEW OF MILLING TRAIN FOR BRIDGE NOS. 00099 & 00105A
(SCHEMATIC) PLAN VIEW OF PAVING TRAIN FOR BRIDGE NOS. 00099 & 00105A
04.03
PAVEMENT PRESERVATIONJPC
ACC 050-219
ON I-95
FAIRFIELD/BRIDGEPORT
S-4
BRIDGE INFORMATIONTABLE
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-4_15.12.29_Installation Table 1.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PJS - PREFORMED JOINT SEAL
APJ - ASPHALTIC PLUG JOINT
NOTES
*ABUTMENT NO. 2 = EAST OR NORTH ABUTMENT
*ABUTMENT NO. 1 = WEST OR SOUTH ABUTMENT
INTERSTATE 95 IS A SOUTH-TO-NORTH ROUTE
04.04
A
-
{ JOINT
{ JOINT
VARIES
{ JOINT
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-5_15.12.28_FULL DECK APJ Details 1.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PAVEMENT PRESERVATIONON I-95
FAIRFIELD/BRIDGEPORT
JPC
050-219ACC
{ JOINT
(TYP.)
VARIES
S-5ASPHALTIC PLUG JOINT
DETAILS 1
N.T.S.
N.T.S.
JOINT AND PAVEMENT REMOVAL (STEPS 1-2)
EXISTING CONDITION
N.T.S.
N.T.S.
PLACEMENT OF PAVEMENT ALONG THE BRIDGE (STEPS 3-6)
N.T.S.
FINAL CONDITION (STEPS 7-8)
9" (TYP.)
FOR ROADWAY MILLING
REFER TO HIGHWAY PLANS
(SECOND LIFT OF 2" THICK)
PLACE PMA S0.5"
(FIRST LIFT OF 1" THICK)
PLACE PMA S0.25"
BRIDGE DECK
ALONG LENGTH OF
INSTALL MEMBRANE
NO MEMBRANE (TYP.)
INSTALLATION OF ASPHALTIC PLUG JOINT WITHOUT BRIDGING PLATE
PLUG JOINT
INSTALL ASPHALTIC
BRIDGE DECK
SUGGESTED SEQUENCE OF WORK
BRIDGE DECK
TO BE REPLACED
JOINT OR PAVED OVER JOINT
EXISTING ASPHALTIC PLUG
PLATE (IF ANY)
EXISTING BRIDGING
EXISTING WEARING SURFACE
LIMITS OF REMOVAL OF
AND BACKER ROD (IF ANY)
BINDER, LOCATING PIN,
REMOVE OVERLAY,
10" (TYP.)
SURFACE (TYP.)
EXISTING WEARING
GLASS FABRIC)
MEMBRANE (WOVEN
INSTALL WATERPROOFING
BRIDGE DECK LEVEL (TYP.)
SAW-CUT PAVEMENT TO
FULL DEPTH (TYP.)
SAW-CUT PAVEMENT
NO. S-19 FOR CRACK SEAL DETAIL.
LENGTH OF THE BRIDGE, BOTH SIDES. SEE DRAWING
INSTALL CRACK SEAL AT CURB LINE ALONG THESTEP 9:
JOINT SYSTEM WITHOUT BRIDGING PLATE.
INSTALL PROPOSED ASPHALTIC PLUG EXPANSIONSTEP 8:
EXPANSION JOINT SYSTEM".
PAID FOR UNDER THE ITEM "ASPHALTIC PLUG
MATERIAL BETWEEN SAW-CUTS. TO BE PAVEMENT
OF CENTERLINE OF JOINT, AND REMOVE ALL
SAW-CUT PAVEMENT FULL DEPTH AT 10" EACH SIDE STEP 7:
PLACE PMA S0.5 (2" THICK) ALONG THE BRIDGE. STEP 6:
PLACE PMA S0.25 (1" THICK) ALONG THE BRIDGE. STEP 5:
SHOWN.
FABRIC) TO THE TOP OF DECK WITHIN THE LIMITS
INSTALL WATERPROOFING MEMBRANE (WOVEN GLASS STEP 4:
NO. S-17.
PATCH (HIGH EARLY STRENGTH)". REFER TO DRAWING
PAID UNDER "PARTIAL DEPTH PATCH" OR "FULL DEPTH
REPAIR DETERIORATED CONCRETE AS NEEDED TO BE STEP 3:
PLATES PRIOR TO MILLING THE BRIDGE DECK.
EXISTING WEARING SURFACE". REMOVE BRIDGING
LENGTH OF BRIDGE TO BE PAID UNDER "REMOVAL OF
MATERIAL TO BRIDGE DECK LEVEL ALONG ENTIRE
REMOVE EXISTING WEARING SURFACE AND ALL JOINT STEP 2:
REMOVAL OF EXISTING WEARING SURFACE.
NEEDED IN ACCORDANCE TO SPECIAL PROVISION OF
ADDITIONAL MEASUREMENTS SHALL BE TAKEN IF
PROPOSED JOINT) BEFORE PROCEEDING TO STEP 2.
LOCATION OF THE DECK ENDS (CENTERLINE OF
DETERMINE THE DEPTH OF PAVEMENT AND THE
TAKEN PER BRIDGE AT THESE LOCATIONS TO
REPRESENTATIVE DEPTH MEASUREMENTS SHALL BE
END OF THE BRIDGE). A MINIMUM OF SIX
BRIDGE) AND THE CROWN (AT THE BEGINNING AND
AT THE GUTTERLINE (AT THE FOUR CORNERS OF THE
CONTRACTOR SHALL PERFORM AN EXPLORATION STEP 1:
CONCRETE PAVEMENT OVER SUB-BASE
EXISTING BITUMINOUS CONCRETE /
PAVEMENT OVER SUB-BASE
BITUMINOUS CONCRETE / CONCRETE
04.05
B
-
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-6_15.12.28_FULL DECK APJ with Bridging Plate Details 2.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PAVEMENT PRESERVATIONON I-95
FAIRFIELD/BRIDGEPORT 050-219
JPC
ACC
MATERIAL FROM ENTERING THE JOINT
SURFACE OF THE JOINT TO PREVENT HMA
INSTALL TEMPORARY BACKER ROD AT THE TOP
{ JOINT
{ JOINT
{ JOINT
S-6ASPHALTIC PLUG JOINT
DETAILS 2
N.T.S.
EXISTING CONDITION
N.T.S.
JOINT AND PAVEMENT REMOVAL (STEPS 1-3)
N.T.S.
PLACEMENT OF PAVEMENT ALONG THE BRIDGE (STEPS 4-8)
(SECOND LIFT OF 2" THICK)
PLACE PMA S0.5
INSTALLATION OF ASPHALTIC PLUG JOINT WITH BRIDGING PLATE
FOR ROADWAY MILLING.
REFER TO HIGHWAY PLANS
(FIRST LIFT OF 1" THICK)
PLACE PMA S0.25
VARIES
BRIDGE DECK
JOINT TO BE REPLACED
EXISTING ASPHALTIC PLUG
VARIES
APROACH SLAB / BRIDGE DECK / OR BACKWALL
EXISTING BRIDGING PLATE (IF ANY)
SURFACE (TYP.)
EXISTING WEARING
EXISTING WEARING SURFACE
LIMITS OF REMOVAL OF
SUGGESTED SEQUENCE OF WORK
9"
NO MEMBRANE
9"
INSTALL MEMBRANE ALONG
LENGTH OF BRIDGE DECKSLAB/BACKWALL.
LENGTH OF APPROACH
INSTALL MEMBRANE ALONG
N.T.S.
BRIDGE DECK
{ JOINTINSTALL NEW BINDER WITH AGGREGATE
FIELD-APPLIED SILICONE CORNER BEADS AND SILICONE BAND
ASPHALTIC OVERLAY (TYP.)•"
10" (TYP.)
APROACH SLAB / BRIDGE DECK / BACKWALL
APPROACH SLAB LEVEL (TYP.)
SAW-CUT PAVEMENT TO BRIDGE DECK/
FINAL CONDITION (STEPS 9-10)
APPLY EPOXY ADHESIVE BOTH SIDES
WEARING SURFACE
AND BACKER ROD (IF ANY)
BINDER, LOCATING PIN,
REMOVE OVERLAY,
FULL DEPTH
SAW-CUT PAVEMENT
(WOVEN GLASS FABRIC) (TYP.)
INSTALL WATERPROOFING MEMBRANE
NECESSARY
TO PROVIDE A SMOOTH AND LEVEL SURFACE AS
APPLY SELF LEVELING CEMENTITIOUS MATERIAL
SELF LEVELING CEMENTITIOUS MATERIAL
N.T.S.
INSTALL BRIDGING PLATE
AM
S-16DETAILS FOR EMSEAL BEJS
REFER TO INSTALLATION
TO BE PAID FOR UNDER THE ITEM "PREFORMED JOINT SEAL"
REMOVE TEMPORARY BACKER ROD AND INSTALL EMSEAL BEJS
SEE DRAWING NO. S-19 FOR CRACK SEAL DETAIL.
INSTALL CRACK SEAL AT CURB LINE ALONG THE LENGTH OF THE BRIDGE, BOTH SIDES.STEP 11:
BE USED TO SECURE THE BRIDGING PLATE.NOTBRIDGING PLATE. LOCATING PINS SHALL
INSTALL PROPOSED ASPHALTIC PLUG EXPANSION JOINT SYSTEM WITH EMSEAL BEJS AND STEP 10:
"ASPHALTIC PLUG EXPANSION JOINT SYSTEM".
REMOVE ALL PAVEMENT MATERIAL BETWEEN SAW-CUTS. TO BE PAID FOR UNDER THE ITEM
SAW-CUT PAVEMENT FULL DEPTH AT 10" EACH SIDE OF CENTERLINE OF JOINT, AND STEP 9:
PLACE PMA S0.5 (2" THICK) ALONG THE BRIDGE DECK. STEP 8:
PLACE PMA S0.25 (1" THICK) ALONG THE BRIDGE DECK. STEP 7:
APPROACH SLAB WITHIN THE LIMITS SHOWN.
INSTALL WATERPROOFING MEMBRANE (WOVEN GLASS FABRIC) TO THE TOP OF DECK AND STEP 6:
OR "FULL DEPTH PATCH (HIGH EARLY STRENGTH)". REFER TO DRAWING NO. S-17.
REPAIR DETERIORATED CONCRETE AS NEEDED TO BE PAID UNDER "PARTIAL DEPTH PATCH"STEP 5:
OR BACKWALL.
