14
Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387 (0)51 337 491 Email: [email protected] Web: www.integralinzenjering.com We build the future! #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE REGION YEARS WITH YOU

#1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

Adress: Omladinska 44, 78250 LaktašiPhone: +387 (0)51 337 401Fax: +387 (0)51 337 491Email: [email protected]: www.integralinzenjering.com We build the future!

#1 CIVIL CONSTRUCTION COMPANY IN B&H

LEADER IN THE REGION

YEARS WITH YOU

Page 2: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

BRIEF OVERVIEW

COMPANY’S PROFILE

OUR STRENGHT QUALITY

Adress:Phone:Fax: Email: Web:

Banja Luka-GradiškaMotorway

(Bosnia & Hercegovina)

Doboj-PrnjavorMotorway

(Bosnia & Hercegovina)

Corridor X Motorway(Serbia)

Bočac HPP (Bosnia & Hercegovina)

We build the future!

Completed project

Ongoing project

Landslide Čemerno (Bosnia & Hercegovina)

Completed projectCompleted projectCompleted project

Dabar HPP(Bosnia & Hercegovina)

Ongoing project

Omladinska 44, 78250 Laktaši+387 (0)51 337 401+387 (0)51 337 [email protected]

Banja Luka-PrnjavorMotorway

(Bosnia & Hercegovina)

Completed project

Page 3: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

• ESTABLISHED 1989, ALL PRIVATE

• +400 COMPLETED CIVIL CONSTRUCTION PROJECTS

• VALUE OF COMPLETED PROJECTS: +1bn €

• INVESTORS :

- PRIVATE (Parsons Delaware INC., Sumimoto Corporation, World Vision, Roughton Int., )

- BANKS (World Bank, European Bank for Reconstruction and Development, Europian

Investment Bank, Central Bank of Bosnia and Herzegovina, Volksbank)

- GOVERNMENTS (USA, Japan, Bosnia and Herzegovina, Republic of Srpska, Montenegro,

Serbia)

- INTERNATIONAL ORGANIZATION (UN, NATO, EU, IOM...)

• COMPLETE AND RELIABLE VALUE CHAIN

BRIEF

OVERVIEW

Page 4: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

The business association Integral Inženjering is registered in the Court Register of the District Commercial Court in Banja Luka under the number 1-91-00 in 1989. Integral Inženjering is a closed joint stock company.

Company name: Integral Inženjering PLC, Laktaši, engineering – traffic – export – importRegistered name/designation: Integral Inženjering PLC LaktašiAddress 1: Laktaši, 44 Omladinska StreetAddress 2: Banja Luka, 8 Trg Republike Srpske Street, XII floor (company’s management)Telephone: +387 51 337 401Fax: +387 51 337 491E-mail address: [email protected] page: www.integralinzenjering.comCompany number: 01255908Company identification number: 4401145050005VAT number: 401145050005Activity code: 42.11Main activity: Construction of buildings, civil engineering and water engineering structuresOther activities: Architectural and engineering activities, retail sale of fuel and lubricantsThe nominal capital: 34,385,835.00 BAM (17,574,449.15 €)Board of directors:Slobodan Stanković, presidentBosiljka Božović, memberDragan Jevtović, member

COMPANY’S PROFILE

Page 5: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

Integral Inženjering PLC has completed the circle of critical elements necessary for successful business in construction industry at the local and regional markets which makes us highly competitive international company.

We have developed our own abilities in the field of civil engineering and water engineering.

We have continually constructed the reference building construction structures for years.

We are constantly investing in our own modern plants for the production of basic building materials.

Completed business concept

OUR STRENGHT

Page 6: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

Integral Inženjering PLC introduced Quality Management System according to the standards ISO 9001 in 2003 and today, we apply Integrated Management System (IMS) which includes international standards ISO 9001, ISO 14001, OHSAS 18001 and ISO/IEC 27001.

Integral Inženjering PLC has been granted the certificate on:

• introduction of quality control standards ISO 9001:2015

• Environmental management systems ISO 14001 :2015

• Occupational Health and Safety Management OHSAS 18001:2007

• Information security management systems ISO/IEC 27001:2013

QUALITY

Integrated Management System (IMS)

žž

Page 7: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

About the project:EMPLOYER: HPP “Dabar” Ltd, TrebinjeCONTRACT: Contract No. 434-18/16 (our ref. 287/16) dated 17-Mar-2016SUBJECT OF THE CONTRACT: Construction of headrace tunnel, intake structure and advance headings for the DabarHPP and investigation and design works during construction.VALUE OF THE PROJECT: 67 m EUR (131 m BAM)FINANCES: Local fundsENGINEER: Civil Engineering Institute “IG” Banja Luka

Contracted are works as follows:A. INTAKE STRUCTURE, WORKING PLATEAU, CONTROL ROOM AND ACCESS ROADIntake structure;Working plateau: P=336.10m2 paved (AB11s and BNS32 d=5+10cm) on th embankment;Control room: hydro-mechanical equipment for water intake structure; electrical equipment.Access road: l=279.00m w=5.00m, road base d=45cm and pavement structure d=15cm;

B. HEADRACE TUNNEL length l=12,125.00m of longitudinal slope i=2.139‰; circular clearance of diameter D=4.6m length 7,853.00m and horse-shoe cross-section l= 4,272.00m length of excavation 5.20m; construction technology: New Austrian Tunnel Method.

