10
- - - - - - - - - - - - - - - - - - - - - - - - 135-301 STAMFORD 3 / 28 / 2016 P :\ P r o j ec t s \ Conn Do t\ 36938292 \ 500 CADD- GI S- Gr a ph i c s \ 510 CADD\ 510 . 04 St r u c _ Br i dg e \ MSt a _ Con t r ac t _ Sh ee t _ F il e s \ SB_ MSH_0135_0301_ T SH- V1 - S08 . dgn INDEX OF DRAWINGS DESIGNED BY: FINAL PLANS FOR REVIEW DESIGNER/DRAFTER: CHECKED BY: PROJECT TITLE: TOWN: DRAWING TITLE: PROJECT NO. DRAWING NO. SHEET NO. Filename: SHEET NO. REVISION DESCRIPTION DATE REV. DEPARTMENT OF TRANSPORTATION STATE OF CONNECTICUT OF WORK WHICH WILL BE REQUIRED. THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND IS SHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED 3 / 28 / 2016 BLOCK: SIGNATURE/ ...\SB_MSH_0135_0301_TSH-V1-S08.dgn Border Version: 11/14/08 P l o tt e d D a t e : C O N N E C T I C U T D E P A R T M E N T O F T R A N S P O R T A T I O N INDEX OF DRAWINGS DRAWING NUMBER DRAWING TITLE DRAWING NUMBER DRAWING TITLE IND-00 01.08.000 RETAINING WALL 107 RETAINING WALL 107 / LAYOUT PLAN RETAINING WALL 107 / PLAN AND ELEVATION RW-01 RW-02 RW-03 RW-04 RETAINING WALL 107 / WALL DETAILS - 1 RETAINING WALL 107 / WALL DETAILS - 2 RW-05 RETAINING WALL 107 / WALL DETAILS - 3 RW-06 RW-07 RW-08 RETAINING WALL 107 / PILE LAYOUT PLAN RETAINING WALL 107 / CONSTRUCTION SEQUENCE RETAINING WALL 107 / FENCE DETAILS 08 - RETAINING WALL 107 ROCKY HILL, CT 06067 500 ENTERPRISE DRIVE AECOM RETAINING WALL 107 / WALL DETAILS - 4 RW-09 REPLACEMENT OF MNRR BRIDGE K. BARKER J. IVES OVER ATLANTIC STREET PHASE 2

08 - RETAINING WALL 107 INDEX OF DRAWINGS atlantic street phase 2. rw o p e n 115 kv overhead s t o r a g e o p e n s t o r a g e conc conc conc o p e n s t o r a g e tower rws rw

  • Upload
    lykhanh

  • View
    212

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 08 - RETAINING WALL 107 INDEX OF DRAWINGS atlantic street phase 2. rw o p e n 115 kv overhead s t o r a g e o p e n s t o r a g e conc conc conc o p e n s t o r a g e tower rws rw

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 135-301

STAMFORD

3/28/2016

P:\Proje

cts\Conn

Dot\

36938292\500

CA

DD-GIS-Graphics\510

CA

DD\510.0

4 Str

uc_

Brid

ge\

MSta

_Contract_

Sheet_

Files\S

B_

MS

H_0135_0301_

TS

H-V1-S08.d

gn

INDEX OF DRAWINGS

DESIGNED BY:

FINAL PLANS FOR REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

3/28/2016

BLOCK:

SIGNATURE/

...\SB_MSH_0135_0301_TSH-V1-S08.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

INDEX OF DRAWINGS

DRAWING NUMBER DRAWING TITLE DRAWING NUMBER DRAWING TITLE

IND-00

01.08.000RETAINING WALL 107

RETAINING WALL 107 / LAYOUT PLAN

RETAINING WALL 107 / PLAN AND ELEVATIONRW-01

RW-02

RW-03

RW-04 RETAINING WALL 107 / WALL DETAILS - 1

RETAINING WALL 107 / WALL DETAILS - 2RW-05

RETAINING WALL 107 / WALL DETAILS - 3RW-06

RW-07

RW-08

RETAINING WALL 107 / PILE LAYOUT PLAN

RETAINING WALL 107 / CONSTRUCTION SEQUENCE

RETAINING WALL 107 / FENCE DETAILS

08 - RETAINING WALL 107

ROCKY HILL, CT 06067

500 ENTERPRISE DRIVE

AECOM

RETAINING WALL 107 / WALL DETAILS - 4

RW-09

REPLACEMENT OF MNRR BRIDGEK. BARKER

J. IVES

OVER ATLANTIC STREET

PHASE 2

Page 2: 08 - RETAINING WALL 107 INDEX OF DRAWINGS atlantic street phase 2. rw o p e n 115 kv overhead s t o r a g e o p e n s t o r a g e conc conc conc o p e n s t o r a g e tower rws rw

RW

OPEN STORAGE

OPE

N ST

OR

AGE

CONC

CONC

CONC

OPE

N ST

OR

AGE

TOWER

RWRWRWS

SWITCH B

OX

H

Capped Abandoned

12"PVC

10"Clay

12"PVC

Gate

GG

Water

Meter

SAN.TP

G.G.

UG CONC F

TG

301+00 302+00

30

14

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - 135-301

STAMFORD

RETAINING WALL 107PLAN AND ELEVATION

CO

NN

EC

TIC

UT

CO

OR

DIN

AT

E

GRID

PLANSCALE: 1" = 10’-0"

SCALE: 1" = 10’-0"

} MANHATTAN STREET

RW-01

3/28/2016

P:\Proje

cts\Conn

Dot\

36938292\500

CA

DD-GIS-Graphics\510

CA

DD\510.0

4 Str

uc_

Brid

ge\

MSta

_Contract_

Sheet_

Files\S

B_

MS

H_

Br08012

R_0135_0301_

W107-1.d

gn

FINAL PLANS FOR REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

3/28/2016

BLOCK:

SIGNATURE/

...\SB_MSH_Br08012R_0135_0301_W107-1.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

01.08.001

DEVELOPED ELEVATION

ABUTMENT 2

-

PROPOSED GUTTER LINE

EL. 31.2

TOP OF WALL

EL. 6.7

C-I-P FACE

BOTTOM OF

EL. 7.6

C-I-P FACE

BOTTOM OF

EL. 9.3

C-I-P FACE

BOTTOM OF

EL. 9.8

C-I-P FACE

BOTTOM OF

GRADE

EXISTING

GRADE

PROPOSED

ROCK SOCKET (TYP.)