INSTALL TEMPORARY BACKER ROD FLUSH WITH THE BRIDGE DECK AND APPROACH SLAB STEP 4:
BRIDGE DECK.
ALONG ENTIRE LENGTH OF BRIDGE. REMOVE BRIDGING PLATES PRIOR TO MILLING THE
REMOVE EXISTING PAVEMENT MATERIAL AND JOINT MATERIAL TO BRIDGE DECK LEVEL STEP 3:
DESIGN FOR REVIEW.
EACH JOINT LOCATION. THE CHECKLIST SHALL BE FORWARDED TO EMSEAL AND BRIDGE
THE CONTRACTOR IS RESPONSIBLE FOR FILLING OUT THE EMSEAL BEJS CHECKLIST FORSTEP 2:
OF EMSEAL REQUIRES A MINIMUM OF THREE WEEKS.
SHALL ALSO MEASURE THE DECK JOINT GAP OPENING FOR SIZING OF EMSEAL. ORDERING
TO SPECIAL PROVISION OF REMOVAL OF EXISTING WEARING SURFACE. CONTRACTOR
TO STEP 2. ADDITIONAL MEASUREMENTS SHALL BE TAKEN IF NEEDED IN ACCORDANCE
LOCATION OF THE DECK ENDS (CENTERLINE OF PROPOSED JOINT) BEFORE PROCEEDING
PER BRIDGE AT THESE LOCATIONS TO DETERMINE THE DEPTH OF PAVEMENT AND THE
BRIDGE). A MINIMUM OF SIX REPRESENTATIVE DEPTH MEASUREMENTS SHALL BE TAKEN
CORNERS OF THE BRIDGE) AND THE CROWN (AT THE BEGINNING AND END OF THE
CONTRACTOR SHALL PERFORM AN EXPLORATION AT THE GUTTERLINE (AT THE FOUR STEP 1:
4"
‚"
04.06
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-7_15.12.28_MILLING APJ with Bridging Plate Details 3.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PAVEMENT PRESERVATIONON I-95
FAIRFIELD/BRIDGEPORT 050-219
JPC
ACC
ASPHALTIC PLUG JOINTDETAILS 3
VARIES
BRIDGE DECK
JOINT TO BE REPLACED
EXISTING ASPHALTIC PLUG
EXISTING CONDITION
{ JOINT
JOINT AND PAVEMENT REMOVAL (STEPS 1-4)
{ JOINT
APPROACH SLAB LEVEL (TYP.)
SURFACE TO BRIDGE DECK/
SAW-CUT EXISTING WEARING
PAVEMENT AND JOINT MATERIAL
LIMITS FOR REMOVAL OF BITUMINOUS
3'-0" 3'-0"
VARIES
N.T.S.
N.T.S.
SUGGESTED SEQUENCE OF WORK
MATERIAL FROM ENTERING THE JOINT
SURFACE OF THE JOINT TO PREVENT HMA
INSTALL TEMPORARY BACKER ROD AT THE TOP
PLACEMENT OF PAVEMENT IN JOINT CUTOUT (STEPS 5-10)
{ JOINT
{ JOINT
9"
NO MEMBRANEMEMBRANE LIMITS MEMBRANE LIMITS
SEALANT (TYP.)
PLACE CRACK
N.T.S.
N.T.S.
N.T.S.
BRIDGE DECK
{ JOINTINSTALL NEW BINDER WITH AGGREGATE
FIELD-APPLIED SILICONE CORNER BEADS AND SILICONE BAND
ASPHALTIC OVERLAY (TYP.)•"
10" (TYP.)
FINAL CONDITION (STEPS 13-14)
MILLING AND PAVING (STEPS 11-12)
C
-N.T.S.
INSTALLATION OF ASPHALTIC PLUG JOINT WITH BRIDGING PLATE
2'-3" 9" 2'-3"
APROACH SLAB / BRIDGE DECK / BACKWALLAPROACH SLAB / BRIDGE DECK / OR BACKWALL
S-7
EXISTING BRIDGING PLATE
APPROACH SLAB LEVEL (TYP.)
SAW-CUT PAVEMENT TO BRIDGE DECK/
APPLY EPOXY ADHESIVE BOTH SIDES
(WOVEN GLASS FABRIC) (TYP.)
INSTALL WATERPROOFING MEMBRANE
FINAL OVERLAY OF PMA S0.5
MILL 2" AND PAVE 2"
SURFACE (TYP.)
EXISTING WEARING
WEARING SURFACE
INSTALL BRIDGING PLATE
LEVEL SURFACE AS NECESSARY
MATERIAL TO PROVIDE A SMOOTH AND
APPLY SELF LEVELING CEMENTITIOUS
AM
S-16DETAILS FOR EMSEAL BEJS
REFER TO INSTALLATION
TO BE PAID FOR UNDER THE ITEM "PREFORMED JOINT SEAL"
REMOVE TEMPORARY BACKER ROD AND INSTALL EMSEAL BEJS
NO. S-19 FOR CRACK SEAL DETAIL.
INSTALL CRACK SEAL AT CURB LINE ALONG THE LENGTH OF THE BRIDGE, BOTH SIDES. SEE DRAWING STEP 15:
BE USED TO SECURE THE BRIDGING PLATE.NOTPLATE. LOCATING PINS SHALL
INSTALL PROPOSED ASPHALTIC PLUG EXPANSION JOINT SYSTEM WITH EMSEAL BEJS AND BRIDGING STEP 14:
"ASPHALTIC PLUG JOINT EXPANSION".
AND REMOVE ALL PAVEMENT MATERIAL BETWEEN SAW-CUTS TO BE PAID UNDER THE ITEM
SAW-CUT PAVEMENT FULL DEPTH AT 10" FROM THE CENTER OF THE JOINT (BOTH SIDES OF JOINT) STEP 13:
PAVE TOP COURSE ON ROADWAY AND BRIDGE.STEP 12:
MILL ROADWAY AND BRIDGE PAVEMENT TO SPECIFIED DEPTH(S).STEP 11:
CONCRETE PLACEMENT REQUIREMENTS).
PLACE HMA S0.375 IN THE JOINT CUT-OUT (REFER TO DRAWING NO. S-2 - JOINT BITUMINOUS STEP 10:
CONSTRUCTION SAW-CUT LINES.
PLACE CRACK SEALANT ON VERTICAL EDGE OF PAVEMENT ALONG SAW-CUT LINES AND STAGE STEP 9:
AND APPROACH SLAB WITHIN THE LIMITS SHOWN.
INSTALL WATERPROOFING MEMBRANE (WOVEN GLASS FABRIC) TO THE TOP OF THE DECK, BACKWALL, STEP 8:
BITUMINOUS CONCRETE PLACEMENT REQUIREMENTS) TO BE PAID UNDER "HMA S0.375".
PLACE TEMPORARY PAVEMENT IN JOINT CUT-OUT AS REQUIRED (REFER TO DRAWING NO. S-2 - JOINT STEP 7:
DEPTH PATCH (HIGH EARLY STRENGTH)". REFER TO S-17.
REPAIR DETERIORATED CONCRETE AS NEEDED TO BE PAID UNDER "PARTIAL DEPTH PATCH" OR "FULL STEP 6:
INSTALL TEMPORARY BACKER ROD FLUSH WITH THE BRIDGE DECK AND APPROACH SLAB.STEP 5:
SHOWN TO BE PAID UNDER THE ITEM "REMOVAL OF EXISTING WEARING SURFACE".
REMOVE THE EXISTING PAVEMENT MATERIAL AND JOINT MATERIAL FULL DEPTH WITHIN THE LIMITS STEP 4:
NOT DAMAGE THE BRIDGE DECK OR APPROACH SLAB.
SAW-CUT LINE SHALL BE 3' FROM THE CENTERLINE OF THE EXISTING JOINT. SAW-CUT SHALL
BE INCLUDED FOR PAYMENT UNDER THE ITEM "REMOVAL OF EXISTING WEARING SURFACE". EACH
SAW-CUT BITUMINOUS PAVEMENT ON BOTH SIDES OF EXISTING JOINT FOR PAVEMENT CUT-OUT TO STEP 3:
LOCATION. THE CHECKLIST SHALL BE FORWARDED TO EMSEAL AND BRIDGE DESIGN FOR REVIEW.
THE CONTRACTOR IS RESPONSIBLE FOR FILLING OUT THE EMSEAL BEJS CHECKLIST FOR EACH JOINT STEP 2:
ORDERING OF EMSEAL REQUIRES A MINIMUM OF THREE WEEKS.
SIZING OF EMSEAL. CONTRACTOR SHALL ALSO MEASURE THE DECK JOINT GAP OPENING FOR
IF NEEDED IN ACCORDANCE TO SPECIAL PROVISION OF REMOVAL OF EXISTING WEARING SURFACE.
PROPOSED JOINT) BEFORE PROCEEDING TO STEP 2. ADDITIONAL MEASUREMENTS SHALL BE TAKEN
DETERMINE THE DEPTH OF PAVEMENT AND THE LOCATION OF THE DECK ENDS (CENTERLINE OF
REPRESENTATIVE DEPTH MEASUREMENTS SHALL BE TAKEN PER BRIDGE AT THESE LOCATIONS TO
THE BRIDGE) AND THE CROWN (AT THE BEGINNING AND END OF THE BRIDGE). A MINIMUM OF SIX
CONTRACTOR SHALL PERFORM AN EXPLORATION AT THE GUTTERLINE (AT THE FOUR CORNERS OF STEP 1:
4"
‚"
VARY BETWEEN 1.25" AND 2.5" THICK)
THICKNESS, BUT ADDITIONAL LIFTS WILL
(THE FIRST LIFT WILL BE 1.25" UNIFORM
PLACE HMA S0.375 IN PAVEMENT CUT-OUT
04.07
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-8_15.12.29_MILLING APJ Details 4.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PAVEMENT PRESERVATIONON I-95
FAIRFIELD/BRIDGEPORT 050-219
JPC
ACC
S-8ASPHALTIC PLUG JOINT
DETAILS 4
SUGGESTED SEQUENCE OF WORK
D
-
INSTALLATION OF ASPHALTIC PLUG JOINT WITHOUT BRIDGING PLATE
N.T.S.
10" TYP.
{ JOINT
(IF ANY)
LOCATING PIN, AND BACKER ROD
REMOVE OVERLAY, BINDER,
N.T.S.