C. ADVANCE HEADINGS – Straževica tunnel and Vodostan tunnelStraževica tunnel: straight-line tunnel l=651.57m, excavation slope i=7.54%, horse-shoe cross section height 5.5m; Vodostan

Hydropower plant “Dabar” (160 MW)Construction of headrace tunnel, intake structure and advance heading, investigation and design works(Bosnia and Herzegovina)

Ongoing project

Page 8: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

About the project:

EMPLOYER: Public company „Corridors of Serbia“CONTRACT No: ICB br: CORRX.E75.EIB.PACK2-LOT5.ICBSUBJECT OF THE CONTRACT: Construction of motorway and bridges at sub-section Caričina Dolina – Tunnel ManajleTYPE OF THE CONTRACT: FIDIC, Yellow BookVALUE OF THE PROJECT: 105,2 m BAM (53,8 m €)FINANCES: European Investment Bank (EIB)ENGINEER: „Louis Berger“ (France)

The works include:

• construction of motorway section in total length of l = 6,75 km, with all structures;• construction of 7 bridges on highway section, one bridge on local road, one railway bridge, 3 galleries, 28 culverts,

relocation of 1 km of railway, relocation of 1,3 km of local roads, works on regulation of the River Južna Morava, the River Sokolnica and the River Koznička;

• relocation of high-, medium- and low-voltage lines, construction of telecommunication channelization, drainage works, supply and installation of traffic signalization and equipment, noise protection walls and landscaping.

Motorway E 75 in SerbiaSubsection: Caričina Dolina – Tunnel Manajle(Serbia)

Ongoing project

Page 9: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

About the project:

EMPLOYER: Public Company „Republic of Srpska Motorways“CONTRACT No: RS/EIB-2012/W SUBJECT OF THE CONTRACT: Design and construction of Banja Luka – Doboj Motorway, Section Banja Luka – PrnjavorTYPE OF THE CONTRACT: FIDIC, Yellow BookVALUE OF THE PROJECT: 361,6 m BAM (184,9 m €)FINANCES: European Investment Bank (EIB)ENGINEER: JV “KuK Consulting South Eastern Europe GmbiH” (Germany) and H.P. “Gauf ING” (Germany)

The works include design and construction of:

• motorway section in total length of l = 33,5 km, with all structures;• motorway intersection with toll plaza;• Traffic Control and Maintenance Center;• rest and service area;• 63 structures: among others, 1 major bridge of l = 340 m and 6 smaller; 3 major viaducts of l = 449 m, l = 400 and l = 146 m, respectively

and 4 smaller; 9 overpasses, tunnel, underpass, passages;• intelligent traffic, video surveillance and traffic management systems; design and construction of traffic signalization and equipment,

installation of optical cables and Emergency Call System, noise protection, installation for dewatering of rainwater system.

Banja Luka-Doboj Motorway (Y 2018) Section: Banja Luka-Prnjavor(Bosnia and Herzegovina)

Completed project

Page 10: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

About the project:

EMPLOYER: Public Company „Republic of Srpska Motorways“CONTRACT NO.: RS/EBRD-2012/WSUBJECT OF THE CONTRACT: Design and construction of Banja Luka – Doboj Motorway, Section Prnjavor – Doboj (km 35+300 to km 71+912.51)TYPE OF THE CONTRACT: FIDIC, Yellow BookVALUE OF THE PROJECT: 411,9 m BAM (210,6 m €)FINANCING: European Bank for Reconstruction and Development (EBRD)ENGINEER: JV „IRD Engineering“ (Italy) in association with „Eptisa“ (Spain)

The works include design and construction of:

• motorway section in total length of l=36,6 km, with all structures;• two motorway intersections with toll plazas;• Traffic Control and Maintenance Center;• rest and service area;• 64 structures: among others, 1 bridge of l = 414 m, 2 bridges of l = 149 m each, 2 viaducts of

l = 149 m each, 21 smaller bridge; underpasses, passages, overpasses, artificial tunnel;• intelligent traffic, video surveillance and traffic management systems; design and construction of traffic signalization and equipment,

installation of optical cables and Emergency Call System, noise protection, installation for dewatering of rainwater system.

