IntroductionIntroduction
■NIRAS: public institute responsible for the safe management of radioactive waste in Belgium. Has developped a coherent and central management system
■Belgoprocess: industrial daughter of NIRAS, main activities are treatment and storage of radioactive waste and decommissioning of shut down nuclear installations
3
IntroductionIntroduction
■NIRAS is charged by the belgian State with the clean up of nuclear liabilities = task of public benefit
~ 1986 : site BP 1 (Eurochemic)~ 1989 : site BP 2 (Ex waste department
of SCK.CEN)~ 1991 : installations and fission products
originated from research reactors and other installations of the SCK.CEN
4
Foto site 1Foto site 1
5
EurochemicEurochemic
6
Eurochemic Eurochemic
■ First reprocessing plant in Europe■ Goal
~ Research and development in the field of reprocessing spent fuel originated from nuclear reactors
~ Construction of a pilot plant
7
Reprocessing ?Reprocessing ?
■ Definition: Reprocessing = recycling
~ Spent fuel (nuclear fuel) can be recycled■ 97% of the material can be reused for
electricity production (U and Pu)■ 3% is waste and is vitrified, interim stored
awaiting for disposal.
8
History of EurochemicHistory of Eurochemic
■ 1957 Constitution of Eurochemic■ 1960 Start construction■ 1966 Start up and active operation■ 1974 Shutdown■ 1978 Take-over by the Belgian State
with the intention to continue reprocessing
■ 1984 Constitution of Belgoprocess■ 1985 Belgoprocess takes over the
personnel
9
■ 1986 Decision to end reprocessing in Belgium Transfer actions to NIRAS
■ 1987 Start decommissioning studies■ 1989 Start decommissioning pilot
project ■ 1990 Start decommissioning
Eurochemic■ 2008 Start conventional demolition
History of EurochemicHistory of Eurochemic
10
Pilot projectPilot project
■ Decommissioning of two smaller buildings for endproducts originated from reprocessing ~ To demonstrate that decommissioning
is feasible~ To demonstrate that costs can be
managed~ To develop and optimise dismantling
techniques~ To train personnel
11
Before and afterBefore and after
12
Main lessons learnedMain lessons learned
■ Emphasis should be put on:
~ Decontamination of metal components~ Automation of concrete decontamin-
ation
13
Clean-up of EurochemicClean-up of Eurochemic
14
■ Main data~ Length 90 m, width 27 m,
height 27 m~ Volume: 56.000 m³~ Concrete volume: 12.500 m³~ Concrete surface: 55.000 m²~ Metal: 1.500 ton
■ 7 levels, 40 main cells■ 106 cell structures
Clean-up of EurochemicClean-up of Eurochemic
15
■ Radiological status in 1981
~ Contamination level up to 200 Bq/cm² (alpha) and 125 Bq/cm² (beta)
~ Sometimes contamination in depth~ Hot spots up to several mSv/h~ No activation
Clean-up of EurochemicClean-up of Eurochemic
16
Used techniquesUsed techniques
■ Removal of metal components■ Decontamination of concrete surfaces■ Removal of contamination in depth■ Removal of pipe penetrations■ Techniques for working on heights
17
Removal of metal Removal of metal componentscomponents
18
Removal of metal Removal of metal componentscomponents
19
Decontamination of Decontamination of concrete surfacesconcrete surfaces
20
Decontamination of floorDecontamination of floor
21
Removal of contamina-Removal of contamina-tion in depthtion in depth
22
Removal of pipe Removal of pipe penetrationspenetrations
23
Working at heightWorking at height
24
Working at heightWorking at height
25
To decontaminateTo decontaminate
■ Main streams~ Metal~ Concrete
26
To decontaminateTo decontaminate
■ Main streams~ Metal 1.494 ton~ Concrete 2.913 ton (incl. barytes blocs)
(period 1988 – 2007)
27
Metal decontaminationMetal decontamination
28
Before and afterBefore and after
29
Concrete samplingConcrete sampling
30
Clearance measuresClearance measures
■ 100 % surface measurement ■ Taking samples and analyses■ Procedure is representative and
approved by the department of fysical control
■ Control organism (Bel-V) subsidiary of FANC
31
Clearance measurementClearance measurement
32
SafetySafety
■ Top priority for Belgoprocess
■ Radiation dose■ Contamination risque■ Conventional safety
33
SafetySafety
■ Top priority for Belgoprocess
■ Radiation dose (average < 2 mSv/year.person over 1990-2007)
■ Contamination risque (Protective clothes including full-face mask)
■ Conventional safety~ Circumstances as on a construction
warf~ Vibration stress
34
Protective clothesProtective clothes
35
Protective clothesProtective clothes
36
Isolation of a moduleIsolation of a module
37
DemolitionDemolition
■ Method
38
Result:Result:
■ Production streams■ Men-hours■ Budget■ Planning
39
Result: productionResult: production
CONTAMINATED MATERIAL
DECONTAMINATION OF MATERIALS
RADIOACTIVE WASTE
UNCONTAMINATED MATERIAL
RECYCLING WASTE PROCESSING
&
&
& &
&&
& &
DECOMMISSIONING
40
Result: productionResult: production
CONTAMINATED MATERIAL
DECONTAMINATION OF MATERIALS
RADIOACTIVE WASTE
UNCONTAMINATED MATERIAL
RECYCLING WASTE PROCESSING
&
&
& &
&&
& &
557 t 1.530 t
2.356 t 145 t
2.913 t 1.675 t63%
DECOMMISSIONING (31/12/2007)4.588 t
2.501 t
41
Result: productionResult: production
CONTAMINATED MATERIAL
DECONTAMINATION OF MATERIALS
RADIOACTIVE WASTE
UNCONTAMINATED MATERIAL
RECYCLING WASTE PROCESSING
&
&
& &
&&
& &
557 t 1.530 t
2.356 t 145 t
2.913 t 1.675 t63% -> 88%
DECOMMISSIONING (31/12/2008)+9.552 t
+9.552 t
4.588 t
2.501 t
42
Result: men-hoursResult: men-hours
■ Initial estimation: 403 man-year■ Current estimation: 600 man-year■ Difference explained by:
~ Decontamination until clearance~ Differences with the initial inventory~ Labour-intensive clearance
measurements and procedures
43
Result: budgetResult: budget
Initial estimation
M€1992 M€2008
1990 - 2007
M€2008
after 2007M€2008
Total
M€2008 Ratio
Decommissioning costs
54,8 73,9 115,1 30,0 145,1 1,96
Treatment (tarif 2008)
68,7 92,6 25,7 4,2 29,9 0,32
Totaal 123,5 166,5 140,8 34,2 175,0 1,05
Forced decontamination till clearance
Less treatment, interim storage and disposal
End result remains equal
44
Result: planningResult: planning
■ Conventional demolition~ East part: september 2008~ Central part: einde
2010~ West part : einde 2012
~ Distribution of water, air, steam,.. for neighbouring buildings remains
45
Result: planningResult: planning
20082010
2012
46
AmbitionsAmbitions
■ Safety■ Environment■ Socio-economical■ Exploitation of the disposal site for
category-A waste■ International partner
47
ConclusionConclusion
■ Start of the conventional demolition of Eurochemic
■ In 2012 completely demolished■ Cleaned-up historical heritage■ Know-how to recycle >90%
Belgoprocess and NIRAS decommission succesfully a nuclear plant