JOINT AND PAVEMENT REMOVAL (STEPS 1-3)
N.T.S.
PLACEMENT OF PAVEMENT IN JOINT CUTOUT (STEPS 4-8)
N.T.S.
FINAL CONDITION (STEPS 9-12)
PLUG JOINT
INSTALL ASPHALTIC
{ JOINT
3'-0" 3'-0"
2'-3"
MEMBRANE LIMITS
{ JOINT
9"
NO MEMBRANE
VARIES
VARIES
VARIES
{ JOINT
N.T.S.
EXISTING CONDITION
BRIDGE DECK
BRIDGE DECK LEVEL (TYP.)
WEARING SURFACE TO
SAW-CUT EXISTING
SURFACE AND JOINT MATERIAL
LIMITS FOR REMOVAL OF EXISTING WEARING
SURFACE (TYP.)
EXISTING WEARING
VARIES
OF PAVEMENT (TYP.)
ON VERTICAL FACE
PLACE CRACK SEAL
BRIDGE DECK
TO BE REPLACED
JOINT OR PAVED OVER JOINT
EXISTING ASPHALTIC PLUG
PLATE (IF ANY)
EXISTING BRIDGING
OVERLAY OF PMA S0.5
MILL 2" AND PAVE 2" FINAL
GLASS FABRIC)
MEMBRANE (WOVEN
INSTALL WATERPROOFING
BRIDGE DECK LEVEL (TYP.)
SAW-CUT PAVEMENT TO
FOR CRACK SEAL DETAIL.
OF THE BRIDGE, BOTH SIDES. SEE DRAWING NO. S-19
INSTALL CRACK SEAL AT CURB LINE ALONG THE LENGTHSTEP 13:
SYSTEM WITHOUT BRIDGING PLATE.
INSTALL PROPOSED ASPHALTIC PLUG EXPANSION JOINT STEP 12:
"ASPHALTIC PLUG EXPANSION JOINT SYSTEM".
BETWEEN SAW-CUTS.TO BE PAID FOR UNDER THE ITEM
TEMPORARY BACKER ROD AND ALL PAVEMENT MATERIAL
OF THE JOINT (BOTH SIDES OF JOINT) AND REMOVE
CUT PAVEMENT FULL DEPTH AT 10" FROM THE CENTER STEP 11:
PAVE TOP COURSE ON ROADWAY AND BRIDGE.STEP 10:
DEPTH(S).
MILL ROADWAY AND BRIDGE PAVEMENT TO SPECIFIED STEP 9:
PLACEMENT REQUIREMENTS).
DRAWING NO. S-2 - APJ BITUMINOUS CONCRETE
PLACE HMA S0.375 IN THE JOINT CUT-OUT (REFER TO STEP 8:
CONSTRUCTION SAW-CUT LINES.
PAVEMENT ALONG SAW-CUT LINES AND STAGE
PLACE CRACK SEALANT ON VERTICAL EDGE OF STEP 7:
LIMITS SHOWN.
FABRIC) TO THE TOP OF THE BRIDGE DECK WITHIN THE
INSTALL WATERPROOFING MEMBRANE (WOVEN GLASS STEP 6:
TO BE PAID UNDER "HMA S0.375".
BITUMINOUS CONCRETE PLACEMENT REQUIREMENTS)
REQUIRED (REFER TO DRAWING NO. S-2 - JOINT
PLACE TEMPORARY PAVEMENT IN JOINT CUT-OUT ASSTEP 5:
PATCH (HIGH EARLY STRENGTH)". REFER TO S-17.
PAID UNDER "PARTIAL DEPTH PATCH" OR "FULL DEPTH
REPAIR DETERIORATED CONCRETE AS NEEDED TO BE STEP 4:
JOINT MATERIAL WITHIN THE LIMITS SHOWN.
REMOVE THE EXISTING PAVEMENT MATERIAL AND STEP 3:
THE BRIDGE DECK OR APPROACH SLAB.
THE EXISTING JOINT. SAW-CUT SHALL NOT DAMAGE
SAW-CUT LINE SHALL BE 3' FROM THE CENTERLINE OF
EXISTING JOINT FOR PAVEMENT CUT-OUT. EACH
SAW-CUT BITUMINOUS PAVEMENT ON BOTH SIDES OF STEP 2:
REMOVAL OF EXISTING WEARING SURFACE.
NEEDED IN ACCORDANCE TO SPECIAL PROVISION OF
ADDITIONAL MEASUREMENTS SHALL BE TAKEN IF
PROPOSED JOINT) BEFORE PROCEEDING TO STEP 2.
AND THE LOCATION OF THE DECK ENDS (CENTERLINE OF
LOCATIONS TO DETERMINE THE DEPTH OF PAVEMENT
MEASUREMENTS SHALL BE TAKEN PER BRIDGE AT THESE
BRIDGE). A MINIMUM OF SIX REPRESENTATIVE DEPTH
AND THE CROWN (AT THE BEGINNING AND END OF THE
GUTTERLINE (AT THE FOUR CORNERS OF THE BRIDGE)
CONTRACTOR SHALL PERFORM AN EXPLORATION AT THE STEP 1:
PAVEMENT OVER SUB-BASE
BITUMINOUS CONCRETE / CONCRETE
CONCRETE PAVEMENT OVER SUB-BASE
EXISTING BITUMINOUS CONCRETE /
VARY BETWEEN 1.25" AND 2.5" THICK)
THICKNESS; ADDITIONAL LIFTS WILL
(THE FIRST LIFT WILL BE 1.25" UNIFORM
PLACE HMA S0.375 IN PAVEMENT CUT-OUT
04.08
•"
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-9_15.12.29_APJ Parapet Joint Details 1.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
-
PAVEMENT PRESERVATION JPC
050-219ACC
ON I-95
FAIRFIELD/BRIDGEPORT
S-9
NOTES FOR SEALING JOINTS
-N.T.S.
N.T.S.
EXPANSION JOINT SYSTEM
INSTALL ASPHALTIC PLUG
AB
-
CENTERLINE OF MEDIAN
MEDIAN BARRIER
N. T. S.
LONGITUDINAL JOINT (TYP.)
-
BEADS AND SILICONE BAND
FIELD-APPLIED SILICONE CORNER
FACE OF PARAPET OR BARRIER
AB
JOINT SYSTEM
ASPHALTIC PLUG EXPANSION
SECTION - PROPOSED PARAPET JOINT TREATMENT
N. T. S.
PREFORMED JOINT SEAL
-
AA
AB
OR BACKWALL
APPROACH SLAB,
BRIDGE DECK,
-
AA
-
AA
-
SECTION - PROPOSED MEDIAN JOINT TREATMENT
10" TYP.
PROPOSED JOINT TREATMENT AT PARAPET AND MEDIAN
EMSEAL BEJS
N. T. S.
PREFORMED JOINT SEAL
-
AD
AB
-
10" TYP.
SURFACE (TYP.)
WEARING
BARRIER (TYP.)
MEDIAN
PARAPET OR
CENTERLINE OF MEDIAN
N. T. S.
LONGITUDINAL JOINT (TYP.)
-
ADSECTION - PROPOSED MEDIAN JOINT TREATMENTAD
-
N. T. S.
SURFACE (TYP.)
WEARING
BARRIER (TYP.)
MEDIAN
PARAPET OR
EXPANSION JOINT SYSTEM
INSTALL ASPHALTIC PLUG
FROM FACE OF BARRIER
INSTALL EMSEAL BEJS RECESSED FROM FACE OF BARRIER
INSTALL EMSEAL BEJS RECESSED
BRIDGE DECK
BRIDGE DECK
JOINT SYSTEM (TYP.)
EXPANSION
ASPHALTIC PLUG
AC
-
EMSEAL/PREFORMED JOINT SEAL
MEDIAN/PARAPET (TYP.)1"x 1" CHAMFER
1/2"
BITUMINOUS WEARING SURFACE
ASPHALTIC PLUG JOINT/
PLAN - MEDIAN AND PARAPET CRACK SEAL
AC
-
AC
-
AC
-
AC
-
N.T.S.
APJ MEDIAN/PARAPET
DETAILS 1
EMSEAL BEJS
SH
ALL E
XT
EN
D
EN
TIR
E
HEIG
HT
PR
EF
OR
ME
D JOIN
T S
EA
L
MEDIAN AND PARAPET JOINT WITH APPROACH SLAB
ELEVATION - PROPOSED JOINT TREATMENT AT
MEDIAN AND PARAPET JOINT WITHOUT APPROACH SLAB
ELEVATION - PROPOSED JOINT TREATMENT AT
FROM FACE OF BARRIER
INSTALL EMSEAL BEJS RECESSED
ITEM "PREFORMED JOINT SEAL".
COST FOR SEALING PARAPET JOINTS TO BE INCLUDED FOR PAYMENT UNDER3.
EMSEAL.
FREE OF DUST AND LOOSE OR DETERIORATED CONCRETE BEFORE INSTALLING
CLEANING. SURFACES TO WHICH EPOXY ADHESIVE WILL ADHERE SHALL BE
SURFACES OF CONCRETE ALONG JOINT SHALL BE CLEANED BY ABRASIVE BLAST2.
PRIOR TO INSTALLING NEW JOINTS SEAL.
ANY EXISTING BACKER ROD AND JOINT SEALANT SHALL BE COMPLETELY REMOVED 1.
SH
ALL E
XT
EN
D
EN
TIR
E
HEIG
HT
PR
EF
OR
ME
D JOIN
T S
EA
L
FROM FACE OF BARRIER
INSTALL EMSEAL BEJS RECESSED
AB
-
-
AB
AB
SILICONE JOINT SEALANT
JOINT SEALANT
FILL VOIDS WITH SILICONE
JOINT SEALANT (TYP.)
FILL VOIDS WITH SILICONE
JOINT SEALANT
FILL VOIDS WITH SILICONE JOINT SEALANT (TYP.)
FILL VOIDS WITH SILICONE
SECTION - PROPOSED PARAPET JOINT TREATMENT
PAVEMENT OVER SUB-BASE
CONCRETE / CONCRETE
EXISTING BITUMINOUS
CONCRETE PAVEMENT OVER SUB-BASE
EXISTING BITUMINOUS CONCRETE /
PAVEMENT OVER SUB-BASE
CONCRETE / CONCRETE
EXISTING BITUMINOUS
NO. S-16
BEJS UNIVERSAL-90. REFER TO DRAWING
INSTALL FACTORY FABRICATED EMSEAL
NO. S-16 (TYP.)