W.P. #1

BEGIN WALL 107

W.P. #5

END WALL 107

TOP OF BEDROCK

FOUNDATION (TO REMAIN)

ABANDONED N.U. TOWER

WALL 107

FRONT FACE OF

U-1

TP-5

B-2 (OW)

SB-8

TOWER 1229

N.U. TRANSMISSION

(TO REMAIN)

INSTALLED UNDER PROJECT 135-326

UNDERGROUND UTILITY PIPES

TO BE RELOCATED UNDER PROJECT 135-326

EXISTING CATENARY STRUCTURE 370X

EL. 8.6

C-I-P FACE

BOTTOM OF

LOCATION

135-362, FIELD VERIFY

UNDER CONTRACT

{ DUCT BANK INSTALLED

STA. 300+53.37

BEGIN WALL 107

STA. 301+90.22

END WALL 107

29.0

EL. EL. 29.5

ANGLE POINT

27.8

EL.

30.3

EL.

29.9

EL.

EL. 27.5

ANGLE POINT

LIMIT OF CAST-IN-PLACE CONCRETE FACE

LIMIT OF SOLDIER PILE AND

ANGLE POINT

30.8

EL.

JOINT SPACING

21.1

EL.

15.0

EL.

INSTALLED IN THIS PROJECT

THIS PROJECT

LAGGING INSTALLED IN

LIMIT OF CAST-IN-PLACE CONCRETE FACE INSTALLED UNDER PROJECT 135-326

LIMIT OF SOLDIER PILE AND LAGGING INSTALLED UNDER PROJECT 135-326

(TO REMAIN)

EXISTING RETAINING WALL

(SEE NOTE 2)

SOLDIER PILE

FENCE (BRIDGE)

6’ CHAIN LINK

FENCE (BRIDGE)

EXISTING 6’ CHAIN LINK

PILE (TYP.)

SOLDIER

EXISTING(MEASURED ALONG { FENCE)

(BRIDGE) POST SPACING

6’ CHAIN LINK FENCE 2 EQ SPA 9 SPA @ 4’-6�"(-) = 40’-9�"

@4’4�"

173’-2�"

29’-9�"27’-5�" 22’-6" 22’-6" 30’-0" 26’-�" 14’-11"

UNDERDRAIN

6" STRUCTURE

(SEE NOTE 4)

OUTLET FOR UNDERDRAIN

REMOVE TEMPORARY 6"

FEEDER LINES

LINES & RAILROAD

TRANSMISSION

115 kV OVERHEAD

CONCRETE NOTES

GENERAL NOTES

NOTES

UNDERDRAIN

STRUCTURE

WALE (TYP.)

DOUBLE CHANNEL

135-326 (TYP.)

UNDER CONTRACT

WEEPHOLE INSTALLED

SHOWN IN ELEVATION

EXISTING CORNER PILE NOT

30

CONTRACT 135-326

REMOVED UNDER

EXISTING RETAINING WALL

FENCE (BRIDGE)

6’ CHAIN LINK

UNDERDRAIN

6" OUTLET FOR

INSTALL JUMP SPANS

WALL REMOVED TO

EXISTING RETAINING

K. BARKER

J. IVES

FOUNDATIONS)

(PROVISIONS FOR FUTURE NU TOWER

N 579,144.19, E 782,440.17

N 579,171.89, E 782,438.74 AND

TO CLEAR 12’ DIA. AREAS CENTERED ON

SPLAY GROUND ANCHORS AS REQUIRED

135-326 (TYP.)

INSTALLED UNDER CONTRACT

UTILITY VAULT & DUCT BANK

PLANS, WILL NOT BE PERMITTED WITHOUT THE PRIOR APPROVAL OF THE ENGINEER.

CONSTRUCTION JOINTS: CONSTRUCTION JOINTS, OTHER THAN THOSE SHOWN ON THE

REINFORCEMENT: ALL REINFORCEMENT SHALL BE ASTM A615 GRADE 60.

DIMENSIONED OTHERWISE.

CONCRETE COVER: ALL REINFORCEMENT SHALL HAVE TWO INCHES COVER UNLESS

DIMENSIONED OTHERWISE.

EXPOSED EDGES: EXPOSED EDGES OF CONCRETE SHALL BE BEVELED 1" X 1" UNLESS

JOINT SEAL: SEE SPECIAL PROVISIONS.

"DRILLED SHAFT (2.0’ DIAMETER)."

CEMENT CONCRETE FOR DRILLED SHAFTS SHALL BE PAID FOR UNDER THE ITEM

PORTLAND CEMENT CONCRETE FOR DRILLED SHAFTS: THE COST OF PORTLAND

CONCRETE USED IN THE DRILLED SHAFTS.

EXCEPTION OF THE CLASS "F" CONCRETE USED IN THE PRECAST LAGGING AND THE

CLASS "A" CONCRETE: CLASS "A" CONCRETE SHALL BE USED THROUGHOUT WITH THE

FOR UNDER ITEM "6" OUTLET FOR UNDERDRAIN".

REMOVE TEMPORARY OUTLET FOR STRUCTURE UNDERDRAIN. WORK TO BE PAID 4.

ALL JOINTS ARE CONTRACTION JOINTS UNLESS OTHERWISE NOTED.3.

SEE "RETAINING WALL 107 PILE LAYOUT PLAN" FOR DETAILED LAYOUT.2.

DETAILS FOR REFERENCE LINE.

ALL DIMENSIONS ARE MEASURED ALONG THE FRONT FACE OF WALL. SEE WALL 1.

REPLACEMENT OF MNRR BRIDGE

OVER ATLANTIC STREET

PHASE 2

BUILDING SHALL BE 90 DECIBELS ON THE "A" WEIGHTED SCALE.

MAXIMUM ALLOWABLE LEVEL OF NOISE AT THE NEAREST RESIDENCE OR OCCUPIED

LEVELS SHALL BE SUBJECT TO THE CONTINUING APPROVAL OF THE ENGINEER. THE

DEFINED HEREIN. ALL METHODS AND DEVICES EMPLOYED TO MINIMIZE NOISE

UNITS SHALL BE MUFFLED SO AS TO REDUCE NOISE TO AN ACCEPTABLE LEVEL AS

NOT LIMITED TO EQUIPMENT USED FOR DRILLING, EXCAVATING AND HAULING. ALL

MINIMIZE NOISE POLLUTION CAUSED BY CONSTRUCTION EQUIPMENT, INCLUDING BUT

NOISE POLLUTION: THE CONTRACTOR SHALL EMPLOY ALL POSSIBLE METHODS TO

DECIMAL PLACES, THE OMITTED DIGITS SHALL BE ASSUMED TO BE ZEROS.

DIMENSIONS: WHEN DECIMAL DIMENSIONS ARE GIVEN TO LESS THAN THREE

BORING LOGS: FOR BORING LOGS, SEE SUBSET 9.

LIVE LOAD: COOPER E-80

REQUIREMENTS OF "SECTION 6.01 CONCRETE FOR STRUCTURES."

