1
Experiences in Automating the Testing of SS7 Signaling Transfer Points
ISSTA 2002 July 22-24, 2002 Via di Ripetta, Rome - Italy
Tim Moors, Malathi Veeraraghavan, Zhifeng Tao, Xuan Zheng, Ramesh Badri
Polytechnic University
Brooklyn, NY, USA
http://kunene.poly.edu/~mv
This project is co-sponsored by Verizon, NYSTAR and CATT.
2
Outline
• Background• Problem statement• Solution approach• Implementation — Automated SS7
Test Results Analyzer (ASTRA)• Summary
3
Telephony & SS7 network
TelephonySwitch
TelephonySwitch
A simple telephony network with two switches and two telephones.
TelephonySwitch
TelephonySwitch
A regular phone call is placed. STP (Signaling Transfer Point) is a datagram router – packet switch of the SS7 (Signaling System No. 7) network.
STP
STP
STP
STP
SS7 Setup message
1-718-260-00001-718-260-0000
Voice trunksSS7 links
TelephonySwitch
TelephonySwitch
An 800 call is placed. Database is consulted for routing number. SS7 network also used for mobility management.
STP
STP
STP
STP1-800-888-8888
1-718-260-8888Databases(e.g. 800)
1-718-260-8888
SS7 Setup message
1-800-8
88-8888
Quad
4
Outline
• Background
• Problem statement
• Solution approach
• Implementation — Automated SS7 Test Results Analyzer (ASTRA)
• Summary
5
Problem statement
• Automate the analysis of test results generated by interoperability tests of STPs– Test result files are too large for
error-free manual analysis– Tests need to be run for every
upgrade (multiple vendors supply STPs to a service provider)
6
What does an STP implement?
• STP is the packet switch of an SS7 network– network layer
• datagram forwarding• routing protocol
– handles failures (topology)– handles congestion (loading)
– data-link layer• complex support needed because of the use of
link-by-link error control• referred to as signaling traffic management
7
• Complex system – many interacting EFSMs• Distributed – many Points of Control and
Observation (PCOs) – synchronization problem• “Embedded testing” or “Testing in Context” – Quad• Testing real-time properties – timed events• Non-determinism – many output sequences possible
STP Quad interoperability testing
STP_C
STP_B STP_D
CO
OC
OA
COACOO
SSP_E1
STP_A
SSP_E6
SSP_W31
SSP_W36
SCP_E1
SCP_E2
SCP_W31
SCP_W32
D4-0,1
A1
A2
A11
A12
A31
A32
A41
A42
D1-0,1
D3-0,1
D2-0,1
C1-
0,1
C2-
0,1
COO
CO
A
……
……
A13
A14
A15
A16
A43
A44
A45A46
COA
CO
O
TF
RT
FR
TFR
TFR
TF
RR
SR
TFP
RSP
System under Test (SUT) Emulatedsystems
8
Complexity of STP testing
Types of tests
• Failure
— Sequential failures
— Simultaneous failures
— STP pair isolation
• Congestion
Number of tests
• High speed links
— 22 test cases
• Low speed links
— 12 test cases
— 22 test parts
— 146 steps
Monitoring
• High speed
— 3 types of monitors
— 252 monitored locations
• Low speed
— 3 types of monitors
— 36 monitored locations
30, 000 test events in test results files
Messages • routing updates• congestion notifications • traffic retrieval
Traffic load• SS7 network engineered for high reliability• Links carry half-load under normal conditions
9
Complete problem
Test EnvironmentSetUp
TestExecution Test
Result
Retrieval
And
Collection
TestResultsAnalysis
ASTRA
ASTRA : Automated SS7 Test Results Analyzer
Automate all steps of STP interoperability testing
10
Outline
• Background
• Problem statement
• Solution approach
• Implementation — Automated SS7 Test Results Analyzer (ASTRA)
• Summary
11
Generic methodology
• The set of actual events (test results) captured by monitor m in step s of test t is At,s,m
• We create the set of Expected Behavior Xt,s,m at monitor m in step s of test t
• Compare the actual captured events At,s,m with the created EB Xt,s,m to verify
– messages and associated parameters– traffic load – timer values
12
Expected behavior at multiple PCOs (monitors)
Expected behavior is represented as a “program” instead of as a database because we:
– Cannot predict the exact sequence of events
• Use a tree structure
– Cannot predict the exact times of occurrences of events
• Use times of test actions for searches of events
– Cannot predict the exact number of occurrences of some events
• use a while loop
13
Expected Behavior Expression Language (EBEL)
Basic language components
•findmsg() function - indicates monitor
•assert_load() function
• foreach(), while() loops
• waitfor() pseudo-event
• test actions– fail_link(), restore_link()– set_load– pause
14
EB program example
14. ...15.foreach $s (@SSPS_E) {16. $ta_restore{$s}: restore_link(A(STP_A)($s)) causes ...