REFER TO DRAWING
BEJS UNIVERSAL-90.
FABRICATED EMSEAL
INSTALL FACTORY
MEDIAN BARRIER
04.09
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-10_15.12.28_APJ Parapet Joint Details 2.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
-
PAVEMENT PRESERVATION JPC
050-219ACC
ON I-95
FAIRFIELD/BRIDGEPORT
S-10
PREFORMED JOINT SEAL
AB
AF
-
-
AF
-
AE
10" TYP.
CENTERLINE OF MEDIAN
N. T. S.
LONGITUDINAL JOINT (TYP.)
-
AF
CENTERLINE OF MEDIAN
MEDIAN BARRIER
LONGITUDINAL JOINT (TYP.)
OVERLAY
JOINT SYSTEM OR BITUMINOUS
ASPHALTIC PLUG EXPANSION
AE
-
EXPANSION JOINT SYSTEM
INSTALL ASPHALTIC PLUG
N. T. S.
N. T. S.
N. T. S.
NOTES FOR SEALING JOINTS
BRIDGE DECK
S-9
SLAB, OR BACKWALL
BRIDGE DECK, APPROACH
MEDIAN BARRIER
PARAPET OR
SECTION - PROPOSED PARAPET JOINT TREATMENT
SECTION - PROPOSED PARAPET JOINT TREATMENT
SECTION - PROPOSED MEDIAN JOINT TREATMENT
N. T. S. -
AESECTION - PROPOSED MEDIAN JOINT TREATMENT
PREFORMED JOINT SEAL
AB
-
AF
-
AG
10" TYP.
N. T. S.
BRIDGE DECK
S-9MEDIAN BARRIER
PARAPET OR
MEDIAN BARRIER
LONGITUDINAL JOINT (TYP.)
N. T. S. -
AGSECTION - PROPOSED MEDIAN JOINT TREATMENT
JOINT SYSTEM (TYP.)
ASPHALTIC PLUG EXPANSION
SUBSTRATE SURFACE (TYP.)
RECESSED FROM
INSTALL EMSEAL BEJS
FROM SUBSTRATE SURFACE
INSTALL EMSEAL BEJS RECESSED
FROM FACE OF BARRIER
INSTALL EMSEAL BEJS RECESSED
FACE OF BARRIER
RECESSED FROM
INSTALL EMSEAL BEJS
SYSTEM (TYP.)
EXPANSION JOINT
ASPHALTIC PLUG
CENTERLINE OF MEDIAN
AG
-
N. T. S.
SECTION - PROPOSED PARAPET JOINT TREATMENT
OF MEDIAN (TYP.)
CUT TO FIT AND SEAL TO BOTTOM
INSTALL UNIVERSAL-90 UPTURN, BOTTOM OF PARAPET
CUT TO FIT AND SEAL TO
INSTALL UNIVERSAL-90 UPTURN,
AC
AC
S-9
S-9
APJ MEDIAN/PARAPET
DETAILS 2
MEDIAN AND PARAPET JOINT WITH APPROACH SLAB
ELEVATION - PROPOSED JOINT TREATMENT AT
MEDIAN AND PARAPET JOINT WITHOUT APPROACH SLAB
ELEVATION - PROPOSED JOINT TREATMENT AT
ITEM "PREFORMED JOINT SEAL".
COST FOR SEALING PARAPET JOINTS TO BE INCLUDED FOR PAYMENT UNDER3.
EMSEAL.
FREE OF DUST AND LOOSE OR DETERIORATED CONCRETE BEFORE INSTALLING
CLEANING. SURFACES TO WHICH EPOXY ADHESIVE WILL ADHERE SHALL BE
SURFACES OF CONCRETE ALONG JOINT SHALL BE CLEANED BY ABRASIVE BLAST2.
PRIOR TO INSTALLING NEW JOINTS SEAL.
ANY EXISTING BACKER ROD AND JOINT SEALANT SHALL BE COMPLETELY REMOVED 1.
AB
S-9
S-9
AB
JOINT SEALANT
FILL VOIDS WITH SILICONE
JOINT SEALANT (TYP.)
FILL VOIDS WITH SILICONE
SH
ALL E
XT
EN
D
EN
TIR
E
HEIG
HT
PR
EF
OR
ME
D JOIN
T S
EA
L
SH
ALL E
XT
EN
D
EN
TIR
E
HEIG
HT
PR
EF
OR
ME
D JOIN
T S
EA
L
PAVEMENT OVER SUB-BASE
CONCRETE / CONCRETE
EXISTING BITUMINOUS
MEDIAN BARRIER
BITUMINOUS OVERLAY
JOINT SYSTEM OR
ASPHALTIC PLUG EXPANSION
JOINT SYSTEM
EXPANSION
ASPHALTIC PLUG
04.10
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-11_15.12.28_Preformed Joint Detail.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
- -
-
-
-
- -
- - -
- - - -
- - -
- - -
- - - -
EXISTING CONDITION
AM
S-16
050-219
BRIDGE DECKAPPROACH SLAB
BRIDGE DECK APPROACH SLAB
SAW CUT (TYP.)
PMS FAIRFIELD/BRIDGEPORT
PREFORMED JOINT SEAL
PAVEMENT PRESERVATION
ON I-95
{ JOINT
{ JOINT
{ JOINT
{ JOINT
{ JOINT
SUGGESTED SEQUENCE OF WORK
LIMITS OF REMOVAL
3'-0"3'-0"
NO MEMBRANE
MATERIAL FROM ENTERING THE JOINT
SURFACE OF THE JOINT TO PREVENT HMA
INSTALL TEMPORARY BACKER ROD AT THE TOP
JOINT AND PAVEMENT REMOVAL (STEPS 1-3)
PLACEMENT OF PAVEMENT IN JOINT CUTOUT (STEPS 5-9)
MILLING AND PAVING (STEPS 10-11)
FINAL CONDITION (STEPS 12-14)
N.T.S.
N.T.S.
N.T.S.
N.T.S.
N.T.S.
FOR CHOSEN PRODUCT.
REFER TO APPROPRIATE DETAIL
EMSEAL BEJS PREFORMED JOINT.
NOTE: THIS DETAIL SHOWS
EXISTING BRIDGING PLATE
EXISTING WEARING SURFACE (TYP.)
SURFACE (TYP.)
EXISTING WEARING
SURFACE (TYP.)
EXISTING WEARING
SLAB LEVEL (TYP.)
TO BRIDGE DECK/APPROACH
SAW-CUT WEARING SURFACE
HEADER (TYP.)
CONSTRUCT ELASTOMERIC CONCRETE
VARIES
VARIES
AS THE WEARING SURFACE
MILL 2" AND PAVE 2" OF PMA S0.5
MEMBRANE LIMITSMEMBRANE LIMITS
2'-4" 2'-4"
N.T.S.
WEARING SURFACE (TYP.)
FABRIC) (TYP.)
MEMBRANE (WOVEN GLASS
INSTALL WATERPROOFING
S-11
HEADER JOINT SYSTEM
OR ELASTOMERIC CONCRETE
EXISTING ASPHALTIC PLUG JOINT
BETWEEN 1.25" TO 2.5" THICK)
ADDITIONAL LIFTS WILL VARY
BE 1.25" UNIFORM THICKNESS;
CUT-OUT (THE FIRST LIFT WILL
PLACE HMA S0.375 IN PAVEMENT
{ JOINT
SURFACE (TYP.)
EXISTING WEARING
REINFORCING, TYP. (MIN.)
REMOVE CONCRETE 1" BELOW
TO CONCRETE REMOVAL (TYP.)
LIMITS OF RECONSTRUCTION PRIOR
SAW-CUT CONCRETE DECK •" DEEP AT
END".
ITEM, "RECONSTRUCT CONCRETE DECK
THIS WORK TO BE PAID FOR UNDER THE
MATCH THE EXISTING DECK ELEVATION.
RECONSTRUCT DECK ENDS (TYP.) TO
DETAILS
INSTALLATION OF PREFORMED JOINT SEAL
-
E
CONCRETE REPAIR (STEP 4)N.T.S.
INSTALL BOND BREAKER BEFORE REPAVING
ELASTOMERIC CONCRETE HEADER (TYP.)
SURFACE BEFORE INSTALLATION OF
REMOVE BOND BREAKER AND ROUGHEN
CRACK SEAL (TYP.)
(MIN.), (TYP.)
TRANSVERSE REINFORCEMENT
REMOVE CONCRETE 1" BEYOND
JOINT SEAL.
FOR THE INSTALLATION OF PREFORMED
FOR CONSTRUCTING STEP AS REQUIRED
REFER TO DRAWING NO. S-16, SECTION AM,
INSTALL PREFORMED JOINT SEAL
DRAWING NO. S-19 FOR CRACK SEAL DETAIL.
LENGTH OF THE BRIDGE, BOTH SIDES. SEE
INSTALL CRACK SEAL AT CURB LINE ALONG THESTEP 15:
JOINT SEAL".
DRAWING S-16 TO BE PAID FOR UNDER "PREFORMED
INSTALL PREFORMED JOINT SEAL ACCORDING TOSTEP 14:
CONCRETE HEADER".
BE PAID FOR UNDER THE ITEM "ELASTOMERIC
CONSTRUCT ELASTOMERIC CONCRETE HEADERS TO STEP 13:
HEADER".
PAYMENT UNDER THE ITEM "ELASTOMERIC CONCRETE
MATERIAL BETWEEN SAW-CUTS TO BE INCLUDED FOR
AND REMOVE BACKER ROD AND ALL PAVEMENT
CUT PAVEMENT FULL DEPTH AT 8" FROM DECK ENDS STEP 12:
TREATMENT.
REFER TO HIGHWAY PLANS FOR PAVEMENT
PAVE TOP COURSE ON ROADWAY AND BRIDGE. STEP 11:
SPECIFIED DEPTH(S).
MILL ROADWAY AND BRIDGE PAVEMENT TOSTEP 10:
PLACE HMA S0.375 IN THE JOINT CUTOUT. STEP 9:
CONSTRUCTION SAW-CUT LINES.
PAVEMENT ALONG SAW-CUT LINES AND STAGE
PLACE CRACK SEALANT ON VERTICAL EDGE OF STEP 8:
APPROACH SLAB WITHIN THE LIMITS SHOWN.
GLASS FABRIC) TO THE TOP OF BRIDGE DECK AND
INSTALL WATERPROOFING MEMBRANE (WOVENSTEP 7:
TO BE PAID UNDER "HMA S0.375".