CONCRETE IN THE CONSTRUCTED COMPONENTS SHALL CONFORM TO THE

COMPONENTS IS NOTED ABOVE. THE MINIMUM COMPRESSIVE STRENGTH OF THE

THE SPECIFIED CONCRETE STRENGTH USED IN DESIGN, f’c, OF THE CONCRETE

BASED ON Fy = 50,000 PSIAASHTO M270, GRADE 50

STRUCTURAL STEEL AND PILES:

BASED ON fy = 60,000 PSIASTM A615 GRADE 60

REINFORCEMENT:

BASED ON f’c = 3000 PSIFOR DRILLED SHAFTS

PORTLAND CEMENT CONCRETE

BASED ON f’c = 4000 PSICLASS "F" CONCRETE

BASED ON f’c = 3000 PSICLASS "A" CONCRETE

CONCRETE:

ENGINEERING AND SHALL BE BASED ON THE FOLLOWING MATERIAL PROPERTIES:

ALLOWABLE STRESSES SHALL CONFORM TO THE AREMA MANUAL FOR RAILWAY

ALLOWABLE DESIGN STRESSES:

BRIDGE DESIGN MANUAL (2003).

BRIDGES (2002) AND BY THE CONNECTICUT DEPARTMENT OF TRANSPORTATION

SUPPLEMENTED BY THE AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY

WAY ASSOCIATION (AREMA) MANUAL FOR RAILWAY ENGINEERING (2014), AS

DESIGN SPECIFICATIONS: AMERICAN RAILWAY ENGINEERING AND MAINTENANCE OF

SUPPLEMENTAL SPECIFICATIONS DATED JULY 2015 AND SPECIAL PROVISIONS.

SPECIFICATIONS: CONNECTICUT DEPARTMENT OF TRANSPORTATION FORM 816 (2004),

Page 3: 08 - RETAINING WALL 107 INDEX OF DRAWINGS atlantic street phase 2. rw o p e n 115 kv overhead s t o r a g e o p e n s t o r a g e conc conc conc o p e n s t o r a g e tower rws rw

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 135-301

STAMFORD

RETAINING WALL 107

CO

NN

EC

TIC

UT

CO

OR

DIN

AT

E

GRID

RW-02

3/28/2016

P:\Proje

cts\Conn

Dot\

36938292\500

CA

DD-GIS-Graphics\510

CA

DD\510.0

4 Str

uc_

Brid

ge\

MSta

_Contract_

Sheet_

Files\S

B_

MS

H_

Br08012

R_0135_0301_

W107-2.d

gn

LAYOUT PLAN

NOTES

SCALE: 1" = 20’-0"

LAYOUT PLAN

301+00

PROFILE

} MANHATTAN STREET

W.P. #1

BEGIN WALL 107

FINAL PLANS FOR REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

3/28/2016

BLOCK:

SIGNATURE/

...\SB_MSH_Br08012R_0135_0301_W107-2.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

VERTICAL SCALE: 1" = 2’

HORIZONTAL SCALE: 1" = 20’

01.08.002

W.P. #5

WALL 107

W.P. #4

WALL 107

} ATLANTIC STREET SB

ABUTMENT 2

S26°1’23.2

3"E

S75°51’44.96"E

N63

°58’15.95"E

S26°1’44.0

5"E

} ATLANTIC STREET NB

W.P. #6

END WALL 107

BRIDGE PIER

2. SEE ROADWAY PLANS FOR BASELINE GEOMETRY.

1. ALL WALL GEOMETRY MEASURED ALONG FRONT FACE OF WALL. SEE WALL DETAILS.

W.P. #2

WALL 107

FRONT FACE OF WALL 107

302+00

W.P. #3

WALL 107

CONTRACT 135-326

CONSTRUCTED IN

THIS CONTRACT

CONSTRUCTED IN

K. BARKER

J. IVES

REPLACEMENT OF MNRR BRIDGE

OVER ATLANTIC STREET

PHASE 2

RETAINING WALL NO. 107 QUANTITIES

LF

SF

LF

LF

SF

SF

LB

LF

LF

LF

LF

LS

CWT

LB

SF

CY

SY

CY

EA

EA

EA

EA

CY

CY

DESCRIPTION UNIT QTY

EASTINGNORTHINGWP #

COORDINATESWORKING POINT

782370.15579158.651

782374.52579149.712

782451.40579130.344

782497.50579152.865

782511.84579123.506

782413.30579139.943

CONSTRUCTED IN CONTRACT 135-326

55

310

10

35

TBD

TBD

15,625

60

20

60

80

*

25

14,500

175

16

125

105

180

3

1

4

180

110

6’ CHAIN LINK FENCE (BRIDGE)

GEOCOMPOSITE SHEET DRAIN

6" OUTLET FOR UNDERDRAIN

6’’ STRUCTURE UNDERDRAIN

EARTH RETAINING SYSTEM LEFT IN PLACE

TEMPORARY EARTH RETAINING SYSTEM

FURNISHING STEEL PILES

PERMANENT CASING (2.0’ DIAMETER)

DRILLED SHAFT ROCK EXCAVATION (2.0’ DIAMETER)

DRILLED SHAFT EARTH EXCAVATION (2.0’ DIAMETER)

DRILLED SHAFT (2.0’ DIAMETER)

FURNISHING DRILLED SHAFT DRILLING EQUIPMENT

STRUCTURAL STEEL (LOW ALLOY)

DEFORMED STEEL BARS

�" PREFORMED EXPANSION JOINT FILLER FOR BRIDGES

CLASS "F" CONCRETE

SIMULATED STONE MASONRY

CLASS "A" CONCRETE

WELDED STUDS

PROOF TEST FOR GROUND ANCHOR

PERFORMANCE TEST FOR GROUND ANCHOR

GROUND ANCHOR

PERVIOUS STRUCTURE BACKFILL

STRUCTURE EXCAVATION-EARTH (COMPLETE)

INCLUDES WORK AT BRIDGE 08012R AND WALLS 105, 106 AND 107.

*THE LUMP SUM ITEM "FURNISHING DRILLED SHAFT DRILLING EQUIPMENT"

0

10

20

300+00 301+00 302+00 303+00

PV

C

ST

A.3

00+

25.0

0

EL.=

10.7

6

L.P.

ST

A.3

00+

39.6

8

EL.=

10.6

1

PVI S

TA.3

00+

50.0

0

EL.=

10.2

6

PV

T S

TA.3

00+

75.0

0

EL.=

11.4

6

PV

C

ST

A.3

00+

85.0

0

EL.=

11.9

4

PVI S

TA.3

01+

25.0

0

EL.=

13.8

7

H.P.