Banja Luka-Doboj Motorway (Y 2016)Section: Doboj-Prnjavor(Bosnia and Herzegovina)

Completed project

Page 11: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

ABOUT THE PROJECT:EMPLOYER: Public Company “Republic of Srpska Roads“SUBJECT OF THE CONTRACT: Permanent solution for the landslide Čemerno at the trunk road M-20 Gacko-FočaVALUE OF THE CONTRACT: 71, 8 m BAM (36,7 m €)FINANCES: Local FundsENGINEER: Civil Engineering Institute “IG” Banja Luka

THE PROJECT WAS COMPLETED IN 2013 AND INCLUDES CONSTRUCTION OF:- construction of trunk road M-20 in the total length of 8,9 km which includes the following:

- tunnel “Čemerno“, l = 2.109 m, with entire electricity installations and ventilation;- tunnel “Surdup“, l =196 m, with entire electricity installations;- bridge-viaduct “Trnova Luka'', length l = 396 m;- bridge-viaduct “Vrba“, length l = 90 m;- bridge-viaduct ”Hrštica“, length l = 37,36 m- bridge “Ždralov potok“, length l = 12 m

- the starting point of alignment, h = 1.115 m.a.s.l.- the end point of alignment, h = 801 m.a.s.l.- the highest point on alignment, h = 1.157 m.a.s.l.- the difference in elevation between starting and end point is 314 m- the difference in elevation between the highest and the lowest point is 356 m- the total length of reinforced-concrete retaining walls construction of different heights: length l = 1.605,00 m

Stabilisation of Landslide Čemerno (Y 2013)(Bosnia and Herzegovina)

Completed project

Page 12: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

ABOUT THE PROJECT:EMPLOYER: Public Company „Republic of Srpska Roads“/Public Company „Republic of Srpska Motorways“CONTRACT NO.: The Project was devided in 3 separate LOTs (contracts)SUBJECT OF CONTRACTS: Construction of entire motorway with all additional elementsVALUE OF THE PROJECT: 116,1 m € (195,6 miliona BAM)FINANCING: Local Funds, EBRD, EIBENGINEER: JV „C. Lotti & Associati“ (Italy) and „IRD engineering“ (Italy)

THE PROJECT WAS COMPLETED IN 2012 AND INCLUDES CONSTRUCTION OF:- 33.7 km of highway (from the river Sava to Klasnice)- 13 overpasses; 3 underpasses- 12 bridges (4 x 40 m, 8 x 30 m)- 4 tunnels (2 x 380 and 2 x 430 m)- 2 viaducts of 250 m length each- 71 km of concrete drainage channels for collecting and channelling of rainwater (of which 17 km in the central reserve)- 67 culverts for rainwater- 30 km of sewers for rainwater (pipeline)- 17 water treatment plants, i.e. degreasing of rainwater that is collected on the motorway- 3 interchanges (Catrnja, Berek and Mahovljani) with lightening and substations- 15 km of paved and 30 km of macadam local roads- 2 retaining walls of total height 5 m and length of 400 m- 2 landings; Luzani (66 000 m2) and Romanovci (42 000 m2)- 27 km of channels for optical and other cables

Banja Luka-Gradiška Motorway (Y 2012)(Bosnia and Herzegovina)

Completed project

Page 13: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

Bočac HPP

ABOUT THE PROJECT:

EMPLOYER: Public Company “Elektroprivreda Republike Srpske”CONTRACT No: IFB: No. ECSSE APL3 BiH/EIB-A2.3-5/10-HPPBSUBJECT OF THE CONTRACT: Construction of additional spillway for control of flood discharges in Bočac HPP storageVALUE OF THE PROJECT: 9,6 m BAM (4,9 m €)FINANCING: European Investment Bank (EIB)ENGINEER: Institute “Jaroslav Černi” plc, Belgrade (Serbia)

THE PROJECT WAS COMPLETED IN 2014 AND INCLUDES CONSTRUCTION OF:

Construction of additional spillway for control of flood discharges in Bočac HPP storage. The works related to this Project include the construction of access road, the works on excavation, concreting and securing of the spillway stability and the spillway slopes, the construction of the hydropower tunnel in the length of 142 m and its inner diameter of dimensions of 9 m. Also, the works include the construction of chute and ski-jump and the installation works of the technical monitoring system for the structure. The total length of the chute and ski-jump is 74 m. The difference in elevation between the highest and the lowest point of the chute and ski-jump is 27 m and the achieved gradient will be 67,5 %.

HPP Bočac (Y 2014) The works on system for control of flood discharges(Bosna and Herzegovina)

Completed project

Page 14: #1 CIVIL CONSTRUCTION COMPANY IN B&H LEADER IN THE …am.ebrd-sarajevo.ba/wp-content/themes/ebrd_theme... · Adress: Omladinska 44, 78250 Laktaši Phone: +387 (0)51 337 401 Fax: +387

Adress: Omladinska 44, 78250 LaktašiPhone: +387 (0)51 337 401Fax: +387 (0)51 337 491Email: [email protected]: www.integralinzenjering.com We build the future!

YEARS WITH YOU

Thank You!