BITUMINOUS CONCRETE PLACEMENT REQUIREMENTS)
REQUIRED (REFER TO DRAWING NO. S-2 - JOINT
PLACE TEMPORARY PAVEMENT IN JOINT CUT-OUT AS STEP 6:
BRIDGE DECK AND APPROACH SLAB.
INSTALL TEMPORARY BACKER ROD FLUSH WITH THE STEP 5:
PAID UNDER "RECONSTRUCT CONCRETE DECK END".
REPAIR DETERIORATED CONCRETE AS NEEDED TO BESTEP 4:
THE ITEM "RECONSTRUCT CONCRETE DECK END".
WITHIN THE LIMITS SHOWN TO BE PAID FOR UNDER
HEADER, BACKER ROD, AND/OR BRIDGING PLATE;
ANY OF THE FOLLOWING: ELASTOMERIC CONCRETE
REMOVE EXISTING PAVEMENT, JOINT MATERIAL, ANDSTEP 3:
BRIDGE DECK OR APPROACH SLAB.
THE JOINT. SAW-CUT SHALL NOT DAMAGE EXISTING
SAW-CUT LINE SHALL BE 3' FROM THE CENTERLINE OF
"RECONSTRUCT CONCRETE DECK END". EACH
INCLUDED FOR PAYMENT UNDER THE ITEM,
OF EXISTING JOINT FOR PAVEMENT CUT-OUT TO BE
SAW-CUT BITUMINOUS PAVEMENT ON BOTH SIDES STEP 2:
EMSEAL REQUIRES A MINIMUM OF THREE WEEKS.
OPENING FOR SIZING OF EMSEAL. ORDERING OF
SHALL ALSO MEASURE THE DECK JOINT GAP
RECONSTRUCT CONCRETE DECK ENDS. CONTRACTOR
NEEDED IN ACCORDANCE TO SPECIAL PROVISION OF
ADDITIONAL MEASUREMENTS SHALL BE TAKEN IF
PROPOSED JOINT) BEFORE PROCEEDING TO STEP 2.
LOCATION OF THE DECK ENDS (CENTERLINE OF
DETERMINE THE DEPTH OF PAVEMENT AND THE
TAKEN PER BRIDGE AT THESE LOCATIONS TO
REPRESENTATIVE DEPTH MEASUREMENTS SHALL BE
END OF THE BRIDGE). A MINIMUM OF SIX
BRIDGE) AND THE CROWN (AT THE BEGINNING AND
THE GUTTERLINE (AT THE FOUR CORNERS OF THE
CONTRACTOR SHALL PERFORM AN EXPLORATION AT STEP 1:
JPC
8" 8"
8" 8"
04.11
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-12_15.12.28_Preformed Median and Parapet Joint Details 1.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PAVEMENT PRESERVATIONON I-95
050-219PMS
S-12
FAIRFIELD/BRIDGEPORT
JPC
VARIES
NOT TO SCALE
AI
AH
NOT TO SCALE -
WEARING SURFACE (TYP.)
SEAL SYSTEM
PREFORMED JOINT
PR
EF
OR
ME
D JOIN
T S
EA
L S
HA
LL
EX
TE
ND
EN
TIR
E
HEIG
HT
OF P
AR
AP
ET
HEADER
ELASTOMERIC CONCRETE
PARAPET
LONGITUDINAL JOINT (TYP.)
CENTERLINE OF MEDIAN
REMOVAL DETAILS
SEE SHEET S-13 FOR
IF STEEL PLATE PRESENT:
8" TYP.
NOT TO SCALE
PREFORMED JOINT SEAL
-
AH
AN
S-16
WEARING SURFACE (TYP.)
AI
AH
NOT TO SCALE -
REMOVED (SEE SHEET S-13)
REPLACE PLATE IF ONE WAS
SECTION - PROPOSED JOINT AT PARAPETSECTION - PROPOSED JOINT AT MEDIAN
AT MEDIAN AND PARAPET
ELEVATION - EXISTING JOINT
MEDIAN/PARAPET (TYP.)
MEDIAN/PARAPET (TYP.)
PREFORMED JOINT SEAL
NOTES:
BRIDGE DECK SLAB, OR BACKWALL
BRIDGE DECK, APPROACH
BRIDGE DECK
SLAB, OR BACKWALL
BRIDGE DECK, APPROACH
•" FROM EDGE OF 1"x1" CHAMFER
INSTALL PREFORMED JOINT SEAL RECESSED
S-13
S-13
AT CENTERED MEDIAN AND PARAPET
ELEVATION - PROPOSED JOINT TREATMENT
AN
S-16
AN
S-16
SEE S-13 IF PRESENT
STEEL PLATE NOT SHOWN;
NOTE:
SEE S-13 IF PRESENT
STEEL PLATE NOT SHOWN;
NOTE:
PREFORMED JOINT SEAL
MEDIAN/PARAPET DETAILS 1
HEADER
ELASTOMERIC CONCRETE
CONCRETE HEADER
JOINT SEAL IN ELASTOMERIC
ASPHALTIC PLUG JOINT OR POURABLE
PR
EF
OR
ME
D JOIN
T S
EA
L
SH
ALL E
XT
EN
D
EN
TIR
E
HEIG
HT
TRAVEL ON BOTH MEDIAN/PARAPET.
THE SLIDING STEEL PLATE IS FACING AWAY FROM THE DIRECTION OF
SCREWS. CARE SHOULD BE TAKEN TO ENSURE THE EXPOSED EDGE OF
STEEL PLATES SHOULD BE REINSTALLED OVER JOINT OPENING WITH NEW
INSTALLING PREFORMED JOINT SEAL.
SHALL BE FREE OF DUST AND LOOSE OR DETERIORATED CONCRETE BEFORE
BLAST CLEANING. SURFACES TO WHICH EPOXY ADHESIVE WILL ADHERE
SURFACES OF CONCRETE ALONG JOINT SHALL BE CLEANED BY ABRASIVE
TO MATCH THE OPENING IN THE DECK.
LARGER, REFER TO SHEET S-14. GAP WIDTH SHALL BE CONSTRUCTED
OF STEEL PLATE OR ELASTOMERIC CONCRETE HEADER, WHICHEVER IS
CURB SECTION OF MEDIAN/PARAPET SHALL BE RECONSTRUCTED FULL WIDTH
ACCORDING TO SHEET S-13.
STEEL PLATES, IF PRESENT, SHALL BE REMOVED AND SALVAGED
COMPLETELY REMOVED PRIOR TO INSTALLING NEW JOINT SEAL.
ANY EXISTING BACKER ROD AND JOINT SEALANT SHALL BE
NO. S-16 (TYP.)
REFER TO DRAWING
BEJS UNIVERSAL-90.
FABRICATED EMSEAL
INSTALL FACTORY
DRAWING NO. S-16
UNIVERSAL-90. REFER TO
FABRICATED EMSEAL BEJS
INSTALL FACTORY
04.12
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-13_15.12.15_Steel Plate on Median and Parapet.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PAVEMENT PRESERVATIONON I-95
050-219PMS
S-13
FAIRFIELD/BRIDGEPORT
JPC
AI
NOT TO SCALE -
•" SLIDING PLATE (GALVANIZED)
(GALVANIZED) (TYP.)
MOUNTING SCREW
•" DIA. COUNTERSUNK
STUD (TYP.)
•" DIA. ANCHOR
EXISTING SECTION THROUGH PLATE
8" TYP.
NOT TO SCALE
PREFORMED JOINT SEAL
2"
2"
6"
6"
-
AT MEDIAN
ELEVATION - PROPOSED JOINT
AH
SE
AL S
HA
LL E
XT
EN
D
EN
TIR
E
HEIG
HT
AN
(GALVANIZED)
•" FIXED PLATE
S-16
PARAPET FACE (TYP.)
MEDIAN (TYP.)
WEARING SURFACE (TYP.)
AI
DIRECTION OF TRAVEL
8" TYP.
NOT TO SCALE
PREFORMED JOINT SEAL
2"
2"
6"
6"
-
AT PARAPET
ELEVATION - PROPOSED JOINT
(GALVANIZED) (TYP.)
MOUNTING SCREW
•" DIA. COUNTERSUNK
STUD (TYP.)
•" DIA. ANCHOR
AH
SE
AL S
HA
LL E
XT
EN
D
EN
TIR
E
HEIG
HT
AN
S-16PARAPET (TYP.)
WEARING SURFACE (TYP.)
AI
DIRECTION OF TRAVELDIRECTION OF TRAVEL
PREFORMED JOINT SEALPREFORMED JOINT SEAL
BRIDGE DECK
SLAB, OR BACKWALL
BRIDGE DECK, APPROACH BRIDGE DECK
SLAB, OR BACKWALL
BRIDGE DECK, APPROACH
S-12 S-12
STUD (TYP.)
•" DIA. ANCHOR
(GALVANIZED) (TYP.)
MOUNTING SCREW
•" DIA. COUNTERSUNK
MEDIAN/PARAPETSLIDING PLATE DETAILS 04.13
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-14_15.12.15_Median and Parapet Reconstruction.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PAVEMENT PRESERVATIONON I-95
050-219PMS
S-14
FAIRFIELD/BRIDGEPORT
JPC
EXISTING PROPOSED
PARAPETGUTTER LINE
SIDE OF JOINT
#5 EACH
(TYP.)
2"
AJ
-
DIR
ECTIO
N
OF TR
AFFIC
GRANITE CURB
PARTIAL PLAN - JOINT TREATMENT IN PARAPET
#5
DRILL AND GROUT
*
(TYP.)
#7
(TYP.)
SAWCUT
•" DEEP
SEE NOTE 'A'
GRANITE CURB
LIMITS (TYP.)
CURB
GRANITE
WIDTH (TYP.)
LIMITED TO HEADER
CONCRETE REMOVAL
NOTE:
REINFORCEMENT.
DRILL AND GROUT DOWEL FOR NEW
REMOVE EXISTING REINFORCEMENT, THEN
IF CONCRETE COVER IS LESS THAN 2",
AN
DECK ENDS".
"RECONSTRUCT CONCRETE
PAID FOR UNDER THE ITEM
JOINT SEAL. THIS WORK
RECONSTRUCT PARAPET FOR
ELASTOMERIC HEADER
•" SAW-CUT
L
#5 GALVANIZED REBAR
FULL STRENGTH OF THE BAR.