1. foreach $s (@SSPS_E) {
2. $ta_fail{$s}: fail_link(A(STP_A)($s)) causes 4,...
3. ...
4. waitfor(T11,STP_A) causes 5,9,...5. foreach $t (@set_1) {
6. findmsg(A(STP_A)($t),$t,STP_A,$t,TFR,$s)
7. }
8. ...9. findmsg(D(STP_A)(STP_D),STP_D,STP_A,STP_D,TFR,$s)causes 1010. while($time<$ta_restore{$s}) {
11. waitfor(T10,STP_D) causes 1212. findmsg(D(STP_A)(STP_D),STP_A,STP_D,STP_A,RSR,$s)
13. }
Timed event
Specify PCO (monitor)
15
EB as a tree
2
4
5 9
6a 6b 6c 10
Abstract expected events form a tree of causation.
If (2) {
if (4) {
foreach $t (@set_1) {/*5*/
6$t
}
}
if (9) {
10
}
}Representing the abstract event tree on the left as a series of nested if statements.
16
Outline
• Background
• Problem statement
• Solution approach
• Implementation — Automated SS7 Test Results Analyzer (ASTRA)
• Summary
17
Architecture of ASTRA
Network Configuration Files
TimingFiles
Test Data
Data Formatting
Test Action Record
Actual Event Record
Analyzer
ParameterObservation
List
Matched Event
Record
Event Lists: Hidden, Missing,
Unexpected
ExpectedBehavior
Translator
• Translate EBEL code into a PERL program• Add time values (consult TAR)• Convert to depth-first search
• Adjust variations in format from different test data
• Synchronize all events
• Filter database to remove irrelevant information
• Sort events in the database into chronological order
DataProgram
18
Analyzer - matching operation
NO
Write to Hidden
Event List
Event Found?NO Write to
Missing Event List
Find all messages with Match Flag = 0
Write to Unexpected
Event List
Was the link monitored?
Find Event on link, params, [t1,t2] from EB
Actual Event Record
Search for event in the time period
YES
Matched Event
Record
YESSet Match Flag to 1
20
ExpectedBehavior
Analyzer
Actual Event Record
Architecture of ASTRA
Translator
ParameterObservation
List
Matched Event
Record
Event Lists: Hidden, Missing,
Unexpected
Test Results Database
Statistical Analysis &Report Generation
Legend
Data
Program
Network Configuration Files
TimingFiles
Test Data
Data Formatting
Test Action Record
•Calculate the numbers of expected, missing, hidden and unexpected events
• Calculate timer observations
• Calculate load measurements
• Declare failure/pass/inconclusiveness of the tests
21
Outline
• Background
• Problem statement
• Solution approach
• Implementation — Automated SS7 Test Results Analyzer (ASTRA)
• Summary
22
ASTRA
Productivity of ASTRA• The size of the EB code 5909• The number of events in collected test results 29196
EB code 6,000 lines
Test Data 30,000 events
Produced database 3,000 events
23
Summary• Challenging problem
• Non-determinism (e.g., simultaneous link restoral)– If A restores before B, a different type of message will be
sent than if B restores before A; if both options not listed with an “OR” in EB, then either “unexpected” or “missing” event
– Solutions (?)• Cover all possible scenarios by automatically creating EB directly from
SDL specification - state explosion problem• Allow EB program to consult the test results to make further predictions
with “IF” statement. This approach trusts test results; Also found need for a “NOT” statement.
• Asides:– Pay attention to monitors: “more the better” and they miss messages! – Need automation of all steps of testing – not just results analysis– Found 3 implementation bugs in STPs tested!