ST

A.3

01+

54.6

4

EL.=

13.6

2

PV

T S

TA.3

01+

65.0

0

EL.=

13.5

8

PVI S

TA.3

01+

82.0

0

EL.=

13.4

6

S=-2.00%

S=4.81

%

S=-0.72%

L.V.C.=50.00

S.S.D.=73

K=7

L.V.C.=80.00

S.S.D.=235

K=14

16" G

AS 12"

WA

TE

R

1.3’x 0.9’ T

ELE

2.2’x 0.9’ E

LE

C

TP #501

TP #

505

3.0’x 1.3’ T

ELE

16"x 12" E

LE

CTP #

1

TP #

218"x ??" E

LE

C

18"x 25" E

LE

CTP #

3

18"x 24" E

LE

CTP #

4

Atlantic Street

Sta 107+

25.1

7

Manhattan Street

Sta 300+

00.0

0=

6" CLAY SANITARY

GA

RD

EN

ST

RE

ET

Page 4: 08 - RETAINING WALL 107 INDEX OF DRAWINGS atlantic street phase 2. rw o p e n 115 kv overhead s t o r a g e o p e n s t o r a g e conc conc conc o p e n s t o r a g e tower rws rw

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 135-301

STAMFORDRW-03

3/28/2016

P:\Proje

cts\Conn

Dot\

36938292\500

CA

DD-GIS-Graphics\510

CA

DD\510.0

4 Str

uc_

Brid

ge\

MSta

_Contract_

Sheet_

Files\S

B_

MS

H_

Br08012

R_0135_0301_

W107-3.d

gn

FINAL PLANS FOR REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

3/28/2016

BLOCK:

SIGNATURE/

...\SB_MSH_Br08012R_0135_0301_W107-3.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

01.08.003

K. BARKER

NORTHING EASTING

P1

P2

P3

P4

32’-8

"

51’-3�

"

39’-3�"40’-0"

9’-1

1�

"

8’-6

"

8’-6

"

8’-6

"

2’-2

"

7’-6" 7’-6" 7’-6" 7’-6" 4’-0" 3’-6" 7’-6" 7’-6" 7’-6" 7’-6"

5’-1

1"

2’-3

"

130°8’15" 139°50’1"

270°0’0"

RETAINING WALL 107

CO

NN

EC

TIC

UT

CO

OR

DIN

AT

E

GRID

P1

P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12

P13

P14

P15

P16

P17

P18

P19

P20

P21

P22

P23

P24

P5

P6

P7

P8

P9

P10

P11

P12

WP# NORTHING EASTING

P22

P23

P24

P13

P14

P15

P16

P17

P18

P19

P20

P21

PILE CENTERLINE COORDINATES

579157.91 782373.76

579152.59 782376.36

579151.07 782381.05

579149.24 782388.32

579147.41 782395.59

579145.58 782402.87

579143.74 782410.14

579141.91 782417.41

579140.08 782424.68

579138.25 782431.96

579136.42 782439.23

579134.58 782446.50

579133.64 782451.51

579137.09 782458.57

579140.38 782465.31

579143.89 782472.50

579147.18 782479.23

579150.69 782486.42

579154.20

579156.20 782497.69

579149.64 782502.32

579142.01 782506.05

579134.37 782509.78

579126.73 782513.51

782493.61

4’-6�

"

8’-0"

8’-0"

7’-6"

8’-0"

7’-6"

7’-1

0"

8�"

PILE #

= INSTALLED IN CONTRACT 135-326

CONTRACT

INSTALLED IN THIS

FRONT FACE OF WALL

IN CONTRACT 135-326 (TYP.)

SOLDIER PILE INSTALLED

IN CONTRACT 135-326

FRONT FACE OF WALL INSTALLED

IN THIS CONTRACT (TYP.)

SOLDIER PILE INSTALLED

J. IVES

REPLACEMENT OF MNRR BRIDGE

OVER ATLANTIC STREET

PHASE 2PILE LAYOUT PLAN

Page 5: 08 - RETAINING WALL 107 INDEX OF DRAWINGS atlantic street phase 2. rw o p e n 115 kv overhead s t o r a g e o p e n s t o r a g e conc conc conc o p e n s t o r a g e tower rws rw

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 135-301

STAMFORD

RETAINING WALL 107

CONCRETE FACE

CAST-IN-PLACE

RW-04

3/28/2016

P:\Proje

cts\Conn

Dot\

36938292\500

CA

DD-GIS-Graphics\510

CA

DD\510.0

4 Str

uc_

Brid

ge\

MSta

_Contract_

Sheet_

Files\S

B_

MS

H_

Br08012

R_0135_0301_

W107-4.d

gn

FINAL PLANS FOR REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

3/28/2016

BLOCK:

SIGNATURE/

...\SB_MSH_Br08012R_0135_0301_W107-4.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

01.08.004

DETAIL

SEE TOP OF WALL

SCALE: �" = 1’-0"

8"

1�"

�"

N.T.S.

5’-0" MIN.

�"

WALE DETAIL AT SOLDIER PILE

6"

8’-0"

MIN.

15’-0" MIN. UNBONDED ANCHOR LENGTH

2"

COVER

3"

CO

VE

R

GRADE

FINISHED

GRADE

EXISTING

4’-0"

MIN.

(TYP.)

#5@12"

SEE WALE DETAIL

DOUBLE CHANNEL WALE

LAGGING DETAIL

9"

SOLDIER

PILE

WALL 107 TYPICAL SECTION

20’-0" MIN. BONDED

ANCHOR LENGTH

N.T.S.

2-0"

MIN.

1�" COVER (TYP.)

2�"

MIN.

3" WIDE

BEVELED ANCHOR PLATE

(TYP.)

(TYP.)

3�" X �" STIFFENER PLATE (TYP.)

SOLDIER PILE (HP14 X 89)

WALL DETAILS - 1

@ 3’-0" MAX.

TIE PLATES SPA.

MC10x41.1 (TYP.)

(TYP.)

N.T.S.

"6" STRUCTURE UNDERDRAIN.

TO BE PAID FOR UNDER THE ITEM

FILTER STONE AND 6" DIA. PVC PIPE

THE COST OF THE FILTER FABRIC,

NOTE:

6"

1’-9"

1’-9"

LAP

8"

STRUCTURE UNDERDRAIN DETAIL

ANCHOR ANGLE

15°

OF ROAD

EXISTING TOP

OF ROAD

PROPOSED TOP

SEE DRILLED SHAFT DETAIL

10’-0"

MA

X.

2" COVER

2’-0"

EQ

UA

LE

QU

AL

{ LAGGING

N.T.S.

LAGGING ELEVATION

2-0"

MIN.

(TYP.)

1�" COVER

HORIZONTAL

TOP ONLY

PERFORATED AT

6" DIA. PVC PIPE

FILTER STONE

SURVIVABILITY) AROUND

SEPARATION (MEDIUM

FILTER FABRIC- GEOTEXTILE -

GEOCOMPOSITE SHEET DRAIN

FRONT FACE ONLY

�" X �" CHAMFER

#8

@6"

MA

X

FR

ON

T F

AC

E

#5

@12"

MA

X

BA

CK

FA

CE

SIMULATED STONE MASONRY

AND ELEVATION FOR LOCATION

STRUCTURE UNDERDRAIN. SEE PLAN

ANCHOR

{ GROUND

#5 @ 12"

#5

@12" B

AC

K

FA

CE

#8

@6" F

RO

NT F

AC

E

BEFORE TENSIONING

ABOVE GROUND ANCHOR

BACKFILL TO 2’-0"

ANCHOR

GROUND

@ 12". SEE DETAIL (TYP.)