ADHESIVE MANUFACTURER TO DEVELOP THE
OF HOLE TO BE AS REQUIRED BY THE CHEMICAL
#5 REINFORCEMENT. DEPTH AND DIAMETER
C DRILLED HOLE FOR CHEMICALLY ANCHORED
(MIN.)
•" SAW-CUT
#5 GALVANIZED REBAR
•" SAW-CUT
#5 GALVANIZED REBAR
(MIN.) HEADER (TYP.)
ELASTOMERIC
AJ
-
6"6"
MIN.6"
2" MIN.
APPROACH SLAB
CONCRETE DECK OR
APPROACH SLAB
CONCRETE DECK OR
NOT TO SCALE
NOT TO SCALE
S-16
HEADER JOINT SYSTEM
ASPHALTIC PLUG JOINT OR ELASTOMERIC
TO BE PAID FOR UNDER PAY ITEM "RECONSTRUCT CONCRETE DECK ENDS".
ALSO, REMOVE THE JOINT SEAL AND STEEL EXTRUSIONS. THIS WORK
REMOVE CONCRETE WITHIN THE LIMITS OF THE EXISTING HEADER.
NOTE 'A':
SECTION - MEDIAN AND PARAPET RECONSTRUCTION
MEDIAN/PARAPETRECONSTRUCTION DETAILS
AND 100 (TYP.)
#6 @ BRIDGES NO. 99
#5 @ BRIDGE NO. 98 (TYP.)
NOTE:
JOINT TREATMENT IN MEDIAN AND PARAPET
PARAPET REINFORCEMENT.
REINFORCEMENTS ARE ASSUMED TO BE SIMILAR TO FACIA
AND SHALL BE VERIFIED BY THE CONTRACTOR. MEDIAN
-EXISTING REINFORCEMENTS ARE ASSUMED FROM 2004 PLANS
ALL JOINT MATERIAL SHOULD BE REMOVED.
-MEDIAN/PARAPET JOINT SEAL NOT SHOWN. IF PRESENT,
UNDER THE ITEM "ASPHALTIC PLUG EXPANSION JOINT SYSTEM".
APPROVED BY THE ENGINEER. THIS WORK WILL BE PAID FOR
BLAST CLEANING. DUST SHALL BE REMOVED BY THE METHOD
EXISTING JOINT MATERIAL. CLEAN JOINT SIDES BY ABRASIVE
PRIOR TO INSTALLING THE PREFORMED JOINT SEAL, REMOVE
IF POSSIBLE
AND SALVAGE
SLIDING PLATE
REMOVE STEEL
PLATE
STEEL SLIDING
RE-INSTALL
04.14
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-15_15.12.28_Preformed Median Joint Details 2.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PAVEMENT PRESERVATIONON I-95
050-219PMS
FAIRFIELD/BRIDGEPORT
JPC
VARIES
NOT TO SCALE
APPROACH SLAB
CONCRETE DECK OR
APPROACH SLAB
CONCRETE DECK OR
WEARING SURFACE (TYP.)
8" TYP.
APPROACH SLAB
CONCRETE DECK ORAPPROACH SLAB
CONCRETE DECK OR
-
AL
AN
S-16
WEARING SURFACE (TYP.)
NOT TO SCALE
NOTE: EMSEAL SHOWN
LONGITUDINAL JOINT (TYP.)
CENTERLINE OF MEDIAN
HEADER (TYP.)
ELASTOMERIC CONCRETE
LONGITUDINAL JOINT (TYP.)
CENTERLINE OF MEDIAN
AL
NOT TO SCALE -
AK
NOT TO SCALE -
SECTION - PROPOSED MEDIAN JOINT
-
AK
AK
NOT TO SCALE -
SEAL SYSTEM
PREFORMED JOINT
NOTE: EMSEAL BEJS SHOWN
PARAPET
AL
NOT TO SCALE -
SEAL SYSTEM
PREFORMED JOINT
PR
EF
OR
ME
D JOIN
T S
EA
L S
HA
LL
EX
TE
ND
EN
TIR
E
HEIG
HT
OF P
AR
AP
ET
NOTE: EMSEAL BEJS SHOWN
PARAPET
AT MEDIAN AND PARAPET
ELEVATION - EXISTING JOINT
SECTION - PROPOSED DECK JOINT AT MEDIANSECTION - PROPOSED DECK JOINT AT PARAPET
SECTION - PROPOSED PARAPET JOINT
PARAPET/MEDIAN (TYP.)
PARAPET/MEDIAN (TYP.)
EXISTING PARAPET SEAL
S-16
S-16
WEARING SURFACE (TYP.)
SEAL SYSTEM
PREFORMED JOINT
S-15
PREFORMED JOINT SEAL
MEDIAN/PARAPET
CRACK SEAL ALONG
TO FACE OF CURB
PREFORMED JOINT SEAL ADHERED
•" FROM 1"x1" CHAMFER
INSTALL PREFORMED JOINT SEAL RECESSED
AT OFF-SET MEDIAN AND PARAPET
ELEVATION - PROPOSED JOINT TREATMENT
AN
AN
AC
S-9
HEADER (TYP.)
ELASTOMERIC CONCRETE
WEARING SURFACE (TYP.)
AC
S-9
PREFORMED JOINT SEAL
MEDIAN/PARAPET DETAILS 2
CONCRETE HEADER
JOINT SEAL IN ELASTOMERIC
ASPHALTIC PLUG JOINT OR POURABLE
JOINT SEALANT
FILL VOIDS WITH SILICONE
JOINT SEALANT (TYP.)
FILL VOIDS WITH SILICONE
PR
EF
OR
ME
D JOIN
T S
EA
L
SH
ALL E
XT
EN
D
EN
TIR
E
HEIG
HT
04.15
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-16_15.12.28_Preform Deck and Parapet Joint Cross Sec..dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PAVEMENT PRESERVATIONON I-95
050-219PMS
FAIRFIELD/BRIDGEPORT
PREFORMED JOINT SEAL
JPC
JOINT OPENING
RECOMMENDED INSTALLATION DEPTH
ACCOMODATE MANUFACTURER'S
APPROACH SLAB TO BE SIZED TO
DEPTH OF STEP IN DECK SLAB OR
(TYP.)
ASPHALTIC OVERLAY
JOINT OPENING •"
BEADS AND SILICONE BAND
FIELD-APPLIED SILICONE CORNER
(TYP.)
ASPHALTIC OVERLAY
JOINT OPENING
SPECIFICATIONS
PER MANUFACTURER'S
INSTALLATION DEPTH
NOT TO SCALE -
SILICOFLEX
EMSEAL BEJS
V-SEALBACKER ROD
•"
(TYP.)
JOINT „" (TYP.)
BEVEL EDGE OF
EPOXY ADHESIVE (TYP.)
JOINT „" (TYP.)
BEVEL EDGE OF
JOINT „" (TYP.)
BEVEL EDGE OF
BITUMINOUS OVERLAY
HEADER „" BELOW
RECESS ELASTOMERIC
HEADER (TYP.)
ELASTOMERIC CONCRETE
•"
(TYP.)
SPECIFICATIONS
PER MANUFACTURER'S
INSTALLATION DEPTH
•"
ADHESIVE BEAD (TYP.)
SILICOFLEX LOCKING
(TYP.)
ASPHALTIC OVERLAY
VA
RIES
VA
RIES
VA
RIES
CONCRETE HEADER
APPROACH SLAB, OR ELASTOMERIC
BUILD STEP IN BRIDGE DECK SLAB,
CONCRETE HEADER
APPROACH SLAB OR ELASTOMERIC
BUILD STEP IN BRIDGE DECK SLAB,
OR APPROACH SLAB
BRIDGE DECK, BACKWALL
OR APPROACH SLAB
BRIDGE DECK, BACKWALL
OR APPROACH SLAB
BRIDGE DECK, BACKWALL
OR APPROACH SLAB
BRIDGE DECK, BACKWALL
HEADER (TYP.)
ELASTOMERIC CONCRETE
HEADER (TYP.)
ELASTOMERIC CONCRETE
OR APPROACH SLAB
BRIDGE DECK, BACKWALL OR APPROACH SLAB
BRIDGE DECK, BACKWALL
DIRECTION OF TRAVEL
DIRECTION OF TRAVEL
DIRECTION OF TRAVEL
OVERLAY (TYP.)
„" BELOW BITUMINOUS
RECESS ELASTOMERIC HEADER
BITUMINOUS OVERLAY
HEADER „" BELOW
RECESS ELASTOMERIC
SP
ECIFIC
ATIO
NS
MA
NU
FA
CT
UR
ER'S
DEP
TH
PE
R
IN
ST
ALL
ATIO
N
•"
(TYP.)
FACE OF PARAPET
ADHESIVE BEAD (TYP.)
SILICONE LOCKING
FACE OF PARAPET
JOINT 1" (TYP.)
BEVEL EDGE OF
SP
ECIFIC
ATIO
NS
MA
NU
FA
CT
UR
ER'S
DEP
TH
PE
R
IN
ST
ALL
ATIO
N
•"
(TYP.)
JOINT 1" (TYP.)
BEVEL EDGE OF
PARAPET (TYP.)
BUILD STEP IN
BACKER ROD
(TYP.)
EPOXY ADHESIVE
•"
SILICONE BAND
BEADS AND
SILICONE CORNER
FIELD-APPLIED
AN
NOT TO SCALE -
SILICOFLEX
EMSEAL BEJS
V-SEAL
JOINT OPENING VARIES
JOINT OPENING VARIES
JOINT OPENING VARIES
CROSS SECTIONS
S-16
NOTESNOTES
AM
EMSEAL BEJS UNIVERSAL-90
FACE OF PARAPET
JOINT 1" (TYP.)
BEVEL EDGE OF
IN MEDIAN OR PARAPET
SECTION - PREFORMED JOINT SEAL
IN BRIDGE DECK
SECTION - PREFORMED JOINT SEAL
RECOMMENDED INSTALLATION DEPTH
ACCOMODATE MANUFACTURER'S
APPROACH SLAB TO BE SIZED TO
DEPTH OF STEP IN DECK SLAB OR
SPLICES AS WELL AS BENDS AND SPLICES 9" ABOVE THE CURBLINE AND HIGHER IS ALLOWED TO BE FIELD FABRICATED.
