McCoy Park Site Improvements - Concept PlanDecember 14, 2016
McCoy Park Site Improvements Concept Plan
Arlington County Department of Parks and Recreation Presentation
1. Meeting Goals2. Overview of McCoy Park Improvement Process3. Existing Site Features4. Proposed Concept Design & Materials5. Design & Construction Next Steps
December 14, 2016
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
Funding & Project Overview
Funding: $150,000** ($113K Construction & Con-tingency, $37k Design & Construction Management)
Area of Disturbance Maximum: 2500 SF maxIntended Open Space Improvements: - Enhance entrance appearance - Improved landscape* -Improvedcirculation&access* - Site amenity improvements: Seating/picnicfacilities* -Otherappropriateneighborhoodparkfacilities* *Per Bergman’s Site Plan Ordinance Conditions ** Includes: Civic Engagement, Staffing, Design & Planning and Construction Fees (9/2016 consolidation of funds)
IMPROVEMENT FOCUS AREA
PROJECT & SITE CRITERIA
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
Background & Overview
CONCEPT IMPROVEMENTS SCOPE
-GeneralLayoutConfiguration(<2500SF)
-Improvementsatlevelportionofsite
-North-Southorientationactivityzone
-Upgradeexistingsitefurnishings
-Upgradelandscapevegetation
-Existingtreemaintenance(limbingandvisibility)
-Updateexistingsidewalk
-Remove&replaceexisting(3)Cherrytreesatside-walk
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
Existing Site
EXISTING SITE
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
© 2015 Greenfi elds Outdoor Fitness
Strengthtraining
CardioFlexilibity
MEDIUM SAMPLE PACKAGE 1maximum fi tness opportunities on a minimum footprint
9 UNITS 25 USERS
GR2005-1-21GR2005-1-22GR2005-1-26GR2005-1-42GR2005-1-47-WGR2005-1-48-WGR2005-1-48A-WGR2005-1-71GR2005-1-104
4-Person Lower Body Combo4-Person Pendulum, Abs & Dips Station2-Person Cross-Country Ski 2-Person Back & Arms Combo2-Person Accessible Vertical Press2-Person Accessible Lat Pull-Down2-Person Accessible Chest Press3-Person Static Combo4-Person Leg Press
Greenfi elds offers custom signage for your fi tness zone! Review safetyguidelines, acknowledge project donors, or share a fi tness plan
“The exercise equipment was really crucial and wanted by the community because they have no other opportunities to do this.”~ Sharn Stinson-Ure, landscape architect
Complete your package with additional amenities
Benches
Trash receptacles
Bike racks
DogiPot
Green elds Outdoor Fitness | www.green elds tness.com | 888-315-9037
Concept Options
FITNESS STATION: - Connection to bike trail- Footprint appropriate for site- Combined with improvements/seating- Activates under used area of park- Full body circuit
PROPOSED CONCEPT OPTIONS*
OPTION 1 - FITNESS STATION OPTION 2- PASSIVE PLAZA
PASSIVE PLAZA: - Passive seating options- Overhead structure (potential)- Individual/Communal gathering- Overlook point
*Concept Options Presented at May 18, 2016 Association meeting & via Online Survey
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
CONCEPT OPTION SURVEY RESULTS WHAT WE HEARD
• Greater interest towards passive recreation space• Expressed interest in ‘fitness’ elements (parkour, rope climb-ing)• Dog focused needs • Interest and activities for children (splash pad, swing basket)• Games/Passive recreation (ping pong, bocce)• Seating area, shade coverage, welcome entrance, plaza• Too many seating areas • Something different to address community needs • Area in need of invasives removal* * Topic presented at Spring 2015 & 2016 meetings
Concept Option Results
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
EXISTING PARK FEATURES
• Moveable tables (limited seating) • Mature surrounding edge canopy • Collapsible trash/recycling • Signage (low visibility) • Overgrown landscape• Open hillside slope & views• Bike share
Existing Site Features
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
Proposed Conditions & Amenities
PROPOSED CONCEPT PLAN & AMENITIES
PROPOSED SITE AMENITIES
1. Re-aligned sidewalk2. Seating deck w. furnishings (Tables & chairs)3. Shade canopy4. Shade canopy enclosure (Chalk encasement)5. Interactive chalk art plaza (Tick-tack-toe or other)6. New landscape vegetation (Flowering trees/shrubs/perennials)7. Discovery path stepping stones8. Trash/recycling receptacles9. New park entry sign10. Existing tree limbing
PROPOSED AMENITIES REQUIRING SPONSORSHIP
A. Dog bag/standB. Little Free Library
2
3
8
1
6
4
10
6
10
5
9
7
6
21st
STREET N
.
N
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
Materials & Furnishings
PROPOSED CONCEPT PLAN - MATERIALS & FURNISHINGS
Proposed Site Furnishings: Seating, Tables, Shade Coverage
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
Materials & Furnishings
PROPOSED CONCEPT PLAN - MATERIALS & FURNISHINGS
Proposed Site Features: Little Free Library, Interactive Chalk Walk, Connect Square
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
Materials & Furnishings
PROPOSED CONCEPT PLAN - MATERIALS & FURNISHINGS
Proposed Site Vegetation Typology
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
ILLUSTRATIVE VIEW
PROPOSED CONCEPT PLAN - PROPOSED ENVISAGE
McCoy Park Site Improvements - Concept PlanDecember 14, 2016
PROPOSED PROJECT SCHEDULE
Arlington County Department of Parks and Recreation Presentation
OPEN HOUSE OF CONCEPT DESIGN: LATE FALL 2016REFINEMENT AND CONSTRUCTION DOCUMENT DEVELOPMENT: LATE FALL 2016-WINTER 2017BIDDING/PERMITTING & CONSTRUCTION: WINTER 2017-LATE SPRING 2017PROJECT COMPLETION: SPRING/SUMMER 2017