TWO ROWS OF WELDED STUDS

SEE LAGGING DETAIL

LAGGING (TYP.)

WELDED STUD DETAILN.T.S.

LAGGING (TYP.)

GROUND ANCHOR NOTES

SOLDIER PILE AND STRUCTURAL STEEL NOTES

1" BEVEL (TYP.)

TOP OF WALL DETAIL

1’-9"

3’-0"

1’-11"

DETAIL

SEE FORM LINER

1"

2"

#5@12"

(TYP.)

2" COVER

SCALE: �" = 1’-0"

OF WALL

FRONT FACE

JOINT

OPTIONAL CONSTRUCTION

1’-8"

2’-0"

8" 8"

16-#5 AS SHOWN

FENCE (BRIDGE)

6’ CHAIN LINK

2’-4"

N.T.S.

GROUND ANCHOR

HEX NUT

HEAVY DUTY

9" X 9" X 1"

BEARING PLATE

MC10x41.1 (TYP.)

3�" X �" STIFFENER PLATE

(TYP.)

(TYP.)�

WALE DETAIL AT GROUND ANCHOR

CAST INTO LAGGING

4" PVC PIPE COLLAR

LAGGING (TYP.)

K. BARKER

J. IVES

(TOP PANEL ONLY)

PARALLEL TO TOP OF WALL

#5 @ 12"

1. CLASS I CORROSION PROTECTION SHALL BE PROVIDED FOR ALL GROUND ANCHORS. WORKING DRAWINGS

OF THE FINAL DETAILS OF THE CLASS I CORROSION PROTECTION SHALL BE SUMITTED TO THE ENGINEER

FOR APPROVAL. SEE "RETAINING WALL 107 / WALL DETAILS - 4" FOR SUGGESTED DETAILS.

2. ANCHOR DETAILS (I.E. BAR DIAMETER, STRESSING LENGTH, BOND LENGTH, HOLE DIAMETER, ETC.) SHALL BE

DESIGNED BY THE CONTRACTOR AND SUBMITTED TO THE ENGINEER FOR APPROVAL. THE MINIMUM

BOND LENGTH SHALL BE 20 FEET. ALL COSTS SHALL BE INCLUDED IN THE ITEM "GROUND ANCHOR".

SEE SPECIAL PROVISION.

3. GROUND ANCHORS SHALL BE DESIGNED FOR A SERVICE LOAD OF 145 KIPS PER ANCHOR.

4. A "PERFORMANCE TEST FOR GROUND ANCHOR" SHALL BE PERFORMED ON THE FIRST THREE PRODUCTION

ANCHORS AND ON A MINIMUM OF TEN PERCENT OF THE REMAINING PRODUCTION ANCHORS

THEREAFTER, AS DIRECTED BY THE ENGINEER. A "PROOF TEST FOR GROUND ANCHOR" SHALL BE

PERFORMED ON ALL ANCHORS THAT ARE NOT PERFORMANCE TESTED.

REPLACEMENT OF MNRR BRIDGE

COLLAR

4" PVC PIPE

APPLICABLE

LEFT IN PLACE, IF

RETAINING SYSTEM

WALL OR EARTH

EXISTING RETAINING

COLLAR

8" PVC PIPE

N.T.S.

AT UNDERDRAIN

LAGGING DETAIL

NOTE: SIMILAR TO "LAGGING

DETAIL" EXCEPT AS NOTED

UNDERDRAIN

{ OUTLET FOR

INSTALLED

UNDERDRAIN

OUTLET FOR

SPACE ONCE

GROUT ANNULAR

AND #5 BACK (TYP.)

ADDITIONAL #8 FRONT

UNDERDRAIN

6" OUTLET FOR

OVER ATLANTIC STREET

PHASE 2

1. ALL COSTS ASSOCIATED WITH FURNISHING, ERECTING, PLUMBING AND BRACING THE SOLDIER PILES SHALL

BE PAID FOR UNDER THE ITEM "FURNISHING STEEL PILES".

2. DOUBLE-CHANNEL WALES, STIFFENERS, TIE PLATES, BEARING PLATES AND BENT PLATES SHALL BE PAID FOR

UNDER THE ITEM "STRUCTURAL STEEL (LOW ALLOY)".

3. SOLDIER PILES AND ALL STRUCTURAL STEEL ASSOCIATED WITH WALL CONSTRUCTION SHALL CONFORM TO

AASHTO M270, GRADE 50.

4. SOLDIER PILES AND BENT PLATES SHALL BE HOT-DIP GALVANIZED IN ACCORDANCE WITH ASTM A123.

5. REPAIR DAMAGED GALVANIZATION IN FIELD WITH ZINC-RICH PAINT CONFORMING TO TT-P-641, TYPE 1 TO

A DRY THICKNESS OF 3 TO 6 MILS. NO PAYMENT SHALL BE MADE FOR REPAIRING DAMAGED

GALVANIZATION.

Page 6: 08 - RETAINING WALL 107 INDEX OF DRAWINGS atlantic street phase 2. rw o p e n 115 kv overhead s t o r a g e o p e n s t o r a g e conc conc conc o p e n s t o r a g e tower rws rw

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 135-301

STAMFORD

RETAINING WALL 107

RW-05

3/28/2016

P:\Proje

cts\Conn

Dot\

36938292\500

CA

DD-GIS-Graphics\510

CA

DD\510.0

4 Str

uc_

Brid

ge\

MSta

_Contract_

Sheet_

Files\S

B_

MS

H_

Br08012

R_0135_0301_

W107-5.d

gn

FINAL PLANS FOR REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

3/28/2016

BLOCK:

SIGNATURE/

...\SB_MSH_Br08012R_0135_0301_W107-5.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

01.08.005WALL DETAILS - 2

{ JT.

1’-0" (T

YP.)

PILE SPACING (TYP.)

SEE ELEVATIONSEE ELEVATION

TOP OF DRILLED SHAFT

(TYP.)

12" MAX. GRADE

PROPOSED

WALE (TYP.)

DOUBLE CHANNEL

CONCRETE FACE

BOTTOM OF

(TYP.)

SOLDIER PILE

SOLDIER PILE SEE LEVELING PAD

DETAIL

2’-0"

SEE ELEVATION

TOP OF DRILLED SHAFT

TOP VIEW

DRILLED SHAFT

LEVELING PAD

SOLDIER PILE

N.T.S.

LEVELING PAD DETAIL

SOLDIER PILE

PAD

CONCRETE LEVELING

SHAFT

TOP OF DRILLED

ST

EP

CONCRETE LEVELING

PAD

5’-0"

N.T.S.

BEARING SURFACE DETAIL

SOLDIER PILE

5" MIN.

TOP VIEW

N.T.S.

BLOCKING DETAIL

SIDE VIEW

(EXPOSED FACE)

SOLDIER PILE

2’-0" I.D.