BENDS AND SPLICES 9" BELOW THE CURBLINE AND THE TRANSITION INTO THE DECK SHALL BE FACTORY FABRICATED. ROADWAY
PARAPETS AND WALLS SHALL BE SEALED FOR THE ENTIRE VERTICAL PORTION AND ACROSS THE TOP WITH THE SEALING ELEMENT -
JOINT DIFFER FROM DECK JOINT
*CUSTOM FIT WHEN PARAPET
HEIGHT, BOTH SIDES
EPOXY ADHESIVE FULL
BOTH SIDES
FULL HEIGHT,
EPOXY ADHESIVE
"QUALITY CONTROL PLAN" AT LEAST 30 DAYS PRIOR TO START OF WORK.
THE DESIGN ENGINEER SHALL RECEIVE THE JOINT GAP WIDTH MEASUREMENT AND THE
THE REVIEW AND COMMENT FOR THE INSTALLATION OF THE SELECTED JOINT SYSTEM.
THE CONTRACTOR SHALL SEND "QUALITY CONTROL PLAN" TO THE DESIGN ENGINEER FOR
SIZE BASED ON THE MEASUREMEMTS RECEIVED FROM THE CONTRACTOR. IN ADDITION,
TO THE DESIGN ENGINEER. THE DESIGN ENGINEER SHALL SELECT THE APPROPRIATE JOINT
APPROPRIATELY SIZED JOINT SEAL. THE CONTRACTOR SHALL SUBMIT ALL MEASUREMENTS
MAXIMUM BRIDGE DECK JOINT WIDTH ALONG THE JOINT TO DETERMINE THE
SEAL" SPECIFICATION. THE MEASUREMENTS SHOULD ALSO INCLUDE THE MINIMUM AND
THE BRIDGE DECKS AND THE PARAPETS, IN ACCORDANCE TO THE "PREFORMED JOINT
THE CONTRACTOR IS RESPONSIBLE FOR MEASURING THE JOINT GAP WIDTHS IN BOTH,4.
OF THE JOINT AND SHALL BE RECESSED „" BELOW THE BITUMINOUS OVERLAY.
THE ELASTOMERIC CONCRETE HEADER SHALL BE BEVELED „" ALONG THE OPENING 3.
HAS BEEN SAW CUT AND REMOVED.
AFTER THE PAVEMENT HAS BEEN PLACED ON THE BRIDGE AND THE DESIGNATED AREA
THE ELASTOMERIC CONCRETE HEADER AND PREFORMED JOINT SEAL SHALL BE INSTALLED 2.
WORK SHALL BE PAID FOR UNDER THE ITEM "PREFORMED JOINT SEAL".
CLEANING. DUST SHALL BE REMOVED BY THE METHOD APPROVED BY THE ENGINEER. THIS
PRIOR TO INSTALLING THE SILICONE SEALANT, CLEAN JOINT SIDES BY ABRASIVE BLAST1.
04.16
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-17_15.12.29_Partial and Full Depth Deck Patch.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
050-219
REMOVAL
BOTTOM OF CONCRETE
VA
RIES
VA
RIES
WITH ADJACENT CONCRETE
FINISH SMOOTH AND EVEN
UPPER MAT
TOP REINFORCING
NOT TO SCALE
NOT TO SCALE
3" (TYP.) EXISTING PVC PIPE WEEPHOLE
MESH (23 GAGE)
REPLACE ‚" SQUARE GALVANIZED
MESH DETAILNOT TO SCALE
WEEPHOLE NOTES
DECK PATCHING DETAILS
AO
-
REPLACE WITH PATCHING MATERIAL
REMOVE ALL DETERIORATED CONCRETE AND
TYPICAL PARTIAL DEPTH PATCH REPAIR
PMS
NOTES: DECK AND APPROACH SLAB PATCHING
VA
RIES
3" 3"TOP OF DECK
PIPE WEEPHOLE
CLEAN EXISTING PVC
AND FOLD IN
WOVEN GLASS FABRIC
SLIT BOTH LAYERS OF
GUTTER LINE
NOT TO SCALE
AP
-
SECTION
AP
-
AO
-
SECTION
NOT TO SCALE
NOT TO SCALE
AQ
-
TOP OF DECK
NOT TO SCALE
AQ
-
SECTION
TO BE FILLED
EXISTING PVC PIPE WEEPHOLE
(IF PRESENT)
REMOVE EXISTING MESH
INSTALL NON-SHRINK GROUT INSTALL EXPANDING FOAM
PLAN
GUTTER LINE
(23 GAGE)
REPLACE ‚" GALVANIZED MESH
ADJACENT DECK SLAB
FLUSH WITH SURFACE OF
INSTALL NON-SHRINK GROUT
WITH ADJACENT CONCRETE
FINISH SMOOTH AND EVEN
TYPICAL FULL DEPTH PATCH REPAIR
REINFORCING STEEL
TRANSVERSE "MAIN"
VA
RIES
REINFORCING STEEL
TRANSVERSE "MAIN"
AND APPROACH SLAB REINFORCEMENT
NOTES FOR DEFECTIVE DECK
REINFORCEMENT
SEE NOTES FOR DEFECTIVE
0"
TRANSVERSE STEEL
SIZE AND SPACING AS EXISTING
NEW REINFORCING STEEL TO BE SAME
REINFORCING STEEL
LONGITUDINAL "DISTRIBUTION"
REINFORCING STEEL
TRANSVERSE "MAIN"
TRANSVERSE STEEL
SIZE AND SPACING AS EXISTING
NEW REINFORCING STEEL TO BE SAME
TRANSVERSE STEEL
SIZE AND SPACING AS EXISTING
NEW REINFORCING STEEL TO BE SAME
REINFORCEMENT
SEE NOTES FOR DEFECTIVE
REINFORCING STEEL
TRANSVERSE "MAIN"
CO
V1" M
IN.
BOTTOM OF CONCRETE REMOVAL. SEE NOTE "A"
SIDES OF CONCRETE REMOVAL. SEE NOTE "A"
WITH ADJACENT CONCRETE
FINISH SMOOTH AND EVEN
FACE ALL AROUND. SEE NOTE B
SAWCUT •" DEEP TO PROVIDE A VERTICAL REINFORCING STEEL
TRANSVERSE "MAIN"
CO
V1" M
IN.
TRANSVERSE STEEL
SIZE AND SPACING AS EXISTING
NEW REINFORCING STEEL TO BE SAME
REINFORCEMENT
SEE NOTES FOR DEFECTIVE HIGH EARLY STRENGTH CONCRETE
1
1
EXIST. #4 @12"|
REMOVAL OF CONCRETE
EXPOSED REINFORCEMENT
FINAL CONDITION
SEE NOTE B
VERTICAL FACE ALL AROUND.
SAWCUT •" DEEP TO PROVIDE A
LONG. REINFORCING STEEL
MAT OF BARS)
(APPROX. 1" BELOW LOWEST
BOTTOM OF STRUCTURAL SLAB
DETAIL-2: DECK WEEPHOLES TO BE FILLED
DETAIL-1: DECK WEEPHOLES TO REMAIN
(TO REMAIN)
STEEL END BEARING DIAPHRAGMS
SCALE: 1"=1'-0" SCALE: 1"=1'-0"
PATCH HAS CURED (TYP.).
REMOVE FORMWORK AFTER
FULL DEPTH PATCH REPAIRS AT DECK JOINTS
DO NOT USE ABRASIVE BLAST CLEANING
CLEAN TOP OF DIAPHRAGM (TYP.)
DETAILS FOR DEFECTIVE REINFORCEMENT (PARTIAL DEPTH PATCHES)
DETAILS FOR DEFECTIVE REINFORCEMENT (FULL DEPTH PATCHES)
REINFORCEMENT
EXPOSED
REQUIREMENT
AS NECESSARY TO ACHIEVE THIS
DECK. SOUND CONCRETE SHALL BE REMOVED
REINFORCEMENT AT THE UNDERSIDE OF THE
JOINT LOCATIONS WHERE THERE IS EXPOSED
REMOVE CONCRETE (FULL DEPTH) AT THE DECK
INSTALL W.G.F. AFTER GROUT HAS CURED
WOVEN GLASS FABRIC TO COVER FILLED WEEPHOLE.
SPACED AT 4-6" O.C.| AT JOINTS
LONGITUDINAL REINFORCING STEEL
(7"-8"|)
VA
RIES
MATCH EXIST. GAP WIDTH
FORM OPEN GAP
CONDITIONS. ALTERNATE LEGS
TO FIT SLAB BUILD DOWN
FIELD CUT #4 @12"
NECESSARY TO ACHIEVE THIS REQUIREMENTSOUND CONCRETE SHALL BE REMOVED ASPART OF THE SIP FORMS).BOTTOM OF STRUCTURAL SLAB (AT THE HIGHESTTHE BOTTOM OF THE PATCH ALIGNS WITH THEPATCH SHALL ALSO BE WIDENED SUCH THATCONCRETE. THE SIZE OF THE FULL DEPTHAND REPLACE WITH HIGH EARLY STRENGTHREMOVE EXIST. CONCRETE (FULL DEPTH)
IF SIP FORMS NOT REMOVED PREVIOUSLY
CONCRETE MAY BE POURED INTO SIP FORMS
FORMS IF ORDERED BY THE ENGINEER.
CUT AND REMOVE DETERIORATED STAY IN PLACE
REMOVE CONCRETE INSIDE STAY IN PLACE FORMS.
REINFORCING MAT (MIN.)
1" REMOVAL BELOW BOTTOM
SEE NOTE B
VERTICAL FACE ALL AROUND.
SAWCUT •" DEEP TO PROVIDE
FAIRFIELD/BRIDGEPORT
S-17PAVEMENT PRESERVATION
ON I-95JPC
PAYMENT UNDER ITEM "PARTIAL DEPTH PATCH"
THE WORK IN DETAIL-2 SHALL BE CONSIDERED INCLUDED FOR
SHALL BE FILLED AS INDICATED IN DETAIL-2
- ALL OTHER WEEPHOLES:
"PMA S0.25".
THE WORK IN DETAIL-1 SHALL BE PAID FOR UNDER ITEM
SHALL BE REHABILITATED AS INDICATED IN DETAIL-1
- WEEPHOLES ADJACENT TO EXPANSION JOINTS (2' AWAY OR LESS):
THE EXISTING WEARING SURFACE SHALL BE TREATED AS FOLLOWS:
DECK WEEPHOLES EXPOSED AFTER REMOVAL OF
CONCRETE)"
"FULL DEPTH PATCH (HIGH EARLY STRENGTH
SIP FORMS AND CONCRETE UNDER ITEM
INCLUDE COST OF CUTTING AND REMOVING
INSTALL THE UNDERSIDE DECK FORMS.
