MuTRG-FEE UpgradeStatus
RIKEN/RBRC
Itaru Nakagawa
2
Schedule
3
• Station-1 Scaffold Construction Completed
• Station-2 Scaffold underway.+2weeks?
• Cable trays are installed• Infrastructures
– Ran LV/Signal Cables• Oct-5,6,7,8
– Chassis Mount– Cooling Water
South Arm InstallationMuTRG-FEE Racks
4
New Cable Trays
5
Chassis & ADTX-FEE Cables• Completed Chassis test completed (Katsuro,
Ken’ichi, Yudai, Kazufumi, Murakami)– Water leak– Dry air blow – Backplane test (1 bad)– Conductivity test
• ADTX-FEE cable test completed (Katsuro, Kazufumi, Seiko, Yudai)
6
Chassis MountInstalled Before Run09
Newly Mounted
• St-1: Octant-1,2,3,4,5 Chassis are mounted.• St-2&3: Oct-1,8,7,6,5 Chassis are mounted.• Modified ground cables in St-2&3
Station-1 Station-2
7
Station-1 CablingRan St-1 LV&Fiber Cables
Yudai, Kazufumi, Seiko, Itaru
8
Trunk Cable Setup at Rackroom
•Patch Bay Labeling and install•Trunk cable connection at back•Cable guide mount for trunk cables
9
Board QA
•Setup ready : Ken’ichi•Actually QA proceed byYudai and Seiko