STEEL CASING

BEDROCK

TOP OF

N.T.S.

DRILLED SHAFT

23’-0" E

MB

ED

ME

NT

SEE LEVELING PAD

DETAIL

2’-0" I.D.

STEEL CASING

DETAIL

SEE LEVELING PAD

SCALE: �" = 1’-0"

(EXPOSED FACE)

SOLDIER PILE

AND WEDGES

HARD WOOD BLOCKING

TOP OF LAGGING { JT.

<

23’-0"

DRILLED SHAFT DETAIL

{ JT.

N.T.S.

SECTION A

-

-

A

AND WEDGES (TYP.)

HARD WOOD BLOCKING

0" MIN.

DRILLED SHAFT

WITH ROCK SOCKET

BEDROCK

TOP OF COMPETENT

4’-0"

(MIN.)

DRAIN (TYP.)

GEOCOMPOSITE SHEET

ELEVATION

ANCHOR

{ GROUND

LAGGING (TYP.)

(TYP.)

WELDED STUD

NOT SHOWN FOR CLARITY)

TOP OF WALL (CHAIN LINK FENCE

5’-0" R

OC

K

SO

CK

ET

(EXPOSED FACE)

LAGGING

LAGGING

LAGGING

K. BARKER

J. IVES

DRILLED SHAFTS

CONCRETE FOR

PORTLAND CEMENT

DRILLED SHAFTS

CONCRETE FOR

PORTLAND CEMENT

JOINT FILLER FOR BRIDGES

�" PREFORMED EXPANSION

JOINT FILLER FOR BRIDGES

�" PREFORMED EXPANSION

JOINT FILLER FOR BRIDGES

�" PREFORMED EXPANSION

REPLACEMENT OF MNRR BRIDGE

OVER ATLANTIC STREET

PHASE 2

2’-6"

Page 7: 08 - RETAINING WALL 107 INDEX OF DRAWINGS atlantic street phase 2. rw o p e n 115 kv overhead s t o r a g e o p e n s t o r a g e conc conc conc o p e n s t o r a g e tower rws rw

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 135-301

STAMFORDRW-06

3/28/2016

P:\Proje

cts\Conn

Dot\

36938292\500

CA

DD-GIS-Graphics\510

CA

DD\510.0

4 Str

uc_

Brid

ge\

MSta

_Contract_

Sheet_

Files\S

B_

MS

H_

Br08012

R_0135_0301_

W107-6.d

gn

01.08.006

ROADWAY

TOP OF EXISTING

ROADWAY

TOP OF PROPOSED

1.5

1

TOP OF DRILLED SHAFT

BACKFILL"

PAY LIMITS FOR "PERVIOUS STRUCTURE

FINAL PLANS FOR REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

3/28/2016

BLOCK:

SIGNATURE/

...\SB_MSH_Br08012R_0135_0301_W107-6.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

FINISHED GRADE

SOLDIER PILE

FRONT FACE OF

2’-0"2’-0"

OBTRUDES WITHIN THIS AREA

UNDISTURBED MATERIAL

SLOPE LINE EXCEPT WHERE

RETAINING WALL 107

ELEVATION

STONE WIDTH VARIES LC MORTAR JOINT

ST

ON

E

HEIG

HT

(T

YP.)

2’-9" TO 9’-0"

3" MAX. RELIEF

1�" AVERAGE RELIEF

(TYP.)

(TYP.)

STEEL REINFORCEMENT

JOINT

MOTAR

2" MIN. COVER

(TYP.)

CONCRETE

STRUCTURAL

LIMITS OF

FORM LINER DETAILSCALE: N.T.S.

(COMPLETE)" (TYP.)

EXCAVATION - EARTH

PAY LIMITS FOR "STRUCTURE

SOLDIER PILE

BACK FACE OF

ARCHITECTURAL NOTES

WALL DETAILS - 3

N.T.S.

DRILLED SHAFT.

REMOVAL LIMITED TO 1’-0" BELOW TOP OF

DEPTH OF EXISTING FOUNDATION UNKNOWN.

PAY LIMITS FOR "REMOVAL OF EXISTING MASONRY."

PAY LIMIT DETAIL

N.T.S.

SECTION A

-

A

-

REPLACEMENT OF MNRR BRIDGE

N.T.S.

0" CONTRACTION

�" EXPANSION JOINT

JOINT DETAIL

1" BEVELFACE

FRONT

N.T.S.

PVC WATERSTOP DETAIL

9"

�"

�"

SOLDIER PILE

5" MIN. BEARING (TYP.)

K. BARKER

J. IVES

(TYP.)

LAGGING

BENT PLATE 1’-0"x �"

ANGLE POINT DETAILSSCALE: N.T.S.

�"

TYP.

1’-9"

1. REFER TO OTHER STRUCTURE DETAILS FOR REINFORCING, DIMENSIONS. ETC.

2. WHERE SHOWN ON THE PLANS, THE CONTRACTOR SHALL UTILIZE CONCRETE FORM

LINERS TO SIMULATE STONE MASONRY CONSTRUCTION. THE COST OF THIS WORK

SHALL BE INCLUDED IN THE UNIT PRICE FOR "SIMULATED STONE MASONRY".

3. CONCRETE FORM LINERS SHALL CONFORM TO THE REQUIREMENTS OF "SIMULATED

STONE MASONRY".

4. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL LAYOUT

DRAWINGS OF ALL FORM LINERS SHOWING STONE SIZES, STONE CONFIGURATIONS,

JOINT SPACING, AND ALL DIMENSIONS REQUIRED.

5. IN ADDITION TO THE DETAILS SHOWN ON THESE SHEETS, ALL EXPOSED EDGES

SHALL RECEIVE A 1" x 1" BEVEL UNLESS DIMENSIONED OTHERWISE.

6. THE ARCHITECTURAL LINERS SHOWN ARE BASED ON FORM LINERS

MANUFACTURED BY CUSTOM ROCK FORMLINER. THE STONE PATTERN IS BASED ON

CUSTOM ROCK FORMLINER PATTERN NO. 1502, "ARCH STREET BRIDGE LIMESTONE." START OF WALL DETAILSCALE: N.T.S.

ABUTMENT 2

FRONT FACE OF

WALL 107

FRONT FACE OF RETAINING

#5 @ 12"

TYPICAL REINFORCEMENT

BLOCKING AS REQUIRED

WITH CONCRETE

FILL ANNULAR SPACE

4 ADDITIONAL #5 AS SHOWN

SOLDIER PILE

(TYP.)