INSIDE THE SIP FORMS, AS REQUIRED TO
FORMS, AND THE UNREINFORCED CONCRETE
CUT AND REMOVE STEEL STAY IN PLACE (SIP)
BY THE ENGINEER.
TO ANY SPECIFIC DECK OR APPROACH SLAB AREAS BUT SHALL BE USED WHERE DIRECTED
THE ESTIMATED QUANTITIES FOR THE PARTIAL DEPTH PATCHING ITEM ARE NOT ASSIGNED
THE PARTIAL DEPTH PATCHING ITEM AS DIRECTED BY THE ENGINEER.
DECK AND APPROACH SLAB AREAS SHALL BE REPAIRED BY THE CONTRACTOR UTILIZING
AND APPROACH SLABS TO DELINEATE THE DETERIORATED AREAS. THE DETERIORATED
OF THE EXISTING OVERLAY, THE ENGINEER SHALL CHAIN DRAG AND HAMMER TAP THE DECK
AREAS TO BE REPAIRED SHALL BE DETERMINED BY THE ENGINEER. AFTER THE REMOVAL
THE EXACT LOCATION AND EXTENT OF ALL DETERIORATED DECK AND APPROACH SLABNOTE C
AS APPLICABLE
FOR "PARTIAL DEPTH PATCH" OR "FULL DEPTH PATCH (HIGH EARLY STRENGTH CONCRETE)"
THE COST OF •" DEPTH SAWCUT SHALL BE INCLUDED IN THE CONTRACT BID PRICENOTE B
BITUMEN, LOOSE PARTICLES, AND FOREIGN MATTER JUST PRIOR TO PATCHING.
ADDITIONAL LOOSE OR POWDER-LIKE RUST, OIL, SOLVENT, GREASE, DIRT, DUST,
AIR AT THE NOZZLE TO BE OIL-FREE. THE PATCH AREA SHALL BE CLEANED OF ALL
AND DESIGNED OIL SEPARATORS ATTACHED AND FUNCTIONAL TO ALLOW DELIVERED
PARTICLES AND DUST. ALL COMPRESSED AIR SOURCES SHALL HAVE PROPERLY SIZED
BE WATER BLASTED, FOLLOWED BY AIR BLASTING IN ORDER TO REMOVE ALL LOOSE
THE CONCRETE SURFACES AND REINFORCING STEEL IN PARTIAL DEPTH PATCHES SHALLNOTE A
STRENGTH CONCRETE)" AS APPLICABLE.
CONCRETE DECK ENDS", "PARTIAL DEPTH PATCH" OR "FULL DEPTH PATCH (HIGH EARLY
AND INSTALLING NEW REINFORCEMENT, SHALL BE PAID FOR UNDER ITEM "RECONSTRUCT
THE COST OF CLEANING EXISTING REINFORCEMENT, AND THE COST OF FURNISHING6)
CONFORM TO ASTM A615, GRADE 60.
SUPPLEMENT REINFORCEMENT SHALL MATCH EXISTING (COATED OR UNCOATED) AND SHALL 5)
DRAWING S-18 FOR "EXISTING STEEL REINFORCEMENT SCHEDULE"
MATCH EXISTING BAR SIZES AND SPACING FOR THE TRANSVERSE (MAIN) BARS. SEE 4)
THE CONCRETE SHALL BE REMOVED TO A MINIMUM DEPTH OF 1" BELOW THE NEW BARS.3)
ALL EXPOSED REINFORCING STEEL TO REMAIN SHALL BE THOROUGHLY CLEANED AND REUSED.2)
- WHEN ORDERED BY THE ENGINEER.
- THE REINFORCING IS BROKEN.
- THE REINFORCING HAS LOST 25% OR MORE OF ITS ORIGINAL CROSS SECTIONAL AREA.
THE EXISTING REINFORCEMENT SHALL BE REINFORCED WHEN:
LIMITS OF THE REPAIR LOCATION.
BY SPLICING A NEW REINFORCEMENT BAR TO THE DEFECTIVE BAR WITHIN THE
IF THE REINFORCEMENT IS FOUND TO BE DEFECTIVE IT SHALL BE REINFORCED
AFTER REMOVAL OF DETERIORATED DECK AND APPROACH SLAB CONCRETE, 1)
04.17
APPROACH SLAB
BRIDGE DECK
BRIDGE DECK
BEARING
CENTERLINE
N.T.S.N.T.S.
BARS OVER EACH PIER.
ADDITIONAL LONGITUDINAL TOP
REINFORCEMENT
APPROACH SLAB TRANSVERSE
REINFORCEMENT
APPROACH SLAB LONGITUDINAL
LOGITUDINAL REINFORCEMENT
TRANSVERSE REINFORCEMENT
EXISTING DECK AND APPROACH SLAB REINFORCEMENT
ADDITIONAL TRANSVERSE REINFORCEMENT
NEAR DECK ENDS
LONGITUDINAL REINFORCEMENT
ADDITIONAL BARS ALTERNATE WITH
TYPICAL EXISTING REINFORCEMENT AT ABUTMENT
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-18_15.11.06_Existing Deck and Approach Slab Reinf..dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PAVEMENT PRESERVATIONON I-95
FAIRFIELD/BRIDGEPORT
S-18
050-219
JPC
PMS
DECK/APPROACH SLAB
EXISTING REBAR SCHEDULE
(IN.)
BAR SPLICE
STRAIGHTBAR SIZE
STEEL REINFORCEMENT LAP SPLICES
40 8
35 7
30 6
25 5
20 4
NO APPROACH SLAB
BOTTOM TRANSVERSE BARS
(IN.)
BAR SPLICE
STRAIGHTBAR SIZE
STEEL REINFORCEMENT LAP SPLICES
18 8
16 7
14 6
12 5
9 4
TOP TRANSVERSE BARS
EXISTING REINFORCEMENT AT PIERS BRIDGE NO. 00099
04.18
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
NOT TO SCALE
12/31/2015
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\S-19_15.12.29_APJ and Preformed Joint Crack Seal Details.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
- -
-
-
-
- -
- - -
- - - -
- - -
- - -
- - - - 050-219
S-19
PAVEMENT PRESERVATION
ON I-95
FAIRFIELD/BRIDGEPORTPMS
JPC
CRACK SEAL DETAILS
6'-0"
PA
VE
LI
MITS
FO
R
CR
AC
K
SE
AL
PA
VE
LI
MITS
FO
R
CR
AC
K
SE
AL
TO THE DECK
REMOVE PAVEMENT
SAWCUT AND
TWO LIFTS
PAVEMENT IN
INSTALL NEW
DECK MEMBRANE
INSTALL BRIDGE
DECK MEMBRANE
INSTALL BRIDGE
APPLY CRACK SEAL
TO THE DECK
REMOVE PAVEMENT
SAWCUT AND
TWO LIFTS
PAVEMENT IN
INSTALL NEW
DECK MEMBRANE
INSTALL BRIDGE
SURFACE OF THE PAVEMENT
•" BELOW THE TOP
ROLL MEMBRANE SAWCUT PAVEMENT
EXISTING PAVEMENT
PREVIOUS STAGE
NEW PAVEMENT FROM
OR PIER
ABUTMENT
AS
-
SECTION - MEMBRANE/CRACK SEAL AT
-
SECTION - MEMBRANE/CRACK SEALAR
-
SECTION - MEMBRANE/CRACK SEALN.T.S.N.T.S. N.T.S.
N.T.S.
PAVEMENT
FULL DEPTH OF
APPLY CRACK SEAL
AR
-
AR
-
S-9
AC
PLAN - PAVEMENT SAWCUT, MEMBRANE & CRACK SEAL STAGED CONSTRUCTION
AS
-
AT
-
AS
-
PAVING (TYP.)
DECK AFTER FINAL MILLING AND
ALONG FULL LENGTH OF BRIDGE
APPLY CRACK SEAL AT CURB LINE,
THE INSTALLATION OF THE CRACK SEAL.
PLAN. THE PURPOSE OF THE DETAILS IS TO SHOW
DETAILS SHOWN ARE ONLY A SCHEMATIC STAGING
NOTE:
CR
AC
K
SE
AL S
AW-C
UT P
AY
LI
MITS
LIMITS.
CONSTRUCTION PAY
CRACK SEAL STAGE
(E) APJ OR HEADER (E) APJ OR HEADER
CR
AC
K
SE
AL S
AW-C
UT P
AY
LI
MITS
APJ/PREFORMED JOINT04.19
* Discipline subset includes the General subset and all other discipline subsets. The 02-Revisions does not need a checklist attached. The standard subsets already have a checklist attached to the index sheets.
– For Internal CTDOT Use Only Discipline Subset Submittal Checklist
The following check list shall be checked and attached to each discipline subset *
prior to being digitally signed.
Check Task Section in DPD
Manual
1. Attach this checklist to the discipline subset. Section 3.1
2. Ensure the plans conform to Section 1.4, step 1 of the Digital Project Development Manual.
Section 1.4
3. Complete the following tasks using Bluebeam on
the discipline subset?
a. Apply Page Labels Section 1.6.2
b. Apply Sheet Numbers Section 1.6.2
c. Apply Watermark Section 2.4
d. Flatten Markups Section 2.4
e. Digital Signature Field Section 2.5.1
4. Type name and telephone number below. 5. Upload, if not in Projectwise already, the
discipline subset into the 100_Contract_Plans folder in Projectwise and attribute the document
correctly?
Section 3.2.4
a. Discipline = CT
b. Main Category = CON
c. Sub Category = FDP, DCD, DCD2,
ADP, ACD, DCO where applicable d. Label = subset number and name.
Example of highways subset would be 03-Highways.
The label for a subset shall be the
same for both FDP and DCD submittals.
Addendum submittals shall match FDP submittals with the addition of “_A#”.
Change Order Submittals shall match FDP submittals with the addition of “_C#”. e. Description field is filled in with
a description of the subset. f. The applicable bridge no.(s) or signal
intersection(s) were selected that is/are associated with this subset.
6. Notify Principal Engineer/Engineer of Record so they can apply their Digital Signature
7. Apply the QA/QC stamp after the discipline subset has been digitally signed.
Section 3.1
I have performed and checked that all the tasks above were performed correctly.
Submitted By (Type in Name) Phone Number (Type in Phone Number)