1 TEPPC March 25, 2010 CCPG

1 TEPPC March 25, 2010. 2 CCPG Transmission Providers

Embed Size (px)

Citation preview

Page 1: 1 TEPPC March 25, 2010. 2 CCPG Transmission Providers

1

TEPPCMarch 25, 2010

CCCCCCPPPGGG

Page 2: 1 TEPPC March 25, 2010. 2 CCPG Transmission Providers

2

CCCCCCPPPGGG

CCPG Transmission Providers

Page 3: 1 TEPPC March 25, 2010. 2 CCPG Transmission Providers

3

CCCCCCPPPGGG

CCPG Activities2009:

NERC Compliance ReportSB100 Report and FilingCPUC Workshops (CPCN & Transmission Proposal)

2010:WestConnect Annual Meeting10-Year Transmission Plan

Charter Implementation CCPG Kick-off February 19, 20102010 Study Plan ApprovalChair SearchTransmission Planning Proposal

Page 4: 1 TEPPC March 25, 2010. 2 CCPG Transmission Providers

4

CCCCCCPPPGGG

CCPG O rganization Chart (DRAFT)

S te erin g C o m m itteeC h a ir: ??

F o o th illsC h a ir:Je re m y B ro w n rigg

S o uth Fro n t R an ge"D E E P "

C h a ir: C hu ck S isk

W Y /S D C om m o n U seC h a ir: E ric E g ge

W e ste rn S lo peC h a ir: Ja re d G riff iths

(T o t 2 A 20 1 0)

E a st S lo peR e fe r to La m ar

S LVN o 2 0 10 S tu dy

T o t 32 0 1 0 - A rch e r S tu dy

D e n ver-M e troP S C o

S u b co m m itte esS p e cif ic G e o gra p h ic P o rtion

m u lt i-ye a r

L o ng R an geC h a ir: M a rk S to u t

1 0 -yr L & R

S B 1 00C h a ir: T o m G re en

2 0 10 - L a m a r S tud ies

B a se C a se C oo rd ina tionC h a ir: T h ie n N g u yen

N E R C C om p lia n ceC h a ir: S h a w n C a rlson

V o ltag e C o ord ina tionC h a ir: Je re m y B ro w n rigg

S h o rt C ircu it D a ta B a seC h a ir: T o m B a rn ish

L o ng e r T e rmC o n cep ts W GL e ad : P S C O

W o rk G ro u pse n tire fo o tp rin t

m u lt i-ye a r

C h a rte r D eve lo pm e ntC h a ir:

A rch er In te rco nn e ctW E C C R a ting

S p o n sor: T S G T

W Y C O In te rt ieW E C C R a ting

S p o nso r: Tra n sE le ct

H P XW E C C R e g ion a l P la n n ing

S p o n so rs : M u lt ip le

C h a ir N o m in a tion

C o m m u n ica tion

T a sk F o rcesp o rt io n o r e n tire fo o tp rin t

1 -2 ye a r d u ra tion

W E C C T E P P C

W E C C O T C P C

C P U C

G E O

L ia iso ns

O ve rsig h t C o m m itteeC h a ir: ??

Org Chart

Page 5: 1 TEPPC March 25, 2010. 2 CCPG Transmission Providers

5

CCCCCCPPPGGG

Transmission Planning Proposal 2006: Colorado’s General Assembly found that a reliable electric

infrastructure was in the public interest and vital to the state’s citizens

Nov 2006: GA prepared “Report of the Task Force on Reliable Electricity Infrastructure”.

Must address:(a) the adequacy of the integrated transmission plan; (b) if plan is appropriately coordinated with plans of other states and

transmission operators in the region; and (c) if legislative action is required to ensure continued progress with

respect to the transmission system in Colorado. Jun 2008: CPUC opened Investigatory Docket

4 workshopsNumerous written filings

Oct 2009: Docket ClosedWritten Decision; intent to issue NOPR

Dec 2009: NOPR IssuedCPCN RulesEMF/Noise Levels

Jan 2010: Transmission Planning Proposal Issued

Page 6: 1 TEPPC March 25, 2010. 2 CCPG Transmission Providers

6

CCCCCCPPPGGG

What the Proposal DoesUses the current coordinated planning structure Provides a reporting mechanism to CPUCDoes not materially increase the workload beyond

what they are or should be doingCPUC participation and oversight Conceptual long range plans (>10 Year)Studies and data more readily available.Identifies the transmission system additions Better aligns the timeframes for generation and

transmission planning

Page 7: 1 TEPPC March 25, 2010. 2 CCPG Transmission Providers

7

CCCCCCPPPGGG

What the Proposal Does Not DoChange how the transmission system is operated.Change how generation is planned.Change roles of CCPG, WC, WECC, NERC, or FERC.Increase Commission oversight over non-

jurisdictional utilities.Change funding rules for new transmission.

Page 8: 1 TEPPC March 25, 2010. 2 CCPG Transmission Providers

8

CCCCCCPPPGGG

What is Proposed?Planning criteriaOperating, 5 year, and 10 year planning studiesShort-circuit studies Log itemsUtility 10 year plans, including load forecastsAll associated planning data and base casesEconomic studiesVoltage Coordination GuidelinesScenario studiesConceptual 20 and 30 year long range plans

Page 9: 1 TEPPC March 25, 2010. 2 CCPG Transmission Providers

9

CCCCCCPPPGGG

What’s NextCCPG Response Due: 3/19/10

CPUC Workshop: 3/22/10

CPUC Report to General Assembly: 7-1-10

Rule Making: Summer 2010

Page 10: 1 TEPPC March 25, 2010. 2 CCPG Transmission Providers

10

CCCCCCPPPGGG

Next for CCPGResponse to CPUCNew Chair AppointmentStudy Plan DevelopmentNext CCPG meeting

April 22, 2010; Denver TSGT officeNotices/Materials Posted at: www.westconnect.com

ContactThomas [email protected]