WELDED STUD

LAGGING

ABUTMENT 2 AND BLOCKING

STEEL ANGLE ATTACHED TO

"CLASS "A" CONCRETE"

PAID FOR UNDER THE ITEM

PVC WATERSTOP, TO BE

(EXPANSION JOINTS ONLY)

JOINT FILLER FOR BRIDGES

�" PREFORMED EXPANSIONPROPOSED GRADE

TO 2’-0" BELOW

RETAINING SYSTEM

OR TEMPORARY EARTH

RETAINING WALL

REMOVE EXISTING

RETAINING SYSTEM

OR TEMPORARY EARTH

EXISTING RETAINING WALL

FOR BRIDGES

JOINT FILLER

EXPANSION

�" PREFORMED

OVER ATLANTIC STREET

PHASE 2

Page 8: 08 - RETAINING WALL 107 INDEX OF DRAWINGS atlantic street phase 2. rw o p e n 115 kv overhead s t o r a g e o p e n s t o r a g e conc conc conc o p e n s t o r a g e tower rws rw

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 135-301

STAMFORD

RETAINING WALL 107

RW-07

3/28/2016

P:\Proje

cts\Conn

Dot\

36938292\500

CA

DD-GIS-Graphics\510

CA

DD\510.0

4 Str

uc_

Brid

ge\

MSta

_Contract_

Sheet_

Files\S

B_

MS

H_

Br08012

R_0135_0301_

W107-7.d

gn

FINAL PLANS FOR REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

3/28/2016

BLOCK:

SIGNATURE/

...\SB_MSH_Br08012R_0135_0301_W107-7.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

REPLACEMENT OF MNRR BRIDGEK. BARKER

J. IVES

STRAND SHEATH

GREASE FILLED

GROUT TUBE (IF REQUIRED)

STRAND SHEATHS)

FOR NON-EXTRUDED

SHEATH (GROUT FILLED

GROUT

EXTERNAL CENTRALIZER

CORRUGATED ENCAPSULATION

BARE PRESTRESSING STRAND

CENTRALIZER

INTERNAL SPACER/

GROUT TUBE (IF REQUIRED)

CENTRALIZER

INTERNAL SPACER/

EXTERNAL CENTRALIZER

ENCAPSULATIONSEAL

NON-EXTRUDED STRAND SHEATHS)

SHEATH (GROUT FILLED FOR

GREASE FILLED STRAND SHEATH

BOND BREAKER

GROUT FILLED SHEATH

GROUT

ANCHOR GROUT

BAR (TYP.)

BARE PRESTRESSING

ENCAPSULATION

CORRUGATED

TENDON BOND LENGTH

UNBONDED LENGTH

N.T.S. N.T.S.

TENDON BOND LENGTH

UNBONDED LENGTH

BOND BREAKER

GROUT FILLED SHEATH

SEALCENTRALIZER

ENCAPSULATION

N.T.S.

SECTION A

-

-

A

-

B

-

C

-

D

N.T.S.

SECTION B

- N.T.S.

SECTION C

- N.T.S.

SECTION D

-

N.T.S.

GROUND ANCHOR CLASS I PROTECTION DETAILS

STRAND TENDON BAR TENDON

WALL DETAILS - 4 01.08.007

OVER ATLANTIC STREET

PHASE 2

Page 9: 08 - RETAINING WALL 107 INDEX OF DRAWINGS atlantic street phase 2. rw o p e n 115 kv overhead s t o r a g e o p e n s t o r a g e conc conc conc o p e n s t o r a g e tower rws rw

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 135-301

STAMFORD

RETAINING WALL 107

RW-08

3/28/2016

P:\Proje

cts\Conn

Dot\

36938292\500

CA

DD-GIS-Graphics\510

CA

DD\510.0

4 Str

uc_

Brid

ge\

MSta

_Contract_

Sheet_

Files\S

B_

MS

H_

Br08012

R_0135_0301_

W107-8.d

gn

FINAL PLANS FOR REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

3/28/2016

BLOCK:

SIGNATURE/

...\SB_MSH_Br08012R_0135_0301_W107-8.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

01.08.008

CONSTRUCTION SEQUENCE

N.T.S.

STAGE AN.T.S.

STAGE B

N.T.S.

STAGE DN.T.S.

STAGE C

CONSTRUCTION SEQUENCE

EXISTING GRADE

OF DRILLED SHAFT

EXCAVATE TO TOP

INSTALL SOLDIER PILE

EARTH RETAINING SYSTEM

EXISTING RETAINING WALL OR

(IF NECESSARY)

AND ROCK SOCKET

INSTALL DRILLED SHAFT

EARTH RETAINING SYSTEM

EXISTING RETAINING WALL OR

EXISTING GRADE

EARTH RETAINING SYSTEM

EXISTING RETAINING WALL OR

TIE BACK ELEVATION

BACKFILL TO 2’-0" ABOVE

INSTALL LAGGING

INSTALL STRUCTURE UNDERDRAIN

INSTALL LEVELING PAD

OF LAGGING

BACKFILL TO TOP

FACE

INSTALL CONCRETE

PROPOSED GRADE

PROPOSED GRADE

OF WALL

INSTALL TOPPROPOSED GRADE

BACKFILL TO

GRADE

BELOW PROPOSED

REMOVE TO 2’-0"

REPLACEMENT OF MNRR BRIDGEK. BARKER

J. IVES

ANCHOR

AND GROUND

INSTALL WALE

BACKFILL TO PROPOSED GRADE.2.

INSTALL TOP OF WALL.1.

STAGE D

INSTALL CONCRETE FACE TO CONSTRUCTION JOINT AT TOP OF LAGGING.2.

BACKFILL TO TOP OF LAGGING.1.

STAGE C

TEST GROUND ANCHORS AS REQUIRED.4.

INSTALL WALE AND GROUND ANCHORS3.

BACKFILL TO 2’-0" ABOVE GROUND ANCHOR ELEVATION.2.

INSTALL LEVELING PAD, LAGGING AND STRUCTURE UNDERDRAIN AS SHOWN.1.

STAGE B

FILL DRILLED SHAFT AND ROCK SOCKET WITH PORTLAND CEMENT CONCRETE.4.

INSTALL SOLDIER PILE IN DRILLED SHAFT AND ROCK SOCKET (IF NECESSARY).3.

CORE DRILLED SHAFT AND ROCK SOCKET (IF NECESSARY).2.

EXCAVATE TO TOP OF DRILLED SHAFT.1.

STAGE A

OVER ATLANTIC STREET

PHASE 2

Page 10: 08 - RETAINING WALL 107 INDEX OF DRAWINGS atlantic street phase 2. rw o p e n 115 kv overhead s t o r a g e o p e n s t o r a g e conc conc conc o p e n s t o r a g e tower rws rw

C POST AND PLATE

C POST AND PLATE

PLAN ELEVATION CAP SCREW

�"

6"

6"

C BOTTOM RAIL

C POST

C POST

6"

CLAMP (TYP)

2 - WAY STANDARD SPLIT

CUP FITTINGS OR EQUIVALENT

2 - WAY CLAMP AND STANDARD

(TYP.)

1" x 1" BEVEL

BOLT (TYP.)

�" STAINLESS STEEL

CLEARANCE

1" MAX.

L

L

L

POSTS FOR DRAINAGE

AT BASE ON SIDE OF ALL

PROVIDE �" DIA. HOLE

PLATE

C POST AND

(TYP)

�" DIA HOLE

SIDE OF ALL POSTS FOR DRAINAGE.

PROVIDE�" DIA. HOLE AT BASE ON

NOTE:

L

L

L

9"

3" 3"1�" 1�"

3"

3"

1�

"1�

"

6"

8�

"

2�

"

BASE PLATE

POST ANCHORAGE DETAILS

PRESET ANCHORAGE SYSTEM

3"

9"

C BASE PLATE

C BASE PLATE

(TYP.)

DOME CAP (TYP.)

AT THE TOP AND BOTTOM

FABRIC SHALL BE KNUCKLED

WOVEN CHAIN - LINK FENCE

(TYP.)

1’-0" O.C.

#9 GA. WIRE TIES (TYP.)

1’-0" O.C.

#6 GA. WIRE TIES

3" (TYP.)

6’-0" (T

YP.)

L

5’-0" MAX.

POST SPACING

L

L

5’-0" MAX.

POST SPACING

AT INTERMEDIATE POSTS (TYP.)

CUP FITTINGS FOR PIPE RAILS

2 - WAY CLAMP AND STANDARD

10"

TRUSS ROD

BOLT AND NUT

BRACE RAIL

BRACE RAIL

LINE POST

WIRE)

TO POST WITH TIE

(SHALL BE ATTACHED

TENSION WIRE

�’’ x 1’’

BANDS

BOLT AND NUT

BOLT AND NUT

BOLT AND NUT

BANDS

DETAIL "A"

DETAIL "B"

"CDETAIL "

"DDETAIL "

TRUSS ROD ATTACHMENT

ATTACHMENT OF BRACE RAILS

TO LINE POSTS (TYPICAL)

LOCATION OF

TENSION WIRE

2"

�’’ x 1’’ BANDS

�’’ DIA. x 1�’’

�’’ DIA. x 1�’’

�’’ DIA. x 1�"

�’’ x 1’’

{ OF TENSION WIRE

1�"

1�

"

�"

�"

TERMINAL POST

TRUSS ROD

FABRIC

BRACE POST

BRACE RAIL

TO ACCOMODATE BRACE RAIL

TERMINAL POST SHALL BE NOTCHED

COVERS BOLT

BRACE RAIL

ATTACHMENT

FOR FABRIC

LOCK LOOPS

ATTACHMENTTRUSS ROD

FABRIC AND BRACE

RAIL ATTACHMENT

SECTION

C

-

"EDETAIL "

3�

"

3�"

2�" DIA. POST

�" BASE PLATE

RAIL

1�" DIA.

TENSION WIRES

COIL SPRING

TIGHTENER

TRUSSTENSION WIRE

COIL SPRING

BAND

BRACE

BRACE RAILCLEAR.

1"

TRUSS ROD

(TYP.)

C 2�" DIA. POST

(TYP.)

WIRE STRUT

�" DIA.

(TYP.)

FERRULE 2�" LONG

THREADED OPEN

�" DIA. 10 NC

CAP SCREW

STAINLESS STEEL

�" ASTM A193,

3" 3"1�" 1�"

9"

1’ APART (TYP)

#6 GA TIE WIRE

SEE DETAIL "B"

SEE DETAIL "C"

SEE DETAIL "D"

7.

6.

5.

4.

3.

2.

1.

TOP OF WALL

BAR

�" x�" STRETCHER

TYPICAL INTERIOR PANEL

TYPICAL END PANEL

CORNER POST

TERMINAL OR

BRACE RAILDETAIL "F"

STRETCHER BAR AND TENSION

WIRE ATTACHMENTS

(TYP.)

1�" DIA. RAIL

12 "

END OF WALL

SEE DETAIL "A"

SEE WALL GENERAL PLANS

LINK FENCE HW-913.01.

FOR ADDITIONAL DETAILS SEE CTDOT STANDARD SHEET, CHAIN

INCLUDED IN THE COST OF EACH RETAINING WALL.

SYSTEM, INCLUDING GROUT PAD AND BASE PLATES, SHALL BE

THE COST OF FURNISHING AND INSTALLING PRESET ANCHORAGE

FIT AND ALIGNMENT.

FABRICATION OF THE PROTECTIVE FENCE TO ENSURE PROPER

ALL MEASUREMENTS SHALL BE FIELD VERIFIED PRIOR TO

SHALL BE FREE OF BURRS AND SHARP EDGES.

EXPOSED SURFACES OF THE ASSEMBLED PROTECTIVE FENCE

CURVATURE.

IN CURVATURE, RAILS SHALL BE FABRICATED TO FOLLOW THE

MAY BE SPRUNG INTO PLACE. FOR STRUCTURES EXCEEDING 3°

FOR STRUCTURES ON CURVATURES OF 3° OR LESS, THE RAILS

GALVANIZED AND PVC-COATED AND WOVEN INTO A 2" MESH.

CHAIN LINK FENCE FABRIC SHALL BE #9 GAGE STEEL WIRE,

POSTS ARE TRULY VERTICAL.

AND ERECTED SO THAT THE RAILS ARE PARALLEL AND THE

ALL POSTS, RAILS AND ANCHORAGES SHALL BE FABRICATED

SCALE: 3" = 1’-0"

SCALE: 3" = 1’-0"

SCALE: 3" = 1’-0"

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

(CHAIN LINK)

PROTECTIVE FENCE

�" NEOPRENE PAD

�" NEOPRENE PAD

C OF POST

�" GROUT PAD AT

L

RAIL TUBE

SLEEVE

SPLICE

ONE BOLT SHALL BE USED.

EXPANSION JOINTS WHERE

SPLICE LOCATIONS EXCEPT

USE TWO BOLTS AT ALL

4�""A"4�"

WHERE "A" = BRIDGE DECK JOINT +�"(1" MIN.)

"A" =�" EXCEPT FOR EXPANSION JOINT LOCATIONS

NOTE:

N.T.S.(TYP.)

BAR AT END PANEL

�" x �" STRETCHER

NUT (TYPICAL)

BOLT, WASHER AND

�" DIA. GALVANIZED

TYPICAL RAIL EXPANSION

NOTES:

0.0747" (#14 GA.)

C OF POST

�" GROUT PAD AT

L

NUT TO BE DAMAGED

THREAD BELOW THE

TIGHT AND THE FIRST

NUTS TO BE FINGER

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 135-301

STAMFORD

RETAINING WALL 107

RW-09

01.08.009FENCE DETAILS

REPLACEMENT OF MNRR BRIDGE

FINAL PLANS FOR REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

3/28/2016

BLOCK:

SIGNATURE/

...\SB_MSH_Br08012R_0135_0301_W107-9.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

OF WALL

FRONT FACE

K. BARKER

J. IVES

1’-0" O.C.

WIRE TIES

OVER ATLANTIC STREET

PHASE 2